Texas Eastern Transmission, LP Planned Service Outage Postings from 01/01/2020 to 01/31/2020 Page 1 of 45

Upload: others

Post on 16-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Texas Eastern Transmission, LP

Planned Service OutagePostings from 01/01/2020 to 01/31/2020

Page 1 of 45

Page 2: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 01/08/2020 04:36:12 PMNotice End Date/Time: 04/07/2020 04:36:12 PMNotice ID: 92443Notice Stat Desc: SupersedeNotice Type: Planned Service OutagePost Date/Time: 01/08/2020 04:36:12 PMPrior Notice: 92136Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2019 Planned Outage Schedule -- UPDATE 63 & OPERATIONS STATUS UPDATE

Notice Text:

The text below is included in the attached Word document located at the bottom of this posting.

Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for 2019. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. Any changes to the list below will be posted at the earliest known date.

Access Area - Longview to Kosciusko:

Yazoo City to Kosciusko 20" Line 26 (ELA)Cleaner Runs: CompleteCaliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Yazoo City to Kosciusko 20" Line 26, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS73251 - ATTALA GENERATING COMPAN LLC (DEL)

***Provident City to Hempstead 24" Line 11 (STX): ILI Tool Runs: January 21, 23 and 25, 2020Potential Repairs Beginning On: March 3 and April 5, 2020Potential Run Comp Repair Beginning On: April 3, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting in-line inspection tool runs on its 24" Line 11 (a single line system) between Provident City to Hempstead stations.

During the ILI runs, south capacity through the Huntsville compressor station will be reduced to Page 2 of 45

Page 3: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

approximately 67,000 Dth/d.

Based on historical nominations, TE anticipates restrictions for interruptible and secondary services for nominations sourced in ETX for delivery in STX, WLA, or ELA.

Additionally, 73417 - COPANO PROCESSING - HOUSTON CENTRAL / COLORADO CO., TX (REC) will be unavailable during the tool runs.

Depending on the results of these detailed investigations, the following meters may be unavailable for flow:

70473 - TEXANA MIDSTREAM COMPANY LP70474 - ETC TEXAS PIPELINE, LTD-SEALY, TX- DEL (B/D 73311)70930 - TEXACO, - ALTAIR, COLORADO CO., TX72266 - GULF COAST PIPELINE COMPANY - #1 MINARCIK/ COLORADO CO., TX72965 - M.E.OPERATING & SERVICES- WRIGHT #1 - COLORADO CO., TX73277 - HURD ENTERPRISES-APPLING FARMS-LAVACA CO., TX (REC)73311 - MME DESOTO PIPELINE, L.P. - AUSTIN CO. -- SEALY, TX (REC) 73417 - COPANO PROCESSING - HOUSTON CENTRAL / COLORADO CO., TX (REC

***Thomaston Station to Provident City Station 16" Line 21 (STX): ILI Tool Runs: January 14, 16 and 17, 2020Potential Repairs Beginning On: February 25 and March 29, 2020Potential Run Comp Repair Beginning On: March 26, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting in-line inspection tool runs on its 16" Line 21 (a single line system) between Thomaston and Provident City stations.

During the ILI runs, capacity through the Thomaston compressor station will be reduced to approximately 45,000 Dth/d.

Depending on the results of these detailed investigations, the following meters may be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 -LINN EXCHANGE PROPERTIES, LLC-SOUTHWEST GOHLKE CP - VICTORI70689 - NOG PRODUCTION & OPERATING LLC- #1 CHILDREN'S HOME - BEE CO70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX 71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX

Page 3 of 45

Page 4: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 -- HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)73313 - DEFS-GEODOMINION - BONORDEN #1 - LAVACA CO., TX73341 -- CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - FLINT INTERESTS, LLC/WRIGHT MATERIALS-GOLIAD CO., TX73810 - AMP UP GOLIAD, LLC/GOEHRING GATHERING-FM 584-GOLIAD CO., TX73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO.,TX

Based on historical nominations TE anticipates restrictions for interruptible and secondary services

Karon Station to Provident City Station 16" Line 21, 6" Line 22-C, 6" Line 22-C-1 and 6" Line 22-H (STX): September 10 - TBDILI Tool Runs: CompletePotential Repairs Beginning On: March 20, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 16" Line 21, 6" Line 22-C, 6" Line 22-C-1 and 6" Line 22-H (a single line system) between Karon and Provident City stations. TE will be adjusting its operating pressure on 16" Line 21, 6" Line 22-C, 6" Line 22-C-1 and 6" Line 22-H to accommodate these investigations.

Additionally, during these investigations, capacity through Charco will be 76,000 Dth/d and Thomaston will be 125,000 Dth /d until detailed investigations are fully analyzed and any anomalies are remediated.

Depending on the results of these detailed investigations, the following meters may be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 -LINN EXCHANGE PROPERTIES, LLC-SOUTHWEST GOHLKE CP - VICTORI70689 - NOG PRODUCTION & OPERATING LLC- #1 CHILDREN'S HOME - BEE CO70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX 71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX

Page 4 of 45

Page 5: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 -- HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)73313 - DEFS-GEODOMINION - BONORDEN #1 - LAVACA CO., TX73341 -- CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - FLINT INTERESTS, LLC/WRIGHT MATERIALS-GOLIAD CO., TX73810 - AMP UP GOLIAD, LLC/GOEHRING GATHERING-FM 584-GOLIAD CO., TX73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO.,TX

Based on historical nominations TE anticipates restrictions for interruptible and secondary services.

Carthage to Longview 20" Line 13: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 20" Line 13 between Carthage to Longview station. TE will be adjusting its operating pressure on 20" Line 13 to accommodate these investigations.

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

72892 - ENTERPRISE TEXAS PIPELINE, LLC - PANOLA COUNTY, TX (REC)73068 - BRAMMER ENGINEERING, INC. -GREEN GAS UNIT #1 - HARRISON CO.73104 - VERADO ENERGY, INC. - YOUNG #3 - RUSK COUNTY, TX73484 - SAMSON RESOURCES - CHEROKEE OAK HILL - RUSK CO. TX. (REC)73502 - BUFFCO PRODUCTION, INC - OAK HILL COTTON VALLEY73896 - EASTMAN CHEMICAL/TXO-CALLAHAN RD., HARRISON CO., TX

Provident City to Joaquin 24" Line 11: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 24" Line 11between Provident City to Joaquin station. TE will be adjusting its operating pressure on 24" Line 11 to accommodate these investigations.

During these investigations, the following meter will be unavailable for flow:

75778 - ATMOS TEXAS - LONE STAR GAS - WALLER, TX-(D72778/R76778)

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

Page 5 of 45

Page 6: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

70473 - TEXANA MIDSTREAM COMPANY LP70474 - ETC TEXAS PIPELINE, LTD-SEALY, TX- DEL (B/D 73311)70859 - GULF SOUTH PIPELINE, LP - HUNTSVILLE, TX (DELIVERY)70930 - TEXACO, - ALTAIR, COLORADO CO., TX71435 - CLECO ENERGY - CHIRENO #1, TX (DELIVERY)71436 - CLECO ENERGY - CHIRENO #2, TX (DELIVERY)71706 - NORAM - SHELBY CO., TX (RECEIPT)72266 - GULF COAST PIPELINE COMPANY - #1 MINARCIK/ COLORADO CO., TX72458 - TRACY PRODUCTION CO. - #1 FULTON FULLER, NACOGDOCHES CO., T72856 - ONALASKA WATER & GAS CORPORATION - POLK COUNTY, TX72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)72965 - M.E.OPERATING & SERVICES- WRIGHT #1 - COLORADO CO., TX73041 - FOUR SQUARE GAS CO., INC. (CHIRENO #3) - SHELBY CO., TX73209 - NORAM FIELD SERVICES - SHELBY CO., TX (REC)73241 - TRANSCOASTAL CORP. - DILLARD #1 / SHELBY CO., TX73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73253 - ETC TEXAS PIPELINE, LTD-HENDERSON #1 / NACOGDOCHES CO., TX73275 - SONERRA RESOURCES - MELROSE GATHERING (KENDRICK #1-H) (REC)73277 - HURD ENTERPRISES-APPLING FARMS-LAVACA CO., TX (REC)73282 - SONERRA RESOURCES - MOUNTAIN WEST, NACOG. CO., TX (REC)73295 - HEC PETROLEUM-FULTON FULLER #1, NACOG. CO., TX (REC)73311 - MME DESOTO PIPELINE, L.P. - AUSTIN CO. -- SEALY, TX (REC) -73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388 - MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391 - ARCADIA OPERATING,LLC- GOLDEN MINER #1 / SAN JACINTO CO., T73409 - FOSSIL RESOURCES - BROWN #1H / NACOGDOCHES CO., TX73410 - CENTERPOINT ENERGY-GATHERING SYSTEM, SHELBY CO., TX (REC)73417 - COPANO PROCESSING - HOUSTON CENTRAL / COLORADO CO., TX (REC73455 - MCBEE OPERATING COMPANY, LLC-RIPPY #1 NACOG. CO., TX (REC)73456 - XTO ENERGY - ANICO #4 - POLK CO., TX (REC)73461 - UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73475 - SAMSON LONESTAR - HERRERA #2 GATHERING, NACOGDOCHES CO., TX73515 - PALMER PETROLEUM INC.-LUMBER GATHERING - ANGELINA CO., TX73517 - ENCANA O&G INC. - GREEN GATHERING - NACOGDOCHES CO.,TX73519 - FOSSIL RESOURCES-CARDINAL GATHERING-NACOGDOCHES CO., TX73546 - SHERIDAN HOLDING COMPANY III,LLC-SHELBY GATHERING-SHELBY CO73549 - NOBLE ENERGY-OLIVER CREEK-SHELBY CO., TX73564 - TANOS EXPLORATION II,LLC/PARMER GATHERING73582 - SAMSON LONESTAR - HERRERA #3, NACOGDOCHES CO., TX73597 - FOSSIL RESOURCES/CARDINAL II GATHERING-NACOGDOCHES CO., TX73600 - FORTUNE RESOURCES LLC/TARANTULA GATHERING73608 - TGG PIPELINE - CENTRAL DELIVERY POINT73613 - BUFFCO PROD./SOUTHERN EGG RANCH-SHELBY CO., TX73639 - SOUTHWESTERN ENERGY/JEBEL GATHERING73640 - XTO ENERGY/BARFIELD WARD GATHERING73641 - NOBLE ENERGY-HARRIS YATES-SHELBY CO., TX73649 - ACCESS MIDSTREAM/CARZENAVA GATHERING73652 - SHERIDAN HOLDING COMPANY III,LLC-WARR GATHERING73669 - TEXANA OPERATING/MASSEY FERGUSON GATHERING, SAN JACINTO CO.73670 - SHERIDAN HOLDING COMPANY III,LLC/KING WILLIAMS, SHELBY CO.,73684 - ETX-ENBRIDGE/WELLS LANDING - POLK73686 - ETX-ENBRIDGE/ZIDER - SHELBY73878 - GOLIAD MIDSTREAM ENERGY/CITY OF MAGNOLIA,TX-ENDERLI STREET,

Page 6 of 45

Page 7: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73887 - ALEGACY/CNG INDUSTRIAL CAMPUS-BUS US 290-WALLER CO.,TX75475 - ETC - DESOTO PIPELINE, LP - (D70475/R76475)75858 - COPANO PIPELINE - MONTGOMEREY CO., TX (D72858/R76858

Castor to EOL 20" Line 2: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 20" Line 2 between Castor to EOL station. TE will be adjusting its operating pressure on its 20" Line 2 to accommodate these investigations.

During this outage, 75688 - REGENCY GAS - BIENVILLE PA. LA-(D72688/R76688) will be unavailable for receipts into the TE system; however deliveries to 75688 will not be impacted.

Additionally, the following meters will be unavailable for flow:

70192 - SMITH (HARVEY BROYLE) #2 MURPHY-BRYCELAND, BIENVILLE PSH., L72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75078 - GULF SOUTH - CASTOR, LA-(D70078/R76078)75688 - REGENCY GAS - BIENVILLE PA. LA-(D72688/R76688)

Based on historical nominations TE doesn't anticipate restrictions at this time. However, if flow patterns change, restrictions may be required, for interruptible and secondary services.

Huntsville to Lufkin 24" Line 11Cleaner Tool Runs: CompleteILI Tool Runs: CompletePotential Repairs Beginning On: January 17, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on its Huntsville to Lufkin 24" Line 11.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the Huntsville to Lufkin compressor stations. As a result, the capacity through the Huntsville compressor station will be approximately 170,000 Dth/d north to south until complete ILI results are received, fully analyzed and any anomalies are remediated.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

Page 7 of 45

Page 8: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

70859 - GULF SOUTH PIPELINE, LP - HUNTSVILLE, TX (DELIVERY)72856 - ONALASKA WATER & GAS CORPORATION - POLK COUNTY, TX73456 - XTO ENERGY - ANICO #4 - POLK CO., TX (REC)73684 -- ETX-ENBRIDGE/WELLS LANDING - POLK

Additionally, any gas sourced between in ETX, M1 -24" and M2-24" for delivery in STX, WLA or ELA may be restricted for interruptible, secondary firm services and potentially primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

Blessing Station to Mt. Belvieu Station 30" Line 16: August 29 - TBDCleaner Tool Runs: CompleteILI Tool Runs: CompletePotential Repairs Beginning On: January 26, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 30" Line 16 between Blessing and Mt. Belvieu stations. TE will be adjusting its operating pressure on 30" Line 16 to accommodate these investigations.

Additionally, during these investigations, capacity north to south through Angleton will be approximately 433,000 Dth/d and Mt. Belvieu will be approximately 534,000 Dth /d until detailed investigations are fully analyzed and any anomalies are remediated. These capacities are subject to change based on TE operating conditions and/or remediation progress.

During the ILI Tool Runs, capacity through Blessing will be reduced to approximately 250,000 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and potentially primary firm services for gas sourced in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Furthermore, during the ILI Tool Runs, TE requests that customers/point operators in Access Area Zones STX, ETX, WLA and ELA be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.

Depending on the results of these detailed investigations and ILI Tool Runs, the following meters may experience lower than normal pressure or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX

Page 8 of 45

Page 9: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73626 - DAVIS SOUTHERN/BINTLIFF #173694 - SWEENY PLANT-CONOCO PIPELINE73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION73912 - BIG ANGLETON DELIVERY, BRAZORIA CO., TX75300 - KINDER MORGAN TEJAS - CLEAR LK. STOR-(D73299/R73300)75301 - CALPINE BAYER PWR. PLANT-(D73301/R76301)75558 - TRES PALACIOS GAS STORGE - 73558D(INJ)/73559R(WTD)

Based on historical nominations TE doesn't anticipate restrictions at this time. However, if flow patterns change, restrictions may be required, for interruptible and secondary services.

La Rose to EOL 36" Line 40: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 36" Line 40 between La Rose to EOL station. TE will be adjusting its operating pressure on 20" Line 40 to accommodate these investigations.

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

71200 - CHEVRON - VENICE, LA72137 - FIELDWOOD ENERGY - WD 8673278 - FIELDWOOD ENERGY - SP 89-B72319 - ENERGY XXI GOM, LLC-SP 9372616 - CANTIUM, LLC - MP 3072831 - NORTHSTAR OFFSHORE- SOUTH PASS 8672849 - ENI PETROLEUM US LLC - 365 MC, LA72936 - CHANDELEUR PIPE LINE CO. (CANTIUM, LLC) - MP 41L72972 - WALTER OIL & GAS - WD 10673027 - FIELDWOOD ENERGY - SP 87-D73070 - CENTANA GATHERING CO. MP 225,LA73071 - NOBLE - VK 82673073 - SHELL OFFSHORE , WD 143, - LAO73090 - VENICE-DELIVERY INTO PLANT73393 - FIELDWOOD ENERGY - SP 89-B BUYBACK73469 - DISCOVERY-LAROSE STATION INTERCONNECT, LAFOURCHE PSH., LA73642 - ENI MC 365 BUY BACK METER73654 - FIELDWOOD ENERGY - CA 4373819 - TANA EXPLORATION BRETON SOUND BLOCK 2579579 - VENICE SLUG CATCHER - BTU MAKEUP79582 - VENICE PLANT PVR METER79738 - PEFS (MAIN PASS) - LDC ALLOCATION POINT

Gillis to Opelousas 14" Line 14-A: May 9 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 14" Line 14-A (a single line system) between Gillis

Page 9 of 45

Page 10: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

to Opelousas Station. TE will be adjusting its operating pressure on 14" Line 14-A to accommodate these investigations.

Depending on the results of these detailed investigations, the following meter will be unavailable for flow:

76043 - ANR - ST. LANDRY PA., LA - REC (B\D72043)

Opelousas to St. Francisville 12" Line 14-K: May 9 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 12" Line 14-K (a single line system) between Opelousas to St. Francisville Station. TE will be adjusting its operating pressure on 12" Line 14-K to accommodate these investigations.

Depending on the results of these detailed investigations, the following meter will be unavailable for flow:

72258 - HILCORP ENERGY I, LP. - DIGBY PLANT, PT. COUPEE PSH., LA

Lufkin to Joaquin 24" Line 11 (ETX)Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on the Lufkin to Joaquin 24" Line 11, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

71435 - CLECO ENERGY - CHIRENO #1, TX (DELIVERY)71436 - CLECO ENERGY - CHIRENO #2, TX (DELIVERY)72458 - TRACY PRODUCTION CO. - #1 FULTON FULLER, NACOGDOCHES CO., T73253 - ETC TEXAS PIPELINE, LTD-HENDERSON #1 / NACOGDOCHES CO., TX73275 - SONERRA RESOURCES - MELROSE GATHERING (KENDRICK #1-H) (REC)73282 - SONERRA RESOURCES - MOUNTAIN WEST, NACOG. CO., TX (REC)73295 - HEC PETROLEUM-FULTON FULLER #1, NACOG. CO., TX (REC)73409 - FOSSIL RESOURCES - BROWN #1H / NACOGDOCHES CO., TX73455 - MCBEE OPERATING COMPANY, LLC-RIPPY #1 NACOG. CO., TX (REC)73515 - PALMER PETROLEUM INC.-LUMBER GATHERING - ANGELINA CO., TX73517 - ENCANA O&G INC. - GREEN GATHERING - NACOGDOCHES CO.,TX73519 - FOSSIL RESOURCES-CARDINAL GATHERING-NACOGDOCHES CO., TX73564 - TANOS EXPLORATION II,LLC/PARMER GATHERING73597 - FOSSIL RESOURCES/CARDINAL II GATHERING-NACOGDOCHES CO., TX73640 - XTO ENERGY/BARFIELD WARD GATHERING

Additionally, any gas sourced between Lufkin to North Little Rock, M1 -24" and M2-24" for delivery South of Lufkin Station in ETX, STX, WLA or ELA may be restricted for interruptible, secondary firm services and potentially primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon Page 10 of 45

Page 11: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

as it is known.

Red River to Castor 24" Line 11 (ETX)Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Red River to Castor 24" Line 11, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)70078 - GULF SOUTH PIPELINE COMPANY, LP - CASTOR, LA (DELIVERY)70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72688 - GULF STATES PIPELINE - BIENVILLE PSH., LA-DEL (B/D 76688)72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA

Red River to Castor Station 14" Line 11-G: May 9 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 14" Line 11-G (a single line system) between Red River to Castor Station. TE will be adjusting its operating pressure on 14" Line 11-G to accommodate these investigations.

Depending on the results of these detailed investigations, the following meter may be unavailable for flow:

73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)

Castor to EOL 20" Line 2Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Castor to EOL 20" Line 2, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)70078 - GULF SOUTH PIPELINE COMPANY, LP - CASTOR, LA (DELIVERY)

Page 11 of 45

Page 12: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L72688 - GULF STATES PIPELINE - BIENVILLE PSH., LA-DEL (B/D 76688)72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA

Mt. Belvieu to Vidor 30" Line 16Cleaners: CompleteILI Tool Runs (Rerun): CompletePotential Repairs Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on its Mt. Belvieu to Vidor 30" Line 16.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the Mt. Belvieu to Vidor compressor stations. As a result, the capacity through the Vidor compressor station will be approximately 528,000 Dth/d north to south until complete ILI results are received, fully analyzed and any anomalies are remediated. During the ILI tool run, capacity through the north to south capacity through the Vidor and Mt. Belvieu compressor stations will be reduced to approximately 165,000 Dth/d.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

72872 - CENTANA,STORAGE - JEFFERSON CO., TX -DEL(B/D72873)73653 - TEPPCO/BEAUMONT VAPOR RECOVERY 73921 - MIDCOAST VIDOR INTERCONNECT MANSFIELD FERRY ROAD ORANGE CO75773 - MOSS BLUFF GAS STRG-CHAMBERS CO. TX

Based on historical nominations TE anticipates restrictions for interruptible, secondary services and primary firm services.

Huntsville to Lufkin 24" Line 11Cleaner Tool Runs: CompleteILI Tool Runs: CompletePotential Repairs Beginning On: January 17, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on its Huntsville to Lufkin 24" Line 11.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the Huntsville to Lufkin compressor stations. As a result, the capacity through the Huntsville compressor station will be approximately 170,000 Dth/d north to south until complete ILI results are received, fully analyzed and any anomalies are remediated.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

Page 12 of 45

Page 13: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

70859 - GULF SOUTH PIPELINE, LP - HUNTSVILLE, TX (DELIVERY)72856 - ONALASKA WATER & GAS CORPORATION - POLK COUNTY, TX73456 - XTO ENERGY - ANICO #4 - POLK CO., TX (REC)73684 -- ETX-ENBRIDGE/WELLS LANDING - POLK

Additionally, any gas sourced between in ETX, M1 -24" and M2-24" for delivery in STX, WLA or ELA may be restricted for interruptible, secondary firm services and potentially primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

24" System - Longview to Berne:

Seymour to Batesville 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on the Seymour to Batesville 24" Line 1, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

70940 - INDIANA GAS CO. - WESTPORT, IN

Donaldson to North Little Rock 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Donaldson to North Little Rock 24" Line 1, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

73150 - ARKLA - PULASKI CO. AR.73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR73729 - CENTERPOINT ENERGY - GRANITE MOUNTAIN QUARRY, PULASKI CO.

Pollard to Oran 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under Review

Page 13 of 45

Page 14: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Potential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Pollard to Oran 24" Line 1, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70043 - UNION ELECTRIC - DEXTER, MO70336 - UNION ELEC. - BLOOMFIELD, MO70398 - BERNIE, MO71043 - UNION ELECTRIC - VANDUSER, MO71141 - ASSOC NATURAL GAS - BERNIE, MO71469 - ATMOS ENERGY CORPORATION - QULIN, MO73191 - ST FRANCIS PWR PLT -DUNKIN, MO73193 - MISS RIV TRANS - STODDARD, MO73207 - AECI PLANT STO - ESSEX PWR PLT -STODDARD CO, MO

Longview to Atlanta 4" Line 1 -N: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 4" Line 1-N (a single line system) between Longview to Atlanta stations. TE will be adjusting its operating pressure on 4" Line 1-N to accommodate these investigations.

Lebanon to Sarahsville 24" Line 3: September 10 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 24" Line 3 between Lebanon and Sarahsville stations. TE will be adjusting its operating pressure on 24" Line 3 to accommodate these investigations.

Additionally, until these detailed investigations are fully analyzed and any anomalies are remediated, capacity for nominations flowing north to south through the stations below will be approximately as follows and are subject to change based on TE operating conditions and/or remediation progress:

Reduced to approximatelySarahsville551,000 Dth/dFive Points537,000 Dth/dLebanon537,000 Dth/d

Based on historical nominations TE anticipates restrictions for interruptible, secondary services and potentially primary firm services.

Norris City to Five Points 24" Line 1: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 24" Line 1 between Norris City to Five Points

Page 14 of 45

Page 15: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

stations. TE will be adjusting its operating pressure on 24" Line 1 to accommodate these investigations.

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

70017 - INDIANA GAS - GREENSBURG, IN70018 - INDIANA GAS - SEYMOUR, IN70041 - COLUMBIA GAS - LEBANON, OH70063 - HUNTINGBURG, IN70089 - CONSUMERS GAS CO. - CARMI, IL70093 - JASPER, IN70215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH70441 - GRAYVILLE, IL70442 - CROSSVILLE, IL70478 - NEW HARMONY, IL70521 - DUKE ENERGY OHIO, INC. DICKS CREEK70552 - TE TODHUNTER - TODHUNTER, OH70573 - BATESVILLE, IN70582 - MIDWEST NAT. - BROWNSTOWN, IN70583 - MIDWEST NAT. -NORTH VERNON, IN70907 - DUKE ENERGY OHIO INC. MILLVILLE70937 - CONSUMERS GAS CO. - OMAHA, IL70939 - INDIANA GAS - FRENCH LICK, IN70940 - INDIANA GAS CO. - WESTPORT, IN70941 - LAWRENCEBURG GAS, IN71170 - MIDWEST NAT. GAS - MEDORA, IN71240 - ENFIELD, IL71353 - COL. GAS - EAST MIDDLETOWN, OH71366 - OSGOOD, IN71439 - INDIANA GAS CO. - DUBOIS, IN71825 - ANR P/L CO. - FRENCH LICK, IN71841 - OHIO INTRASTATE ENERGY, LLC (FORD) - BUTLER CO., OH71993 - CIN GAS & ELEC -BUTLER CO., OH72026 - NGO (MILLER) - BUTLER CO., OH72798 - HAMILTON, OH73233 - DUKE ENERGY INDIANA73280 - DUKE ENERGY KENTUCKY73711 - NTE MIDDLETOWN ENERGY CENTER, BUTLER CO, OH74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH75661 - ENERGY SUPPLY CONSULTANT - WHITE CO., IL-(D72661/R79714 - MIDWEST BROWNSTOWN & MEDORA - LDC ALLOCATION POINT79736 -INDIANA GAS CO - LDC ALLOCATION POINT

Summerfield to Berne 36" Line 66Cleaning Tool Dates: CompleteCaliper & ILI Tool Runs: CompletePotential Repair Beginning On: 1/23/2020Potential Run Comp Beginning On: TBD

Page 15 of 45

Page 16: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Summerfield to Berne 36" Line 66, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 350,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.

Somerset to Summerfield 36" Line 65Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 36" Line 65, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 350,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, the following meter may experience lower than normal pressure or be unavailable for low:

70062 - NAT GAS & OIL - SOMERSET, OH

Additionally, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.

Page 16 of 45

Page 17: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Somerset to Summerfield 26" Line 3ILI Tool Runs: CompletePotential Repair Beginning On: TBD Spring-2020Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 26" Line 3, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 398,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, the following meter may experience lower than normal pressure:

70062 - NAT GAS & OIL - SOMERSET, OH

Additionally, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.

Five Points to Somerset 20" Line 2Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: March 23, 2020Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Five Points to Somerset 20" Line 2.

During the ILI tool runs, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 375,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

Lebanon to Five Points 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: April 13, 2020Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Page 17 of 45

Page 18: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Integrity Project, TE will be conducting in-line inspection tool run on the Lebanon to Five Points 24" Line 1.

During the ILI tool runs, north to south capacity through the Five Points compressor stations will be reduced to approximately 500,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery south of Five Points to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

30" System - Kosciusko to Uniontown:

Salineville Station to Colerain Station 30" Line 73Caliper & ILI Tool Runs: CompletePotential Repair Beginning on: Under ReviewPotential Run Com Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Salineville Station to Colerain Station 30" Line 73. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

74201 - ACCESS MIDSTREAM CLARKS MILL ROAD-JEFFERSON CO., OH74202 - ACCESS MIDSTREAM HIGHWAY 219 - JEFFERSON CO., OH74203 - DOMINION ENERGY TRANSMISSION, INC - CLARKS MILL ROAD, JEFFEIn addition, if isolation is necessary, worst case scenarios are as follows:

A.Customers sourcing gas from meters South of Colerain Station, including TE's Mainline delivering to meters North of Colerain Station, including deliveries to NEXUS, will be reduced to 0 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services.

B.Customers sourcing gas from North of Salineville Station, including NEXUS for deliveries to meters South of Salineville, including TE's mainline, will be reduced to 0 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services.

Kosciusko to Egypt 30" Line 15Cleaner Tool Runs: CompleteILI Tool Runs: CompletePotential Repairs Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on its Kosciusko to Egypt 30" Line 15.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the Egypt to Barton compressor stations. As a result, the capacity through the Barton compressor station will be approximately 1,350,000 Dth/d until complete ILI results are received, fully analyzed and any anomalies are remediated.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

Page 18 of 45

Page 19: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73219 - FINA - GEORGIA PACIFIC #1, OKTIBBEHA CO., MS73256 - FINA - LOVE HILL GATHERING - OKTIBBEHA CO., MS

Based on historical nominations TE doesn't anticipate restrictions at this time. However, if flow patterns change, restrictions may be required, for interruptible and secondary services.

***West Monroe to Providence 20" Line 26ILI Tool Runs: CompletePotential Repairs Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on its West Monroe to Providence 20" Line 26.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the West Monroe to Providence compressor stations. As a result, the capacity through the West Monroe compressor station will be approximately 208,000 Dth/d until complete ILI results are received, fully analyzed and any anomalies are remediated.

Due to the results of the ILI tool run, TE has determined that further detail investigations are required. As a result, TE will be required to reduce pressure on Line 26 between the West Monroe to Providence compressor stations while TE conducts these detail investigations. This pressure reduction will result in capacity through West Monroe compressor station as follows:

Reduced to ApproximatelyCurrent - January 1243,000 Dth/dJanuary 13 - January 2130,000 Dth/d

Depending on the results of these further detailed investigations, the following meters may be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT72568 - ENABLE GAS TRANSMISSION WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

Based on historical nominations TE anticipates restrictions for interruptible and secondary services.

Uniontown to Market Area (M3):

Leidy Line - 6" Line 24-A: April 24 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 6" Line 24-A between Perulack Station and Leidy facility. TE will be required to operate this line at a lower pressure during these investigations. However, restrictions to injections into Leidy facility are not anticipated at this time.

Depending on the results of these detailed investigations, the following meter may be unavailable for flow:

72080 - GREAT LAKES ENERGY PARTNERS- #1 TEX. GULF-CENTRE CO., PA

Page 19 of 45

Page 20: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Chester Junction to EOL 14"/16" Line 1A: April 28, 2020 - May 19, 2020 (approximately 3 weeks)

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting pipeline isolation on 14"/16" Line 1A between Chester Junction to EOL.

During this isolation, the following meters will be unavailable for flow:

70030 - PHILADELPHIA GAS WORKS - POINT BREEZE,PA71682 - PHILADELPHIA GAS WORKS PENROSE (EASTWICK)-PHILADELPHIA, PA72649 - SUN R&M - PHILADELPHIA CO., PA72930 - PECO ENERGY - EDDYSTONE, DELAWARE CO., PA 73060 - PGW - HARKNESS POINT - PHILADELPHIA, PA73127 - PAULSBORO REFINERY73318 - LIBERTY ELEC-DEL.PA.

Bechtelsville to Lambertville 30" Line 19 ILI Tool Runs: CompletePotential Repairs: On Going

As previously posted, a temporary pressure reduction is in place between a portion of Bechtelsville to Lambertville Line 19.

Please refer to the TETLP Customer Overview Gas Operations document for the latest information on the status of these detailed investigations and capacities associated with the pressure restriction.

Based on historical nominations, restrictions are anticipated for interruptible and secondary services and primary firm services.

Eagle Station to Linden Station 20" Line 1: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 20" Line 1 between Eagle to Linden stations. TE will be adjusting its operating pressure on 20" Line 1 to accommodate these investigations.

Additionally, until these detailed investigations are fully analyzed and any anomalies are remediated, capacity through Marietta to Linden stations will be as follows:

Winter- Reduced to approximatelyLambertville2,406,000 Dth/dLinden1,983,000 Dth/d

TE requests that customers/point operators between Marietta to Chester Junction 20" Line 1A and Chester Junction Line 1A1 be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels. To the extent feasible, TE will work with point operators to minimize operational impact.

Based on historical nominations TE anticipates restrictions for interruptible, secondary and potentially primary firm services.

Page 20 of 45

Page 21: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Linden to EOL 12" Line 1-D and 10" Line 1-D-3: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 12" Line 1-D and 10" Line 1-D-3 between Linden to EOL station. TE will be adjusting its operating pressure on 12" Line 1-D and 10" Line 1-D-3 to accommodate these investigations.

Please refer to the TETLP Customer Overview Gas Operations document (page 7) for the latest information on the status of these detailed investigations and capacities associated with the pressure restrictions.

Additionally, if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

70066 - PUBLIC SERVICE - SEWAREN, NJ71075 - ELIZABETHTOWN GAS COMPANY - PERTH AMBOY, NJ

Holbrook to Uniontown 30" Line 15 Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Holbrook to Uniontown 30" Line 15.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73402 - GREAT LAKES (VOYTEK) ENERGY INTERCONNECT-FAYETTE CO., PA

Lambertville to Linden Line 24" 20B:Pipeline Outage Dates: CompleteCaliper and ILI Tool Run: CompletePotential Repair Beginning On: CompletePotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be a conducting in-line inspection tool run on Lambertville to Linden Line 24" 20-B.

Depending on the results of the ILI Tool run and if further detailed investigations are required, worst case scenarios are as follows:

1.The following meter may unavailable for flow:

73062 - ELIZABETHTOWN GAS COMPANY - UNION CO., NJ

2.Net receipts into TE may be restricted to a low of approximately 350,000 Dth /d cumulative from interconnects with Algonquin Gas Transmission, which includes receipts on the TE/AGT Lease.

70087 - ALGONQUIN - LAMBERTVILLE, NJ76087 - ALGONQUIN - LAMBERTVILLE, NJ (RECEIPT)71078 - ALGONQUIN - HANOVER, NJ

Page 21 of 45

Page 22: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

78200 - AGT Mainline (NJ-NY) 78201 - MAHWAH78214 - RAMAPO

Holbrook to Uniontown 30" Line 25 Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: CompletePotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Holbrook to Uniontown 30" Line 25.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73808 - DOMINION ENERGY TRANSMISSION, INC - CRAYNE II, RT 188 GREEN

*Please refer to the TE 2019 Planned Outages Schedule PDF attachment for a complete list of tool runs.

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Armagh to Lilly (Line 12)Athens to Berne (Line 15)Atlanta to Hope (Line 1)Batesville to Lebanon (Line 1)Barton to Mt. Pleasant (Line 10)Barton to Mt. Pleasant (Line 15)Barton to Mt. Pleasant (Line 25)Bechtelsville to Lambertville (Line 19)Berne to Holbrook (Line 10)Berne to Holbrook (Line 15)Berne to Holbrook (Line 25)Berne to Holbrook (Line 30)Bernville to Bechtelsville (Line 12)Bernville to Bechtelsville (Line 27)Bernville to Lambertville (Line 19)Blessing to Angleton (Line 16)*Chester Junction to EOLN (Line 1-A)Danville to Owingsville (Line 10)Delmont to Armagh (Line 12)Delmont to Armagh (Line 19)Delmont to Armagh (Line 27 Aux)*Eagle to Chester Junction (Line 1-A)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Egypt to Barton (Line 10)Egypt to Barton (Line 25 - Sec 1)

Page 22 of 45

Page 23: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Entriken to Perulack (Line 12)French Lick to Seymour (Line 1)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Holbrook to Uniontown (Line 15)Karon to Charco (Line 22)Kosciusko to Egypt (Line 15)Kosciusko to Egypt (Line 25)Lambertville to Linden (Line 1) Lick Creek to Norris City (Line 1)Lilly to Entriken (Line 12)Lilly to Entriken (Line 19)*Linden to EOLN (Line 1-D)*Linden to EOL (Line 38)*Linden to EOLN (Line 20)Marietta to Eagle (Line 1)Mt. Pleasant to Gladeville (Line 10)Owingsville to Wheelersburg (Line 10)Perulack to Shermansdale ( Line 12)Perulack to Shermansdale ( Line 19)Perulack to Shermansdale (Line 27)*Santa Fe to Mexico (Line 16)Seymour to Batesville (Line 1)Shermansdale to Grantville (Line 12)Shermansdale to Grantville (Line 19)Shermansdale to Grantville (Line 27)Somerset to Summerfield (Line 3 - Sec 1)Somerset to Summerfield (Line 65)Tompkinsville to Danville (Line 10)Tompkinsville to Danville (Line 15)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 29)Uniontown to Delmont (Line 39)Wheelersburg to Athens (Line 15)Wheelersburg to Athens (Line 25)

Download File: TE 2019 Planned Outages Schedule Version 63.pdfDownload File: TETLP Customer Overview Gas Operations 12.pdf

Page 23 of 45

Page 24: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

TSP: 007932908TSP Name: Texas Eastern Transmission, LPCritical Desc: Not a critical noticeNotice Eff Date/Time: 01/16/2020 04:34:34 PMNotice End Date/Time: 04/15/2020 04:34:34 PMNotice ID: 92733Notice Stat Desc: SupersedeNotice Type: Planned Service OutagePost Date/Time: 01/16/2020 04:34:34 PMPrior Notice: 92443Reqrd Rsp Desc: No response requiredRsp Date/Time: Subject: TE 2019 Planned Outage Schedule -- UPDATE 64 UPDATE

Notice Text:

The text below is included in the attached Word document located at the bottom of this posting.

Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas Eastern Transmission (TE) system for 2019. Due to unforeseen delays or scheduling conflicts, the dates below are subject to change. Any changes to the list below will be posted at the earliest known date.

Access Area - Longview to Kosciusko:

Yazoo City to Kosciusko 20" Line 26 (ELA)Cleaner Runs: CompleteCaliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Yazoo City to Kosciusko 20" Line 26, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

73141 - MISSISSIPPI CHEMICAL - YAZOO CITY, MS73251 - ATTALA GENERATING COMPAN LLC (DEL)

Thomaston Station to Provident City Station 16" Line 21 (STX): ILI Tool Runs: January 16 and 17, 2020Potential Repairs Beginning On: February 25 and March 29, 2020Potential Run Comp Repair Beginning On: March 26, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting in-line inspection tool runs on its 16" Line 21 (a single line system) between Thomaston and Provident City stations.

During the ILI runs, capacity through the Thomaston compressor station will be reduced to approximately Page 24 of 45

Page 25: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

45,000 Dth/d.

Depending on the results of these detailed investigations, the following meters may be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 -LINN EXCHANGE PROPERTIES, LLC-SOUTHWEST GOHLKE CP - VICTORI70689 - NOG PRODUCTION & OPERATING LLC- #1 CHILDREN'S HOME - BEE CO70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX 71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 -- HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)73313 - DEFS-GEODOMINION - BONORDEN #1 - LAVACA CO., TX73341 -- CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - FLINT INTERESTS, LLC/WRIGHT MATERIALS-GOLIAD CO., TX73810 - AMP UP GOLIAD, LLC/GOEHRING GATHERING-FM 584-GOLIAD CO., TX73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO.,TX

Based on historical nominations TE anticipates restrictions for interruptible and secondary services

***Provident City to Hempstead 24" Line 11 (STX): ILI Tool Runs: January 23 and 25, 2020Potential Repairs Beginning On: March 3 and April 5, 2020Potential Run Comp Repair Beginning On: April 3, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting in-line inspection tool runs on its 24" Line 11 (a single line system) between Provident City to Hempstead stations.

During the ILI runs, south capacity through the Huntsville compressor station will be reduced to approximately 67,000 Dth/d.

Page 25 of 45

Page 26: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Based on historical nominations, TE anticipates restrictions for interruptible and secondary services for nominations sourced in ETX for delivery in STX, WLA, or ELA.

Additionally, 73417 - COPANO PROCESSING - HOUSTON CENTRAL / COLORADO CO., TX (RECTX will be unavailable during the tool runs.

Depending on the results of these detailed investigations, the following meters may be unavailable for flow:

70473 - TEXANA MIDSTREAM COMPANY LP70474 - ETC TEXAS PIPELINE, LTD-SEALY, TX- DEL (B/D 73311)70930 - TEXACO, - ALTAIR, COLORADO CO., TX72266 - GULF COAST PIPELINE COMPANY - #1 MINARCIK/ COLORADO CO., TX72965 - M.E.OPERATING & SERVICES- WRIGHT #1 - COLORADO CO., TX73277 - HURD ENTERPRISES-APPLING FARMS-LAVACA CO., TX (REC)73311 - MME DESOTO PIPELINE, L.P. - AUSTIN CO. -- SEALY, TX (REC) 73417 - COPANO PROCESSING - HOUSTON CENTRAL / COLORADO CO., TX (REC

Karon Station to Provident City Station 16" Line 21, 6" Line 22-C, 6" Line 22-C-1 and 6" Line 22-H (STX): September 10 - TBDILI Tool Runs: CompletePotential Repairs Beginning On: March 20, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 16" Line 21, 6" Line 22-C, 6" Line 22-C-1 and 6" Line 22-H (a single line system) between Karon and Provident City stations. TE will be adjusting its operating pressure on 16" Line 21, 6" Line 22-C, 6" Line 22-C-1 and 6" Line 22-H to accommodate these investigations.

Additionally, during these investigations, capacity through Charco will be 76,000 Dth/d and Thomaston will be 125,000 Dth /d until detailed investigations are fully analyzed and any anomalies are remediated.

Depending on the results of these detailed investigations, the following meters may be unavailable for flow:

70633 - B&T OIL CO., YOWARD C.P. - BEE CO., TX70655 -LINN EXCHANGE PROPERTIES, LLC-SOUTHWEST GOHLKE CP - VICTORI70689 - NOG PRODUCTION & OPERATING LLC- #1 CHILDREN'S HOME - BEE CO70912 - BRITANCO, LLC WILCOX - TULETA CP, BEE CO., TX 71607 - VICTORIA OPERATING - ANNA BARRE FIELD, DEWITT CO., TX (REC71773 - JAMES L. NELSON - JUNKER, DEWITT CO., TX71862 - BRITANCO, LLC - #1D GOREE, BEE CO., TX72249 - TRI-UNION DEV. CORP.-#1 WRIGHT / GOLIAD COUNTY, TX (REC)72309 - CHAPARRAL ENERGY, L.L.C. - #1 HESTER, GOLIAD CO., TX72621 - WILLIAMS FIELD SERVICES - DUVAL CO., TX72626 - WING CORP - C.P., DEWITT COUNTY, TX (REC)72654 - BLUESTONE NATURAL RESOURCES, LLC- BONNE TERRE FIELD, MCMULL72723 - ABRAXAS PETROLEUM CORP.- TIPTON LEASE / GOLIAD CO., TX (REC72950 - APTIAN GAS CORP., K.W. SCHREINER #1 - LIVE OAK CO., TX72963 - AUBURN ENTERPRISES - KERLICK #1, DEWITT, TX73139 - DCP MIDSTREAM, LP- #1 DIEBEL, GOLIAD CO., TX

Page 26 of 45

Page 27: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73164 - DCP MIDSTREAM, LP - GOLIAD CO., TX73165 - SANCHEZ O'BRIEN-BODDEN FROST, LIVE OAK CO., TX73199 - DCP MIDSTREAM, LP - BEE CO., TX73214 - DEFS - PETTUS, BEE CO., TX73242 - COASTAL OIL & GAS - PAWLIK #1, LIVE OAK CO., TX73244 - WINN EXPLORATION/KERLICK #1 - DEWITT COUNTY, TX (REC)73276 -- HURD ENTERPRISES - LUKER #2, GOLIAD CO., TX (REC)73313 - DEFS-GEODOMINION - BONORDEN #1 - LAVACA CO., TX73341 -- CIMA ENERGY LTD - GATH. SYSTEM / DEWITT CO., TX (REC)73452 - DEFS/SOUTHERN RESOURCES GATH. - BEE CO., TX (REC)73454 - KALER ENERGY-CARPENTER #1/BEE CO., TX (REC)73482 - MAGNUM LP - CHICOLETE CREEK - LAVACA CO., TX (REC)73505 - DESF-ANGEL CITY GATHERING-GOLIAD CO. TX73604 - FLINT INTERESTS, LLC/WRIGHT MATERIALS-GOLIAD CO., TX73810 - AMP UP GOLIAD, LLC/GOEHRING GATHERING-FM 584-GOLIAD CO., TX73876 - ELLIOTT OIL&GAS/STEINDORF #1-FM 799-BEE CO.,TX

Based on historical nominations TE anticipates restrictions for interruptible and secondary services.

Carthage to Longview 20" Line 13: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 20" Line 13 between Carthage to Longview station. TE will be adjusting its operating pressure on 20" Line 13 to accommodate these investigations.

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

72892 - ENTERPRISE TEXAS PIPELINE, LLC - PANOLA COUNTY, TX (REC)73068 - BRAMMER ENGINEERING, INC. -GREEN GAS UNIT #1 - HARRISON CO.73104 - VERADO ENERGY, INC. - YOUNG #3 - RUSK COUNTY, TX73484 - SAMSON RESOURCES - CHEROKEE OAK HILL - RUSK CO. TX. (REC)73502 - BUFFCO PRODUCTION, INC - OAK HILL COTTON VALLEY73896 - EASTMAN CHEMICAL/TXO-CALLAHAN RD., HARRISON CO., TX

Provident City to Joaquin 24" Line 11: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 24" Line 11between Provident City to Joaquin station. TE will be adjusting its operating pressure on 24" Line 11 to accommodate these investigations.

During these investigations, the following meter will be unavailable for flow:

75778 - ATMOS TEXAS - LONE STAR GAS - WALLER, TX-(D72778/R76778)

Depending on the results of these detailed investigations, the following meters may experience lower than Page 27 of 45

Page 28: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

normal pressure or be unavailable for flow:

70473 - TEXANA MIDSTREAM COMPANY LP70474 - ETC TEXAS PIPELINE, LTD-SEALY, TX- DEL (B/D 73311)70859 - GULF SOUTH PIPELINE, LP - HUNTSVILLE, TX (DELIVERY)70930 - TEXACO, - ALTAIR, COLORADO CO., TX71435 - CLECO ENERGY - CHIRENO #1, TX (DELIVERY)71436 - CLECO ENERGY - CHIRENO #2, TX (DELIVERY)71706 - NORAM - SHELBY CO., TX (RECEIPT)72266 - GULF COAST PIPELINE COMPANY - #1 MINARCIK/ COLORADO CO., TX72458 - TRACY PRODUCTION CO. - #1 FULTON FULLER, NACOGDOCHES CO., T72856 - ONALASKA WATER & GAS CORPORATION - POLK COUNTY, TX72964 - ELLIOT OIL & GAS, BROWDER #C-1, SAN JACINTO CO., TX (REC)72965 - M.E.OPERATING & SERVICES- WRIGHT #1 - COLORADO CO., TX73041 - FOUR SQUARE GAS CO., INC. (CHIRENO #3) - SHELBY CO., TX73209 - NORAM FIELD SERVICES - SHELBY CO., TX (REC)73241 - TRANSCOASTAL CORP. - DILLARD #1 / SHELBY CO., TX73249 - ENTERGY - LEWIS CREEK / MONTGOMERY COUNTY, TX73253 - ETC TEXAS PIPELINE, LTD-HENDERSON #1 / NACOGDOCHES CO., TX73275 - SONERRA RESOURCES - MELROSE GATHERING (KENDRICK #1-H) (REC)73277 - HURD ENTERPRISES-APPLING FARMS-LAVACA CO., TX (REC)73282 - SONERRA RESOURCES - MOUNTAIN WEST, NACOG. CO., TX (REC)73295 - HEC PETROLEUM-FULTON FULLER #1, NACOG. CO., TX (REC)73311 - MME DESOTO PIPELINE, L.P. - AUSTIN CO. -- SEALY, TX (REC) -73364 - BRAMMER-BROWDER GATHERING-SAN JACINTO CO., TX (REC)73388 - MONTGOMERY GAS TRANSMISSION, INC. - MONTGOMERY CO., TX (DEL73391 - ARCADIA OPERATING,LLC- GOLDEN MINER #1 / SAN JACINTO CO., T73409 - FOSSIL RESOURCES - BROWN #1H / NACOGDOCHES CO., TX73410 - CENTERPOINT ENERGY-GATHERING SYSTEM, SHELBY CO., TX (REC)73417 - COPANO PROCESSING - HOUSTON CENTRAL / COLORADO CO., TX (REC73455 - MCBEE OPERATING COMPANY, LLC-RIPPY #1 NACOG. CO., TX (REC)73456 - XTO ENERGY - ANICO #4 - POLK CO., TX (REC)73461 - UNIVERSAL NATURAL GAS/INTERCONNECT - MONTGOMERY CO., TX (DE73475 - SAMSON LONESTAR - HERRERA #2 GATHERING, NACOGDOCHES CO., TX73515 - PALMER PETROLEUM INC.-LUMBER GATHERING - ANGELINA CO., TX73517 - ENCANA O&G INC. - GREEN GATHERING - NACOGDOCHES CO.,TX73519 - FOSSIL RESOURCES-CARDINAL GATHERING-NACOGDOCHES CO., TX73546 - SHERIDAN HOLDING COMPANY III,LLC-SHELBY GATHERING-SHELBY CO73549 - NOBLE ENERGY-OLIVER CREEK-SHELBY CO., TX73564 - TANOS EXPLORATION II,LLC/PARMER GATHERING73582 - SAMSON LONESTAR - HERRERA #3, NACOGDOCHES CO., TX73597 - FOSSIL RESOURCES/CARDINAL II GATHERING-NACOGDOCHES CO., TX73600 - FORTUNE RESOURCES LLC/TARANTULA GATHERING73608 - TGG PIPELINE - CENTRAL DELIVERY POINT73613 - BUFFCO PROD./SOUTHERN EGG RANCH-SHELBY CO., TX73639 - SOUTHWESTERN ENERGY/JEBEL GATHERING73640 - XTO ENERGY/BARFIELD WARD GATHERING73641 - NOBLE ENERGY-HARRIS YATES-SHELBY CO., TX73649 - ACCESS MIDSTREAM/CARZENAVA GATHERING73652 - SHERIDAN HOLDING COMPANY III,LLC-WARR GATHERING73669 - TEXANA OPERATING/MASSEY FERGUSON GATHERING, SAN JACINTO CO.73670 - SHERIDAN HOLDING COMPANY III,LLC/KING WILLIAMS, SHELBY CO.,73684 - ETX-ENBRIDGE/WELLS LANDING - POLK

Page 28 of 45

Page 29: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73686 - ETX-ENBRIDGE/ZIDER - SHELBY73878 - GOLIAD MIDSTREAM ENERGY/CITY OF MAGNOLIA,TX-ENDERLI STREET,73887 - ALEGACY/CNG INDUSTRIAL CAMPUS-BUS US 290-WALLER CO.,TX75475 - ETC - DESOTO PIPELINE, LP - (D70475/R76475)75858 - COPANO PIPELINE - MONTGOMEREY CO., TX (D72858/R76858

Castor to EOL 20" Line 2: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 20" Line 2 between Castor to EOL station. TE will be adjusting its operating pressure on its 20" Line 2 to accommodate these investigations.

During this outage, 75688 - REGENCY GAS - BIENVILLE PA. LA-(D72688/R76688) will be unavailable for receipts into the TE system; however deliveries to 75688 will not be impacted.

Additionally, the following meters will be unavailable for flow:

70192 - SMITH (HARVEY BROYLE) #2 MURPHY-BRYCELAND, BIENVILLE PSH., L72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA75078 - GULF SOUTH - CASTOR, LA-(D70078/R76078)75688 - REGENCY GAS - BIENVILLE PA. LA-(D72688/R76688)

Based on historical nominations TE doesn't anticipate restrictions at this time. However, if flow patterns change, restrictions may be required, for interruptible and secondary services.

Huntsville to Lufkin 24" Line 11Cleaner Tool Runs: CompleteILI Tool Runs: CompletePotential Repairs Beginning On: January 17, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on its Huntsville to Lufkin 24" Line 11.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the Huntsville to Lufkin compressor stations. As a result, the capacity through the Huntsville compressor station will be approximately 170,000 Dth/d north to south until complete ILI results are received, fully analyzed and any anomalies are remediated.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following Page 29 of 45

Page 30: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

meters may experience lower than normal pressures or be unavailable for flow:

70859 - GULF SOUTH PIPELINE, LP - HUNTSVILLE, TX (DELIVERY)72856 - ONALASKA WATER & GAS CORPORATION - POLK COUNTY, TX73456 - XTO ENERGY - ANICO #4 - POLK CO., TX (REC)73684 -- ETX-ENBRIDGE/WELLS LANDING - POLK

Additionally, any gas sourced between in ETX, M1 -24" and M2-24" for delivery in STX, WLA or ELA may be restricted for interruptible, secondary firm services and potentially primary firm services.

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

Blessing Station to Mt. Belvieu Station 30" Line 16: August 29 - TBDCleaner Tool Runs: CompleteILI Tool Runs: CompletePotential Repairs Beginning On: January 26, 2020

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 30" Line 16 between Blessing and Mt. Belvieu stations. TE will be adjusting its operating pressure on 30" Line 16 to accommodate these investigations.

Additionally, during these investigations, capacity north to south through Angleton will be approximately 433,000 Dth/d and Mt. Belvieu will be approximately 534,000 Dth /d until detailed investigations are fully analyzed and any anomalies are remediated. These capacities are subject to change based on TE operating conditions and/or remediation progress.

During the ILI Tool Runs, capacity through Blessing will be reduced to approximately 250,000 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and potentially primary firm services for gas sourced in ETX or STX north of Blessing Compressor Station (including the Wilcox system) for delivery to ELA, WLA, and to STX east of Blessing and STX south of Blessings (McAllen line).

Furthermore, during the ILI Tool Runs, TE requests that customers/point operators in Access Area Zones STX, ETX, WLA and ELA be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels.

Depending on the results of these detailed investigations and ILI Tool Runs, the following meters may experience lower than normal pressure or be unavailable for flow:

70129 - LOUIS DREYFUS72382 - HOUSTON PIPE LINE CO.-ENERFIN LYONDELL SYS./ HARRIS CO., TX72451 - WILMAR PIPELINE, INC. - #1 DUNCAN SLOUGH, MATAGORDA CO., T72601 - ENTERPRISE TEXAS PIPELINE LLC - MATAGORDA COUNTY, TX (REC)72837 - MONUMENT PIPELINE, LP - HARRIS COUNTY, TX72877 - DENBURY ONSHORE, LLC73148 - DEEP ROCK RESOURCES - FLOWERS / MATAGORDA CO., TX - RUN 0173283 - UNION PETROLEUM, LTD (LINE 16LL) - BRAZORIA CO., TX73338 - SANTOSUSA CORP73407 - CHESAPEAKE OPERATING INC-ANKENMEN GATHERING, BRAZORIA CO.,

Page 30 of 45

Page 31: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

73412 - BUCKEYE RANCH GATHERING - MATAGORDA CO., TX73504 - WALTER OIL & GAS-KASMAN GATHERING - MATAGORDA CO., TX73539 - NET LP - MONUMENT PIPELINE - HARRIS COUNTY, TX73590 - NRG - CEDAR BAYOU73626 - DAVIS SOUTHERN/BINTLIFF #173694 - SWEENY PLANT-CONOCO PIPELINE73811 - ENTERPRISE PRODUCTS/WALLACE JUNCTION73912 - BIG ANGLETON DELIVERY, BRAZORIA CO., TX75300 - KINDER MORGAN TEJAS - CLEAR LK. STOR-(D73299/R73300)75301 - CALPINE BAYER PWR. PLANT-(D73301/R76301)75558 - TRES PALACIOS GAS STORGE - 73558D(INJ)/73559R(WTD)

Based on historical nominations TE doesn't anticipate restrictions at this time. However, if flow patterns change, restrictions may be required, for interruptible and secondary services.

La Rose to EOL 36" Line 40: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 36" Line 40 between La Rose to EOL station. TE will be adjusting its operating pressure on 20" Line 40 to accommodate these investigations.

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

71200 - CHEVRON - VENICE, LA72137 - FIELDWOOD ENERGY - WD 8673278 - FIELDWOOD ENERGY - SP 89-B72319 - ENERGY XXI GOM, LLC-SP 9372616 - CANTIUM, LLC - MP 3072831 - NORTHSTAR OFFSHORE- SOUTH PASS 8672849 - ENI PETROLEUM US LLC - 365 MC, LA72936 - CHANDELEUR PIPE LINE CO. (CANTIUM, LLC) - MP 41L72972 - WALTER OIL & GAS - WD 10673027 - FIELDWOOD ENERGY - SP 87-D73070 - CENTANA GATHERING CO. MP 225,LA73071 - NOBLE - VK 82673073 - SHELL OFFSHORE , WD 143, - LAO73090 - VENICE-DELIVERY INTO PLANT73393 - FIELDWOOD ENERGY - SP 89-B BUYBACK73469 - DISCOVERY-LAROSE STATION INTERCONNECT, LAFOURCHE PSH., LA73642 - ENI MC 365 BUY BACK METER73654 - FIELDWOOD ENERGY - CA 4373819 - TANA EXPLORATION BRETON SOUND BLOCK 2579579 - VENICE SLUG CATCHER - BTU MAKEUP79582 - VENICE PLANT PVR METER79738 - PEFS (MAIN PASS) - LDC ALLOCATION POINT

Gillis to Opelousas 14" Line 14-A: May 9 - TBD

Page 31 of 45

Page 32: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 14" Line 14-A (a single line system) between Gillis to Opelousas Station. TE will be adjusting its operating pressure on 14" Line 14-A to accommodate these investigations.

Depending on the results of these detailed investigations, the following meter will be unavailable for flow:

76043 - ANR - ST. LANDRY PA., LA - REC (B\D72043)

Opelousas to St. Francisville 12" Line 14-K: May 9 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 12" Line 14-K (a single line system) between Opelousas to St. Francisville Station. TE will be adjusting its operating pressure on 12" Line 14-K to accommodate these investigations.

Depending on the results of these detailed investigations, the following meter will be unavailable for flow:

72258 - HILCORP ENERGY I, LP. - DIGBY PLANT, PT. COUPEE PSH., LA

Lufkin to Joaquin 24" Line 11 (ETX)Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on the Lufkin to Joaquin 24" Line 11, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

71435 - CLECO ENERGY - CHIRENO #1, TX (DELIVERY)71436 - CLECO ENERGY - CHIRENO #2, TX (DELIVERY)72458 - TRACY PRODUCTION CO. - #1 FULTON FULLER, NACOGDOCHES CO., T73253 - ETC TEXAS PIPELINE, LTD-HENDERSON #1 / NACOGDOCHES CO., TX73275 - SONERRA RESOURCES - MELROSE GATHERING (KENDRICK #1-H) (REC)73282 - SONERRA RESOURCES - MOUNTAIN WEST, NACOG. CO., TX (REC)73295 - HEC PETROLEUM-FULTON FULLER #1, NACOG. CO., TX (REC)73409 - FOSSIL RESOURCES - BROWN #1H / NACOGDOCHES CO., TX73455 - MCBEE OPERATING COMPANY, LLC-RIPPY #1 NACOG. CO., TX (REC)73515 - PALMER PETROLEUM INC.-LUMBER GATHERING - ANGELINA CO., TX73517 - ENCANA O&G INC. - GREEN GATHERING - NACOGDOCHES CO.,TX73519 - FOSSIL RESOURCES-CARDINAL GATHERING-NACOGDOCHES CO., TX73564 - TANOS EXPLORATION II,LLC/PARMER GATHERING73597 - FOSSIL RESOURCES/CARDINAL II GATHERING-NACOGDOCHES CO., TX73640 - XTO ENERGY/BARFIELD WARD GATHERING

Additionally, any gas sourced between Lufkin to North Little Rock, M1 -24" and M2-24" for delivery South of Lufkin Station in ETX, STX, WLA or ELA may be restricted for interruptible, secondary firm services and potentially primary firm services.

Page 32 of 45

Page 33: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known.

Red River to Castor 24" Line 11 (ETX)Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Red River to Castor 24" Line 11, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)70078 - GULF SOUTH PIPELINE COMPANY, LP - CASTOR, LA (DELIVERY)70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L70970 - NGC ENERGY RESOURCES - SLIGO GAS PLANT, LA (RECEIPT)72688 - GULF STATES PIPELINE - BIENVILLE PSH., LA-DEL (B/D 76688)72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)73672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA

Red River to Castor Station 14" Line 11-G: May 9 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 14" Line 11-G (a single line system) between Red River to Castor Station. TE will be adjusting its operating pressure on 14" Line 11-G to accommodate these investigations.

Depending on the results of these detailed investigations, the following meter may be unavailable for flow:

73328 - PETROCHEM OPERATING / LOTT #1 - BOSSIER PARISH, LA (REC)

Castor to EOL 20" Line 2Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Castor to EOL 20" Line 2, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

Page 33 of 45

Page 34: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

70065 - TEXAS GAS TRANSMISSION - LISBON, LA (DELIVERY)70078 - GULF SOUTH PIPELINE COMPANY, LP - CASTOR, LA (DELIVERY)70192 - SMITH (HARVEY BROYLE)#2 MURPHY-BRYCELAND, BIENVILLE PSH., L72688 - GULF STATES PIPELINE - BIENVILLE PSH., LA-DEL (B/D 76688)72718 - SMITH OPER. (HARVEY BROYLE M.P. 0.00) - BIENVILLE PSH. LA73134 - PANENERGY FIELD SERVICES - LINCOLN PARISH, LA73168 - WILLAMETTE INDUSTRIES - BIENVILLE PARISH, LA73672 - ENERGY TRANSFER/TIGER PIPELINE BIENVILLE, LA

Mt. Belvieu to Vidor 30" Line 16Cleaners: CompleteILI Tool Runs (Rerun): CompletePotential Repairs Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on its Mt. Belvieu to Vidor 30" Line 16.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the Mt. Belvieu to Vidor compressor stations. As a result, the capacity through the Vidor compressor station will be approximately 528,000 Dth/d north to south until complete ILI results are received, fully analyzed and any anomalies are remediated. During the ILI tool run, capacity through the north to south capacity through the Vidor and Mt. Belvieu compressor stations will be reduced to approximately 165,000 Dth/d.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

72872 - CENTANA,STORAGE - JEFFERSON CO., TX -DEL(B/D72873)73653 - TEPPCO/BEAUMONT VAPOR RECOVERY 73921 - MIDCOAST VIDOR INTERCONNECT MANSFIELD FERRY ROAD ORANGE CO75773 - MOSS BLUFF GAS STRG-CHAMBERS CO. TX

Based on historical nominations TE anticipates restrictions for interruptible, secondary services and primary firm services.

24" System - Longview to Berne:

Seymour to Batesville 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on the Seymour to Batesville 24" Line 1, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

70940 - INDIANA GAS CO. - WESTPORT, INPage 34 of 45

Page 35: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Donaldson to North Little Rock 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Donaldson to North Little Rock 24" Line 1, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

73150 - ARKLA - PULASKI CO. AR.73667 - HOT SPRING POWER PLANT, HOT SPRING CO, AR73729 - CENTERPOINT ENERGY - GRANITE MOUNTAIN QUARRY, PULASKI CO.

Pollard to Oran 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Pollard to Oran 24" Line 1, a single line system.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70043 - UNION ELECTRIC - DEXTER, MO70336 - UNION ELEC. - BLOOMFIELD, MO70398 - BERNIE, MO71043 - UNION ELECTRIC - VANDUSER, MO71141 - ASSOC NATURAL GAS - BERNIE, MO71469 - ATMOS ENERGY CORPORATION - QULIN, MO73191 - ST FRANCIS PWR PLT -DUNKIN, MO73193 - MISS RIV TRANS - STODDARD, MO73207 - AECI PLANT STO - ESSEX PWR PLT -STODDARD CO, MO

Longview to Atlanta 4" Line 1 -N: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 4" Line 1-N (a single line system) between Longview to Atlanta stations. TE will be adjusting its operating pressure on 4" Line 1-N to accommodate these investigations.

Page 35 of 45

Page 36: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Lebanon to Sarahsville 24" Line 3: September 10 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 24" Line 3 between Lebanon and Sarahsville stations. TE will be adjusting its operating pressure on 24" Line 3 to accommodate these investigations.

Additionally, until these detailed investigations are fully analyzed and any anomalies are remediated, capacity for nominations flowing north to south through the stations below will be approximately as follows and are subject to change based on TE operating conditions and/or remediation progress:

Reduced to approximatelySarahsville551,000 Dth/dFive Points537,000 Dth/dLebanon537,000 Dth/d

Based on historical nominations TE anticipates restrictions for interruptible, secondary services and potentially primary firm services.

Norris City to Five Points 24" Line 1: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 24" Line 1 between Norris City to Five Points stations. TE will be adjusting its operating pressure on 24" Line 1 to accommodate these investigations.

Depending on the results of these detailed investigations, the following meters may experience lower than normal pressure or be unavailable for flow:

70017 - INDIANA GAS - GREENSBURG, IN70018 - INDIANA GAS - SEYMOUR, IN70041 - COLUMBIA GAS - LEBANON, OH70063 - HUNTINGBURG, IN70089 - CONSUMERS GAS CO. - CARMI, IL70093 - JASPER, IN70215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH70441 - GRAYVILLE, IL70442 - CROSSVILLE, IL70478 - NEW HARMONY, IL70521 - DUKE ENERGY OHIO, INC. DICKS CREEK70552 - TE TODHUNTER - TODHUNTER, OH70573 - BATESVILLE, IN70582 - MIDWEST NAT. - BROWNSTOWN, IN70583 - MIDWEST NAT. -NORTH VERNON, IN70907 - DUKE ENERGY OHIO INC. MILLVILLE70937 - CONSUMERS GAS CO. - OMAHA, IL70939 - INDIANA GAS - FRENCH LICK, IN70940 - INDIANA GAS CO. - WESTPORT, IN70941 - LAWRENCEBURG GAS, IN71170 - MIDWEST NAT. GAS - MEDORA, IN71240 - ENFIELD, IL71353 - COL. GAS - EAST MIDDLETOWN, OH

Page 36 of 45

Page 37: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

71366 - OSGOOD, IN71439 - INDIANA GAS CO. - DUBOIS, IN71825 - ANR P/L CO. - FRENCH LICK, IN71841 - OHIO INTRASTATE ENERGY, LLC (FORD) - BUTLER CO., OH71993 - CIN GAS & ELEC -BUTLER CO., OH72026 - NGO (MILLER) - BUTLER CO., OH72798 - HAMILTON, OH73233 - DUKE ENERGY INDIANA73280 - DUKE ENERGY KENTUCKY73711 - NTE MIDDLETOWN ENERGY CENTER, BUTLER CO, OH74215 - TEXAS GAS TRANSMISSION LLC - LEBANON, OH75661 - ENERGY SUPPLY CONSULTANT - WHITE CO., IL-(D72661/R79714 - MIDWEST BROWNSTOWN & MEDORA - LDC ALLOCATION POINT79736 -INDIANA GAS CO - LDC ALLOCATION POINT

Summerfield to Berne 36" Line 66Cleaning Tool Dates: CompleteCaliper & ILI Tool Runs: CompletePotential Repair Beginning On: 1/23/2020Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Summerfield to Berne 36" Line 66, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 350,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.

Somerset to Summerfield 36" Line 65Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Beginning On: TBD

Page 37 of 45

Page 38: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 36" Line 65, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 350,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, the following meter may experience lower than normal pressure or be unavailable for low:

70062 - NAT GAS & OIL - SOMERSET, OH

Additionally, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.

Somerset to Summerfield 26" Line 3ILI Tool Runs: CompletePotential Repair Beginning On: TBD Spring-2020Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Somerset to Summerfield 26" Line 3, a single line system.

During the ILI tool run, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 398,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

In addition, depending on the results of the ILI Tool run and if further detailed investigations are required, the following meter may experience lower than normal pressure:

70062 - NAT GAS & OIL - SOMERSET, OH

Additionally, worst case scenario is as follows:

Any gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between

Page 38 of 45

Page 39: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Longview and N. Little Rock may be restricted to 0 Dth (Zero Flow), including deliveries to the Lebanon Lateral.

Five Points to Somerset 20" Line 2Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: March 23, 2020Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Five Points to Somerset 20" Line 2.

During the ILI tool runs, north to south capacity through the Summerfield (Sarahsville) compressor stations will be reduced to approximately 375,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Summerfield on the M2-24 for delivery south of Summerfield to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

Lebanon to Five Points 24" Line 1Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: April 13, 2020Potential Run Comp Beginning On: TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool run on the Lebanon to Five Points 24" Line 1.

During the ILI tool runs, north to south capacity through the Five Points compressor stations will be reduced to approximately 500,000 Dth/d.

Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services. for gas sourced in STX, WLA, ELA, M1-30", M2-30", M3 and receipt points north of Five Points on the M2-24 for delivery south of Five Points to the M1-24", M2-24" or delivery locations in ETX between Longview and N. Little Rock, including deliveries to the Lebanon Lateral.

30" System - Kosciusko to Uniontown:

Salineville Station to Colerain Station 30" Line 73Caliper & ILI Tool Runs: CompletePotential Repair Beginning on: Under ReviewPotential Run Com Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Salineville Station to Colerain Station 30" Line 73. Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

74201 - ACCESS MIDSTREAM CLARKS MILL ROAD-JEFFERSON CO., OH74202 - ACCESS MIDSTREAM HIGHWAY 219 - JEFFERSON CO., OH74203 - DOMINION ENERGY TRANSMISSION, INC - CLARKS MILL ROAD, JEFFE

Page 39 of 45

Page 40: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

In addition, if isolation is necessary, worst case scenarios are as follows:

A.Customers sourcing gas from meters South of Colerain Station, including TE's Mainline delivering to meters North of Colerain Station, including deliveries to NEXUS, will be reduced to 0 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services.

B.Customers sourcing gas from North of Salineville Station, including NEXUS for deliveries to meters South of Salineville, including TE's mainline, will be reduced to 0 Dth/d. Depending on the level of nominated quantities, restrictions are possible for interruptible, secondary services and primary firm services.

Kosciusko to Egypt 30" Line 15Cleaner Tool Runs: CompleteILI Tool Runs: CompletePotential Repairs Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on its Kosciusko to Egypt 30" Line 15.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the Egypt to Barton compressor stations. As a result, the capacity through the Barton compressor station will be approximately 1,350,000 Dth/d until complete ILI results are received, fully analyzed and any anomalies are remediated.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

73219 - FINA - GEORGIA PACIFIC #1, OKTIBBEHA CO., MS73256 - FINA - LOVE HILL GATHERING - OKTIBBEHA CO., MS

Based on historical nominations TE doesn't anticipate restrictions at this time. However, if flow patterns change, restrictions may be required, for interruptible and secondary services.

***West Monroe to Providence 20" Line 26ILI Tool Runs: CompletePotential Repairs Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on its West Monroe to Providence 20" Line 26.

As previously posted, a temporary pressure reduction will be in place for the portion of the TE system between the West Monroe to Providence compressor stations. As a result, the capacity through the West Monroe compressor station will be approximately 208,000 Dth/d until complete ILI results are received, fully analyzed and any anomalies are remediated.

Due to the results of the ILI tool run, TE has determined that further detail investigations are required. As a result, TE will be required to reduce pressure on Line 26 between the West Monroe to Providence compressor stations while TE conducts these detail investigations. This pressure reduction will result in capacity through West Monroe compressor station as follows:

Reduced to ApproximatelyJanuary 13 - February 2230,000 Dth/d

Page 40 of 45

Page 41: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Depending on the results of these further detailed investigations, the following meters may be unavailable for flow:

71000 - GULF SOUTH PIPELINE COMPANY, LP - WEST MONROE, LA (RECEIPT72568 - ENABLE GAS TRANSMISSION WEST MONROE, LA72614 - TRANSOK - OUACHITA PSH., LA

Based on historical nominations TE anticipates restrictions for interruptible and secondary services.

***Wheelersburg to Owingsville 30" Line 25Caliper & ILI Tool Runs: January 21Potential Repair Beginning On: February 21Potential Run Comp Beginning On: March 28

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Wheelersburg to Owingsville 30" Line 25.

During these tool runs, TE will be required to lower north to south capacity through stations on the 30 inch line will be reduced as follows:

Reduced to approximatelyBerne 30" South1,357,000 Dth /dDanville South 1,173,000 Dth/dTompkinsville South 966,000 Dth /d

Additionally, based on historical north to south nominations, TE anticipates restrictions for interruptible, secondary out of path, secondary in path and potentially primary firm nominations flowing north to south through Berne, Danville and Tompkinsville.

Uniontown to Market Area (M3):

Chester Junction to EOL 14"/16" Line 1ACaliper & ILI Tool Runs: TBD (1st Quarter)Potential Repair Dates: TBD (Anticipated ILI report in conjunction with April 28 planned line outage)

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on the Chester Junction to EOL 14"/16" Line 1A.

During the ILI tool runs, the following meters will be unavailable for flow:

72930 - PECO ENERGY - EDDYSTONE, DELAWARE CO., PA 73060 - PGW - HARKNESS POINT - PHILADELPHIA, PA73127 - PAULSBORO REFINERY73318 - LIBERTY ELEC-DEL.PA.

Page 41 of 45

Page 42: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

During this ILI tool run, the following meters will be needed to flow:

70030 - PHILADELPHIA GAS WORKS - POINT BREEZE,PA71682 - PHILADELPHIA GAS WORKS PENROSE (EASTWICK)-PHILADELPHIA, PA72649 - SUN R&M - PHILADELPHIA CO., PA

Depending on the results of the ILI Tool runs and if further detailed investigations are required, the following meters may experience lower than normal pressures or be unavailable for flow:

70030 - PHILADELPHIA GAS WORKS - POINT BREEZE,PA71682 - PHILADELPHIA GAS WORKS PENROSE (EASTWICK)-PHILADELPHIA, PA72649 - SUN R&M - PHILADELPHIA CO., PA72930 - PECO ENERGY - EDDYSTONE, DELAWARE CO., PA 73060 - PGW - HARKNESS POINT - PHILADELPHIA, PA73127 - PAULSBORO REFINERY73318 - LIBERTY ELEC-DEL.PA. - (73318)

In addition, TE will work with downstream point operators to minimize operational impact.

Chester Junction to EOL 14"/16" Line 1A: April 28, 2020 - May 19, 2020 (approximately 3 weeks)

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting pipeline isolation on 14"/16" Line 1A between Chester Junction to EOL.

During this isolation, the following meters will be unavailable for flow:

70030 - PHILADELPHIA GAS WORKS - POINT BREEZE,PA71682 - PHILADELPHIA GAS WORKS PENROSE (EASTWICK)-PHILADELPHIA, PA72649 - SUN R&M - PHILADELPHIA CO., PA72930 - PECO ENERGY - EDDYSTONE, DELAWARE CO., PA 73060 - PGW - HARKNESS POINT - PHILADELPHIA, PA73127 - PAULSBORO REFINERY73318 - LIBERTY ELEC-DEL.PA.

Eagle Station to Linden Station 20" Line 1: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 20" Line 1 between Eagle to Linden stations. TE will be adjusting its operating pressure on 20" Line 1 to accommodate these investigations.

Additionally, until these detailed investigations are fully analyzed and any anomalies are remediated, capacity through Marietta to Linden stations will be as follows:

Winter- Reduced to approximatelyLambertville2,406,000 Dth/dLinden1,983,000 Dth/d

TE requests that customers/point operators between Marietta to Chester Junction 20" Line 1A and Chester Junction Line 1A1 be aware of the impact non-ratable hourly takes from the system may have in causing delivery pressures reaching lower than desired levels. To the extent feasible, TE will work with point operators to minimize operational impact.

Page 42 of 45

Page 43: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Based on historical nominations TE anticipates restrictions for interruptible, secondary and potentially primary firm services.

Linden to EOL 12" Line 1-D and 10" Line 1-D-3: August 29 - TBD

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Program, TE will be conducting further investigations on 12" Line 1-D and 10" Line 1-D-3 between Linden to EOL station. TE will be adjusting its operating pressure on 12" Line 1-D and 10" Line 1-D-3 to accommodate these investigations.

Please refer to the TETLP Customer Overview Gas Operations document (page 7) for the latest information on the status of these detailed investigations and capacities associated with the pressure restrictions.

Additionally, if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

70066 - PUBLIC SERVICE - SEWAREN, NJ71075 - ELIZABETHTOWN GAS COMPANY - PERTH AMBOY, NJ

Holbrook to Uniontown 30" Line 15 Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: Under ReviewPotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE has conducted in-line inspection tool runs on Holbrook to Uniontown 30" Line 15.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73402 - GREAT LAKES (VOYTEK) ENERGY INTERCONNECT-FAYETTE CO., PA

Lambertville to Linden Line 24" 20B:Pipeline Outage Dates: CompleteCaliper and ILI Tool Run: CompletePotential Repair Beginning On: CompletePotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be a conducting in-line inspection tool run on Lambertville to Linden Line 24" 20-B.

Depending on the results of the ILI Tool run and if further detailed investigations are required, worst case scenarios are as follows:

1.The following meter may unavailable for flow:

73062 - ELIZABETHTOWN GAS COMPANY - UNION CO., NJ

2.Net receipts into TE may be restricted to a low of approximately 350,000 Dth /d cumulative from Page 43 of 45

Page 44: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

interconnects with Algonquin Gas Transmission, which includes receipts on the TE/AGT Lease.

70087 - ALGONQUIN - LAMBERTVILLE, NJ76087 - ALGONQUIN - LAMBERTVILLE, NJ (RECEIPT)71078 - ALGONQUIN - HANOVER, NJ78200 - AGT Mainline (NJ-NY) 78201 - MAHWAH78214 - RAMAPO

Holbrook to Uniontown 30" Line 25 Caliper & ILI Tool Runs: CompletePotential Repair Beginning On: CompletePotential Run Comp Repair Beginning On: Under Review

To comply with the applicable regulatory requirements associated with TE's ongoing DOT Pipeline Integrity Project, TE will be conducting in-line inspection tool runs on Holbrook to Uniontown 30" Line 25.

Depending on the results of the ILI tool runs and if further detailed investigations are required, the following meter may experience lower than normal pressures or be unavailable for flow:

73808 - DOMINION ENERGY TRANSMISSION, INC - CRAYNE II, RT 188 GR

*Please refer to the TE 2019 Planned Outages Schedule PDF attachment for a complete list of tool runs.

As a result of prior DOT mandated investigations, the following locations have been identified as requiring additional evaluation which may require a reduction of capacity. Should any of these investigations lead to a reduction of capacity, TE will post on the bulletin board as soon as it is known:

Armagh to Lilly (Line 12)Athens to Berne (Line 15)Atlanta to Hope (Line 1)Batesville to Lebanon (Line 1)Barton to Mt. Pleasant (Line 10)Barton to Mt. Pleasant (Line 15)Barton to Mt. Pleasant (Line 25)Bechtelsville to Lambertville (Line 19)Berne to Holbrook (Line 10)Berne to Holbrook (Line 15)Berne to Holbrook (Line 25)Berne to Holbrook (Line 30)Bernville to Bechtelsville (Line 12)Bernville to Bechtelsville (Line 27)Bernville to Lambertville (Line 19)Blessing to Angleton (Line 16)*Chester Junction to EOLN (Line 1-A)Danville to Owingsville (Line 10)Delmont to Armagh (Line 12)

Page 44 of 45

Page 45: Texas Eastern Transmission, LP · 2020-03-02 · Below is a list of major outages known to date that will affect capacity or that impact major receipt/delivery areas on the Texas

Delmont to Armagh (Line 19)Delmont to Armagh (Line 27 Aux)*Eagle to Chester Junction (Line 1-A)Eagle to Lambertville (Line 1)Eagle to Lambertville (Line 2)Egypt to Barton (Line 10)Egypt to Barton (Line 25 - Sec 1)Entriken to Perulack (Line 12)French Lick to Seymour (Line 1)Gladeville to Tompkinsville (Line 10)Gladeville to Tompkinsville (Line 15)Grantville to Bernville (Line 12)Grantville to Bernville (Line 19)Holbrook to Uniontown (Line 15)Karon to Charco (Line 22)Kosciusko to Egypt (Line 15)Kosciusko to Egypt (Line 25)Lambertville to Linden (Line 1) Lick Creek to Norris City (Line 1)Lilly to Entriken (Line 12)Lilly to Entriken (Line 19)*Linden to EOLN (Line 1-D)*Linden to EOL (Line 38)*Linden to EOLN (Line 20)Marietta to Eagle (Line 1)Mt. Pleasant to Gladeville (Line 10)Owingsville to Wheelersburg (Line 10)Perulack to Shermansdale ( Line 12)Perulack to Shermansdale ( Line 19)Perulack to Shermansdale (Line 27)*Santa Fe to Mexico (Line 16)Seymour to Batesville (Line 1)Shermansdale to Grantville (Line 12)Shermansdale to Grantville (Line 19)Shermansdale to Grantville (Line 27)Somerset to Summerfield (Line 3 - Sec 1)Somerset to Summerfield (Line 65)Tompkinsville to Danville (Line 10)Tompkinsville to Danville (Line 15)Uniontown to Delmont (Line 9)Uniontown to Delmont (Line 29)Uniontown to Delmont (Line 39)Wheelersburg to Athens (Line 15)Wheelersburg to Athens (Line 25)

Download File: TE 2019 Planned Outages Schedule Version 64.pdf

Page 45 of 45