TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information ompiled by: ....Jonas Wennström........................... details: [email protected]............................ Project Title Norra länken (the Northern Link) Location Northern part of Stockholm cite centre, Sweden Purpose The purpose of the project is to create a new link for the E20 motorway from the E4 motorway “Essingeleden” in north west to Värtan in the north east. This will improve the accessibility for Lidingö and open up for new urban developments in “Norra Djurgårdsstaden”. Norra Länken is also a prerequisite for the development of “Norra Stationsområdet” in the western parts. When finished, it will relieve the traffic load in the city centre [ME]. Scope The project includes the original plan of “Norra länken” with a connection only between Norrtull-Värtan but also the extension of the project to include the overdecking for “Norra Stationsområdet”. The project consists of rock and concrete tunnels and traffic facilities in connection to the tunnels. Contractual Framework Mixed between design, design-build and build contracts. In total it is planned to consist of 62 contracts [STATN] [STAE]. Relevant Physical Dimensions The length of the main tunnels will be 5 km of which 1 km was constructed twenty years ago. In total it will be11 km of road tunnels, of which 9 km is rock tunnels and 2 is concrete SECTION 1 - BASIC PROJECT INFORMATION

Upload: phillip-knight

Post on 29-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

TEST VERSIONONLY

MEGAPROJECT Case Study

Basic Project Information

Case compiled by: ....Jonas Wennström...........................Contact details: [email protected]............................

Project Title Norra länken (the Northern Link)

Location Northern part of Stockholm cite centre, Sweden

Purpose The purpose of the project is to create a new link for the E20 motorway from the E4 motorway “Essingeleden” in north west to Värtan in the north east. This will improve the accessibility for Lidingö and open up for new urban developments in “Norra Djurgårdsstaden”. Norra Länken is also a prerequisite for the development of “Norra Stationsområdet” in the western parts. When finished, it will relieve the traffic load in the city centre [ME].

Scope The project includes the original plan of “Norra länken” with a connection only between Norrtull-Värtan but also the extension of the project to include the overdecking for “Norra Stationsområdet”. The project consists of rock and concrete tunnels and traffic facilities in connection to the tunnels.

Contractual Framework Mixed between design, design-build and build contracts. In total it is planned to consist of 62 contracts [STATN] [STAE].

Relevant Physical Dimensions

The length of the main tunnels will be 5 km of which 1 km was constructed twenty years ago. In total it will be11 km of road tunnels, of which 9 km is rock tunnels and 2 is concrete tunnels.

SECTION 1 - BASIC PROJECT INFORMATION

Page 2: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

Stakeholder Category Case-Study Comments (e.g. maturity, previous experiences of stakeholders, skills, influence on project)

Internal

Supply-Side Client Swedish Transport Administration (STA)Financiers Värtan - Norrtull

75 %: the Swedish government via the STA.25 %: Stockholm Municipality.

Norrtull – Tomteboda80 %: Stockholm Municipality. 20 %: STA

Sponsors EU funding TEN-T subsidy: €56,15 millionClient’s Customers The public and the road usersClient’s Owners Swedish state.Other internal supply-side categories ( please specify)

Category Case-Study

Demand Side) Principal Contractor STA is responsible for procurement of design, construction and operation contracts [STAFAQ]

First Tier Contractors Design: Sweco, Grontmij, WSP, Bravida Mixed between design, design-build and build contracts

Build: Svevia, Hochtief, Bilfinger Berger, Skanska, Züblin-Pihl, PEAB, Veidekke and OdenIn total, the project is planned to consist of 44+18=62 contracts

Second Tier Consultants

Not known.

Professional Services ProvidersOther internal supply-side categories ( please specify)

Category Case-Study

MEGAPROJECT Stakeholder Identification (Internal)

SECTION 2 - PROJECT STAKEHOLDERS

Page 3: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

Stakeholder Category Case-Study Comments (e.g. maturity, previous experiences of stakeholders, skills, influence on project)

External

Public Regulatory Agencies • Supreme Administrative Court of Sweden• County Administrative Boards of Sweden• Miljödomstolen

Local Government Stockholm Municipality and Solna MunicipalityNational Government Swedish GovernmentOther internal supply-side categories ( please specify)

Category Case-study

Private Local residents Albano, Vasastan, Östermalm,Roslagstull, Gärdet, HjorthagenLocal Landowners N/AEnvironmentalists “Förbundet för Ekoparken”ConservationistsArchaeologistsOther External Private stakeholders (please specify)

Category Case studyKTH, Värtan harbour

MEGAPROJECT Stakeholder Identification (External)

SECTION 2 - PROJECT STAKEHOLDERS

Page 4: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

SECTION 2 -PROJECT STAKEHOLDERS

MEGAPROJECT Stakeholder Relationship Maps

Key: - Project Actor

- Project Relationship

?

Description of relationship

STA (client)

Ministry of

Finance

Swedish parliame

nt

Swedish governm

ent

Finances 75 %Finances 25%

Stockholm

Municipality

Contracts with

WSP

Design

GrontmijRamböll

Build/”Design Build”

Svevia HochtiefSkanskaPEAB Veidekke

Bilfinger-Berger

Züblin-Pihl

Road users

Subcontractors

Subconsultants

MEEC

Supreme

Administrative

Court of Sweden

County Administ

rative Boards

of Sweden

Bravida

62 contracts

Public

Public participationEnvironmentalis

ts

Operation

Page 5: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

SECTION 2 - PROJECT STAKEHOLDERS

MEGAPROJECT External Stakeholder Attitude Analysis

External Stakeholder External Stakeholder’s Attitude to this Project

External Stakeholder’s Influence on project

Impact of Project on External Stakeholder

“Förbundet för Ekoparken”Negative

Concerned of the urban national park, Nationalstadsparken. Appealed against construction in 1997 and 2002. Won in court 1997 which halted the construction ten years and changed construction method.

Hagastaden (association consisting of municipalities institutions)

Positive Development of “Norra Stationsområdet”

Opens the possibility to build “Norra stationsområdet” and expansion of Karolinska Institutet

Svenska vägföreningen (Road association)

Positive

Page 6: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

MEGAPROJECT Project ManagementProject Organisation

Client Project Team Size & Structure

Contractor Project Team Size and Structure

800 people at maximum [STAA]

Sub-Contractor Project Team Involvement

Project Tools and TechniquesPlease √ if present, x if absent , leave blank if unknown

Life-Cycle Costing Approaches □

Stakeholder Involvement □Y[VV05]

Building Information Modelling (BIM) □Y[BIM]

Project Management Software □Y

Relationship Management Tools □

Project Knowledge Management Tools □

Lessons Learnt Transfers □

Team Building Tools □

Competency framework □Other Tools and Techniques or More InformationFor the design procurements , requirement of all drawings should be presented in 3D based on experiences from the Southern Link project [3DP] .

SECTION 3 - PROJECT MANAGEMENT

Page 7: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

Risk Management Processes Present (describe below) □Not Present □ No Information □

HR Management Processes Present (describe below) □Not Present □ No Information □

Procurement Management Processes Present (describe below) □Not Present □ No Information □

Integration Management Processes Present (describe below) □Not Present □ No Information □

Scope Management Processes Present (describe below) □Not Present □ No Information □

Time Management Processes Present (describe below) □Not Present □ No Information □

Cost Management Processes Present (describe below) □Not Present □ No Information □

Quality management Processes Present (describe below) □Not Present □ No Information □

Communications Management Processes

Present (describe below) □Not Present □ No Information □

Project Processes

SECTION 3 - PROJECT MANAGEMENT

Page 8: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

MEGAPROJECT Project Performance

Aspects of Performance Concerned with Doing the Project Right

Original Targets and changes to targets

Actual Achievements Against Targets

Performance relating to time If only the project in its current form is considered, the tunnels between Norrtull and Värtan should be open for traffic in 2015 [STAFAQ]. Norrtull to Tomteboda is planned for 2015 and 2017. Railway tunnel for Värtabanan in 2019 [STATN]. Procurements of all contracts have been planned in[VV05] .

In current form, no major construction delays have been reported. Some delays have been reported in the early stages. However, in 2010 was the project on, or ahead of schedule [IN10] . A breakthrough of finishing a continuous tunnel was accomplished in November 2011 [IN]. Procurement plans and written contracts have been mostly followed [STAE].

Performance relating to cost Original stretch between Norrtull and Värtan: 11 billion SEK [STAA]“Norra stationsområdet “ added in 2010: 5,6 billion SEK [STATN]

To be done

Performance related to

achieving specificationOverdecking of the E4 motorway for the development of “Norra stationsområdet” was added in 2010. Included was also widening of roads to add extra capacity and a tunnel for Värtabanan.

Contracts written in 2010. Construction has begun.

SECTION 4 - PROJECT PERFORMANCE

Page 9: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

Aspects of Performance Concerned with Doing the Right Project

Stakeholder or Stakeholder Grouping

Original Aims of Project Involvement and Changes to these

Aims

Achievement of these Aims

SECTION 4 - PROJECT PERFORMANCE

Page 10: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

MEGAPROJECT Project Environment

Legal and Regulatory Environment

Legal and Regulatory Project Environment (regionally, nationally and Europe wide)

In Sweden are road constructions regulated by the “Road Act”. This law specify , for example, how the formal planning process should be accomplished, land owner rights, right of way and responsibilities [RA].Plan & bygglagen regulates planning and zoning of land developments for municipalities.The Environmental Code include laws regarding planning, EIA’s, public participation.Included are also laws regulating national parks, which in this case the tunnel between Norrtull and Värtan will mostly go under. [EC]

Specific Legal and Regulatory events impacting on the project

In 2009, the government gave acceptance to construct the concrete tunnel near Bellevue park with a more traditional method. This by changing a paragraph in the Environmental Code for allowance of temporary works in national parks. This was estimated to reduce the cost with around 1 billion SEK [BV09].

Political Environment

Political Project Environment

Specific Political Events impacting on the project

SECTION 5 - PROJECT ENVIRONMENT

Page 11: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

MEGAPROJECT Project Environment

Economic Environment

Economic Project Environment

2007 -2008 – Economic boom, difficulties to find labour2008-2009 global recession

Specific Economic Events impacting on the project

SECTION 5 - PROJECT ENVIRONMENT

Page 12: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

Eve

nts

in

pro

ject

Eve

nts

in

e

nvi

ron

me

nt

MEGAPROJECT Project Key Events and Activities TimelineTIME

SECTION 6 - PROJECT TIMELINE

60’s

Ring road discussions

1991

Completion of Karlberg -

Norrtull

Aug 1996

Start of

rock tunnel construction

Project halt

Jan 1997

2007

Events before current development

2008 2009 2010

Current development

20062005

Design & Procure.

NL11 : Skanska

2011

NL12 : PEAB

NL22 : BBNL31 : Züblin

NL33 : Veidekke

NL34 : Veidekke

NL35 : Hochtief & Oden

Political acceptance

NL51 : Hochtief & Oden

NL41 : PEAB

NL62 : Veidekke

NL52 : Skanska

N66 : TE AB

N67 : Bravida

N68 : Bravida

N69 : Läckeby

N72 : Bravida

Working tunnels

Appeal against project rejected, full

project legally accepted

Change in the ”Environmental Code” regarding temporary

works in National Parks

Extension of project with”Norra stationsområdet”

Breakthrough in tunnel boring

Contracting

Hard to find labour [REF?] Economic recession

Page 13: TEST VERSION ONLY TEST VERSION ONLY MEGAPROJECT Case Study Basic Project Information Case compiled by:....Jonas Wennström........................... Contact

TEST VERSIONONLY

References•[STAFAQ] Trafikverket: Frågor och svar. http://www.trafikverket.se/Privat/Projekt/Stockholm/E20-norra-lanken/Fragor-och-svar/•[ME] Genomslaget klart - asfalteringen börjar http://www.me.se/Tidning/Branschnytt/20111/Nomvember/Genomslaget-klart---asfalteringen-borjar/•[IN] Genomslag för Norra Länken. Infrastrukturnyheter. http://www.infrastrukturnyheter.se/2011/12/genomslag-i-norra-l-nken•[3D] ”Väg- och vattenbyggaren”. Volume 4. 2006•[BIM] Trafikverket. Stefan Engdahl.•[VV05]. Norrtullsområdet. Vägverket. 2005.•[GA] Startklart för Norra länken, Svenska Dagbladet 6 april 2006•[BV09] Byggare kan börja gräva för Norra länken. 2009. http://www.byggvarlden.se/nyheter/byggprojekt/article87866.ece•[RA] The Road Act SFS 1971:948. http://www.notisum.se/rnp/sls/lag/19710948.htm•[EC] The Environmental Code 1998:808•[STATN] http://www.trafikverket.se/Privat/Projekt/Stockholm/E20-norra-lanken/Delprojekt-i-Norra-lanken/Tomteboda--Karlberg/•[STAE] Entreprenader, tecknade kontrakt. http://www.trafikverket.se/Privat/Projekt/Stockholm/E20-norra-lanken/Om-projektet/Entreprenader-Tecknade-kontrakt/•[STAA] http://www.trafikverket.se/Privat/Projekt/Stockholm/E20-norra-lanken/Om-projektet/•[3DP] 3D-projektering – framtiden i vägbyggnadssektorn? . Rasmus Regnstrand. Master thesis. 2011.•[IN10] Snabbt driv i Norra länken. Infrastrukturnyheter. http://www.infrastrukturnyheter.se/2010/02/snabbt-driv-i-norra-lanken