  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    1/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    P R E - C O M M IS S IO N I N G T E S T R E P O R T

    TRANSFORMER 01

    Name of the Client : DESH ENERGYLTD.

    Job Description : 35 MVA, 11/132 KV, 3-phase, 50Hz, Power Transformer

    Preference Standard : BS-171, IEC-76

    Test Performed by : Engr. Rashiduzzaman Bulbul (Asstt. Engr., XFR, Testing)Engr. Mamun Biswas (Asstt. Engr., XFR, R&D)

    Reviewed By : Engr. Faruk Hannan Raju (Sr. Engr., R&D)

    Testing Duration : 08/12/2010 - 09/12/2010

    Date of Issue :

    Remarks

    Test results are in conformance with contractual requirements.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 1 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    2/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    C O N T E N T S

    1 PHYSICAL INSPECTIONS

    1.1 Inspection for Transformer condition on arrival at site

    1.2 Inspection for Transformer Accessories

    2. T E S T I T E M S

    2.1 Magnetic Balance test2.2 Measurement of excitation current

    2.3 Vector group test

    2.4 Measurement of voltage ratio

    2.5 Measurement of winding insulation resistance

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 2 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    3/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    1.1 Inspection for Transformer Condition on arrival at site

    1. Explanation and criteria

    1.1. Check for Damage: check the state of damage if the Transformer was dropped accidentally,

    or reinforcement o& piping were distorted.

    1.2. Rust : when the painting is damaged or the metal parts are rusted, remove the rust with sand

    paper and coat with the appropriate paint.

    1.3. Bolts & Nuts: check weather the bolts & Nuts are loosened or not.

    Note: for any serious damaged the matter should be immediately informed to Energypac

    Engineering Ltd.

    2. Checking Result

    Check Item Date Results Remarks

    External Damage 08/12/2010 None Good

    Rust 08/12/2010 None Good

    Bolts & Nuts 08/12/2010 Tightened Good

    Oil leakage 08/12/2010 none Good

    RESULT : Satisfactory_______

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 3 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    4/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    1.2 Transformer Rating Sheet

    Apparatus : 35 MVA, 11/132 kV Transformer

    Voltage ratio : 11/132 kV

    Number of Phase(s) : 3 (Three)

    Rated Frequency : 50 Hz

    Vector Group : YNd1

    Type of Cooling : ONAN / ONAF

    Tapping Range : + 10 % to 20 % in steps of 1.25 % provided onHV winding.

    Type of Tap Changer : ON-Load Tap Changer

    Winding Designation : HV LV

    Terminal Notation : A B C N a b c

    Rated Capacity in MVA

    ONAF : 35

    Connections : Star Delta

    Rated Voltage (in kV) : 132 11Rated Current (in Ampere) :

    ONAF : 153.1 1837

    Insulation level (in kV)

    HV Winding : LI 650 kV, AC 275 kV

    HV-N Winding : LI 325 kV, AC 140 kV

    LV W inding : LI 75 kV, AC 28 kV

    LV Voltage : 11000 Volts in all Tap Positions.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 4 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    5/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    1.3 Visual check of accessories

    Name of accessories Result Date

    High voltage line bushing (A Phase) GOOD 08/12/2010

    High voltage line bushing (B Phase) GOOD 08/12/2010

    High voltage line bushing (C Phase) GOOD 08/12/2010

    Neutral bushing GOOD 08/12/2010

    Low voltage bushing (a phase) GOOD 08/12/2010

    Low voltage bushing (b phase) GOOD 08/12/2010

    Low voltage bushing (c phase) GOOD 08/12/2010Radiators GOOD 08/12/2010

    Conservator GOOD 08/12/2010

    Cooling fan GOOD 08/12/2010

    Valves GOOD 08/12/2010

    Oil level indicator for OLTC GOOD 08/12/2010

    Buchholz relay GOOD 08/12/2010

    Dehydrating breather GOOD 08/12/2010

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 5 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    6/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    TEST ITEMS

    2.1 Magnetic Balance Test

    PROCEDURE:

    The following procedures are followed during magnetic balance check:1) Single phase supply (220v) is applied across one phase.

    2) Voltage is measured from the other two phase.

    For A-phase, when single phase voltage is applied in A-phase, flux A is produced. A will induce flux

    B and C phase and for this,voltage will be generated at B & C phase.

    A c

    So,

    A =B + C.OR, NIA/RA =NIB/RB +NIC/RC

    As Rc > RB , c < B.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 6 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    7/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    So voltage induced in the C phase must be less than the voltage induced in phase B.

    That is, VBN > VCN. Criteria 1.

    For a balance 3 phase circuit,

    VAN + VBN + VCN = 0

    VAN = -( VBN + VCN)criteria 2.

    So the sum of the voltage induced on the two phases should be almost equal to the applied voltage on the

    3rd phase.

    PHASE C:

    THE SAME RESULT WILL BE OBTAINED WHILE APPLYING VOLTAGE IN THE C-

    PHASE.

    For C-phase,

    VcN= -( VBN + VAN).

    PHASE B:

    FOR B-phase, as B is the middle phase, the flux induced by B, will be equally divided and A &

    C phase will be induced equally. So,

    B =C + A.OR, NIB/RB =NIC/RC +NIA/RA

    Accordingly, VBN= -( VCN + VAN).

    The above theory is verified in the test results given on the next page.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 7 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    8/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    MAGNETIC BALANCE (TEST DATA) :

    a) Input Voltage in = 234 V

    Voltage across < N-B > = 182 V

    Voltage across < N-C > = 52 V

    b) Input Voltage in < N - B > = 234 VVoltage across < N-A > = 62 V

    Voltage across < N-C > = 175 V

    c) Input Voltage in < N - C > = 238 VVoltage across < N-A > = 18 V

    Voltage across < N-B > = 221 V

    From the test data, the magnetic circuit is confirmed as a balanced circuit.

    Result: ___________Magnetic circuit is well balanced_________

    ** Voltage measured by FLUKE-189Digital Meter, manufactured by FLUKE,USA.

    ** Current measured by KYORITSU-2431 milli amps Meter, by kyoritsu, japan.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 8 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    9/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    2.2 Measurement of Excitation current

    3-phase Supply from HV side

    Measured Voltage A-B : 407 V, Measured current : IA = 5.6 mA

    Measured Voltage B-C : 409 V, Measured current : IB = 2.4 mA

    Measured Voltage C-A : 409 V, Measured current : IC = 4.03 mA

    Result: Excitation current is on normal magnitude & Balanced

    ** Voltage measured by FLUKE-189Digital Meter, manufactured by FLUKE,USA

    ** Current measured by KYORITSU-2431 milli amps Meter, by kyoritsu, japan.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 9 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    10/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    2.3 Vector Group Test

    PROCEDURE:

    There are few method of testing of vector group of a particular powerType equation

    here.transformer. Among those one is to assume a vector group first and then perform the test

    accordingly. If the test result matches the assumption then the vector group is proved. If it doesnt then a

    new assumption is made.

    The vector group of 30/35-11 transformer is found as YNd1 in the name plate. So we

    assume that the vector group is YNd1 and then perform the following test.

    Step 1: 3 phase supply is applied on the HT side.

    A

    a

    c

    C b B

    Step 2: C and c is shorted. Then the vector diagram turns into the following:

    A

    a

    c,C B

    b

    Vectorially. Voltage of Aa=Bb=Ba

    And Ab is greater than all other voltage.

    So. Ab> Aa=Ba=Bb..(1)

    Step 3: measurement is performed to record the magnitude of Ab,Aa,Ba,Bb, comparison is done

    according to 1.

    The above procedures are followed below:

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 10 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    11/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    TEST DATA:

    Terminals Cand c shorted together.

    Voltage applied across the terminals A-B- C = 410V, AC

    Voltage measured across : Terminal A b = 414 V

    TerminalA a = 374 V

    TerminalBb = 376 V

    TerminalB a = 375 V

    As the terminal voltage across Bb = A a =B a and A-b> Voltage acrossAll OtherTerminals,

    The Vector Group Test is confirmed as YNd1.

    Result: _____________Vector group is ok____

    ** Voltage measured by FLUKE-189Digital Meter, manufactured by FLUKE,USA.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 11 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    12/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    2.4 Measurement of voltage ratio

    Tap

    Position

    HT

    Voltage

    LT

    Voltage

    ACTUAL

    RATIO

    Measured RATIO

    Phase-A Phase-B Phase-C

    1 145200 11000 7.621 7.659 7.652 7.650

    2 143550 11000 7.534 7.570 7.564 7.564

    3 141900 11000 7.447 7.482 7.475 7.475

    4 140250 11000 7.361 7.393 7.387 7.388

    5 138600 11000 7.274 7.306 7.298 7.299

    6 136950 11000 7.188 7.215 7.211 7.2107 135300 11000 7.101 7.128 7.123 7.122

    8 133650 11000 7.014 7.035 7.034 7.034

    9 132000 11000 6.928 6.951 6.946 6.945

    10 130350 11000 6.841 6.862 6.857 6.856

    11 128700 11000 6.754 6.773 6.769 6.769

    12 127050 11000 6.668 6.685 6.680 6.681

    13 125400 11000 6.581 6.598 6.592 6.592

    14 123750 11000 6.495 6.509 6.503 6.504

    15 122100 11000 6.408 6.420 6.416 6.416

    16 120450 11000 6.321 6.332 6.328 6.32817 118800 11000 6.235 6.244 6.239 6.239

    18 117150 11000 6.148 6.155 6.151 6.151

    19 115500 11000 6.062 6.068 6.063 6.064

    20 113850 11000 5.975 5.979 5.976 5.975

    21 112200 11000 5.888 5.891 5.888 5.887

    22 110550 11000 5.802 5.803 5.798 5.797

    23 108900 11000 5.715 5.714 5.710 5.710

    24 107250 11000 5.629 5.627 5.622 5.622

    25 105600 11000 5.542 5.538 5.534 5.534

    Remarks: The voltage ration between HT & LT side of the transformer for every TAP POSITION isOK. The vector group of this transformer is YNd1

    ** Measured by Vanguard Turn Ratio Meter (Model: ATRT-03, S/N-18661)

    Manufactured by Vanguard Instrument Co., Inc.

    ** Calibrated by Cali-Labs Pv. Ltd., Bhopal, India

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 12 of 13

  • 8/3/2019 Test Report PRE ing DESH ENERGY TR 01

    13/13

    ENERGYPACR

    E N E R G Y P A C E N G I N E E R I N G L T D.

    DEPARTMENT OF RESEARCH & DEVELOPMENT

    REF : EELF/TR- DESH- 35 MVA

    REV : 00

    DA TE : 12 / 12 /2010

    2.5 Measurement of winding Insulation Resistance

    Test Voltage = 5kVMean Transformer Oil Temperature = 30 C

    Measured

    After

    Insulation Resistance (Giga Ohms) Remarks

    HV E LV E HV LV

    15 Sec. 9.12 4.60 8.35 Good

    60 Sec. 13.10 7.40 11.50 Good

    DAR 1.43 1.60 1.37 Good

    Result:________Satisfactory_______

    ** Insulation Resistance measured by 5kV ElectronicBM !4Mega-ohm Meter & 5 kV Megger

    manufactured by Megger Industries Ltd., England.

    Prepared By Mamun Biswas

    Checked By Faruk Hannan

    Testing Engr. Rashiduzzaman

    Page 13 of 13