tesco cd overview
DESCRIPTION
Casing Drive SystemTRANSCRIPT
Drilling with Casing
“Reduces Cost and Risk”
OVERVIEW
TESCO CASING DRILLING™
Asia Pacific Business Unit
DOUG REID LONNIE WERCHOLUK ANDREW HARRIS
Casing Services Manager Casing Services CASING DRILLING™ Engineer
Office: +62 21725 5454 Office: +65 6333 7500 Office: +65 6333 7502
Mobile: +62 811841151 Mobile: +60 12 327 9612 Mobile: +65 8138 8710 Email: [email protected] Email: [email protected] Email: [email protected]
Outline
• Overview of Tesco Corporation
• What is and Why drill with Casing
• Definition of a good CASING DRILLING™ Candidate
• Available Systems, Commercial Experience
• Overview of Casing Drilling Equipment and operations
• CASING DRILLING™ Project planning
• Case Histories
• Summary / Conclusions
Who Is Tesco?
Tesco Corporation is a global leader in the design, manufacture and service of technology-based solutions for the upstream energy industry. With a strong commitment to creating exceptional value, Tesco is able to leverage in-house research and development to take innovative solutions from concept to commerciality.
Calgary Facility Houston Facility Machining Facility - Calgary
Defining features. . .
Tesco Corporation
• A Service Company with global infrastructure
• Over 1600 employees, operating in 23 Countries
• Pioneer and leader in portable Top Drives, CASING
DRILLING™ , Casing Running Services
• An award winning and strong technology based
organization
– Over 100 Patents/ Patents Pending
– 21 Technical Papers
– World Oil 2002 Next Generation Idea Award
• Unique combination of services that include the
power train from the Top Drive, to Casing Running to
drilling a well with Casing.
DRILLING WITH CASING - A Definition
A rotary drilling process:
• That “cases” the well as it is drilled
• Where the well “casing” is the drillstring
• Where the “casing” provides hydraulic energy and mechanical
force to the cutting structure
CASING DRILLING™
– All BHA’s are tripped through the casing without removing it.
– The BHA can be Rot. drilling assembly, Motor and RSS directional assembly, etc.
– At casing point the BHA is pulled and the casing cemented in place.
A rotary drilling Process…
The ‘Good Candidate’
Wells with Borehole Stability Problems
Wells with significant Lost Circulation
Wells where depleted/ normally pressured zones are encountered
Wells where CASING DRILLING® can eliminate a casing string through
slimming down well design
CASING DRILLING® eliminates problems related to tripping as BHA’s are
trip in/out of the hole inside casing
Utilising a small rig –Single mast, small pumps, Limited Horsepower
CASING DRILLING® Candidate Selection
Available Casing Drilling® Systems
PDC Pilot Bit
Rotary
Steerable
MWD / LWD
Roller Reamer
Under- Reamer
PD Motor
Casing Shoe
Casing Profile
Nipple
Drill Lock
Assembly
Internal
Stabilizers
Casing String
Non Retrievable – Drillable Casing Shoe
+ No rig modification, very easy to implement
+ Can drill out for subsequent casing strings
- Vertical holes only and 1 bit / hole section Directional Retrievable BHA’s –
Level 3 & 4
+ Allows for multiple bit/bha changes
+ Allows directional control, LWD
+ No Rig Modifications Required
- Requires up-front Eng. / planning.
Float Collar
Tesco XCD™ diamond enhanced
CASING DRILLING® Bit
Casing String
designed to drill soft to medium-soft
formations at high rates of penetration
7,500psi UCS
D-exp < 1.0
Levels of CASING DRILLING™ Systems
Complexity
Drilled with disposable bit
Drilled with drillable shoe. i.e. XCD2, EZ Case
Drilled with retrievable assembly
332
37
600
67
Drilled while Coring with Casing 7
26
Directional CASING DRILLING™
Casing Drilled with
Rotary Steerable Tools
CASING DRILLING® Experience
3,000,000 plus feet drilled
Updated May 2009
Reaming Tools – Level 1
Tesco’s Warthog
Casing Reamer
Tesco’s XCD™ 2
Casing Drill
TESCO can provide a selection of
tools best suited to the well bore
conditions to ensure that the
casing string can be run or drilled
to bottom.
XCD™ Drillshoe – Level 2 Drill-ins
• Body made from forged Steel
• Spiralled blades to minimise Vibration
• Premium PDC cutters lead / gauge of blades
• Nose set with TSP diamond cutters
• Coated with high density tungsten carbide
• Fitted with Nozzles for hydraulic optimisation
Formations of up to 7,500psi UCS
Features of the XCD2
5 1/2"Casing
PDC Pilot Bit
Under-Reamer
PD Motor (Bent Housing)
LWD
MWD
Jar
Drill Collar
Torque Anchor
Stop Dogs Axial Lock
Bypass Seal Assembly
Quick Release Connect Top Sub
l
Stabilizer Sub
Level 3
CASING DRILLING™ Retrievable Motor Assembly
Casing Profile Nipple
Casing Shoe
Drill Lock Assembly
Setting and retrieving Overview LEVEL 3 – Drillpipe conveyance
PDC Cutter Design
Type 5 – Dual 13mm Cutter
Type 5 – Underreamers – Design Considerations
• Bit Selection & Rock Strength analysis
• Match Bit / Underreamer cutter
• Include Premium cutters – 13mm / 16mm / 19mm
NOTE: Shell Rocky Mtns USA – 8 1/2” Type 5 formations up to 20,000psi
NOTE: Hess Indonesia – 17 1/2” Type 5 formations up to 30,000psi
Type 5 – 19mm Cutter
Casing Drive System™ Features & Benefits
• DESIGNED FOR CASING DRILLING™
• Fast rig up and rig down!
• Connects directly below the Top Drive
• Adapts to All Top Drives – rig survey req.
• WILL MAKE UP THE CASING – No Tongs!
• Eliminates conventional casing running equipment:
• Allows simultaneous rotation and circulation of casing
• CAN REAM & PERFORM WIPERTRIP WITH THE CASING
Performed 600 jobs in AP – 450 with Premium Conn.
North America extended reach liner record
6,790m (md) with a 1,696m(tvd)
10 ¾” x 9 5/8” L-80 Csg, c/w Hydril 563 connections
Key Success – Ability to rotate the csg to reduce
Frictions
HYDRAULIC ACTUATOR
API 6 5/8” REG RH CONNECTION
STABBING GUIDE
PACKER CUP
TRIP & TORQUE GRAPPLE
LENGTH 10’
Internal Drive Tool
7” – 20”
“Game Changing” technology that makes
Operations Safer
• Eliminates • Stabber in derrick
• Power Tongs
• Traveling Rig Elevators
• Elevated Work Platforms
• Casing Fill-up tools
• Rig Floor hands
• Circulating head
• Reduces
• Risk of Stuck Casing
• Risk of not getting casing to TD
• Well Control Incidents
Fewer Lifts to Rig Floor
- CDS w/ travel frame ready to
lift from the catwalk
- CDS on rotary table for rig up
. Running 9-5/8”Vam Top Casing .
1. Pick Up CDS.
2. Make up CDS to top drive.
3. Place joint in V-door with crane.
4. Hoist Joint with CDS.
1
4
3 2
. Running Casing .
5. Tail in joint.
6. Stab joint.
7. Stab CDS.
8. MU & Tq connection.
5 6
8 7
Uncluttered Floor While Running Casing
Project Selection / Engineering Overview
Project Selection and Planning
Identify fundamental driver
Economics
Review Conventional NPT times vs CASING DRILLING™ Time /
cost benefits
Technical
• Optimize the well plan for CASING DRILLING™
Curvature limitations
Torque and drag
Stress Analysis
Hydraulics
Drilling assembly selection
TESCO CASING DRILLING® ENGINEERING SOFTWARE
Provide complete Engineering review
of CASING DRILLING® well program:
– Casing Design
– Casing Connections
– Bits, Mud, Cementing Programs
– Directional Program
– Hydraulics – Sensitivities ECD/ AV
– Well Control
– Torque and Drag Analysis
– Fatigue
– Buckling and Wear
Overview Well Control – Level 3
CASING DRILLING™ Well Control
Five Scenarios in CDWC where potential for a Kick – Level 3
Drilling, 0n-bottom – BHA locked into casing
Tripping the Dir. BHA on DP – False rotary table
Handling the BHA on surface – False rotary table
Out of hole with BHA, open ended Casing String
Tripping the BHA, with the Casing Hung in wellhead
Detailed plan with all rig personnel as to the correct monitoring of the well,
Mitigations to prevent an influx and Actions to be taken in case of a
Kick.
CDWC - Scenario 1 – Drilling on bottom
Primary Barrier Drilling Mud wt.
Secondary Barrier BOP – Casing Rams Casing Drive System (CDS™) DLA Pack-offs
Float in BHA Competent Shoe
Action to Take (if a kick occurs) Risk Mitigation in Place (to prevent a Kick)
Stop pumps (unless on a connection and the pumps are already stopped) and space out to ensure that a casing
coupling is not across the rams in the BOP’s.
Drilling with sufficient mud wt to prevent an influx. Keep the annulus full, top up on the backside if required
Higher ECD available while CASING DRILLING™ Monitor drain back on every connection Crew to perform Kick Drills
Shut in Well with Annular BOP
Obtain SIDPP & SICP
Kill Well with the Driller’s Method. Note: Will have an SCR with the BHA off bottom
and the DLA engaged as flow goes thru the BHA.
An example…….
TESCO EXPERIENCE WITH
DIRECTIONAL CASING DRILLING
STEERABLE MOTOR FIELD OBSERVATIONS (~50+ directional motor sections drilled)
Directional control dependent on casing size.
•13-3/8” & 9-5/8” & 7” similar to conventional
•Directional control get more difficult with smaller sizes
Wells drilled with inclinations to 90o.
Motor assemblies have a natural build tendency
Dropping angle requires more sliding than building.
Motor selection more critical than for conventional well
• Conventional: 12 ¼” hole => 9-5/8” or 8” motor
• Casing Drilling: 12 ¼” hole => 6.75– 7” motor.
Orientations are achievable / Sliding may require rocking.
No
n-
Mag
MW
D
Mo
tor
Rotary Steerable CASING DRILLING® System
• Same surface equipment as conventional
• Same casing accessories.
• Rotary steerable tool run in pilot hole
below underreamer.
• Mud motor is used to get rpms to bit.
• Eliminates sliding problems, increases
ROP and drills smoother hole.
• Casing Drilled 10 ¾”, 9 5/8”, 7 ¾” and 7”
Motor
Under- reamer
Stabilizers
MWD
RSS
Bit
Casing
Shoe
CASE HISTORIES
Case Study – Offshore QATAR
TESCO’s CASING DRILLINGTM technology, implemented to drill Unstable Shale formation at high inclination. When Conventionally drilled :
• Shale unloads massive amount of cuttings
• Significant hole enlargement seen in caliper logs.
• Multiple incidents BHA’s lost in hole / not get casing to TD
CASING DRILLING™
•Successfully performed CD operations with no safety incidents or issues
•No rig modifications were required
•9-5/8” 47 lb/ft L-80 BTC with MLT™ Rings, casing drilled 2,025 feet
•Drilled with 9-5/8” casing from 28 to 75 - degrees inclination while
making a 26-degree turn utilizing RSS
•Eliminated losses and no stuck pipe
•Drill Pipe retrieval operation
•Drilled a gauged hole with no DHT failure
Mud
Motor
Under- reamer
Stabilizers
MWD
RSS
Bit
Casing
Shoe
Drill-
Lock
Assy.
Case Study – Offshore Indonesia
CASING DRILLINGTM Campaign (1st Two Wells)
• Objective – Eliminate a 20” Casing
• No incidents or accidents during CD campaign
• Drilled 4,206ft with 13 3/8” Casing, losses of 27kbbl/day
• No hole problems were encountered – T & D’s trended
• Directional CD BHA proves ability to steer 13-3/8” Casing
• Retrieved BHA on Drillpipe
• Cemented Csg, pressure test, FIT for 12 ¼” hole section
• Next Well to eliminate 20” Casing ($500k/well)
0
2000
4000
6000
8000
10000
12000
0 10 20 30 40
Drilling Days
Measu
red
Dep
th, ft
First Convent’l Attempt (4/02)
• Lost Well at TD ~ 11,500 ft
• Unable to Trip Out for Casing • Cemented Drill Pipe
• ($ > 1.0 MM) Lost
Second Convent’l Attempt
(11/02) • Lost Circ Caused 7.0” Set Early
• Required 5-1/2” Liner @ 7.0” CP
• Lost Returns at TD ~ 11,600 ft
• Stuck Pipe, Well Kicked, Cmt DP • ($ > 1.5 MM) Lost
CASING DRILLING®
• Slight Seepage Losses
• Set 7” at 8,085 ft • Set 4-1/2” at 11,574 ft
• Delivered Productive Well
Performance - CASING DRILLING®
Saves Well – Apache Tx
Lost Circulation
7” Csg Pt
5-1/2” Liner
Summary / Conclusion
CASING DRILLING® Retrievable System ACHIEVEMENTS
• Safer operations – Well Control , Pipe Handling, etc
• Drilled 500+ wells / 800+ intervals (onshore and offshore)
• 3,000,000+ feet drilled with Casing
• Technology applied fit for purpose on conventional rigs
• Casing sizes 5 1/2" to 13 3/8"
• 90 degrees maximum inclination
• Less stuck pipe with CASING DRILLING than conventional drlg
• Less losses with CASING DRILLING than conventional drlg
• Drilled formations from very soft to hard – PDC drillable
Casing Drilling Conclusion
• Casing Drilling has proven to be feasible.
• Reliability and ROP are essential for economic success
• Good candidates need a specific problem to be addressed by casing drilling.
• Typical 3 well learning curve to capture learnings & optimise
performance