Terry MitchellRoad Warrior for Federal Construction Contracts.

Pontiac, MI [email protected] - 9569493192

To obtain a long term or contract position, in the Construction Mgmt. Area. My expertise is with Federalprograms. Looking for Construction Site Mgr. or Site Supervisor position in the USA.Willing to relocate: AnywhereAuthorized to work in the US for any employer

WORK EXPERIENCE

Site SuperintendentW4 LLC - Pontiac, MI - September 2015 to Present

Short term Contract installing a New Type of Mass Notification Fire Alarm in 3 buildings, at the Great LakesNaval Training. Center .The project will Be ending very Soon. We are currently ahead of schedule, and buyoff is approaching.

Site SuperintendentRio Grande City TX Site Super - Rio Grande City, TX - May 2014 to Present

for an Army Reserve Training Center.

Contracts as a General ContractorBrix Corp - Detroit, MI - September 2013 to February 2014

I've had many years Experience in this Field, mainly complying with the Federal Regulations in the Field,Daily reports, Safety enforcement, Running the Sub-Contractors in a timely fashion, staying on Schedule andkeeping the customer satisfied., Currently in Sturgeon Bay WI for a short term contract.For the Coast Guard.

Supervisor of Make ready for sale. Curb Appeal.Browne Hollar Real Estate - Terrell, TX - May 2013 to September 2013

Misc. Contracts, Clean-out, Repair Re-possessed Homes for FmHA, Fanny-Mae, and other Banking lenders.Using my company, hiring crews as needed.

Upgrade repair Tech.Knight Industries - Detroit, MI - August 2012 to April 2013

Finish Site Installation at General Motors. Inspect New installations, Oversee change orders..Inspect all untilbuy off.

Rep, QCContract, US Army Corp - Sault Ste. Marie, MI - March 2010 to October 2011

of Engineers Sault Ste. Marie MI, Quality Assurance Rep. In Construction and Technical Services. This is atemp. Contract position. I work with the General Contractors on projects at this site. I do daily reports inspectmaterials and work, quality. I enforce Safety practices and the contract. I am the main liaison on the site forthe contractors ( Rep, QC), and safety specialist. I verify labor wages, and payroll report updates. Take photosof the site work and go over problems with our staff.

Site Superintendant

Page 2: Terry-Mitchell Res 8-3-16

Petosky MI - 2008 to 2010

Ran construction sites, ground up builds Comm. And Res. Work with Architects. Safety tool box meetings,verify QA/QC on work and materials. Schedule and do hrs. Pull permits, get inspections stay on schedule,work with owners on hit lists and go thru buy offs.

Site installation MgrSecureusa - Atlanta, GA - 2006 to 2008

Mark Austin supervisor. Position consists of perimeter anti-terrorist installations, including Gates, guard booths,camera systems, crash barriers, and other systems, electric and hydraulic. Over see contractors, work withEngineering and Customers for System control and training. Security Clearance Required.

Project site supervisorZertuche Construction - Laredo, TX - 2004 to 2006

Running several construction projects in the Laredo area. They are mostly city or county projects, fromremodels to new construction. I supervised all sub-contractors and interface with the engineers involved in theprojects. Safety Mgr. Of all projects at Company. OSHA Safety training.

Floor installation SupervisorC&E company - Tyler, TX - 2003 to 2003

contract position) I installed 2 frame assembly lines, including robotics and overhead transfer system. ForDANA corp.(tier one supplier for General Motors),Automotive Frames were for the Hummer 3 at the Shreveport GM plant. . Overhead installation of lift andcarry transfer system. I had a crew from 8 to 22 millwrights. Worked with plant engineering to establish framedimensions. And achieve production run at rate.

Tooling build and installation supervisorPaslin Company - Warren, MI - 1996 to 2002

Establish System layout in Paslin facility, review project with plant project mgr., project engineers and customer.Work out timelines for build timing. Work with team to assemble tooling, system transfer system, and roboticinstallation.Plant layout, installation, and tryout, debug system, dimensional control,run at rate, until total customer approval. Go thru installation process withMechanical, electrical, and manufacturing engineers and work out changes.Supervise all sub contractors, rent equipment needed for the installation. Performed installations in Mexico,Canada, and various states in the USA.

Builder Tooling Citation ToolRio Grande City TX Site Super - 1995 to 1996

Build Machine tooling from blue prints, machine part changes as needed. Interface with customer and designengineers. Point outpotential problems with tooling, such as interferences and errorproofing. Run tooling and robots prove system to customer and discuss changes, possibly for dimensionalcontrol of part interfacing.

Human Resources, project maintenance superintendentLandura Mgmt. Associates - Salem, OR - 1986 to 1995

Safety Committee MGR.I started as a resident mgr. for 60 units apt. Complex. Performed all

Page 3: Terry-Mitchell Res 8-3-16

elect. Plumbing, painting and ground maint. After 1 yr. I was moved to main office as maint. Superintendent,duties included interviewingprospective management teams, training mgrs. on all phases of elect. Plumbing, painting, and grounds maint.as needed.Inspected apt. Complexes for needed maint. Such as re-roofing, dry rotrepair, outside appearance for painting and parking lots. Receivedquotes for repairs and worked with HUD and Fmha for completing repairs.I also formed the company safety policy and organized the safetycommittee as required by the federal regs. (HUD & FmHA).

Many refs. Available upon request in Laredo, Detroit, and Mexico

EDUCATION

Wayne St University - Detroit, MI

Industrial ElectronicsRadio Electronics School - Detroit, MI

SKILLS

Building and Moving Assembly lines to Mexico.

CERTIFICATIONS

Army Corps of Engineers for ContractorsWent to a one week Class.

30 hr OshaStill active

First Aide - AEDNew old one expired.

Competent Person1 Yr old

ADDITIONAL INFORMATION

QUALIFICATIONS:I'm Currently Focusing on Federal Projects, Specialize in Army Corps of Engineers Contracts, I'm Certified byACE in Contractor Administration..I was asst. project super in building an Embassy Suites in Phx. AZ. And really enjoy that type of work also,custom homes and solar experience. I'm skilled at ground up and close out. Custom concrete experience.Read prints and elevation lay out. Fast Track and Design Build. I keep a Clean and Very Safe SiteQuality Control or Quality Assurance is a field I'm well trained in. Manufacturing is rewarding type of work.Building and installing assembly lines is my forte. I've overseen the installation from the plant layout, until thefirst saleable vehicle goes out the door. Tooling, transfer systems and weld lines are my specialty.(I have a letter of recommendation from the General Motors launch Mgr.) Manufacturing facilities, layout-assembly line relocation and installation are strong points. KEYWORDS: PPAP-Run at rate-CCM-Body in

Page 4: Terry-Mitchell Res 8-3-16

white-Vision stations-GEO stations-poke yolk-error proofing. Moving and reinstalling assembly lines from theUSA to Mexico, or the reverse, is a position I'm very Qualified in.