terrestrial facilities and disturbance footprint plan
TRANSCRIPT
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
1/30
BrowseLNGDevelopment
Terrestrial Facilitiesand DisturbanceFootprint Plan
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
2/30
Contents
Dii ad Abbiai .................1
Iduci..............................................3
objci ................................................4
Dii Fi pa .....................5
sakhd Cuai ......................16
Figures
Figu 3.1 lcai ma B lnG
pcic ....................................................6
Figu 3.2 pcic noItt aid
B lnG pcic buday .............7
Figu 3.3 Iidicai tia layu
ad Caig Aa ..................................11
Figu 3.4 Aa A ad B Iidcai
tia layu & Caig Aa ......12
Figu 3.5 Aa A Icudig pia
Idic Iac Z .............................13
Figu 3.6 Aa D Idicai tia
layu & Caig Aa .........................14
Figu 3.7 Aa e Idicai tia
layu ad Caig Aa ......................15
Adix 1: tab 1 miiia
sa 917 .......................................17
Adix 2: Figu 1 miiia
sa 917..........................................26
i
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
3/30
DEFINITIONS AND ABBREVIATIONS
Term Defnition
Area A th p Aa hich cai h si A Diubac Z.
Area B th Hydcab pcig ad C U aa hich cai h si B
Diubac Z.
Area D th Accdai Aa hich cai h si D Diubac Z.
Area E th suh pii Aa hich cai h si e Diubac Z.
Area H th sh Cig Aa b aidd du agica uc.
Browse LNG Downstream
Development
th h lnG cig aciiy ad aciad iaucu u h sa/
Cah a buday.
Contractor th Cay Fi gagd udak dig ad cuci aciii
h ic a cay aciia h B lnG Da D.
Direct Impact Iac hich ha b ad by h w Auaia (wA) mii, hich
u i maia siu eia Ha ihi h Diubac Z.
Disturbance Zone tha z ihi h B lnG pcic hich i b diubd cuci
h B lnG Da D. thi ci Aa A, B, D ad e
Diubac Z.
Indirect Impact Iac hich iay u i maia siu eia Ha uid
h ia Diubac Z.
Ministerial Conditions Cdii by mii ei i miiia sa 917, a a h
aa h pjc, hich a gay bidig wdid ad a i cac.
Potential Indirect
Impact Zone
Aa h idic caig, auhid ihi miiia sa 917, ha
ia ccu.
1
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
4/30
thi da i h tia Faciii adDiubac Fi pa i b ud a a bai cuai ih a akhd i aa i big ubid mii aa, h adic h epA.
2
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
5/30
1 INTRODUCTION
1.1 Description
wdid egy liid, bha h B Jivu paicia; sh D (Auaia) py ld, Bp
D Auaia py ld, Jaa Auaia lnG (mImI
B) py ld, BHp Bii pu (nh w sh)
py ld ad wdid B py ld, cuc
ad a h B lnG Da D (h
Da D) ihi h ad B lnG
pcic i h Kiby gi w Auaia.
o 19 nb 2012 h w Auaia (wA) mii
ei iud a miiia sa (n. 917) aig
h B lnG pcic. th cdii aa (ha a
iky ay uu did a) quid daid
aag a ciyig h aguad, aag ad
iigai au aid igica iac. th quid
a add bh iigai au ha a cidd
c acic h cuci ad ai a
lnG aciiy, ad au digd add ia
iac hich ay u du h cgica
i h Ja pic pi caa aa. th a a
gay bidig h ud h wA a giai.
thi dcu dai h tia Faciii ad Diubac
Fi pa (tFDFp) h B lnG Da
D. I ha b ad id h quid
iai kig aa h a, a dd iCdii 5 miiia sa n.917 ducd b.
5-1The proponent shall not undertake any ground disturbing
activities or commence installation of the terrestrial facilities prior
to having obtained the Ministers approval, on advice of the EPA,
of its Terrestrial Facilities and Disturbance Footprint Plan.
I kig aa h tFDFp, wdid, a , iquid id:
> a a hig h d ia aciii ad
diubac i h d u ad aciii;
> a aia daa;
> cai ha ai gai caig i ihi
h x iib;
> cai ha m vi thick gai
caig i ihi h x iib;
> adic h accabiiy h dig ciia
h B lnG pcic C Gu;
> h tia Bai sa a quid by
cdii 6-1; ad
> idc sakhd cuai.
thi da i h tFDFp i b ud a a bai
cuai ih a akhd i a a i
big ubid mii aa, h adic h
epA. Fig aa, h dcu i i agid h
ky ia dcu aag h ia
ibiii aciad ih iai h B
lnG Da D. I ha b cad a a a
h B lnG Da D eiamaag Fak.
3
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
6/30
2 OBJECTIVES
2.1 Overview
th a bjci h tFDFp i d h a hia aciii ad diubac i h B lnG
Da D a h Ja pic pi caa aa.
th cic bjci h tFDFp, a ad i cdii 5-2
miiia sa n. 917, a id:
i. a a hig h d ia aciii ad
diubac i :
a. h iaucu / cid d ad u
id i tab 1 ( schdu 1 ag 18), ihi
13 ki h buday Aa B, a dicd i
Figu 1 ad dd by cdia i schdu 2;
b. hay iduia ad uig d ad u
id i tab 1, ihi h budai Aa B h
Figu 1 ad dd by h cdia i schdu 2;
c. igh iduia d ad u id i tab 1,
ihi h budai Aa C h Figu 1 ad
dd by h cdia i schdu 2;
d. accdai d ad u, id i
tab 1, ihi h budai Aa D h
Figu 1 ad dd by h cdia i schdu 2;
. h ia c h ii id i tab 1,
ihi h budai Aa e F h Figu 1
ad dd by h cdia i schdu 2; ad. h ia c h Igad mai
Faciiy id i tab 1, ihi h budai Aa
A h Figu 1 ad dd by h cdia i
schdu 2;
ii. aia daa i a a caib ih a Ggahica
Iai sy accab h Ceo;
iii. cai ha h a aa ia ai gai
cad dicy ad idicy a a u h ia
diubac d i h tia Diubac Fi
pa d xcd h x caig ia ai
gai iib h pa a u i tab 1;
i. cai ha h a aa m vi thick(mvt) gai cad dicy ad idicy a a u
h ia diubac d i h tia Faciii
ad Diubac Fi pa d xcd 83 hca
i h iai h udai a xcd
110 hca i h iai ay cbiai
did a;
. h adic h B lnG pcic C Gu ha h
tia Faciii ad Diubac Fi pa h
ig ciia:
a. h d diubac i u ha h
aciii dig b acic adad;
b. h aciii dig iiiz h diubac i
haig gad h iky uu a;
c. h aciii dig id a haig iaucu
ad ic cid ha h diubac i
ad uu a i iiid;
d. h aciii dig h sa d
iaucu haig;
i. h tia Bai sa r quid by Cdii 6-1;
ad
ii. idc ha a akhd, icudig tadiia
o, ha b cud abu h ia aciiiad diubac i; b gi a aab
uiy c ad h hi c ha b
addd.
th tia Bai sa r idicad i cdii 5-2 (i)
i b cidd a ada dcu hich u ad
a h ia dcu quid i
h B lnG Da D. I i icudd
ihi hi dcu.
4
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
7/30
3 DEFINITION OF FOOTPRINT PLAN
3.1 Overview
wdid, a a h d B lnGDa D, a cciai h B
Ji vu h ga ad cda d, Bckck,
Caiac ad ta, 425 k h B h Kiby
ca. Ga ad iquid h d i b xacd uig
h aciii h bugh a h iqud aua
ga aciiy caab cig u 25 ii
au (ma) lnG. th B lnG Da
D cig aciii ad aciad iaucu
i b cad a h w Auaia G B
lnG pcic, a Ja pic pi, abu 60 k h
B i w Auaia (Figure 3.1).
th ia buday h B lnG pcic a
d a Figu 1 miiia sa 917, ad d
i miiia Cdii 5 a did fc h nic
I tak (noItt) iud by h w Auaia
G. Figure 3.2 iua h id cic
budai dd by h noItt ad a iua h
pcic layu a dd i Figu 1 miiia sa
917. th ii accda h xcii Aa H ad a
duci i idh h h cig ad ii cid.
A pcic iaucu i b cd ihi h noItt
buday ad a ih hy caid ihi h cdia
diubac i budai dd i schdu 2
miiia sa 917, a h idiaucu ad cid d, aciii ad u
ihi 13 k h buday Aa B, a dd i
schdu 2 miiia sa 917.
3.2 Vegetation Disturbance Associated with TerrestrialFacilities
3.2.1 Area A (Port Area)
th ia c h p Aa (Aa A)
a cid cc h p Aa h Hay Iduia
Aa (Aa B). th ia caac aciad ih
h iaucu ihi Aa A i xcd b u 81
ha, icudig 47 ha dic mvt caac. th BlnG
Da D ra Dcu id a
xi i iaucu i hi aa. Ky c
ha i icud:
> Igad mai Faciiy (ImF);
> lnG sag tak;
> ai fa;
> ad ad uac daiag;
> cda adig au cy; ad
> ay d aa.
th ia x Aa A ha b iiid ha
hich acicaby a h iiig h ab ciica
iaucu adjac h p Aa hi ig h
xcui diac ad giad ik a
h pcic buday.
5
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
8/30
COULOMB POINT
QUONDONG POINT
CAPE LATREILLE
CAPE BASKERVILLE
JAMES PRICE POINT
Datum: GDA 1994 MGA Zone 51
0 10 20
kilometres
Broom
eCape
Levequ
eRoad
Broome R
oad
ManariRoad
Gre
at
No
rthern
Highw
ay
R o e b u c k B a yR o e b u c k B a y
LOCATION MAP
Western
Australia
BLNG
Precinct
DRIMS-#8497034-v1-4
Broome
Legend
LNG Precinct
Port Precinct
Shipping Channel
Outer Limit of CoastalWaters (3nmiles)
Industrial LandUse Buffer
Sensitive LandUse Buffer
Figure 3.1 Location Map of Browse LNG Precinct
6
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
9/30
A B
D
A
E
C
F
G
H
405000 410000 415000 420000
8045000
8050000
8055000
8060000
8065000
8070000
122150"E122100"E12250"E
17300"S
17350"S
17400"S
BLNG Precinct1
NOITT (DP 72951)
Outer Limit of State Waters (3nm Limit)
INDUSTRIAL BUFFER ZONE (2000m)
SENSITIVE LAND USE B-ZONE (3000m)
Western
Aust rali a
INDIAN
OCEAN
Broome
LOCATION MAP
A
B
C
D
Port Area
Industrial Blocks and Common User Areas
Light Industrial Area
Workers Accomodation
Southern Pipeline Corridor
Northern Pipeline Corridor
Shipping Channel Corridor
Shore Crossing Area to be avoided
E
F
G
H
BLNG Precinct Layout Areas1
NOTES:1. BLNG Precinct Layout Areas are as per Coordinates
of Schedule 2 and Figure 1 of Ministerial Statement 917.DRIMS-#8497034-3_v5
Datum: GDA 1994Projection: MGA Zone 51
0 2 4
kilometres
Figure 3.2 Precinct NOITT overlaid on Browse LNG Precinct boundary (from Figure 1 of Ministerial Statement 917)
7
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
10/30
3.2.2 Area B (Heavy Industrial and Supporting
Developments)
Aa B h ajiy a ia diubac
i h B lnG Da D. Aa
B i back h ca (>1 k) aid iac ii
ia cuii ad hiag i. A a u, i i
iid uid aa mvt, i ii pida hubad.
Hydrocarbon Processing Area
th Hydcab pcig Aa ihi Aa B i cai
hydcab cig, ag ad ad iaucu. th
BlnG Da D ra Dcu id a
xi i a u i hi aa. Ky c ha i
icud:
> cig uiii;
> hydcab cig ai;
> cd dy fa ad a ai fa;
> cda ag;
> ay d;
> ii;
> a a a aciii;
> cc bachig a ad ck cig ad cuhig;
> ad ad daiag; ad
> adiiai buidig.
th ayu h ab aciii i di diay by ay
ad aia cai. Iaucu aai diaca guidd by Fi ad exi Aayi ad Quaiai rik
Aayi, i accdac ih iaia b acic h
ci ad h iiiai caai i h
aj accid . th aay i b d
i h oh say Ca ad id by h Da
mi ad pu. H a dicud ab, h
ajiy h ia iaucu i b cad uid
iay ii aa.
th cd dy ad a ai fa i b a gud
duc iua iac. H hi d u i a ga
qui aa aiai accab aai
diac b ia ga ak ad h igii uc.
th d cig aciii ihi Aa B i b
had i accdac ih quid duci caaciy, u a
uia caaciy 25 a.
Common User Area
wihi Aa B h i b c u aa adjac h
hay iduia aa ihi h pcic. th aa i icud
aciay aciii ad uig iaucu b aaiab
u by ha , a a ia bu
u ha iuau ai ay b udak
axii u aaiab ad hi ig ayqui.
Duig cuci ad ak aia i, xi ay
d caaciy i quid. Caig ay d aa ihi h
c u aa i b gi, ih caig udak
a a quid bai.
Fd aag ad daiag k i b cducd i
h c u aa, i addii ia ad ad -
hydcab ii.
th h diubac gad ihi h iduia bck
ad c u aa by h B lnG Da
D i b 1085 ha.
3.2.3 Area D (Accommodation Area)
th k accdai i b cad xa h
bu ii ad u (ix i ki uh a
h lnG aciii) ad ca a i ca, cuci
ca, ad a accdai duig ai. th
k accdai i c a a ad aa 150 ha.
3.2.4 Area E (Southern Pipeline)
th h uh ii i a a hydcab
h ad -hy gyc (meG) h. t
iii h x ia diubac aciad ih h
ii cid, h d hi cig hdgy
i i ubuac uig ad/ diig a y i
bhid h du a i h. th ii i h
b iad hugh h cuci u / HDD b gud
. B h y i ad h lnG a i, h ii
i b cucd i a ch ad ubquy backd.
th iiia ha d ica
ii (ga, cda, ad meG) ih a aac a
addiia ii u uu xai. Dic caig
aciad ih h ii i axiay 132 ha, icudig
14 ha dic mvt caac. Duig h aia ha, a
a ii iaucu, ih h xci a ub
ici i, i b b gud. A a u, aiy
diubd aa ii iaai i b gad, ih
h xci a acc ack ha i b aiaid
ici u.
3.2.5 Inrastructure and Services Corridors
(within 13km o Area B)
Iaucu uch a:
> Bd (icudig guda, uac a ad
gai iig cai);
> eciciy aii ic cid;
> pii bd pcic;
> Bd acc ad ic ad;
> sic aciii (icudig uiii, cig, i acc
ad ad daiag);
> Fibak.
vgai caig aciad ih iaucu/cid
d i xcd 80ha.
8
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
11/30
3.2.6 Additional Vegetation Disturbances
A aac addiia gai diubac ha b
idd accu ia idic iac, a quid
ud miiia Cdii 5-2 (ii) ad 5-2 (i), a a h
u ia iig qui quid by
G agci.
Ac aciad ih h d ha ay cau
idic iac ai gai i adjac aa icud:
> chag guda gi, icudig guda
ad guda quaiy;
> chag uac a f;
> ad gi;
> ia dichag, icudig -ui dichag; ad
> iduci aua ad fa.
o h ac, chag guda ad uac a
gi a cidd h ga ik idicdiubac ai gai. A ub b acic
au ha b icudd i h B lnG Da
D dig ad aag a, ih aicua
hai iiiig idic iac m vi
thick (mvt).
th d dig guda abaci ad
iig b ha b idid i cuai ih h
Da wa (Dw), uig iai baid
gchica uy ad guda dig. exaci
b a cad dia aa mvt ad a ubjc
a by h Dw ud h righ i wa ad Iigai
Ac 1914, u abaci a d ady iac
h guda u, icudig mvt.
A ggad daiag y ha a b digd h
aia lnG pa, bad h chi cau ad
a iay caiad uac a. th i
a daiag dig ha axiid h cci ad
a ucaiad aia h aua i
i a cd a aiai aua chag aa
mvt, daiag bai gai ad guda. naua
uac a f xiig daiag i i a b
aiaid a a a acica. thi icud h dig h
h cig daiag y a h/uh fbhid h du y. th dig i aiai h aua
f uac a duig yica a aia ,
uig h hah uac a dd gai
ad cuii.
I addii h dig aibu, idic iac caud
by h ab ia ac a aagd hugh
cdua chai duig cuci ad aia
ha h d. th agi aag ach
h ac duig cuci a daid i h tia
Cuci ei maag pga (tCemp) ad
pii sh Cig maag ad miig pga
(psCmmp). each aag agy d i htCemp ha b digd h ig ia
bjci h B lnG Da D
ad i aid h aicua ia iiii
Jpp. th aag aci a ci ih b acic
au yd cay uc jc i
Auaia. th agi aagig h idua ik iac
h ia i duig h aia ha i
b addd i h oai eia maag
pa, hich i b dd i h cc
ai.
A uy igad gai hah, uac a ad
guda iig ga i b id h i
h pjc, cgiig h ih ik b gai
hah ad uac a ad gud a gi. th
iig ga i ag ia idic iac mvt
ad icud igg iiia a adai aag
.
miiia sa 917, cdii 5-4, cib h a
dic ad idic mvt aibuab h udai
u xcd 83ha. I accdac ih hi
qui, h a dic diubac mvt aibuab
h B lnG Da D i 61ha, ah i Figure 3.4, idig a cig 22ha mvt
aciad ih idic iac ihi Aa A ad e ad
abih ia iig i. thi ia
mvt a a u idic iac ad abih
ia iig i i cidd cai akig
i cidai h b acic dig ad aag
au dcibd ab ad h ia iig
ga b id by wdid. Iay, h
i b dic caig mvt byd h dic diubac
aa dcibd i Figure 3.5 ad Figure 3.7, ih h xci
ia iig i a quid by g
agci.
3.3 Defnition o Disturbance Footprint or Terrestrial
Facilities
th h B lnG Da D i
icudig h d ad aciii dcibd i Section
3.2 a axiay 1528 ha. th h ia
i ica Aa A, B, D, e, iaucu/cid
d ad ia idic iac. th agig h
h ia aciii i fc h had achi
h u duci caaciy 25 ma. r Table 3.1
a bakd h ad ia gai caig.
th B lnG Da D ha bdigd i accdac ih h piiay D
Ag b h Da sa D
ad wdid. thi Ag icudd bjci iii
i, axii h uiy haig iaucu
ad u ha bai h y uh
aiai hugh dig.
th ayu, a d, a idicai, ih ia
duig daid dig.
9
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
12/30
Table 3.1 Caig tia nai vgai Ac Dd Aa
Clearing o Terrestrial Vegetation across areas
shown in Figure 3.2
Permissible Area (ha) within
the Browse LNG Precinct
(as defned in Ministerial
Statement 917)
Extent o Vegetation
Disturbance associated with
Browse LNG Downstream
Development oundation
proponent (ha)
Aa A (p Aa ) 110 81
Aa B (Hay Iduia ad suig D) 1 980 1085
Aa C (ligh Iduia D) 200 0
Aa D (Accdai Aa1) 200 150
Aa e (suh pii2) 2503 132
Iaucu/ Cid D ihi 13k Aa B 297 804
Total 3,037 1,528
wihi h a aa iib caig, m vi thick
thad ecgica Cuiy b cad ih dicy
idicy by h iai udai a.
110 83
1 Icud acc ad.
2 Bad HDD.
3 ta x caig ihi bh h suh pii (Aa e) ad nh pii (Aa F).
4 mi ad ad ic cid ad bd.
10
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
13/30
A
B
D
E
F
H
13kmfrom
thebo
undar
y of A
reaB
410,000 415,000 420,000
8,0
55,0
00
8,0
60,0
00
8,0
65,0
00
122130"E122100"E
17280"S
17310"S
17340"S
17370"S
Horizontal Datum: GDA 1994Projection: MGA Zone 51
0 1 2
kilometres
DRIMS-#8563073_1v2
Quondong Point
James Price Point
BLNG Precinct *
Proposed Infrastructure
Phase 1
Phase 2
Land Clearing Requirements
Phase 1 ^
Phase 2
Potential Indirect Impact Zone
Service Corridor with Indicative BoreLocations and Minor Access Roads
NOTES* BLNG Precinct Layout Areas are as per
Coordinates of Schedule 2 and Figure 1 ofMinisterial Statement 917.
^ Clearing undertaken as required
Figure 3.3 Indicative Terrestrial Layout and Clearing Area
11
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
14/30
A
B
COMMON USER CORRIDOR
COMMONUSERAREA
INTEGRATEDMARINE
FACILITY
STORAGE ANDLOADING FLARES
INLETFACILITIES
POWERGENERATION
PROCESSTRAINS
ADMINISTRATIONAND SUPPORTFACILITIES
WATER, EFFLUENTTREATMENTAND UTILITIES
MAIN FLARE
LAYDOWNAREA
E
H
409,000 411,000 413,000 415,000
8,0
62,0
00
8,0
64,0
00
122120"E122110"E122100"E12290"E
17300"S
17310"S
17320"S
Horizontal Datum: GDA 1994Projection: MGA Zone 51
0 250 500
Meters
DRIMS-#8563073_2v2
Quondong Point
James Price Point
NOTES* BLNG Precinct Layout Areas are as per
Coordinates of Schedule 2 and Figure 1 ofMinisterial Statement 917.
^ Clearing undertaken as required
BLNG Precinct *
Proposed Infrastructure
Phase 1
Phase 2
Land Clearing Requirements
Phase 1 ^
Phase 2
Service Corridor with Indicative BoreLocations and Minor Access Roads
Figure 3.4 Area A and B Indicative Terrestrial Layout and Clearing Area
12
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
15/30
A
409,000 410,000 411,000
8,0
64,0
00
8,0
65,0
00
122930"E12290"E122830"E
17300"S
173030"S
Horizontal Datum: GDA 1994Projection: MGA Zone 51
0 100 200
Meters
DRIMS-#8563073_4v2
Quondong Point
James Price Point
BLNG Precinct *
Land Clearing Requirements
Phase 1 ^
Vegetation Type / Structure (Biota 2011)
Drainage basin
Monsoon vine thicket deciduous
Monsoon vine thicket evergreen
NOTES:* BLNG Precinct Layout Areas are as per
Coordinates of Schedule 2 and Figure 1 ofMinisterial Statement 917.
^ Clearing undertaken as required
Figure 3.5 Area A Including Potential Indirect Impact Zone
13
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
16/30
D
415,000 417,000 419,000 421,000
8,0
56,0
00
8,0
58,0
00
122150"E122140"E122130"E122120"E
17340"
S
17350"S
Horizontal Datum: GDA 1994Projection: MGA Zone 51
0 250 500
Meters
DRIMS-#8563073_5v2
Quondong Point
James Price Point
Land Clearing Requirements
Service Corridor with Indicative Bore Locations
and Minor Access Roads
Phase 1 ^
^ NOTE: Clearing undertaken as required
Figure 3.6 Area D Indicative Terrestrial Layout and Clearing Area
14
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
17/30
E
410,000 411,000 412,000
8,0
59,0
00
8,0
60,0
00
122100"E12290"E
17
330"S
Horizontal Datum: GDA 1994Projection: MGA Zone 51
0 100 200
Meters
DRIMS-#8563073_3v2
Quondong Point
James Price Point
^ NOTE: Clearing undertaken as required
Land Clearing Requirements
Phase 1 ^
Phase 2
Potential Indirect Impact ZoneVegetation Type / Structure (Biota 2011)
Drainage basin
Monsoon vine thicket deciduous
Monsoon vine thicket evergreen
Figure 3.7 Area E Indicative Terrestrial Layout and Clearing Area
15
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
18/30
4 STAKEHOLDER CONSULTATION
I accdac ih Cdii 5-2(ii) miiia sa 917, wdid ha cud ih a akhd i kig
aa h tia Faciii ad Diubac Fi pa.
Table 4.1 i h a cuai.
Table 4.1 sakhd Cuai ad ouc
Date Stakeholder Purpose o Consultation
th c cid h akhd ha b ak i cidai i h aai hi dcu.
16
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
19/30
APPENDIX 1
17
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
20/30
Schedule 1
Table 1: Description of developments/activities of future proposals and theirmaximum limits/extents
Developments/activities/change in land use
Description of limits/extent
1 Hydrocarbon processingarea
Maximum of two heavy industrial areas of up to 500hectares (ha) each (in total up to 1,000 ha) to be locatedwithin Area B identified in Figure 1 Precinct Layout.
Permitted Use and Development:
Facilities for the conversion of natural gas to produceup to 50 Mtpa of LNG (plus associated LPG,condensate, other hydrocarbon products (excluding
petrochemicals)), storage and export at variable rates,flare structures, other ancillary facilities and facilities forcarbon dioxide export offsite.
Any relevant supporting infrastructure includingwastewater treatment facilities, water supplies,desalination water production facility (if required),electricity generation plants, concrete batching plants,rock screening and crushing facilities, relevantadministration buildings and offices, internal accessand haul roads.
Clearing of terrestrial native vegetation directly related
to permitted uses and developments but not exceedingthe areas listed in item 11.
2 Common user area Up to 980 ha for the common user area within Area B asidentified in Figure 1 Precinct Layout.
Permitted Use and Development:
Lay down areas and internal buffer areas between theindustrial facilities.
Administration and plant buildings.
Internal access roads.
Wastewater pipes.
Temporary stockpiles.
Contractor offices.
Concrete batch plant.
Trucking, parking and assembly areas.
Flood management works.
Clearing for bush fire management.
Service utilities.
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments but not exceedingthe areas listed in item 11.
3 Light industrial area (LIA) Up to 200 ha within area C as identified in Figure 1
(as approved for the Browse LNG Precinct)
18
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
21/30
Precinct Layout.
Permitted Use and Development:
Developments and uses permitted in light industrialarea include all those developments and usespermissible in the Industrial Zone referred to in the
Shire of Broome Town Planning Scheme No. 4 (e.g.fuel and transport depot and warehouses), subject toany buffer zone restrictions, as identified in Figure 1 -Precinct Layout.
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments but not exceedingthe areas listed in item 11.
4 Port Area Up to 1,100 ha within Area A identified in Figure 1 Precinct Layout.
Permitted Use and Development:
Loading berths and load out infrastructure. Multi-user shipping channel.
Desalination seawater intake and brine outlet.
Flood management works.
Tug pens.
Support vessel area.
Storage tanks (diesel, LNG, LPG, condensate).
Marine flares.
Pipelines.
Roads. Lay down areas.
Piled jetties.
Turning basin(s).
Breakwater(s) (as required in final design).
Wastewater disposal pipelines and diffusers.
Capital and maintenance dredging.
Integrated Marine Facilities (IMF), including connectingcauseway(s), support vessel harbours, marine supportfacilities, marine offloading facilities (MOF) and roll-on,
roll-off facilities (RORO). Breakwater(s)/seawall(s) (as required).
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments but not exceedingthe areas listed in item 11.
Total permanent loss of Benthic Primary Producersand Benthic Primary Producer Habitat directly relatedto permitted uses and developments, but notexceeding the area of loss listed in item 12.
5 Shipping Channel Area Shipping channel within Area G (identified in Figure 1
Precinct Layout) up to 550 m wide and extending from thelimit of Port Area A to the limit of State Waters.
19
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
22/30
Permitted Use and Development:
Multi-user shipping channel.
6 Pipeline Corridor Areas Areas E and F identified in Figure 1 Precinct Layout. Upto 250 ha of terrestrial habitat in aggregate may be utilisedfor pipelines and their operating/ service corridors.
Permitted Use and Development:
Construction of up to a maximum of 16 pipelines intotal in Areas E and F for natural gas, mono-ethyleneglycol, liquids, services and potentially carbon dioxideexport.
Support facilities.
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments but not exceedingthe areas listed in item 11.
Total permanent loss of Benthic Primary Producers
and Benthic Primary Producer Habitat directly relatedto permitted uses and developments, but notexceeding the area of loss listed in item 12.
7 Accommodation Area Up to 200 ha within Area D identified on Figure 1 Precinct Layout
Permitted Use and Development:
Accommodation and associated support facilities.
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments but not exceedingthe areas listed in item 11.
8 Infrastructure and servicescorridors
Up to a total of 297 ha located within 13 km from theboundary of Area B identified in Figure 1 - Precinct Layout.
Permitted Use and Development:
Borefield.
Electricity transmission services corridors.
Pipelines from borefield to Precinct .
Borefield access and service roads.
Manari Road diversion.
Service facilities.
Other access and management tracks. Clearing of terrestrial native vegetation directly related
to permitted uses and developments but not exceedingthe areas listed in item 11.
9 Industrial land use bufferzone
Area extending 2,000 m from the boundary of Area Bidentified in Figure 1 - Precinct Layout. The outer boundaryof the industrial land use buffer zone is indicated by brokenyellow line in Figure 2 - Precinct Layout.
Permitted Use and Development:
No permanent land uses or activities are permittedsave for the infrastructure and service corridordevelopments and activities (see item 8).
20
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
23/30
10 Sensitive land use bufferzone
Area between 2,000 m and 3,000 m from the boundary ofArea B identified in Figure 1 - Precinct Layout. The outerboundary of the sensitive land use buffer zone is indicatedby broken green line on Figure 1 - Precinct Layout.
Permitted Use and Development:
No sensitive land uses are permitted (e.g.accommodation).
Compatible light industry uses and developmentpermissible.
11 Clearing of terrestrialnative vegetation acrossall Areas shown in Figure1 - Precinct Layout
Total clearing of terrestrial native vegetation permissiblefor all future development, activities and changes of landuses is up to a maximum of 3,037 ha in the Areas andamounts as specified below:
Area A up to 110 ha,
Area B up to 1,980 ha,
Area C up to 200 ha,
Area D up to 200 ha,
Areas E and F up to 250 ha in aggregate,
Within 13 km of the boundary of Area B an area of upto 297 ha in addition to the limits to clearing providedfor in Areas A, B, C, D, E and F identified by co-ordinates in Schedule 1.
Within the total area of permissible clearing no more thana maximum of 83 ha in the implementation foundationproposal or 110 ha in the implementation of anycombination of derived proposals of Monsoon Vine ThicketThreatened Ecological Community to be cleared eitherdirectly or indirectly (e.g. as a consequence ofgroundwater drawdown).
12 Permanent loss of BenthicPrimary Producers andBenthic Primary ProducerHabitat
Permanent loss of Benthic Primary Producers and BenthicPrimary Producer Habitat directly related to permitted usesand developments in:
Port Area A,
Marine portions of the Pipeline Corridor Areas E andF,
Shipping Channel Area G,
to be confined to the Zone of High Impact.
13 Construction andoperation of hydrocarbonprocessing facilities forconverting natural gas toLNG plus associated LPGand condensate(excludingpetrochemicals).
Located within Port Area A and/or heavy industrialareas located in Area B.
Up to a maximum combined operating capacity of 50Mtpa of LNG.
LNG, condensate and LPG storage tankscommensurate with a 50 Mtpa LNG development.
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments but not exceedingthe areas listed in item 11.
14 Construction andoperation of supporting
Located within Port Area A and/or heavy industrial
21
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
24/30
developments andactivities.
area in Area B.
Discharge from wastewater treatment facilities andwastewater outfalls of up to a total of 30 GL per annumof produced water, condensed water, desalinationbrine, treated sewage and greywater.
First flush stormwater to be captured and treated andall captured water to be used on site or discharged viamarine outfall.
Water supply by groundwater abstraction and/ordesalination of up to a combined total of 8 GL perannum.
All supporting infrastructure necessary for LNGproduction developments/activities contained withinPrecinct boundaries A to F and the borefield within 13km of the boundary of Area B, identified in Figure 1 -Precinct Layout.
15 Construction andoperation of a marine andterrestrial port and portinfrastructure including.
Up to 1,100 ha within Port Area A (identified in Figure 1 -Precinct Layout) comprising;
Up to 6 loading berths.
Up to 3 piled jetties extending up to 3 km west from thecurrent location of the Lowest Astronomical Tide.
One multi-user shipping channel to limit of Area A asidentified in Figure 1 Precinct Layout.
Turning basins.
Breakwaters extending up to 3 km west from thecurrent location of the Lowest Astronomical Tide.
Wastewater pipelines and diffusers with up to 30 GLper annum capacity.
Up to 34 million m3 of capital dredging plus periodicmaintenance dredging (more details see item19below).
16 Construction andoperation of the Multi-userShipping Channel.
Multi-user shipping channel in Area G identified in Figure1- Precinct Layout.
Up to 550 m wide and extending from the western limitof Port Area A to the limit of State Waters.
17 Construction andoperation of the IntegratedMarine Facilities (IMF).
Contained within Area A identified in Figure 1 - PrecinctLayout.
Onshore excavation (if required) shall not extend morethan 330 m east from current location of HighestAstronomical Tide.
Clearing of terrestrial native vegetation related to IMFis included in the 110 ha of permissible clearing inArea A at item 11 above.
18 Construction and use ofaccommodation village.
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments but not exceedingthe areas listed in item 11.
All access to and from accommodation village to be viaBrowse LNG Precinct Road (not part of this proposal).
22
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
25/30
19 Dredging and spoildisposal activities.
Up to 34 million cubic metres of capital dredge materialplus periodic maintenance dredging as required.
No dredge spoil disposal in State Waters.
20 Infrastructure andServices Corridordevelopment activities.
Groundwater production limited to up to 8 GL per
annum. Clearing up to 297 ha directly related to activities in
this item within 13 km of the boundary of Area Bindicated in Figure 1 Precinct Layout.
21 Pipeline corridors for gas,mono-ethylene glycol,liquids, and potentiallycarbon dioxideexport andcommunications.
Within Areas E and F identified in Figure 1 PrecinctLayout.
Clearing of terrestrial native vegetation directly relatedto permitted uses and developments, but notexceeding the areas listed in item 11.
23
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
26/30
Schedule 2
Co-ordinates of Disturbance Footprint Boundaries
The co-ordinates defining the Disturbance Footprint Boundaries dataset are
prescribed below, noting that the correct recreation of the boundaries requires thesequential connection of the co-ordinates as per its co-ordinate number.
All co-ordinates are listed in Map Grid of Australia Zone 51 (MGA Zone 50), datum ofGeodetic Datum of Australia 1994 (GDA94).
Co-ordinateNo.
Easting Northing Area
1 409104.17 8065051.08 A
2 409104.23 8065050.67 A
3 409267 8065050 A
4 409323.49 8065050 A
5 409400.8 8065050 A
6 410017 8065050 A
7 410017 8063700 A
8 410017 8063280 A
9 409807.4 8063280 A
10 409267 8063280 A
11 409267 8063057.33 A
12 409267 8062100 A
13 409267 8061350 A14 405967 8061350 A
15 405967 8062100 A
16 405967 8065200 A
17 405967 8065950 A
18 408444.06 8065950 A
19 408928.32 8065051.94 A
20 409104.17 8065051.08 A
1 414077 8067108 B
2 414077 8061908 B
3 410420 8061908 B
4 410377 8061908 B
5 410377 8061984 B
6 410377 8063280 B
7 410017 8063280 B
8 410017 8063700 B
9 410017 8065200 B
10 410017 8065950 B
11 410377 8065950 B
12 410377 8067108 B13 414077 8067108 B
Co-ordinateNo.
Easting Northing Area
1 416077 8066097 C
2 418128 8066097 C
3 418128 8060889 C
4 416993 8060889 C
5 416077 8062378 C
6 416077 8066097 C
1 415477.97 8051593.2 D
2 415414.35 8051853.83 D
3 415140.34 8052236.23 D
4 414866.32 8052618.64 D
5 414592.31 8053001.05 D
6 414318.29 8053383.46 D
7 414044.28 8053765.87 D8 413770.26 8054148.28 D
9 413496.25 8054530.69 D
10 413414.11 8054645.06 D
11 418202 8057490 D
12 420129 8054357 D
13 415477.97 8051593.2 D
1 412085.9 8061914.55 E
2 412087 8059162 E
3 403716.88 8059162.02 E
4 403734.2 8059247.13 E
5 403778.82 8059433.34 E
6 403829.85 8059617.9 E
7 403827.49 8059820.88 E
8 403832.54 8060023.82 E
9 403841.04 8060161.96 E
10 411087 8060162 E
11 411087.03 8061907.96 E
12 412085.9 8061914.55 E
1 411609.95 8069857.97 F2 411610 8067108 F
(as approved for the Browse LNG Precinct)
24
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
27/30
Co-ordinateNo.
Easting Northing Area
3 410610 8067108 F
4 410610.05 8068857.98 F
5 403389.89 8068857.96 F
6 403389.99 8068858.21 F
7 403422.05 8068958.86 F
8 403486.06 8069138.32 F
9 403556.18 8069315.48 F
10 403632.34 8069490.14 F
11 403714.45 8069662.08 F
12 403802.4 8069831.1 F
13 403816.96 8069857.97 F
14 403816.97 8069857.96 F
15 411609.95 8069857.97 F
1 405967 8063500 G
2 405967 8063355.56 G
3 403540.87 8063347.06 G
4 403520.59 8063500 G
5 403502.17 8063619.13 G
6 403491.36 8063641.38 G
7 403406.48 8063823.55 G
8 403328.26 8064008.67 G
9 403256.77 8064196.5 G
10 403192.12 8064386.8 G11 403141.14 8064545.39 G
Co-ordinateNo.
Easting Northing Area
12 403094.92 8064705.43 G
13 403053.52 8064866.79 G
14 403016.97 8065029.32 G
15 402976.23 8065222.89 G
16 402942.4 8065417.78 G
17 402931.12 8065500 G
18 405967 8065500 G
19 405967 8065200 G
20 405967 8063500 G
1 408996 8065950 H
2 409267 8065950 H
3 409274.72 8065950 H
4 410017 8065950 H
5 410017 8065200 H
6 410017 8065050 H
7 409267 8065050 H
8 409104.23 8065050.67 H
9 409104.17 8065051.08 H
10 408928.32 8065051.94 H
11 408444.06 8065950 H
12 408455.91 8065950 H
13 408487.7 8065950 H
14 408958.62 8065950 H15 408996 8065950 H
END OF CO-ORDINATE LISTING
25
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
28/30
APPENDIX 2
26
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
29/30
Figure 1: BLNG Precinct Layout
27
-
7/29/2019 Terrestrial Facilities and Disturbance Footprint Plan
30/30
Head Ofce:
wdid pu ld
240 s Gg tac
ph wA 6000 Auaia
Terrestrial Facilities and Disturbance Footprint Plan
xpod
esign