Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA . studio Terminal Design Update

Upload: others

Post on 28-May-2020

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Terminal Design Update

Page 2: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Saltbox Roof - Site Plan

Page 3: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

ATM

LUGGAGE PICK-UP

EL 10' - 6"

EL 8' - 6"

EL 10' - 6"

JAN

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A101

Author

Checker

07/21/17

First Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

1

7

4

2 85

3

11

10

9

113’- 0”52’- 0”

UP

UP

UP UP

UP

UP

UP

12

13

14

16UP

WAITING ROOM 40’-0” x 50’-0”

1.

4.

7.

2.

5.

8.

3.

6.

9.

10.

11.

12.TICKETING 11’-0” x 22’-6”

CASH ROOM 15’-6” x 7’-6”

PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”

PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”

MECHANICAL 4’-0” x 20’-0”

JANITOR CLOSET 4’-0” x 4’-0”

STAIR

ELEVATOR

13.

15.STORAGE 12’-0” X 10’-0”

VENDING 15’-6” x 8’-6”

STAIR

UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”

14.

UP

TERMINAL MANAGER’S OFFICE 12’-0” X 10’-0”

TERMINAL AGENTS OFFICE 13’-6” X 16’-0”

15

16. TERRACE

ATM

LUGGAGE PICK-UP

EL 10' - 6"

EL 8' - 6"

EL 10' - 6"

JAN

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A101

Author

Checker

07/21/17

First Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

EL +13’-0”

6

Saltbox Roof - First Floor Plan

Page 4: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

MECHANICAL ROOM 15’-0” x 36’-6”

17.

20.

18.

19.

STAFF MEN’S RESTROOM 10’-0” x 8’-0”

STAFF WOMEN’S RESTROOM 10’-0” x 8’-0”

ELECTRICAL 7’-0” x 14’-6”

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A102

Author

Checker

07/21/17

Second Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

STORAGE 10’-0” x 7’-6”

21.

24.

22.

23.

ELEVATOR MACHINE ROOM 5’-0” x 6’-0”

ELEVATOR

LOCKERS 17’-0” x 24’-0”

BREAK ROOM 12’-0” x 31’-0”

25.

28.

26.

27.

JANITOR CLOSET 5’-0” x 4’-6”

TEL/DATA 11’-6” x 13’-0”

MULTI-PURPOSE ROOM 17’-6” x 21’-6”

17

24

25 26

18

23

19

20

21 22

28

27

67’- 0”52’- 0”

Saltbox Roof - Second Floor Plan

Page 5: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

EAST ELEVATION

WEST ELEVATION

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

30’- 6”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

30’- 6”

Saltbox Roof

Page 6: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

30’- 6”

SOUTH ELEVATIONNORTH ELEVATION

Saltbox Roof

Page 7: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Page 8: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Gable Roof - Site Plan

Page 9: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

ATM

LUGGAGE PICK-UP

EL 10' - 6"

EL 8' - 6"

EL 10' - 6"

JAN

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A101

Author

Checker

07/21/17

First Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

1

7

4

2 85

3

11

10

9

6

113’- 0”52’- 0”

UP

UP

UP UP

UP

UP

UP

12

13

14

16UP

WAITING ROOM 40’-0” x 50’-0”

1.

4.

7.

2.

5.

8.

3.

6.

9.

10.

11.

12.TICKETING 11’-0” x 22’-6”

CASH ROOM 15’-6” x 7’-6”

PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”

PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”

MECHANICAL 4’-0” x 20’-0”

JANITOR CLOSET 4’-0” x 4’-0”

STAIR

ELEVATOR

13.

15.STORAGE 12’-0” X 10’-0”

VENDING 15’-6” x 8’-6”

STAIR

UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”

14.

UP

TERMINAL MANAGER’S OFFICE 12’-0” X 10’-0”

TERMINAL AGENTS OFFICE 13’-6” X 16’-0”

15

16. TERRACE

ATM

LUGGAGE PICK-UP

EL 10' - 6"

EL 8' - 6"

EL 10' - 6"

JAN

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A101

Author

Checker

07/21/17

First Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

EL +13’-0”

Gable Roof - First Floor Plan

Page 10: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

MECHANICAL ROOM 15’-0” x 36’-6”

17.

20.

18.

19.

STAFF MEN’S RESTROOM 10’-0” x 8’-0”

STAFF WOMEN’S RESTROOM 10’-0” x 8’-0”

ELECTRICAL 7’-0” x 14’-6”

STORAGE 10’-0” x 7’-6”

21.

24.

22.

23.

ELEVATOR MACHINE ROOM 5’-0” x 6’-0”

ELEVATOR

LOCKERS 17’-0” x 24’-0”

BREAK ROOM 12’-0” x 31’-0”

25.

28.

26.

27.

JANITOR CLOSET 5’-0” x 4’-6”

TEL/DATA 11’-6” x 13’-0”

MULTI-PURPOSE ROOM 17’-6” x 21’-6”

17

24

25 26

18

23

19

20

21 22

28

27

67’- 0”52’- 0”

Gable Roof - Second Floor Plan

Page 11: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

EAST ELEVATION

WEST ELEVATION

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

32’- 0”

23’- 6”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

32’- 0”

23’- 6”

Gable Roof

Page 12: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

SOUTH ELEVATION

312

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

32’- 0”

23’- 6”

NORTH ELEVATION

Gable Roof

Page 13: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Page 14: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

ATM

LUGGAGE PICK-UP

EL 10' - 6"

EL 8' - 6"

EL 10' - 6"

JAN

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A101

Author

Checker

07/21/17

First Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

1

7

4

2 85

3

11

10

9

6

113’- 0”52’- 0”

UP

UP

UP UP

UP

UP

UP

12

13

14

16UP

WAITING ROOM 40’-0” x 50’-0”

1.

4.

7.

2.

5.

8.

3.

6.

9.

10.

11.

12.TICKETING 11’-0” x 22’-6”

CASH ROOM 15’-6” x 7’-6”

PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 24’-6” x 25’-0”

PUBLIC MEN’S RESTROOM 3 W.C. / 4 UR / 4 LAV 13’-0” x 16’-6”

MECHANICAL 4’-0” x 20’-0”

JANITOR CLOSET 4’-0” x 4’-0”

STAIR

ELEVATOR

13.

15.STORAGE 12’-0” X 10’-0”

VENDING 15’-6” x 8’-6”

STAIR

UNISEX RESTROOM 1 W.C. / 1 LAV 8’-6” x 8’-6”

14.

UP

TERMINAL MANAGER’S OFFICE 12’-0” X 10’-0”

TERMINAL AGENTS OFFICE 13’-6” X 16’-0”

15

16. TERRACE

ATM

LUGGAGE PICK-UP

EL 10' - 6"

EL 8' - 6"

EL 10' - 6"

JAN

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A101

Author

Checker

07/21/17

First Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

EL +13’-0”

Gable Roof (Alternate)- First Floor Plan

Page 15: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

MECHANICAL ROOM 15’-0” x 36’-6”

17.

20.

18.

19.

STAFF MEN’S RESTROOM 10’-0” x 8’-0”

STAFF WOMEN’S RESTROOM 10’-0” x 8’-0”

ELECTRICAL 7’-0” x 14’-6”

STORAGE 10’-0” x 7’-6”

21.

24.

22.

23.

ELEVATOR MACHINE ROOM 5’-0” x 6’-0”

ELEVATOR

LOCKERS 17’-0” x 24’-0”

BREAK ROOM 12’-0” x 31’-0”

25.

28.

26.

27.

JANITOR CLOSET 5’-0” x 4’-6”

TEL/DATA 11’-6” x 13’-0”

MULTI-PURPOSE ROOM 17’-6” x 21’-6”

17

24

25 26

18

23

19

20

21 22

28

27

67’- 0”52’- 0”

Gable Roof (Alternate) - Second Floor Plan

Page 16: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

EAST ELEVATION

WEST ELEVATION

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

32’- 0”

23’- 6”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

32’- 0”

23’- 6”

Gable Roof (Alternate)

Page 17: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

SOUTH ELEVATION

312

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

32’- 0”

23’- 6”

NORTH ELEVATION

Gable Roof (Alternate)

Page 18: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Page 19: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Three-Story Crossing Gable Roof - Site Plan

Page 20: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

1

7

4

2

8

5

3

11

10

96

113’- 0”52’- 0”

WAITING ROOM 40’-0” x 50’-0”

1. 4. 7.

2. 5. 8.

3. 6. 9.

10.

11.

12.

TICKETING 12’-0” x 25’-0”

CASH ROOM 12’-0” x 8’-0”

PUBLIC WOMEN’S RESTROOM 12 W.C. / 10 LAV 12’-0” x 45’-0”

PUBLIC MEN’S RESTROOM 3 W.C. / 5 UR / 4 LAV 12’-0” x 18’-0”

STORAGE 10’-0” x 10’-0”

MECHANICAL 9’-0” x 9’-0”

STAIR

ELEVATOR 13.

15. TERRACE

UP

UP

UP UP

UP UP

UP

STORAGE 12’-0” X 6’-0”

12

13

14

15UP

VENDING 15’-0” x 15’-0”

STAIR

UNISEX RESTROOM 1 W.C. / 1 LAV 10’-0” x 8’-0”

14. JANITOR CLOSET 12’-0” x 6’-0”

DN

ATM

LUGGAGE PICK-UP

EL 10' - 6"

EL 8' - 6"

EL 10' - 6"

JAN

N

0

bertaux + iwerks architects118 South Street, Boston, Massachusetts 02110t: 617.423.6500 w: www.bi-arch.com

Childs Engineering CorporationMarine Engineering34 William Way, Bellingham, MA 02019

DG Jones InternationalCost Estimating3 Baldwin Green Common, Suite #202Woburn, MA 01801

Carol R Johnson AssociatesLandscape Architecture

GZA GeoEnvironmentalGeotechnical, Environmental, Civil Engineering530 Broadway Providence, RI 02909

115 Broad St, Boston, MA 02110

Kalin AssociatesSpecifications1121 Washington Street #2West Newton, MA 02465

Thornton TomasettiStructural Engineering27 Wormwood Street Suite 200Boston, MA 02210

WSPMEP / FP / Security/ Site Elec /Lighting88 Black Falcon Avenue, Suite 210Boston, MA 02210

Woods Hole, Martha's Vineyard & NantucketSteamship AuthorityFoot of Railroad AvenueWoods Hole, MA 02543

Drawn By:

Checked By:

Date:

Scale:

Design Phase:

Seal:

4'-0" 8'-0" 16'-0"

Sheet No.Phase

5

1/8" = 1'-0"

Woods Hole FerryTerminal Reconstruction

A101

Author

Checker

07/21/17

First Floor Plan -Presentation

Community Redesign

Issue / Revision Schedule

No. Revision Date

EL +13’-0”

Three-Story Crossing Gable Roof - First Floor Plan

Page 21: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Third Floor Plan

16UP DN UP DN

17

OPEN

18

19 20

21 22

23

24

25

26

TERMINAL AGENTS OFFICE 24’-0” x 9’-0”

16.

19.

17.

20.

18.

21.TEL/DATA 15’-0” x 9’-0”

TERMINAL MANAGER ‘S OFFICE 14’-0” x 9’-0”

JANITOR CLOSET 4’-11” x 9’-0”

BREAK ROOM 14’-0” X 15’-0”

22.

23.

24. LOCKERS 15’-0” x 18’-0”

ELEVATOR

ELECTRICAL 5’-0” X 11’-0”

MULTI-PURPOSE ROOM 16’-0” X 20’-0”

25. STAFF WOMEN’S RESTROOM 10’-0” X 8’-0”

26. STAFF MEN’S RESTROOM 10’-0” X 8’-0”

27

28

29

30 32

31

ELECTRICAL 11’-0” x 11’-0”

27.

30.

28.

29.

ELEVATOR

JANITOR CLOSET 4’-0” x 9’-0”

STORAGE 25’-0” X 9’-0”

ELEVATOR MACHINE ROOM 4’-0” x 6’-0”

31.

MECHANICAL ROOM 22’-0” x 22’-0”

32.

113’- 0”

52’- 0”

25’- 0”32’- 0”25’- 0”31’’- 0”

20’-0”16’-0”

16’-0”

32’- 0”

DN DN

Three-Story Crossing Gable Roof - Second Floor Plan

Page 22: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

EAST ELEVATION

48’- 4”

WEST ELEVATION

32’- 4”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

THIRD FLOOR - EL. 36’-0”

1012

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

THIRD FLOOR - EL. 36’-0”

1012

48’- 4”

32’- 4”

Three-Story Crossing Gable Roof

Page 23: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

48’- 4”

32’- 4”

GRADE - EL. 10’-0”

FIRST FLOOR - EL. 13’-0”

SECOND FLOOR - EL. 25’-0”

THIRD FLOOR - EL. 36’-0”10

12

SOUTH ELEVATIONNORTH ELEVATION

Three-Story Crossing Gable Roof

Page 24: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Page 25: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Page 26: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Three-Story Crossing Gable Roof

Gable Roof

Saltbox Roof

Previous Option

Page 27: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Gable roof alternate

Page 28: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Three-Story Crossing Gable Roof

Gable Roof

Saltbox Roof

Previous Option

(alternate)

Page 29: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

2.5’ thick concrete slab - to resist hydro-static uplift forces

12’ high concrete walls extend up to the second floor

First floor elev 13’ - eight feet above current grade at elev 5’

Second floor structure carried on exterior concrete bearing walls

Solid floodproof vertical concrete

walls - waterproofed to elev 17

Base Structural System

(a floodproof “boat” )

Page 30: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Elev 17’ (12’ above current grade)

8” concrete wall

Rigid insulation (pink)

Exterior stone cladding

First floor elev 13’

Air space

24” concrete mat slab

3” concrete protection slab

Sidewalk elev 10.5

3” mud slab

Waterproofing

Concrete foundation wall

Rigid insulation

Concrete footing

Current grade today - elev 5’

Partial Wall Section

Page 31: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Structural System - a “boat”

4’ high dry floodproofing panels at open-ings on terrace side

30” elevated terrace

6.5’ high dryfloodproofing panels on sidewalk side

Page 32: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Saltbox massing

24” concrete mat slab

3” concrete protection slab

(+ 3” mud slab)

Sidewalk

8” concrete wall

6.5’ high dry floodproofing panel

Page 33: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

Gable roof massing

Page 34: Terminal Design Update - Steamship Authority...Terminal Design Update. Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019 BIA.studio

Steamship Authority Woods Hole Ferry Terminal Reconstruction Alternative Terminal Designs 3/19/2019

BIA .studio

3 story crossing gable roof massing