TENDER: TEN10/12 - UPGADE TO FUEL STORAGE FACILITIES
LITHGOW & WALLERAWANG WORK DEPOTS.
Submitted by
45 Powers Road
Seven Hills NSW 2147
22 Strathmore Road Muswellbrook NSW 2333
Dated November 2 2012
2 | P a g e
November 2 2012 Lithgow City Council Administration Building 180 Mort Street Lithgow NSW 2790 Reference “Upgrade of Fuel Storage” RFQ Closing 3/8/2012 Dear Sir Thank you for the opportunity to allow Priority Fuel Management to offer our quotation for the works you
are considering at your two nominated sites.
Priority Fuel would like to provide completed costings and a review of the scope of Project works as
provided below.
Please review the document and provide your amendments comments or alterations as required.
We refer to the Lithgow City Council Request for Tender – Closing Date 10.00 am Tuesday November 6
2012
The Tender is offered as a fully complying Tender with respect to both the client requirements of Lithgow
City Council as well consideration of Dangerous Goods and NSW WorkCover legislation. Appropriate
regulations relating to the handling and storage of Flammable and Combustable Liquids in strict
accordance with AS1940-2004.
Additionally all offered documentation and contractor services are carried out under UPSS guidelines
Underground Petroleum Storage Systems UPSS-2008 with relation to the removal and disposal of
underground tanks
Priority Fuel Management has detailed the project within two components, these being;
Part A Lithgow City Council Fuel Storage Project Works Lithgow and
Part B Wallerawang Council Fuel Storage Depot Project works
Our formal offer of quotation follows.
Part A Lithgow Depot 1) Removal and Disposal of Underground Storage Tanks Priority Fuel Management is to provide for the safe removal and certified disposal of three off existing
UST (underground steel tanks) at the Lithgow City Council Facility. Tanks removal and disposal is under
the UPSS guidelines as determined in accordance with NSW WorkCover for correct removal and
traceable/certified disposal.
See over for Scope of Works description;
3/45 Powers Road Seven Hills NSW 2147 22 Strathmore Road Muswellbrook NSW 2333 Phone (612) 96206972 Fax (612) 96206980
3 | P a g e
Lithgow City Council Lithgow Facility Program Works
1 & 2) Removal / Disposal Underground Storage Tanks & Existing Bowsers and Infrastructure
a) Transferral and filtration of existing fuel loads from Underground tanks into above ground storage
tanks for ULP and distillate product.
b) Tank bottoms waste to be disposed of under NSW EPA Licence 12862
c) ALL product within unused LRP or leaded fuel tank to be disposed as certifiable waste
d) Disconnection ( Electrical) of existing Datafuel Module and Data cabling
e) Disconnection and Removal of existing Datafuel module.(1)
f) Demolition and Removal of Existing Datafuel Canopy and hording
g) Disconnection (Electrical) of existing Diesel (1) and ULP (1) bowsers from forecourt.
h) Disconnection and Removal and disposal of existing Diesel (1) and ULP (1) bowsers from
forecourt.
i) Exposure by excavator of the underground tank farm area (ULP and Diesel Tanks) by removal of
concrete forecourt area
Designated sizes
i. 16500 Safe Fill Level Distillate Tank
ii. 4500 Safe Fill Level ULP Tank
iii. 2200 Safe Fill Level Leaded Tank (no concrete removal required)
Note 1 Concrete disposal by Lithgow City Council.
Note 2 Soil to be confirmed by Envirowest prior to disposal by the contractor.
3) Supply and Installation of New Bowsers
Supply installation and commissioning of Fuel transfer pumps (Submersible Turbine Pumps) into
each of two Tanks designated as Diesel and ULP (Volume capacity to be confirmed by Lithgow
City Council.
Supply and Installation of (two only) Fuel Dispensers inclusive of containment sumps.
Dual Hose (Hi Flow/Std. Flow) Diesel Dispenser
Single Hose Standard Flow Dispenser ULP Product
Dispensers each set up for Fuel Management system connection.[Gilbarco Protocol]
Supply and Installation of Add Blue Dispenser Sump and barrier plate for future pump
connection.
4 | P a g e
Lithgow City Council Fuel Facility Program Works
4) Electrical Work
The Contractor agrees to the Supply and Installation of a new IP rated Electrical Switchboard
located similarly to the existing switchboard position for;
Pump control and Dispenser Hook Isolation for Fuel Pump operations [Diesel
Pump]
Pump control and Dispenser Hook Isolation for Fuel Pump operations [ULP
Pump]
Pump control and Dispenser Hook Isolation for Fuel Pump operations [ADD
Blue]1 future pump connection
Electrical connections inclusive of Emergency Stop Switches [E Stops] at Re-
fuelling location and Storage Tank Refilling areas for ULP and Diesel.
RCD and Circuit Protection Devices
Safety Valves Electrics as below
Supply and installation of Safety Solenoid Operated Anti Siphon protection
valves (Diesel and ULP) at Tank locations. No provision or requirement for Add
Blue anti syphon valve
Provide additional Circuit to include provision for Add Blue dispenser installation
(timing at a later stage as nominated by Lithgow City Council)
Provide electrical conduit and cabling for above from forecourt to switchboard for
the future FMS System. A Fuel Management System is to be later supplied and
installed (by others).
All necessary cabling and communications protocol cabling to be provided by the
Contractor.
5) Set up Storage Tanks
Confirm supply and installation conformity of 80mm Product Fill Line to Diesel Storage Tank
Confirm supply and installation conformity of 80mm Product Fill Line to ULP Storage Tank
Connection, testing and commissioning of two only above ground Fuel Storage Tanks (Tanks existing)
Provide for the Supply and Installation of necessary pipe-works to connect and commission AGT’s (Above Ground Tanks) supplied by others including placement and securement to AS1940-2004
Supply, install and commissioning external (above ground) product supply line (Schedule 40
Galvanised)2
Note. External pipework’s are to run behind existing above ground tanks and Diesel and ULP
product supply lines are to terminate adjacent to the ULP Tank prior to underground
installation.
1 Add Blue Electrical connections and terminations below Sump Cover Plate. No Pump provided. 2 Medium Galvanised Pipework Supplied to above ground areas of Fuel Installation
5 | P a g e
Install approved vent pipes and capping vents as necessary to Diesel and ULP Tanks.
Lithgow City Council Fuel Facility Program Works
6) Fuel Pipes
Supply install and commission UPP® Secondary containment3 thermoplastic Pipework for
underground pipework for Diesel and ULP.
Supply install and commission UPP® double walled Add blue thermoplastic Pipework for
underground pipework for Add Blue line connection to Sump termination.
Supply and installation of Secondary containment test area and ground box for secondary
containment integrity verification by client.
Hydrostatic Testing and Commissioning all pipework
7) Signage
External Pipework to be to Australian Standard Paint colour and all identification decals
supplied and fitted in accordance with AS1345-1995 Pipeline Identification Standards
Supply and Fitment of Dangerous Goods approved signage appropriate in accordance with
AS1940-20044 as and where required at Tanks and fuel filling area.
Class 3 Flammable Liquid ULP Pump
Combustable Liquid Signage at Diesel Bowser
Note
Dangerous Goods Signage including No Smoking/Mobile Phones etc to be mounted on
Galvanised post (supplied and installed by the Contractor)
Dangerous Goods Detail documentation to the client.
8) Commission and Calibrate
All Pumps are to be wet tested and calibrated prior to client handover.
Calibration certification to be part of the handover documentation requirements.
Commissioning ITP’s (Inspection and Test Plans) will be provided to the client by the
Contractor and confirmed prior to handover.
Fleet vehicles and light vehicles re-fuelling will be undertaken by the Contractor to the
satisfaction of the client at handover
3 Secondary containment Thermoplastic pipework provision for testing and verification of integrity of inner pipe 4 As1940-2004 The Storage and Handling of Flammable and Combustable Goods
6 | P a g e
Lithgow City Council Fuel Facility Program Works
Project Scope
A full outline of services is broken up into the project scope as detailed below in the following categories;
i. Site Preliminary Works
ii. Site Excavation & Fuel Facility Abandonment (Remediation of Tank Excavation)
iii. Diesel & ULP line Connection & Installation
iv. Pumps Fitment
v. Provisional Add Blue Connection
vi. Electrical Sub Boards Supply and Connection
vii. Commissioning and Testing
viii. Client Handover
ix. Project Costing
x. Pricing Terms and Conditions
7 | P a g e
Lithgow City Council Lithgow Facility Program Works
i. Site Preliminary Works
The Contractor in providing preliminary works is to provide the following site establishment and works
programme documentation prior to commencement of works at Lithgow City Council.
The Contractor nominates the following services necessary to establish preliminaries at the Lithgow
Council site as follows;
Lithgow City Council Inductions and Priority Fuel personnel sign on to project works area
Establish and submit Traffic Management Plan [LCC Lithgow Works site/Wallerawang works site]
Provide security Barrier Fencing to immediate area of project works
Establish Deep Excavation Signage and appropriate Work safe Compliance documentation and
signage including;
Hard Hats/ Hearing Protection/PPE
Construction Area
Flammable Atmosphere/Combustable Atmosphere Signage
Authorised personnel only
Submit Safe Work Method Statements to LCC designated personnel
Submit Plant and Equipment Register to LCC designated personnel
Submit Priority Fuel Personnel & Contact Register to LCC designated personnel
Establish Visitor Sign on Register (as appropriate)
Lock out Tag Out all existing Fill Points
Advise LCC Supervisory Personnel re Fuel Deliveries cessation and confirm.
Lock out Tag out all Fuel Dispensing Areas
Provide Electrical and Mechanical isolation of existing Fuel Bowsers
Drain down all product suction lines Diesel and ULP after bowser disconnection.
Sample and Report to client on remaining Diesel Fuel Quantity in existing Underground Steel
Tank prior to product removal.
Decant and disposal5 of distillate in accordance with NSW EPA Regulations6
Re-instatement7 by Filtration and transferral to new Above Ground Tank
Decant and disposal of remaining fuel product in ULP & leaded tanks and disposal under Lic #
12862
5 Disposal under Priority Fuel Management NSW EPA licence 12862 6 Certified Disposal Recording to be provided to Lithgow City Council on disposal completion 7 Re-instatement by Closed System Filtration™ process Transferral determination considers remaining Diesel Volume
8 | P a g e
Lithgow City Council Lithgow Facility Program Works
ii. Site Excavation & Fuel Facility Abandonment;-
Order of precedence of Works is as follows;
1. Decanting Tank Fuel Loads for removal or transferral8 [ULP, Leaded and Diesel Tanks]
2. Contaminated Waste Fuel Removal and Disposal under NSW EPA Licence number 12862
3. Draining Fuel Product Supply lines from Bowsers
4. Electrical Isolation and Lock out Tag out of Existing Fuel Bowsers
5. Electrical Isolation of DataFuel Module
6. Mechanical Disconnection of Existing Fuel Bowsers
7. Mechanical Disconnection of existing DataFuel Module
8. Disconnection and Removal of existing Vent Lines (All products)
9. Excavation of Concrete Forecourt at re-fuelling area and relocation on LCC works site
10. Tank top excavation Diesel Tank
11. Tank Top excavation Unleaded Tank
12. Tank Top excavation Leaded (De-commissioned)
13. Soil Management transferral on Client works site
14. Tank #1 de-gassing
15. Tank Removal by Approved Craneage method and Preparation for Transportation
16. Transportation and Compliant Disposal
17. Disposal Certification
18. Backfilling of existing tank holes (Backfilling materials supply by LCC)
19. Compaction and setting of tank filled area with Sheep’s foot Roller Equipment
Removal of Existing Fuel Bowsers
The Contractor is to provide for both the mechanical and electrical isolation and disconnection and
preparation for the removal of two existing fuel dispensing bowsers.
Removal of existing fuel bowsers including;
Electrical isolation and disconnection Pumps
Electrical isolation and disconnection DataFuel module
Electrical isolation and disconnection Pump and DataFuel Cabling
Mechanical isolation and disconnection from forecourt area
Sealing and transportation preparation including pallet supply and strapping of Bowsers
Disposal or transportation to clients’ requirements
Site break up of concrete at refuelling area. (Concrete disposal is agreed to be provided
by Lithgow City Council)
8 Priority Fuel Management agrees to Filter and transfer resident Diesel Fuel within the existing tank to ensure run downs of the fuel do not require LCC management
9 | P a g e
Lithgow City Council Lithgow Facility Program Works
ii. Site Excavation & Fuel Facility Abandonment (continued) Site Works Excavation
The Contractor is to excavate9 overburden above each of the three existing underground tanks to be de-
commissioned.
All demolition of Concrete civil works above the existing underground tank farm is inclusive within this
quotation. Saw cutting of concrete may be required and provision made for these services.
Note 1
It is understood by the Contractor that Enviro West has completed out Monitor well Hydrocarbon analysis
prior to Project commencement and report findings provided to LCC and the Contractor.
All soil analysis and testing will be required on completion of tanks removal by Envirowest as a LCC cost.
Note 2
Reinstatement of the excavation site is to be undertaken by LCC on confirmation of contaminant free soil
analysis. (Contaminated Soil is the responsibility of the client with regards to EPA compliant disposal if
applicable.)
Contaminated Soil costs will be at $200.00/metric tonne.
Note 3
No additional Fill material allowances have been included by the contractor within the quotation to backfill
entire excavation area.
Note 4
Contaminated Excavated Materials.
In the event of tainted excavated materials, the contractor agrees to transport and store the material to a
nominated location on the clients’ site. Transportation and disposal of tainted or contaminated excavated
waste off site is not inclusive within this quotation.(refer Note 2 above)
9 Excavation is inclusive excavation of natural material only [ENM]
10 | P a g e
Lithgow City Council Lithgow Facility Program Works
Tank(s) Removal
The contractor agrees to provide for the following services;
Removal of Type 17 Underground Steel Diesel Storage Tank and ancillary pipework and valve-
work
Removal of Type 5 Underground Steel Unleaded Tank and ancillary pipework and valve-work
Removal of Type 3 Underground Steel unused leaded Tank and ancillary pipework and valve-
work
Disconnection and disposal of Tank Infill Lines and Product supply lines to each of three
underground tanks.
Disconnection and disposal of Tank Vent Lines10 to each of three underground tanks
Disposal and traceable certification documentation of underground steel tanks as identified
above.
Notification of NSW WorkCover Authority of tanks abandonment within 7 days of abandonment
under UPSS Regulation 2008
Soil Remediation/Backfilling
Backfilling of excavation works with new backfill material (by others) (See Note 2 previous page)
Soil remediation (refer Note 4 previous pages)
Compaction and excavated site remediation to pre-existing condition. (by others)
Removal of Existing Data Fuel Module
The Contractor is to provide for both the mechanical and electrical isolation and disconnection and
preparation for the removal of the existing Data Fuel Module
Disconnected Data Fuel module is to be palletised and shrink wrapped by the contractor for efficient
storage. (Storage or disposition at LCC discretion)
Removal of Existing DataFuel Module Canopy structure
The Contractor is to provide for the safe demolition and disposal of the existing DataFuel Building
structure.
Transportation and Disposal costs of demolished materials are inclusive within the scope of services.
10 No Allowance made for disconnection of high level vent lines by scissor Lift (Disconnection and removal from ground level)
11 | P a g e
Lithgow City Council Lithgow Facility Program Works
iii. Diesel and Unleaded Motor Spirit Lines Connection
Diesel Product Load IN Product Fill
The Contractor agrees to provide the following as stated below inclusive of;
Supply and installation of 80 NB medium galvanised pipework to Diesel Storage tank.
Connection point to flanged connection of tank (tank by others)
Fill Pipework to be terminated with 80mm Camlock attachment and isolation provided by
lockable 80mm Stainless Steel Fire Safe rated Ball Valve. (existing)
Confirm supply and installation conformity of 80mm Diameter Swing check valve for fuel
load in piping. (Supplied by others)
Supply and Installation of 316 Stainless Steel Fill Point Spill containment Drip Tray and
fastenings
Labelling of external Fill Point pipework in accordance with AS 1345-1995 (pipework
supplied by others)
Fitment of Vent Stack pipework (Vent supplied by others)
Site Supervision of initial Tank filling inclusive of;
Overfill protection device activation
Vent activation checks during Filling
Swing Check Valve activation checks
Dip Stick Calibrations
External Gauge Calibration/check (if applicable) and
Reconciliation against Tanker consignment
Hydrostatic Testing11 product pipe-works prior to commissioning
Unleaded Product Load IN Product Fill Line
The Contractor agrees to provide the following as stated below inclusive of;
Supply and installation of the ULP product Filling line connection point to the existing tank
(tank supply by others) including
Supply of Product Load IN Pipework and connections inclusive of;
Confirm supply and installation conformity of Mechanical isolation valve 80mm and
Confirm supply and installation conformity of Swing check valve (80mm) and
Confirm supply and installation conformity of 80mm Camlock attachment (male) and cap
assembly. (Tanker Connection Point)
Fill Pipework is to be terminated with 80mm Camlock attachment and isolation provided
by lockable 80mm Stainless Steel Fire Safe rated Ball Valve. Handle Assembly not
sighted
11 Hydrostatic Testing undertaken by the Contractor shall ensure all connections are pressure tested (Air pressure ) to a maximum 100kPa
Commission test approval will be accorded after a period not less than 12 hours duration without pressure decay.
12 | P a g e
Lithgow City Council Lithgow Facility Program Works
iii. Diesel and Unleaded Motor Spirit Lines Connection
Supply and Installation of 316 Stainless Steel Fill Spill Containment Point Drip Tray and
fastenings by the Contractor
Labelling of external Fill Point pipework in accordance with AS 1345-1995
Hydrostatic Testing and Wet test prior to commissioning
Product Supply Line OUT [Diesel]
The Contractor agrees to provide the following as stated below inclusive of;
Supply and installation of 50mm Galvanised steel pipework connection to existing exit
point on Logitank. Pipework is to be extended by the contractor to the rear of the
Logitank and continue to South Western corner of the Fuel storage facility concrete slab.
Galvanised pipework Painted to AS1345-1995
Double walled thermoplastic pipework is to be connected to this point.
Supply and installation of Double Walled Thermoplastic UPP® petroleum pipework
63mm OD/ 50mm ID for product supply traversing the forecourt area.
Pipework Termination point12 to be a 316 Stainless Steel Firesafe rated lockable Ball
Valve
Supply and installation Hydraulic shear13 (Safety valve) to Diesel product supply
thermoplastic line.
Hydrostatic Testing prior to commissioning
Product Supply Line OUT [ULP]
The Contractor is to provide for the following materials supply and installation for the following ULP
product supply to Dispenser at re-fuelling forecourt as follows;
Provide 50mm stainless steel braided hose connection from STP (Submersible Pump)
outlet to connection point on tank pipework14.
Supply and installation of 80 NB medium galvanised pipework to Unleaded Storage tank
to provide for product supply OUT.
Pipework is to extend to the entry point at ground level adjacent to the South Western
corner adjacent to the Unleaded Petrol Tank area where a thermoplastic double walled
pipework attachment continues to the Re-fuelling forecourt.
All Galvanised Steel pipework to be painted in accordance with Australian Standards and
labelled accordingly to AS1345-1995
Supply and installation of Double Walled Thermoplastic UPP® petroleum pipework
63mm OD/ 50mm ID for product supply traversing across to the forecourt area from the
ULP tank drop down area.
Hydrostatic Testing15 and Wet test prior to commissioning
12 Termination Point within Sump area of Fuel Dispenser 13 Shear Valve installation design allows for immediate fuel shutoff/isolation within the Dispenser sump in the event of Dispenser collision damage 14 2.00” Tank outlet point to be isolated within the tank confines. Confined Space Entry Manway to be removed / re-installed by Contractor
13 | P a g e
Lithgow City Council Lithgow Facility Program Works
iv Pumps Fitment
The Contractor agrees to provide the following as stated below inclusive of;
One only Dual Handle Compac16 (Hi Flow and Standard Flow ) Diesel Fuel Pump
One Only Single Handle Compac17 ULP Fuel Pump
Dual Pump Sump containment and Thru sump terminations
Single Pump Sump containment and Thru sump terminations
Eskay under pump valve Diesel
Eskay under pump valve ULP
Electrical thru sump fittings Diesel and ULP pumps
Mechanical fastenings (Stainless steel)
High Flow Mast assembly (Diesel Pump)
Breakaway Hose Fittings Diesel (Qty 2)
Breakaway Hose fittings ULP (Qty 1)
Shear Valve Assembly (Pump Impact Protection component) Diesel Pump
Shear Valve Assembly (Pump Impact Protection component) ULP Pump
ADD Blue under pump Sump and cover plate and fastenings
Electrical thru sump fittings ADD Blue
Thru sump terminations and pipework
Terminated pipe ADD Blue
316 Stainless Steel Isolation valve
Electrical connection of Pumps and testing
Wet testing and commissioning
v. Provisional [DEF18] Add Blue Connection
The contactor is to provide provisional connection (partial only) for the establishment of an Add Blue urea
dispensing station at the diesel re-fuelling area of the forecourt.
This is to consist of the provision of the supply and connection of Add Blue thermoplastic pipework from
the existing add blue line outlet (previously installed by others) adjacent to the proposed add blue IBC
storage shed.
Thermoplastic Line to run underground to connection point on under sump containment.
A 50mm OD Add blue line is to be provided by the contractor to extend to a forecourt re-fuelling position
at which point the line will be terminated by fitment of a 316 Stainless steel isolation ball valve. Location is
to be adjacent to new Diesel dispenser.
15 Hydrostatic Testing undertaken by the Contractor shall ensure all connections are pressure tested (Air pressure ) to a maximum 100kPa
Commission test approval will be accorded after a period not less than 12 hours duration without pressure decay. 16 Fitted with Gilbarco Protocol for Fuel Management system connection by others 17 Fitted with Gilbarco Protocol for Fuel Management system connection by others 18 DEF (Diesel Emission Fluid Urea Solution)
14 | P a g e
Lithgow City Council Lithgow Facility Program Works
v. Provisional [DEF19] Add Blue Connection (continued)
Add blue line is to be thermoplastic welded and laid within a trench of a minimum 600mm depth, with the
trenching preparation and backfilling provided by others.
The underground pipework trench20 is to run approximately parallel to the existing stormwater trenching
with an appropriate easement from the stormwater as appropriate to Council regulations.
The Add blue Dispenser footprint (Dispenser Frame assembly) is to be determined following client advice
on the dispenser make and model selected.
Priority Fuel Management has included attachments providing varied add blue dispenser options for
reference by the client that may assist in the selection process.
The contractor agrees to provide a blanking plate across the Dispenser Frame to isolate pipework and
fittings from damage or unauthorised access.
vi. Electrical Sub Boards and Connection
The contractor agrees to supply all electrical requirements necessary to commission the new Fuel
dispensing operation (Diesel ULP and Add Blue)21 at the Lithgow works depot inclusive of the following;
Electrical isolation and disconnection and removal of the existing sub board
Supply and installation of new external electrical IP Rated22 sub board23 and wiring to the
bowsers and the storage tank transfer pump (including wiring for the Ad-Blue bowser.)
Supply and installation of STP Turbine relays and Single Phase Controller (2)
Supply and installation Variable frequency drive pump controllers
Supply and Installation of Dispenser Hook Isolators
Supply and installation of approved RCD devices for Dispensers (3)
Supply and installation of approved RCD electrical circuit protection devices for Pump circuit
protection
Supply and installation of electrical E Stop (Emergency Stop) button at three locations these
being;
1. Re-fuelling area adjacent to each dispenser Qty. 2 and
2. E Stop24 at Re-filling station adjacent to Fuel Storage tanks.
E Stop at 2 is to be activated by Tanker Driver to isolate all Fuel dispensers when Tanker
filling operations are in progress.
19 DEF (Diesel Emission Fluid Urea Solution) 20 All Product pipework [Diesel ULP & Add Blue] is to be installed in single 450mm width at 600mm trench depth. 21 Add Blue Dispenser not inclusive within quoted package. [Electrical connection to termination point at forecourt only) 22 IP Rating to AS 1939 Clause 5 and Clause 6 23 Sub Board to be affixed to area adjacent existing switchboard on brickwork 24 E Stop to be mounted on external 316 Stainless Steel Pedestal between ULP and Diesel filling areas.
15 | P a g e
Lithgow City Council Lithgow Facility Program Works
vii. Testing and Commissioning
The Contractor is to check and pre-commission the complete fuel installation including;
o All external and underground pipe-works static testing. (Refer Static Testing ITP)
o Secondary Containment Testing
o Static testing all pipework from Tank outlet to under pump shear or isolation valve
o Fuel Dispenser Isolation Valve to Dispenser inlet test
o Wet testing all fuel load IN pipework
o Wet testing all Fuel Dispensing pipework
o Operation of Tank overfill protection valve(s)
o Electrical operation of Tank Anti Siphon valves
o Operation of above ground Tank Vents
o Check and confirmation of fuel storage level gauging/dip sticks etc.
o Operation of E Stop emergency switches
o Check and conformity of operation of electricals including;
Residual Circuit protection devices
Solenoid Safety Valves
Circuit breakers
o Pump Hook Isolation (Authorisation operation/shut-off at Pump Handles)
o Dangerous Goods Audit including
Appropriate Combustable and Flammable Class 3 Signage at Dispenser outlets
and Fuel Storage Facility
Safety Signage and Placement
Line Identification to AS1345-1995
Added Scope of Works -Amendments
Construction of Concrete Hardstand and Oily Water Separator Supply & Install
Priority Fuel Management agrees to provide a new concrete hard stand area at the refuelling
area of the Lithgow Depot in accordance with AS2870-2011
Reference Document Drawing Number 2012-0130A Sheet 4 of 6
Concrete is to be at 32Mpa tensile strength to a 200mm depth with an envelope dimension of 12
metres x 9 metres. (Inclusive of 100mm height kerbing at both Northern and Southern extremities
of the Hardstand.
A tied reinforced steelworks raised concrete island is also inclusive within the quotation @ 25Mpa
tensile at 100mm height for entire refuelling island.
Safety Painting by two pack urethane Safety Yellow of the island verticals is inclusive within the
scope of works
16 | P a g e
Hardstand to be fitted with Durham 200mm width drainage grate and channel to 200mm depth
discharging to Oily Water Separator.
Lithgow City Council Lithgow Facility Program Works
Construction of Concrete Hardstand and Oily Water Separator Supply & Install (continued)
A 600mm width bund at 100mm height will be provided at each end of the concrete hardstand by
the Contractor via tied reinforced steelworks to provide connection reinforcement to main
concrete slab.
Further, the company will provide and commission a Qwikflo KCPS-1500 240Vac Coalescing
Plate Oily Water Separator and pump unit inclusive of electrical connection and installation and
commissioning. (See Inset photo equivalent)
o 32mm Pressure Inlet
o 50mm Outlet (to Sewer)
o Oil 50mm UPVC Socket
o Sludge Hopper 50mm Bronze Ball Valve
o 2 Vertical Plate Packs achieving an effluent quality of 30ppm oil
o Mac 3 Model electro mechanical level regulator
Plumbing from Bund trench to be provided to Oily Water Separator
Note.
Sewer connection from the oily water separator is not inclusive within the scope of works as
outlined by the Contractor.
Installation of Refuelling Area Hardstand awning.
The Contractor agrees to provide all necessary trades and Craneage to ensure the safe assembly
installation and attachment of the hardstand awning as referenced on plans provided by Anthony Daintith
Town planning.
Reference Document Drawing Number 2012-0130A Sheet 5 of 6.
SPECIAL NOTE
A supplied costing for the fabrication of the awning structure is provided by Priority Fuel Management for
comparative purposes and referencing understanding the awning structure may be provided (by Lithgow
City Council)
Cost pricing Lithgow Awning $43,698.00 Supply and Installation
$4,760.00 Install ONLY
17 | P a g e
Lithgow City Council Lithgow Facility Program Works
viii Client Handover
The Contractor is to provide Lithgow City Council or its nominated representative with the following
documentation on Fuel Storage and Dispensing Facility handover inclusive of;
o A completed Bill of Materials manifest for the entire installation.
o All testing documentation ITP’s and results.
o Detailed description of the Facility for Certification (By others)
o Detailed description of the Facility documentation for Certification of the facility by Dangerous
Goods Consultant
o Additional drawings as requested may be provided by the Contractor and include product supply
lines (underground location confirmations)
o Electrical lines (underground) locations
o Operational Manuals for Electrical Sub Board
o Operational and Programming Manuals for Fuel Pumps
o Specification sheets and documentation Fuel Pumps Pipework/Isolation Valves
o Warranty Certificates and documentation all equipment supplied
ix Project Costing
Total Project Costing
Total project costing is to include the Lithgow Works Depot Fuel Storage and dispensing Installation as
well as the Wallerawang Works Depot Fuel Storage and dispensing Installation.
See project costing immediately following Section viii Wallerawang Depot Client Handover
(Refer to Page 29)
18 | P a g e
Lithgow City Council Wallerawang Facility Program Works
Part B Wallerawang Fuel Storage Project Works 1 & 2) Removal & Disposal Underground Storage tanks Bowsers and ancillaries
1. Priority Fuel Management is to provide for the safe removal and certified disposal of three off
existing UST (underground steel tanks) at the Lithgow City Council Wallerawang Facility.
a. Designated sizes
i. 11500 Safe Fill Level Distillate Tank
ii. 4000 Safe Fill Level ULP Tank
iii. 2200 Safe Fill Level Leaded Tank
2. Removal and disposal of existing Diesel (1) and ULP (1) bowsers from existing forecourt.
3. Disconnection and Removal of existing Datafuel module.(1)
4. Disconnection and removal of existing Datafuel electrics and communications cabling.
5. Removal and traceable disposal of 1000 litres of waste fuel
3) Construction of Concrete Hardstand and Oily Water Separator Supply & Install
Priority Fuel Management agrees to provide a new concrete hard stand area at the refuelling
area of the Lithgow Depot in accordance with AS2870-2011
Reference Document Drawing Number 2012-013DA Sheet 4 of 6
Concrete is to be at 32Mpa tensile strength to a 200mm depth with an envelope dimension of 12
metres x 9 metres. (Inclusive of 100mm height kerbing at both North East and South west
extremities of the Hardstand.
A tied reinforced steelworks raised concrete island is also inclusive within the quotation @ 25Mpa
tensile at 100mm height for entire refuelling island.
Safety Painting by two pack urethane Safety Yellow of the island verticals is inclusive within the
scope of works
Hardstand to be fitted with Durham 200mm width drainage grate and channel to 200mm depth
discharging to Oily Water Separator.
Plumbing from Bund trench to be provided to Oily Water Separator
A 600mm width bund at 100mm height will be provided at each end of the concrete hardstand by
the Contractor via tied reinforced steelworks to provide connection reinforcement to main
concrete slab.
Further, the company will provide and commission a Qwikflo KCPS-1500 Oily Water Separator
and pump unit inclusive of electrical connection and installation and commissioning.
(Refer Detail Lithgow Scope of Works page 16 previous)
Note.
Sewer connection from the oily water separator is not inclusive within the scope of works as
outlined by the Contractor.
19 | P a g e
Lithgow City Council Wallerawang Facility Program Works
3) Installation of Refuelling Area hardstand awning Wallerawang Depot (continued)
The Contractor agrees to provide all necessary trades and Craneage to ensure the safe assembly
installation and attachment of the hardstand awning as referenced on plans provided by Anthony Daintith
Town planning.
Reference Document Drawing Number 2012-013DA Sheet 5 of 6.
SPECIAL NOTE
A supplied costing for the fabrication of the awning structure is provided by Priority Fuel Management for
comparative purposes and referencing understanding the awning structure may be provided (by Lithgow
City Council)
Cost pricing Wallerawang Awning $43,698.00 Supply and Installation
$4,760.00 Install ONLY
4) Supply of New Bowser
Priority Fuel Management agrees to the Supply and Installation of (one only) Fuel Bowser
exclusive of containment sumps. Containment Sump installed by others
As nominated Dual Hose (Hi Flow/Standard Flow) Compac Diesel Pump.[80lpm/40lpm]
Dispenser to be set up for Fuel Management system connection.[Gilbarco Protocol]
The Contractor agrees to provide the following as stated below inclusive of;
One only Dual Handle Compac25 (Hi Flow and Standard Flow ) Diesel Fuel Pump
Dual Pump Sump containment and Thru sump terminations
Eskay under pump valve Diesel
Electrical thru sump fittings Diesel and ULP pumps
Mechanical fastenings (Stainless steel)
High Flow Mast assembly (Diesel Pump)
Breakaway Hose Fittings Diesel (Qty 2)
Shear Valve Assembly (Pump Impact Protection component) Diesel Pump
Electrical connection of Pumps and testing
Wet testing and commissioning
25 Fitted with Gilbarco Protocol for Fuel Management system connection by others
20 | P a g e
Lithgow City Council Wallerawang Facility Program Works
5) Electrical Works
Priority Fuel Management agrees to the Supply and Installation of Electrical Switchboard
adjacent to Works Equipment Shed area for;
Fuel Pump control
Dispenser Hook Isolation
Electrical connections inclusive of Emergency Stop Switches at
Re-fuelling Dispenser location (Qty 1) and
Storage Tank Re-filling area. (Qty 1)
Supply and installation of Solenoid Operated Anti Siphon protection valve (Diesel)
Provide additional Circuit to include provision for Add Blue dispenser installation (timing
at a later stage as nominated by Lithgow City Council)
6) Set up Storage Tank
Confirm supply and installation conformity of 80mm Product Fill Line to Diesel Storage Tank
Connection, testing and commissioning of one only above ground Fuel Storage Tank
(Tank existing).Provide for the Supply and Installation of necessary pipe-works to connect
and commission AGT (Above Ground Tank) supplied by others including placement and
securement to AS1940-2004
Supply, install and commissioning external (above ground) product supply line (Schedule 40
Galvanised)26
Note 1 External pipework’s are to run alongside existing above ground tank.
Note 2 Disconnection and re-connection of existing secondary containment pipework is to be
provided by the contractor as existing line bury depth and fittings will require confirmation
and checking.
Install approved vent pipe and capping vents as necessary to Diesel Tank
7) Fuel Pipes
Check confirm and commissioning product supply line (Medium Galvanised and Secondary
containment UPP thermoplastic Pipework. (Note Smartflex 75mm Double walled pipework
connected prior by others)
Hydrostatic Testing Commissioning and Client handover
Dangerous Goods Detail documentation to the client
8) Signage
Supply and Fitment of Dangerous Goods approved signage appropriate in accordance with
AS1940-200427. Class 3 Flammable at Refuel areas
26 Medium Galvanised Pipework Supplied to above ground areas of Fuel Installation 27 As1940-2004 The Storage and Handling of Flammable and Combustable Goods
21 | P a g e
Pipework signage to be to Australian Standard Paint colour and all identification decals supplied
and fitted in accordance with AS1345-1995 Pipeline Identification Standards. Supply and install
Safety Sign on approved height Galvanised Pole (No smoking/mobile phones etc)
Lithgow City Council Wallerawang Facility Program Works
9) Commission and Calibrate
All Pumps are to be wet tested and calibrated prior to client handover.
Calibration certification to be part of the handover documentation requirements.
Commissioning ITP’s (Inspection and Test Plans) will be provided to the client by the
Contractor and confirmed prior to handover.
Fleet vehicles and light vehicles re-fuelling will be undertaken by the Contractor to the
satisfaction of the client at handover
Contaminated Materials and UST Disposal Schedule of Rates Location Tank Size Certified Traceable tanks Disposal Costs Lithgow 16500 litre $3540 Lithgow 4500 litre $2200 Lithgow 2200 litre $1890 Wallerawang 11500 litre $3280 Wallerawang 4000 litre $2200 Wallerawang 2200 litre $1890 Waste Disposal Rate /metric tonne VENM $20-38/tonne Contaminated $200/tonne
22 | P a g e
Lithgow City Council Wallerawang Facility Program Works
Part B Wallerawang i. Site Preliminary Works
The Contractor in providing preliminary works is to provide the following site establishment and works
programme documentation prior to commencement of works at Lithgow City Council. [Wallerawang
Depot]
The Contractor nominates the following services necessary to establish preliminaries at the Wallerawang
Council site as follows;
Lithgow City Council Wallerawang works depot Inductions
Priority Fuel personnel sign on to project works area
Establish and submit Traffic Management Plan [LCC Wallerawang works site]
Provide security Barrier Fencing to immediate area of project works
Establish Deep Excavation Signage and appropriate Work safe Compliance documentation and
signage including;
Hard Hats/ Hearing Protection/PPE
Construction Area
Flammable Atmosphere/Combustable Atmosphere Signage/No Smoking
Authorised personnel only
Submit Safe Work Method Statements to LCC designated personnel
Submit Plant and Equipment Register to LCC designated personnel
Submit Priority Fuel Personnel & Contact Register to LCC designated personnel
Establish Visitor Sign on Register (as appropriate)
Lock out Tag Out all existing Fill Points
Advise LCC Supervisory Personnel re Fuel Deliveries cessation and confirm.
Lock out Tag out all Fuel Dispensing Areas
Provide Electrical and Mechanical isolation of existing Fuel Bowsers
Drain down all product suction lines Diesel and ULP after bowser disconnection.
Sample and Report to client on remaining Diesel Fuel Quantity in existing Underground Steel
Tank prior to product removal.
Decant and disposal28 of contaminated ULP product in accordance with NSW EPA Regulations29
Estimated contaminated product approximately 1000 litres
Re-instatement30 of Diesel Fuel by Filtration and transferral to new Above Ground Tank (See
Options)
Decant and disposal of remaining fuel product in leaded tanks and disposal under Lic # 12862
28 Disposal under Priority Fuel Management NSW EPA licence 12862 29 Certified Disposal Recording to be provided to Lithgow City Council on disposal completion 30 Re-instatement by Closed System Filtration™ process Transferral determination considers remaining Diesel Volume
23 | P a g e
Note. All fuel product disposed is considered J12031 Hazardous waste and must be disposed in
strict accordance with NSW EPA Regulations. (NSW Government Dept. of Environment &
Heritage) Priority Fuel Management is holder of NSW EPA Waste licence Number 12862
Lithgow City Council Wallerawang Facility Program Works
ii Site Excavation & Fuel Facility Abandonment;-Wallerawang Depot
Order of precedence of Works is as follows;
1. Decanting Tank Fuel Loads for removal or transferral32 [ULP and Diesel Tanks]
2. Contaminated Waste Fuel Removal and Disposal under NSW EPA Licence number 12862
3. Draining Fuel Product Supply lines from Bowsers
4. Electrical Isolation and Lock out Tag out of Existing Fuel Bowsers
5. Electrical Isolation of DataFuel Module
6. Mechanical Disconnection of Existing Fuel Bowsers
7. Mechanical Disconnection of existing DataFuel Module
8. Disconnection and Removal of existing Vent Lines (All products)
9. Excavation of Concrete Forecourt at re-fuelling area and relocation on LCC works site
10. Tank top excavation Diesel Tank
11. Tank Top excavation Unleaded Tank
12. Tank Top excavation Leaded (De-commissioned)
13. Soil Management transferral on Client works site
14. Tank #1 de-gassing
15. Tank Removal and Preparation for Transportation and Compliant Disposal
16. Transportation and Disposal
31 J120 Classification Waste oil/hydrocarbons mixtures/emulsions in water by NSW DEH 32 Priority Fuel Management agrees to Filter and transfer resident Diesel Fuel within the existing tank to ensure run downs of the fuel do not require LCC management
24 | P a g e
Lithgow City Council Wallerawang Facility Program Works
ii Site Excavation & Fuel Facility Abandonment;-Wallerawang Depot
Removal of Existing Fuel Bowsers
The Contractor is to provide for both the mechanical and electrical isolation and disconnection and
preparation for the removal of two existing fuel dispensing bowsers.
Removal of existing fuel bowsers including;
Electrical isolation and disconnection Pumps
Electrical isolation and disconnection DataFuel module
Electrical isolation and disconnection Pump and DataFuel Cabling
Mechanical isolation and disconnection from forecourt area
Sealing and transportation or storage preparation including pallet supply and strapping
Disposal or transportation to clients’ requirements
Site Works Excavation
The Contractor is to excavate33 overburden above each of the three existing underground tanks to be de-
commissioned.
Any demolition of Concrete civil works above the existing underground tank farm is not inclusive within
this quotation. Site visit or confirmation of this requirement is necessary.
Note 1
It is understood by the Contractor that Enviro West is to carry out Monitor well Hydrocarbon analysis at
the Wallerawang depot prior to Project commencement and report findings to LCC and the Contractor as
well as all soil analysis and testing on completion of tanks removal.
Note 2
Reinstatement of excavation site is to be undertaken by the contractor on confirmation of contaminant
free soil analysis. (Contaminated Soil is the responsibility of the client with regards to EPA compliant
disposal if applicable.) See Schedule of Rates reference Page 21
Note 3
Additional Fill material allowances have been included by the contractor within the quotation to backfill
entire excavation area.
Note 4
Contaminated Spoil.
In the event of tainted overburden the contractor agrees to transport and store the material to a
nominated location on the clients’ site. Transportation and disposal of tainted or contaminated excavated
waste off site is not inclusive within this quotation.
33 Excavation is inclusive excavation of natural material only [ENM]
25 | P a g e
Lithgow City Council Wallerawang Facility Program Works
ii Site Excavation & Fuel Facility Abandonment;-Wallerawang Depot
Tank(s) Removal
The contractor agrees to provide for the following services;
Removal of Type 11.5 Underground Steel Diesel Storage Tank and ancillary pipework and valve-
work
Removal of Type 4 Underground Steel Unleaded Tank and ancillary pipework and valve-work
Removal of Type 2.2 Underground Steel unused leaded Tank and ancillary pipework and valve-
work
Disconnection and disposal of Tank Infill Lines and Product supply lines to each of three
underground tanks.
Disconnection and disposal of Tank Vent Lines34 to each of three underground tanks
Disposal and traceable certification documentation of underground steel tanks as identified
above.
Soil Remediation/Backfilling
Soil remediation (refer Note 4 previous pages)
Backfilling of excavation works with new backfill material
Compaction and excavated site remediation to pre-existing condition. In preparation for concrete
hardstand civil works
Removal of Existing Data Fuel Module
The Contractor is to provide for both the mechanical and electrical isolation and disconnection and
preparation for the removal of the existing Data Fuel Module
Disconnected Data Fuel module is to be palletised and shrink wrapped by the contractor for efficient
storage. (Storage or disposition at LCC discretion)
34 No Allowance made for disconnection of high level vent lines by scissor Lift (Disconnection and removal from ground level)
26 | P a g e
Lithgow City Council Wallerawang Facility Program Works
iii Diesel Lines Connection
Diesel Product Load IN Product Fill
The Contractor agrees to provide the following as stated below inclusive of;
Supply and installation of 80 NB medium galvanised pipework to Diesel Storage tank.
Connection point to flanged connection of tank (tank by others)
Fill Pipework to be terminated with 80mm Camlock attachment and isolation provided by
lockable 80mm Stainless Steel Fire Safe rated Ball Valve. (Supplied by others)
Supply and fitment of 80mm Diameter Swing check valve for fuel load in piping.
(Supplied by others)
Supply and Installation of 316 Stainless Steel Fill Point Spill containment Drip Tray and
fastenings
Labelling of external Fill Point pipework in accordance with AS 1345-1995 (Supplied by
others)
Fitment of Vent Stack pipework
Hydrostatic Testing35 product pipe-works prior to commissioning
Site Supervision of initial Tank filling inclusive of;
Overfill protection device activation
Vent activation checks during Filling
Swing Check Valve activation checks
Dip Stick Calibrations
External Gauge Calibration/check (if applicable) and
Reconciliation against Tanker consignment
iv Pump Fitment
The Contractor agrees to provide the following as stated below inclusive of;
Compac Dual Flow Hi Lo Diesel Fuel Pump
Descriptive
The Contractor is to supply and install 1 only Compac High Flow dual Fuel pump assembly.
(See brochure attachments) 80lpm/40lpm
Pump assembly is to be mechanically connected to existing under pump sump assembly (supplied prior)
by others.
35 Hydrostatic Testing undertaken by the Contractor shall ensure all connections are pressure tested (Air pressure ) to a maximum 100kPa
Commission test approval will be accorded after a period not less than 12 hours duration without pressure decay.
27 | P a g e
Lithgow City Council Wallerawang Facility Program Works
v. Provisional Add Blue Connection
The contactor is to provide provisional connection (partial only) for the establishment of an Add Blue urea
dispensing station at the re-fuelling forecourt.
This is to consist of the provision of the supply and connection of Add Blue thermoplastic pipework from
the existing add blue line outlet (previously installed by others) adjacent to the proposed add blue IBC
storage shed.
A 50mm OD Add blue line is to be provided by the contractor to extend to a forecourt re-fuelling position
at which point the line will be terminated by fitment of a 316 Stainless steel isolation ball valve.
Add blue line is to be thermoplastic welded and laid within a trench of a minimum 600mm depth, with the
trenching preparation and backfilling provided by others.
The underground pipework trench36 is to run approximately parallel to the existing stormwater trenching
with an appropriate easement from the stormwater as appropriate to Council regulations.
The Add blue Dispenser footprint (Dispenser Frame assembly) is to be determined following client advice
on the dispenser make and model selected.
Priority Fuel Management has included attachments providing varied add blue dispenser options for
reference by the client that may assist in the selection process.
The contractor agrees to provide a blanking plate across the Dispenser Frame to isolate pipework and
fittings from damage or unauthorised access.
36 All Product pipework [Electrical Diesel ULP & Add Blue] is to be installed in single 450mm width at 600mm trench depth. Trenching by LCC
28 | P a g e
Lithgow City Council Wallerawang Facility Program Works
vi. Electrical Sub Boards and Connection
The contractor agrees to supply all electrical requirements necessary to commission the new Fuel
dispensing operation (Diesel and Add Blue)37 at the Wallerawang works depot inclusive of the following;
Electrical isolation and disconnection and removal of the existing sub board
Supply and installation of new external electrical IP Rated38 sub board39 and wiring to the
bowsers and the storage tank transfer pump (including wiring for future Ad-Blue bowser.)
Supply and installation of Pump relays and circuit protection
Supply and Installation of Dispenser Hook Isolators
Supply and installation of approved RCD devices for Dispensers (3)
Supply and installation of approved RCD devices for Pump circuit protection
Supply and installation of electrical E Stop (Emergency Stop) button at two locations these being;
1. Re-fuelling area adjacent to Diesel dispenser Qty. 1 and
2. E Stop40 at Re-filling station adjacent to Fuel Storage tank.
E Stop at 2 may be activated by Tanker Driver to isolate all Fuel dispensers when Tanker
filling operations are in progress.
vii. Testing and Commissioning
The Contractor is to check and pre-commission the complete fuel installation including;
o All external and underground pipe-works static testing
o Static testing all pipework from Tank outlet to under pump shear or isolation valve
o Fuel Dispenser Isolation Valve to Dispenser inlet test
o Wet testing all fuel load IN pipework
o Wet testing all Fuel Dispensing pipework
o Operation of Tank overfill protection valve(s)
o Operation of above ground Tank Vents
o Check and confirmation of fuel storage level gauging/dip sticks etc.
o Operation of E Stop emergency switches
o Confirm Dispenser Hook Isolation (Authorisation operation/shut-off at Dispenser Handles)
o Appropriate Combustable and Flammable Class 3 Signage at Dispenser outlets and Fuel
Storage Facility
o Appropriate external pipework identification to AS1345-1995
37 Add Blue Dispenser not inclusive within quoted package. [Electrical connection to termination point at forecourt only) 38 IP Rating to AS 1939 Clause 5 and Clause 6 39 Sub Board to be affixed to area adjacent existing switchboard on brickwork 40 E Stop to be mounted on external 316 Stainless Steel Pedestal between ULP and Diesel filling areas.
29 | P a g e
Lithgow City Council Wallerawang Facility Program Works
viii. Client Handover
The Contractor is to provide LCC with the following on Fuel Storage and Dispensing Facility handover
inclusive of;
o A completed Bill of Materials manifest for the entire installation.
o All testing documentation and results.
o Detailed description of the Facility for Certification
o Detailed description of the Facility documentation for Certification of the facility by Dangerous
Goods Consultant
o Additional drawings as requested may be provided by the Contractor and include product supply
lines (underground location confirmations)
o Electrical lines (underground) locations
o Operational Manuals for Electrical Sub Board
o Operational Manuals for Dispensers
o Specification sheets and documentation Dispensers/STP’s/UPP Pipework/Isolation Valves/
o Warranty Certificates and documentation
ix Total Project Costing
Lithgow and Wallerawang Fuel Facility Works $284,930 ex GST
x Terms and Conditions
o All pricing is quoted exclusive of GST
o All pricing remains firm for 30 days from the submission closing date 6/11/2012
o All pricing includes Free into Store Lithgow and Wallerawang
o Pricing Inclusive of all fuel related works
o Pricing Inclusive of Installation of Awnings Lithgow & Wallerawang
Schedule of Terms
20 per cent payable on order entry [Pumps Electrical and Ancillaries]
15 per cent payable on excavation works and tank removal completion
15 per cent payable on Sumps and Pipe-works Installation
15 per cent payable on delivery of Electrical Sub Boards
30 per cent payable on commissioning and Handover
5 per cent balance payable on receipt Warranty and operational documentation
Total Payable $284,930.00 ex GST
o Availability (Personnel) Two-Three working weeks’ notice of project commencement
o Lead Times
Please give consideration to critical item lead times as detailed below
Compac Pump Units 3-4 weeks
30 | P a g e
Electrical Sub Boards Minimum 4 weeks
Lithgow City Council Lithgow & Wallerawang Facility Program Works
x Terms and Conditions (continued)
o Pricing assumes Wallerawang and Lithgow Works undertaken separately.
(Please refer to Options clause Economies of Scale page number 30 over)
o Tainted or Contaminated Soil disposal is not inclusive within the scope of supply (refer
schedule of rates)
31 | P a g e
Lithgow City Council Lithgow & Wallerawang Facility Program Works
Options
As referenced within the request for quotation documentation, any options that may be considered
necessary or to enhance the safety or efficiency of either the project or the operations of the fuel storage
and dispensing facility were to be nominated.
Priority Fuel Management provides the following list for reference and consideration.
All options are provided below are inclusive within the scope of supply as offered by the Contractor.
Extended Warranty Period
As a Primary Contractor to Lithgow City Council, Priority Fuel Management will provide an extended
warranty period on all operational componentry of the system “as Built”
The Warranty period of 12 months will be extended for an additional 12 month period (24 months
Warranty) on all operational componentry as identified within the list below.
This will extend to Fuel Pumps and ancillary protection devices and all electrical works.
Extended Warranty Includes;
Fuel Pumps
Electrical or Mechanical breakdown as above
Filter Strainer Assemblies Hoses41 and Pumps
Breakaway Couplings on all Fuel Pump Hoses
Shear Valves under pumps
Isolation Valves and Gasketting
Anti-Siphon Valves including their internal sealing components
Test Pressure Gauges
Service Calls
On-site Service
During the 24 month extended Warranty period, Priority Fuel Management will attend both the Lithgow
and Wallerawang sites each and every six monthly interval during the course of the Warranty period.
Service calls will include Filter and Strainer maintenance, external cleaning of all pumps, tightness tests
and line monitoring for underground works carried out during the construction period.
Any operational aspects of concern may at any time be advised by Lithgow City Council during this 24
month period.
Site attendance to operational issues will be attended to by Priority Fuel Management on the next working
day to the logged Service call or enquiry.
SAFETY Anti-Siphoning Protection Devices Priority Fuel Management agrees to provide a “secondary anti siphoning protection device” by a 50mm
diameter solenoid controlled normally closed bronze fuel shut-off valve to each of the three fuel tanks.
41 Excludes normal wear and tear/abrasion and cuts
32 | P a g e
Dispenser activation “only” will energise a 240Vac solenoid to provide full safety against tank siphoning
occurrences. Associated electricals and connection works are inclusive.
Lithgow City Council Lithgow & Wallerawang Facility Program Works
Underground Pipework Identification Priority Fuel Management agrees to include metallic identification tracer tape on all underground installed
fuel product pipework for identification and subsequent location as may be required.
Priority Fuel Management agrees to include metallic identification tracer tape on all underground installed
electrical conduits for identification and subsequent location as may be required.
Economies of Scale Opportunities While pricing assumes the Wallerawang Depot and Lithgow Depot Works are undertaken independently
of each other, opportunities for economies of scale savings can be considered by LCC in the event that
simultaneous program of works are considered for both locations.
Cost implications for the removal of independent excavation works activities for tanks removal works may
provide LCC project cost savings and some discussion in this regard is encouraged by the Contractor.
Simultaneous project works may be a consideration.
Above Ground pipework Support The Contractor is to provide for the support and affixing of all above ground pipework (Diesel) by way of
316 Stainless Steel Pipe stands affixed directly to the existing concrete slab at the Lithgow Works Depot.
Pipework is to run behind the existing Diesel Storage tank traversing behind the Add Blue Storage Shed
and ULP above ground tank.
Diesel and ULP Pipework will terminate at external of ULP Above ground tank where it penetrates below
ground level. All steel pipework is to be double DENSO tape wrapped at any area where pipework
extends below the ground.
Referees
BP Australia BHP Billiton Rio Tinto Australia Exxon Mobil Delta Electricity Pacific National Busways Buslines Sydney Ports D’Albora Marinas FTS Tanks Datafuel Australia
Priority Fuel Management is a privately owned Australian company operating in the Eastern states of
Australia.
All personnel are full time employees and all are Australian Institute of Petroleum trained [AIP]
As Contractor of the Year for BP Australia, we are proud of our safety record and due diligence to
statutory authority regulations and requirements as set down within the addendum provided.
33 | P a g e
Our industry knowledge provides the organisation with best practice methodology with specific regards to
documentation and rigorous application to Australian standards.
Lithgow City Council Lithgow & Wallerawang Facility Program Works
We thank you for the opportunity of providing our conforming tender to the Lithgow City Council.
We are confident of providing Lithgow City Council a first class refuel and underground facility works at
both your operational depots.
Should you require any further information or clarification of the Installation and services provided by
Priority Fuel Management please do not hesitate to contact the writer.
Sincerely
[No signature as electronically transmitted]
Priority Fuel Management Pty Limited David Maltby
34 | P a g e
Lithgow City Council Addendum 1
References ADTP Anthony Daintith Town Planning Drawing Number 20012-013DA Pages 1-6
ADF Automotive Diesel Fuel
AGT Above Ground Tank
AS1345-1995 Australian Standards for Pipeline identification
AS1940-2004 Storage & Handling of Flammable and Combustable Liquids
AS4976-2008 The Removal and Disposal of Underground Petroleum Storage Tanks
AS-2008b) The Removal and Disposal of Underground Petroleum Storage Tanks
DG Dangerous Goods
DECCN Department of Environment & Climate Change NSW
DEF [Diesel Exhaust Fluid] Add Blue Urea Solution
ITP Inspection & Testing Plan
LCC Lithgow City Council
NSWWC NSW WorkCover Authority 2005
OHS DG Occupational Health and Safety (Dangerous Goods) Regulation 2001
STP Submersible Turbine Pump
ULP Unleaded Petrol
UPSS Underground Petroleum Storage Systems
UST Underground Steel Tank
35 | P a g e
Lithgow City Council Addendum 2 Product Detail
Fuel Dispensers (Dual Flow Diesel)
36 | P a g e
Lithgow City Council Addendum 2 Product Detail
Fuel Pumps (Standard Flow ULP)
37 | P a g e
Lithgow City Council Addendum 2 Product Detail
Fuel Dispensers (Configurations)
o Diesel Dual Flow MMR80P 80 lpm /40 lpm o ULP Standard Flow MR40P 40 lpm
38 | P a g e
Lithgow City Council Addendum 2 Product Detail
39 | P a g e
Lithgow Works Depot Addendum 3 [Project Outline]
40 | P a g e
Photo 2 Existing Lithgow Works Depot Forecourt Indicating Distillate and ULP Tank Locations for removal
Photo 3 Distillate Bowser and ULP Bowser (For Removal) Indicating Site Shed for Demolition & disposal
Photo 4 DF9000 Datafuel Module Disconnect/Remove and Package
To existing ULP Tank and existing Decommissioned ULP Tank Removal and Certified Disposal
41 | P a g e
Lithgow Works Depot (Project Outline) Addendum 3 [Project Outline]
Photo 5 New Logitank Above Ground Self Bunded SFL 27416 litres Distillate
Photo 6 Indicates Existing 50mm Outlet Diesel Line Note Pipework to run behind Logitank to rear and terminate adjacent to side of ULP Above Ground Tank
Note. Safety Shut off Valve Handle to be fitted prior to Tank Filling
42 | P a g e
Lithgow Works Depot (Project Outline)
Photo 7 Removal and Disposal Existing Vent Stacks
Photo 8 Existing Sub Board Isolate Disconnection and Removal of Existing Sub Board
Photos 9& 10 ULP Self Bunded Tank and ULP Tank Upper Pump Suction Connection Point
Pump Connection Point NOTE Drop tube riser and suction stub to be installed by the Contractor