TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2011 - 2020 APPROVED BY THE NH LEGISLATURE AND SIGNED INTO LAW BY THE GOVERNOR PURSUANT TO RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE PROJECTS LISTED ALPHABETICALLY PREPARED BY THE NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION JUNE 28, 2010 Projects Only

Upload: dangtruc

Post on 29-Aug-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

TEN YEAR TRANSPORTATION IMPROVEMENT PLAN

2011 - 2020

APPROVED BY THE NH LEGISLATURE

AND SIGNED INTO LAW BY THE GOVERNOR

PURSUANT TO

RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE

PROJECTS LISTED ALPHABETICALLY

PREPARED BY THE NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION

JUNE 28, 2010

Projects Only

TEN YEAR TRANSPORTATION IMPROVEMENT PLAN

2011 - 2020

APPROVED BY THE NH LEGISLATURE

AND SIGNED INTO LAW BY THE GOVERNOR

PURSUANT TO

RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE

PROJECTS LISTED ALPHABETICALLY

PREPARED BY THE NEW HAMPSHIRE

DEPARTMENT OF TRANSPORTATION

JUNE 28, 2010

Projects Only

TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2011 - 2020~ Alpha Sort with Funding Category Label ~

June 28, 2010

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

ACWORTH

NH 123A Bridge repaired following flood

damage. Red List Bridge

Priority #20.

REPLACE BRIDGE OVER BOWERS BROOK - 113/064 {Red List} [Oct 2005 Flood] (Bridge Rehab

= 14540T, FY 2007)

6641FHWA

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C 2018

1.000Total:Highway and Bridge 1.000

ALEXANDRIA

14964

WASHBURN ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER PATTEN BROOK - 160/109 {Red List}

6610State Aid Bridge

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.015C 2014

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .117P

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

1.137Total:Highway and Bridge 0.540

ALTON

14239

PLACES MILL ROAD Specific project from Statewide

program, Municipal managed.

BRIDGE REPLACEMENT OVER SUNSET LAKE OUTLET - 098/178

5634 State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .275C 2011

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .055P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.335Total:Highway and Bridge 0.335

ANDOVER

14573

MORRILL HILL ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER ELBOW BROOK (AKA GREAT BROOK) - 127/106 {Red List}

6152State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .502C 2011

.502Total:Highway and Bridge 0.507

ANTRIM

14828

US 202 / NH 31 MAIN

STREET

Specific project from Statewide

program. Municipal Managed.

REHABILITATION PHASE 2: CONTINUE EXISTING PROJECT ON THE WEST SIDE TO RECONSTRUCT

SIDEWALKS, SHOULDERS AND DRAINAGE TO IMPROVE THE DOWNTOWN PEDESTRIAN

FACILITIES AND COMPLETE TRAFFIC CALMING AND PEDESTRIAN FLOW IMPROVEMENTS (TE

Program) [06-03TE]6232 FHWA

2011 L220 - STP - TRANSPORTATION ENHANCEMENT .337C TE 2006

.337Total:Bike / Pedestrian 0.341

Projects Page - 1 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

ANTRIM

14940

DEPOT STREET Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER RELIEF - 181/071

6497State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .235C 2010

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.285Total:Highway and Bridge 0.285

ANTRIM

14941

DEPOT ST Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER CONTOOCOOK RIVER OVERFLOW - 183/071 {Red List}

6496State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .310C 2010

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.375Total:Highway and Bridge 0.375

ANTRIM

14942

CRAIG ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER BROOK - 117/093 {Red List}

6495State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .170C 2013

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.220Total:Highway and Bridge 0.220

ANTRIM - BENNINGTON

15349 A

DEPOT STREET Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REHABILITATION - 184/071, PHASE II {Red List}

7001State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .570C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.670Total:Highway and Bridge

AUBURN

15512

CHESTER TURNPIKE Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REHABILITATION OVER MURRAY BROOK - 120/149 {Red List}

6999State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .184C New Project

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .036P

.220Total:Highway and Bridge

Projects Page - 2 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

AUBURN

15657

OLD CANDIA ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REHABILITATION OVER MAPLE FALLS BROOK - 088/159 {Red List}

7170State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .227C New Project

.227Total:Highway and Bridge

BARNSTEAD - ALTON

14121

NH 28 Initial intersection priorities in

2010. Pavement rehabilitation

and/or other corridor priorities.

RECONSTRUCTION FROM THE ALTON CIRCLE SOUTH APPROXIMATELY 7.0 MILES TO THE

IMPROVED SECTION IN BARNSTEAD

2738FHWA

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 4.125C 2015

2011 L200 - STP - AREAS LESS THAN 200,000 .096P

2011 L250 - STP - RURAL AREAS < 5,000k .010P

2013 L250 - STP - RURAL AREAS < 5,000k .010P

2013 L250 - STP - RURAL AREAS < 5,000k .100P

2011 L250 - STP - RURAL AREAS < 5,000k .027R

2014 L250 - STP - RURAL AREAS < 5,000k .340R

4.708Total:Highway and Bridge 6.100

BEDFORD

FEE Tpk Specific project from HB 391,

Turnpike Capital Program.

WIDENING AND RETROFIT EXISTING BEDFORD TOLL FACILITY TO IMPLEMENT HIGHWAY SPEED

(OPEN ROAD) TOLLING {Turnpike}

7394 Turnpike Expansion

2012 TPK - TURNPIKE EXPANSION (State FY) 10.435C New Project

2013 TPK - TURNPIKE EXPANSION (State FY) 9.565C

2011 TPK - TURNPIKE EXPANSION (State FY) .400R

20.400Total:Highway and Bridge

BEDFORD

13527

US 3 Turnpike Capital Program, Red

List Bridge Priority # 32

REPLACE BRIDGE OVER F.E.E.T. - 189/121 & ASSOCIATED APPROACH WORK {Turnpike} {Red

List}

3036 Turnpike Expansion

2012 TPK - TURNPIKE EXPANSION (State FY) 12.200C 2013

2011 TPK - TURNPIKE EXPANSION (State FY) .350R

12.550Total:Highway and Bridge 13.318

BEDFORD

13953

NH 101 DOT priority list, SNHPC priority

#1

WIDEN TO 5 LANES FOR APPROXIMATELY 2 MILES, FROM NH 114 TO WALLACE ROAD

1818 FHWA

2019 L050 - NATIONAL HIGHWAY SYSTEM 6.500C Previously Programmed Beyond TYP (Deferred)

2015 L050 - NATIONAL HIGHWAY SYSTEM .385P

2016 L050 - NATIONAL HIGHWAY SYSTEM .250P

2016 L050 - NATIONAL HIGHWAY SYSTEM .250R

7.385Total:Highway and Bridge

Projects Page - 3 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

BEDFORD - MANCHESTER -

LONDONDERRY -

MERRIMACK

11512 H

AIRPORT ACCESS ROAD Current construction schedule

and specific construction

contract breakout. Advanced

due to ARRA funds.

CONSTRUCT NORTH OF LITTLE COHAS BRIDGE AND FINAL PAVING TO NH 3A (Parent = Bed-

Man-Lon-Mer 11512)

5670 FHWA

2011 L050 - NATIONAL HIGHWAY SYSTEM 2.753C 2012

2011 L050 - NATIONAL HIGHWAY SYSTEM .650C 2012

2012 L050 - NATIONAL HIGHWAY SYSTEM 3.750C 2012

7.153Total:Highway and Bridge 5.000

BEDFORD - MANCHESTER -

LONDONDERRY -

MERRIMACK

11512 K

AIRPORT ACCESS ROAD Current construction schedule

and specific construction

contract breakout. Advanced

due to ARRA funds.

SELECTS, FINAL PAVING AND MISCELLANEOUS WEST OF MERRIMACK RIVER (Parent = Bed-

Man-Lon-Mer 11512)

5952 FHWA

2011 L050 - NATIONAL HIGHWAY SYSTEM 7.225C 2013

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.088C 2013

2012 L050 - NATIONAL HIGHWAY SYSTEM 8.750C 2013

17.062Total:Highway and Bridge 14.572

BELMONT - LACONIA

NH 106 Scope to address pavement

and problem intersections only.

RECONSTRUCT FROM 0.4 MILES NORTH OF US 3 / NH 11 BYPASS SOUTHERLY INTO BELMONT

SOUTH OF OPECHEE PLAZA

2787 FHWA

2018 L050 - NATIONAL HIGHWAY SYSTEM 1.500C 2017

2011 L050 - NATIONAL HIGHWAY SYSTEM .100P

2012 L050 - NATIONAL HIGHWAY SYSTEM .100P

2014 L050 - NATIONAL HIGHWAY SYSTEM .800P

2012 L050 - NATIONAL HIGHWAY SYSTEM .100R

2015 L050 - NATIONAL HIGHWAY SYSTEM .625R

3.225Total:Highway and Bridge 3.225

BERLIN

12958 B

NH 110 Earmark funding.PHASE 2 RECONSTRUCTION FROM FIRST AVENUE TO WIGHT STREET (APPROX.0.7 MILES)

[Section 1702 - Designated Project; Demo Id NH043 & NH062]

3763 FHWA

2012 L200 - STP - AREAS LESS THAN 200,000 1.420C 2011

2012 LY20 - HIGH PRIORITY PROJ SEC 1702 .580C

2013 HPER - HIGH PRIORITY 1.793C

2013 L200 - STP - AREAS LESS THAN 200,000 .207C

2011 HY20 - HIGH PRIORITY PROJ SEC 1702 .523R

2011 LY20 - HIGH PRIORITY PROJ SEC 1702 2.477R

2012 LY20 - HIGH PRIORITY PROJ SEC 1702 .550R

7.550Total:Highway and Bridge

Projects Page - 4 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

BERLIN

15792

HILLSIDE AVENUE Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER DEAD RIVER - 232/066 [SAB*4216] {State Aid Bridge Program}

7338 State Aid Bridge

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .497C New Project

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.567Total:Highway and Bridge

BERLIN

15793

12th STREET Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION OVER ANDROSCOGGIN RIVER - 256/087 [SAB*4216] {State Aid Bridge

Program}

7339 State Aid Bridge

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .776C New Project

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P

.836Total:Highway and Bridge

BETHLEHEM

13087

US 302 Specific project from Statewide

Program. Municipal Managed.

CORRECTION OF TRAFFIC & PEDESTRIAN SAFETY DEFICIENCIES; INCLUDING SIDEWALKS,

CURBING, CROSSWALKS, SIGNING, & LIGHTING IN THE CENTER OF TOWN (TE Program) [98-

77TE]2331 FHWA

2011 L220 - STP - TRANSPORTATION ENHANCEMENT .035C TE 1998

.035Total:Highway and Bridge

BOW

13742 B

I-93 Breakout from Bow-Concord

13742 Turnpike Capital

Program. Red List Bridge

Priorities #22 & #23.

BRIDGE REDECKING OVER I-89 & TURKEY RIVER - 135/160 & 136/160 [Parent = Bow-Concord

13742] {Both Red List}

6816

Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 5.000C

5.000Total:Highway and Bridge

BOW - CONCORD

I-93 Preliminary Design of corridor

improvements

WIDEN FROM I-89 TO I-393 (PE Only)

7447 FHWA

2014 L010 - INTERSTATE MAINTENANCE 1.000P Previously Programmed Beyond TYP (Deferred)

2014 TPK - TURNPIKE EXPANSION (State FY) 1.000P

2.000Total:Highway and Bridge

BOW - CONCORD

13742 A

I-93 Breakout from Bow-Concord

13742 Turnpike Capital

Program. Red List Bridge Priority

#58.

EXIT 12 (Concord), NH 3A OVER I-93 BRIDGE REDECKING - 203/087 {Red List} (Includes Pe &

Row for 'B' & 'C') [Parent = Bow-Concord 13742]

6815

Turnpike Expansion

2012 TPK - TURNPIKE EXPANSION (State FY) 3.000C Previously Programmed Beyond FY2018

2011 TPK - TURNPIKE EXPANSION (State FY) .400P

3.400Total:Highway and Bridge

Projects Page - 5 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

BRADFORD

15857

BREEZY HILL ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER WARNER RIVER - 161/145 [SAB*4216] {State Aid Bridge Program}

7449 State Aid Bridge

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .865C New Project

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .140P

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R

1.020Total:Highway and Bridge

CANAAN

14952

GOOSE POND ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER GOOSE POND BROOK - 087/092 {Red List}

6599State Aid Bridge

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .320C 2014

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.400Total:Highway and Bridge 0.400

CART

TRANSIT Annual Program FundingOPERATING ASSISTANCE

7239 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .690

6.901Total:Transit

CART

TRANSIT Boston urbanized area FTA

funds.

PREVENTATIVE MAINTENANCE

2985 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

.850Total:Transit

Projects Page - 6 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

CHESTERFIELD

13597

NH 63 Original scope to address

pavement and guardrail.

RECONSTRUCT TO IMPROVE SAFETY ADJACENT TO SPOFFORD LAKE IN THE AREA OF THE "S-

CURVES" FROM NORTH SHORE ROAD SOUTHERLY APPROXIMATELY 0.5 MILES {STP-Safety}

2747 FHWA

2011 H210 - STP - SAFETY .440C 2011

.440Total:Highway and Bridge 0.450

CLAREMONT

CLAREMONT AIRPORT Safety Issue for future airport

upgrade.

BUILDING DEMOLITION

3400 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM .289

.289Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Address Safety Concerns.CONSTRUCT TAXIWAY 'C' WEST

6515 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .684

.684Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Address Capacity ConcernsCONSTRUCTION ONLY: APRON EXPANSION

6662 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .500

.500Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Address Capacity Concerns.DESIGN ONLY: AIRPORT EXPANSION

6520 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM .158

.158Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Address Capacity ConcernsDESIGN & CONSTRUCT T-HANGARS

7364 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .158

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .158

.316Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Address Safety ConcernsOBSTRUCTION REMOVAL

6519 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .116

.116Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Replace Aging EquipmentPURCHASE SNOW-REMOVAL EQUIPMENT

6663 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .300

.300Total:Aeronautics

Projects Page - 7 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Address Safety Concerns.REMOVE SOUTHERN END OF ABANDONED RUNWAY 5-23 PAVEMENT (REPLACE WITH LOAM

AND SEED)

6516 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .132

.132Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Revisit Airport Role & NeedsUPDATE AIRPORT MASTER PLAN

6517 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM .116

.116Total:Aeronautics

CLAREMONT

CLAREMONT

MUNICIPAL AIRPORT

Address Safety Concerns.UPGRADE RUNWAY SAFETY AREAS

6518 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .447

.447Total:Aeronautics

CLAREMONT

13248 #

NH 12 Earmark funding. Municipal

Managed

NORTH STREET INTERSECTION RELOCATION [Section 1702 - Designated Project; Demo Id

NH039 & NH059] [Parent]

2802 FHWA

2012 HPER - HIGH PRIORITY .078C

2012 HPER - HIGH PRIORITY 1.295C 2012

2012 HY20 - HIGH PRIORITY PROJ SEC 1702 .650C

2012 LY10 - HIGH PRIORITY PROJ SEC 1702 .414C

2012 LY20 - HIGH PRIORITY PROJ SEC 1702 1.955C

4.392Total:Highway and Bridge 4.300

COAST

COAST ADA OPERATIONS

3070 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .074

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .076

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .101

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

.979Total:Transit

Projects Page - 8 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

COAST

COAST Annual Program FundingCAPITAL PROGRAM [ARRA]

3503 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .536

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .553

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .981

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .157

3.171Total:Transit

COAST

COAST Annual Program FundingGENERAL & COMPREHENSIVE PLANNING

3069 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .109

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .113

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .052

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .054

.652Total:Transit

COAST

COAST Annual Program FundingMISC. SUPPORT EQUIPMENT

3067 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .035

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .033

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .034

.340Total:Transit

Projects Page - 9 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

COAST

COAST Annual Program FundingMISC. BUS STATION EQUIPMENT [ARRA]

3068 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .065

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .066

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .065

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

.665Total:Transit

COAST

COAST Annual Program FundingOPERATING ASSISTANCE

567 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.788

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.844

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.566

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.613

16.489Total:Transit

COAST

COAST Annual Program FundingPREVENTIVE MAINTENANCE

2691 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .523

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .538

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .380

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .391

4.178Total:Transit

Projects Page - 10 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

COLEBROOK

13476

NH 26 Specific Project from Statewide

Program

BRIDGE REHABILITATION OVER MOHAWK RIVER - 147/068

571 FHWA

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C 2016

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .058P

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .058P

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .054R

1.169Total:Highway and Bridge 1.169

COLUMBIA

US 3 Prioity Corridor Weight

Restricted Bridge (C1)

REHABILITATE / REPLACE BRIDGE OVER CONE BROOK - 059/089

7360 FHWA

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C New Project

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R

1.150Total:Highway and Bridge

CONCORD

CONCORD AIRPORT Address Safety and Security

Concerns

CONSTRUCTION OF NEW TERMINAL BUILDING

4237 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .256

2019 AIP - AIRPORT IMPROVEMENT PROGRAM 2.132

2.388Total:Aeronautics

CONCORD

CONCORD AIRPORT Safety Issue. New taxiway to

prevent taxiing on runway.

PARALLEL TAXIWAY FOR RUNWAY 12/30 - PHASE I

3403 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM .650

.650Total:Aeronautics

CONCORD

CONCORD AIRPORT Priority as identified by airport

sponsor. Rehabilitation of old

runway to a taxiway.

REHABILITATE TAXIWAY / OLD RUNWAY 3-21

3402Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM 2.850

2.850Total:Aeronautics

CONCORD

CONCORD MUNICIPAL

AIRPORT

Address Safety Concerns.CONSTRUCT ONLY - TAXIWAY 'A' (SOUTH SECTION)

6530 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM 1.390

1.390Total:Aeronautics

CONCORD

CONCORD MUNICIPAL

AIRPORT

Address Safety Concerns.DESIGN ONLY - TAXIWAY 'A' (SOUTH SECTION)

6529 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM .200

.200Total:Aeronautics

Projects Page - 11 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

CONCORD

CONCORD MUNICIPAL

AIRPORT

Address Safety ConcernsDRAINAGE/EROSION REPAIRS - R/W 17 & 30 INTERSECTION

6664 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM 1.750

1.750Total:Aeronautics

CONCORD

CONCORD MUNICIPAL

AIRPORT

Needed to plan for future

projects.

ENVIRONMENTAL ASSESSMENT

6528 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM .300

.300Total:Aeronautics

CONCORD

CONCORD MUNICIPAL

AIRPORT

Address Safety Concerns.EXPAND ITINTERANT APRON

6531 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM 1.600

1.600Total:Aeronautics

CONCORD

CONCORD MUNICIPAL

AIRPORT

Address Safety Concerns.PROPERTY ACQUISITION RUNWAY 17 RPZ - PHASE VI

6527 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .700

.700Total:Aeronautics

CONCORD

CONCORD MUNICIPAL

AIRPORT

Replace Aging EquipmentPURCHASE SNOW REMOVAL EQUIPMENT

6665 Airport

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .295

.295Total:Aeronautics

CONCORD

12004

SEWALLS FALLS ROAD Earmark Funding (partial). City

pays 20% match, Municipal Red

List Bridge.

REPLACE BRIDGE OVER MERRIMACK RIVER - 070/117 [Section 1702 - Designated Project;

Demo Id NH045] {Red List}

293FHWA

2012 HPER - HIGH PRIORITY .089C 2012

2012 HY10 - HIGH PRIORITY PROJ SEC 1702 .171C 2012

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.656C 2012

2012 LY10 - HIGH PRIORITY PROJ SEC 1702 .542C 2012

2012 LZ10 - EQUITY BONUS - EXEMPT LIM .299C 2012

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .028R

8.784Total:Highway and Bridge 8.565

CONCORD

14817

STORRS STREET Specific project from Statewide

program.

PARK AND RIDE [06-02CM] (CMAQ Project)

6220 FHWA

2019 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .900C CMAQ 2006

.900Total:Highway and Bridge 2.350

Projects Page - 12 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

CONCORD

15877

HOOKSETT TURNPIKE

(Local Rd)

Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BELA BROOK - 200/015 [SAB*4216] {State Aid Bridge Program}

7469 State Aid Bridge

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .480C New Project

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .125P

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R

.620Total:Highway and Bridge

CONCORD

15878

BIRCHDALE ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BELA BROOK - 193/027 [SAB*4216] {State Aid Bridge Program}

7470 State Aid Bridge

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .480C New Project

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .125P

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R

.620Total:Highway and Bridge

CONCORD - PEMBROKE

14841 A

NORTH PEMBROKE

ROAD

Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION OVER SOUCOOK RIVER - 183/156

6743 State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .540C New Project

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.650Total:Highway and Bridge

CONWAY

11339 B

US 302 / NH 16 Original overall project for PE

and ROW.

DESIGN & ROW ACQUISITIONS OF THE US 302 / NH 16 CONWAY BYPASS PHASES TO PROVIDE

CONGESTION RELIEF [PE & ROW Only; CONSTRUCTION BROKEN INTO OTHER 11339

PROJECTS] [Section 1602 - Designated Project; Demo Id NH004]176 FHWA

2011 L200 - STP - AREAS LESS THAN 200,000 .055P

2014 L050 - NATIONAL HIGHWAY SYSTEM .055P

2011 L050 - NATIONAL HIGHWAY SYSTEM .055R

.165Total:Highway and Bridge

CONWAY

11339 O

NH 16 Conway Bypass.CONWAY BYPASS - LANDSCAPE SOUTHERN SEGMENT (Parent = Conway 11339B)

1215 FHWA

2016 L050 - NATIONAL HIGHWAY SYSTEM .350C 2016

.350Total:Highway and Bridge 0.350

CONWAY

14958

NH 16 Deck plate girder bridge,

priority #77.

BRIDGE REHABILITATION OVER SACO RIVER - 170/071

5552 FHWA

2015 L050 - NATIONAL HIGHWAY SYSTEM 2.850C 2015

2011 L050 - NATIONAL HIGHWAY SYSTEM .060P

2011 L050 - NATIONAL HIGHWAY SYSTEM .010R

2.920Total:Highway and Bridge 2.850

Projects Page - 13 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

CONWAY

15300

TASKER HILL ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER PEQUAWKET POND - 182/066 {Red List}

6755State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .336C New Project

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .062P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.403Total:Highway and Bridge

CONWAY

15864

US 302 Red List Bridge. Specific project

from Statewide program.

REPLACE BRIDGE OVER CONWAY LAKE OUTLET - 158/137 {Betterment} (Red List)

7458 Betterment

2013 BET - BETTERMENT (State FY) 2.800C New Project

2011 BET - BETTERMENT (State FY) .025P

2012 BET - BETTERMENT (State FY) .025P

2011 BET - BETTERMENT (State FY) .010R

2012 BET - BETTERMENT (State FY) .055R

2.915Total:Highway and Bridge

CONWAY

15888

NH 153 Specific project from Statewide

program.

ROADWAY AND DRAINAGE IMPROVEMENTS FROM TASKER HILL RD SOUTH 1.2 MILES IN

CONWAY [BET-RSR*6730] {Betterment}

7479 Betterment

2011 BET - BETTERMENT (State FY) .500C New Project

.500Total:Highway and Bridge

DANBURY

US 4 Bridge Prioity #63REHABILITATE BRIDGE OVER NHRR - 156/105

7347 FHWA

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.500C New Project

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .150P

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R

1.700Total:Highway and Bridge

DERRY / LONDONDERRY

13065

I-93 Engineering for Final Design and

coordination with I-93

reconstruction. Partial funding

with communities.

CONSTRUCTION OF EXIT 4A - NEW INTERCHANGE BETWEEN EXISTING EXIT 4 AND EXIT 5 TO: (1)

RELIEVE TRAFFIC; (2) ALLOW ACCESS TO POTENTIAL DEVELOPMENT OF INDUSTRIAL LAND (PE

Only)1816

FHWA

2014 L010 - INTERSTATE MAINTENANCE 1.000P Previously Programmed Beyond TYP (Deferred)

1.000Total:Highway and Bridge

DOVER

15402

WHITTIER STREET Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REHABILITATION - 111/132 {Red List}

6902State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.643C New Project

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .207P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .050R

1.900Total:Highway and Bridge

Projects Page - 14 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

DOVER

15800

SPAULDING TURNPIKE Specific project from Statewide

program.

DOVER TOLL PLAZA SAFETY IMPROVEMENT (TRR*4042) {TRR Program}

7344 npike Renewal & Replacem

2012 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .700C

.700Total:Highway and Bridge

DOVER - MILTON

15758

EASTERN TPK -

SPAULDING TPK

Specific project from Statewide

program.

TURNPIKE RESURFACING, FY 2011 [TRR*4042] {TRR Program}

7295 npike Renewal & Replacem

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 2.100C New Project

2.100Total:Highway and Bridge

DUBLIN

15684

CHARCOAL ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER CHARCOAL BROOK - 085/103 {Red List}

7208State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .285C New Project

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.365Total:Highway and Bridge

DUMMER

15815

OLD NH 110 Specific project from Statewide

program, Municipal managed.

Portion of ARRA-Related

Federally Funded Project.

BRIDGE REPLACEMENT - 042/043 [SAB*4216] {State Aid Bridge Program}

7397

State Aid Bridge

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .940C

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .130P

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

1.075Total:Highway and Bridge

DUMMER - CAMBRIDGE -

ERROL

NH 16 DOT Priority List, NCC priority.

Scope of work and specific

limits to be determined.

WIDEN & REHABILITATE FROM ERROL SOUTHERLY 10 MILES

2766 FHWA

2019 L250 - STP - RURAL AREAS < 5,000k 4.700C New Project

2016 L250 - STP - RURAL AREAS < 5,000k .250P

2016 L250 - STP - RURAL AREAS < 5,000k .050R

5.000Total:Highway and Bridge

DURHAM

US 4 Bridge Priority #40.BRIDGE REPLACEMENT & APPROACHES OVER BUNKER CREEK - 145/116

4059 FHWA

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.000C 2017

4.000Total:Highway and Bridge 4.000

Projects Page - 15 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

DURHAM

US 4 / NH 108 From Route 4 Safety Study.INTERCHANGE IMPROVEMENTS AND RECONFIGURATION INCLUDING THE INSTALLATION OF

TRAFFIC SIGNALS, DEDICATED TURNING LANES, SIGNAGE, ETC. - PHASE 2

3286 FHWA

2014 L050 - NATIONAL HIGHWAY SYSTEM .500C 2014

2011 L050 - NATIONAL HIGHWAY SYSTEM .020P

2013 L050 - NATIONAL HIGHWAY SYSTEM .030P

.550Total:Highway and Bridge 0.550

DURHAM - NEWMARKET

13080

NH 108 CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BRIDGE TO DAME ROAD AND SANBORN

AVE IN NEWMARKET (3.4MI) STP & [98-17TE] (TE Program)

2296 FHWA

2012 L200 - STP - AREAS LESS THAN 200,000 3.800C 2011

2012 L220 - STP - TRANSPORTATION ENHANCEMENT .215C CMAQ 1998

2012 LZ10 - EQUITY BONUS - EXEMPT LIM .165C

2011 L220 - STP - TRANSPORTATION ENHANCEMENT .030P

4.210Total:Bike / Pedestrian 4.250

ENFIELD

13592

SHAKER BOULEVARD Specific project from Statewide

program, Municipal Managed.

INSTALL TEMPORARY BRIDGE AND REPLACE BRIDGE OVER THE KNOX RIVER - 120/115

3164 State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .235C 2008

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R

.300Total:Highway and Bridge 0.050

ENFIELD - LEBANON

13962

I-89 Bridge priority #43 {Red List} and

#44.

REHAB FROM EXIT 15 TO EXIT 17, INCLUDES BRIDGES 156/117 {Red List} & 155/117(4.0 MILES)

[BRPPI*6601] {4R & Statewide Federal Bridge Program}

2761 FHWA

2012 L010 - INTERSTATE MAINTENANCE 4.000C

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.000C

2013 L010 - INTERSTATE MAINTENANCE 4.800C 2011

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.000C

12.800Total:Highway and Bridge 8.000

EPPING

13712

NH 125 DOT priority list, RPC Inter-

Regional priority #5

RECONSTRUCTION FROM NH 27 NORTH TO NH 87

1894 FHWA

2020 L050 - NATIONAL HIGHWAY SYSTEM 4.150C Previously Programmed Beyond TYP (Deferred)

2017 L050 - NATIONAL HIGHWAY SYSTEM .063P

2017 L050 - NATIONAL HIGHWAY SYSTEM .088P

2017 L050 - NATIONAL HIGHWAY SYSTEM .200R

4.500Total:Highway and Bridge

Projects Page - 16 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

EPSOM

15766

ECHO VALLEY FARM

ROAD

Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER GRIFFIN BROOK - 156/103 [SAB*4216] {State Aid Bridge Program}

7302 State Aid Bridge

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .395C New Project

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .040P

.435Total:Highway and Bridge

EXETER

14090 A

PARK STREET Red List bridge, Municipal

Managed, Awaiting Municipal

Action; funding 80% Federal,

10% Town, 10% State.

BRIDGE REPLACEMENT OVER B&M RAILROAD - 088/076 (Red List) [Parent = MOBRR-221]

5580

FHWA

2015 L110 - BRIDGE PROGRAM - OFF SYSTEM 2.500C 2015

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .150P

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .100P

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .050P

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .135R

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .015R

2.950Total:Highway and Bridge 2.950

EXETER

15399

STRING BRIDGE ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION OVER SQUAMSCOTT RIVER - 102/074 & 103/074

6899 State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .835C New Project

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .204P

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .001R

1.040Total:Highway and Bridge

FARMINGTON

NH 153 Red List Bridge Priority #36REPLACE BRIDGE OVER COCHECO RIVER - 096/140 {Red List}

6778 FHWA

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.800C 2015

1.800Total:Highway and Bridge 1.800

FARMINGTON

15677

BAY ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER COCHECO RIVER - 060/144

7188 State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .428C New Project

.428Total:Highway and Bridge

FITZWILLIAM

14560

NH 119 Specific Project from Statewide

Program

REALIGNMENT OF NH 119 & HOLMAN ROAD INTERSECTION, REPLACEMENT OF DRAINAGE,

ADDING A SHOULDER & INSTALLING GUARD RAIL [BET-ISU*3833] {Betterment}

6115 Betterment

2011 BET - BETTERMENT (State FY) .075C 2007

2011 BET - BETTERMENT (State FY) .005P

.080Total:Highway and Bridge

Projects Page - 17 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

FRANCESTOWN

15762

JUNIPER HILL ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BRENNAN BROOK - 093/087 [SAB*4216] {State Aid Bridge

Program}

7298 State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .495C New Project

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.600Total:Highway and Bridge

FRANCESTOWN

15763

RUSSELL STATION ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER RUSSELL - 125/058 [SAB*4216] {State Aid Bridge Program}

7299 State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .680C New Project

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .140P

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.825Total:Highway and Bridge

FRANCESTOWN

15764

WOODWARD HILL ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BRENNAN BROOK - 121/077 [SAB*4216] {State Aid Bridge

Program}

7300 State Aid Bridge

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .475C New Project

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.575Total:Highway and Bridge

FRANCESTOWN

15765

SOUTH NEW BOSTON

ROAD

Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER PISCATAQUOG RIVER - 149/058 [SAB*4216] {State Aid Bridge

Program}

7301 State Aid Bridge

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .855C New Project

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .140P

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

1.000Total:Highway and Bridge

FRANCONIA - LITTLETON

I-93 PAVEMENT REHABILITATION FROM THE FRANCONIA NOTCH TO NORTH OF EXIT 41 (9 Miles) [4R]

3255 FHWA

2019 L010 - INTERSTATE MAINTENANCE 10.000C 2017

2020 L010 - INTERSTATE MAINTENANCE 10.000C 2018

2014 L010 - INTERSTATE MAINTENANCE .222P

2016 L010 - INTERSTATE MAINTENANCE .278P

20.500Total:Highway and Bridge 20.500

FRANKLIN

13928 #

US 3 Earmarked funding.UPGRADE AT INTERSECTION OF INDUSTRIAL PARK DRIVE IN FRANKLIN [Section 1702 -

Designated Project; Demo Id NH057 (13928B) & NH037 (13928A)] [PARENT]

2732 FHWA

2011 HPER - HIGH PRIORITY .996C 2011

2011 HY20 - HIGH PRIORITY PROJ SEC 1702 .310C 2011

2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.504C 2011

2.810Total:Highway and Bridge 3.360

Projects Page - 18 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

GILFORD

LACONIA AIRPORT Protects Federal investment of

snow removal equipment

CONSTRUCT SNOW REMOVAL EQUIPMENT BUILDING

3998 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM .350C

.350Total:Aeronautics 0.350

GILFORD

LACONIA AIRPORT Priority as identified by airport

sponsor.

DESIGN ONLY TAXIWAY TO SERVE NW QUADRANT

3672 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .520

.520Total:Aeronautics

GILFORD

LACONIA AIRPORT Equipment required for safe

winter operations.

PURCHASE SNOW REMOVAL EQUIPMENT

4001 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .350

.350Total:Aeronautics

GILFORD

LACONIA AIRPORT Safety and Security issue.SECURITY/SAFETY FENCING- PHASE III

3414 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .666

.666Total:Aeronautics

GILFORD

LACONIA MUNICIPAL

AIRPORT

Address Safety Concerns.CONSTRUCT ONLY TAXIWAY TO SERVE NW QUADRANT

6533 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.705

1.705Total:Aeronautics

GILFORD

LACONIA MUNICIPAL

AIRPORT

Address Safety Concerns.CONSTRUCT EMERGENCY ACCESS ROAD

6534 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .720

.720Total:Aeronautics

GILFORD

LACONIA MUNICIPAL

AIRPORT

Address Safety Concerns.DESIGN AND INSTALL PERIMETER FENCING - PHASE IV

6537 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .650

.650Total:Aeronautics

GILFORD

LACONIA MUNICIPAL

AIRPORT

Required for safe winter

operations.

PURCHASE SNOW-REMOVAL EQUIPMENT

6535 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .315

.315Total:Aeronautics

Projects Page - 19 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

GILFORD

LACONIA MUNICIPAL

AIRPORT

Required for safe aircraft

operations.

REHABILITATE OBSTRUCTION LIGHTS

6536 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .030

.030Total:Aeronautics

GILFORD

15890

BELKNAP MOUNTAIN

ROAD

Specific project from Statewide

program, Municipal Managed.

BRIDGE REPAIR / REPLACEMENT - 184/098 [SAB*4216] {State Aid Bridge Program}

7481 State Aid Bridge

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .165C New Project

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .030P

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.200Total:Highway and Bridge

GRAFTON

13373 A

MILL BROOK ROAD Specific project from Statewide

program, Municipal managed.

BRIDGE REPLACEMENT AT TOWN BRIDGE SITE #162/139 (PHASE 2)

6511 State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .250C 2011

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.300Total:Highway and Bridge 0.360

GRAFTON

14627

DAVIS ROAD Specific project from Statewide

program, Municipal managed.

REPLACE BRIDGE OVER SMITH RIVER - 123/104

6263 State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .744C 2012

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .120P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.874Total:Highway and Bridge 0.874

HAMPTON - NORTH

HAMPTON

15678 D

I-95 (BLUE STAR TPK) Specific project from HB 391,

Turnpike Capital Program.

IMPROVEMENT TO EXISTING HAMPTON TOLL PLAZA & FACILITY AS RESULT OF THE OPEN ROAD

TOLLING PROJECTS (PE & ROW ARE IN 15678) {Turnpike}

7279 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 2.000C New Project

2.000Total:Highway and Bridge

HAMPTON FALLS -

HAMPTON

13408 B

I-95 Bridge Priority #48. Previously

studied under Statewide

Culvert Repair. Turnpike Priority

Capital Program

REPLACEMENT OF THE TAYLOR RIVER BRIDGE ON THE BLUE STAR HIGHWAY AND

REPLACEMENT OR REMOVAL OF THE TAYLOR RIVER DAM IN HAMPTON AT MILE 3.6501 (Red

List) {Turnpike}

6048Turnpike Expansion

2012 TPK - TURNPIKE EXPANSION (State FY) 9.930C 2009

9.930Total:Highway and Bridge 10.155

Projects Page - 20 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

HAVERHILL - BATH

10436

US 302 Scope reduction to address

pavement and problem

intersections only. Further

addressed by private

development

RECONSTRUCTION FROM JUNCTION @ NH 10 NORTHERLY APPROXIMATELY 1.8 MILES

99

FHWA

2013 L200 - STP - AREAS LESS THAN 200,000 2.500C 2010

2011 L250 - STP - RURAL AREAS < 5,000k .141P

2012 L250 - STP - RURAL AREAS < 5,000k .020P

2011 L250 - STP - RURAL AREAS < 5,000k .061R

2011 L250 - STP - RURAL AREAS < 5,000k .020R

2012 L250 - STP - RURAL AREAS < 5,000k .060R

2012 L250 - STP - RURAL AREAS < 5,000k .010R

2.811Total:Highway and Bridge 2.781

HENNIKER

15718

WESTERN AVENUE Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

REPAIR / REPLACEMENT OF BRIDGE OVER CONTOOCOOK RIVER - 095/100 {Red List}

7256State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town 3.060C New Project

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .250P

3.310Total:Highway and Bridge

HINSDALE

14920

MONUMENT ROAD Specific project from Statewide

program, Municipal managed.

BRIDGE REPLACEMENT OVER ASH BROOK - 085/064

6475 State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .334C 2013

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.394Total:Highway and Bridge 0.394

HINSDALE, NH -

BRATTLEBORO, VT

12210 #

NH 119 Earmark funding (partial).

Bridge priority #71 and #72.

REPLACE 2 BRIDGES OVER CONNECTICUT RIVER - 041/040 & 042/044, BY CONSTRUCTING A

NEW BRIDGE 043/044 JUST DOWNSTREAM [Section 1602 - Designated Project; Demo Id

NH018 (12210) & NH021 (12210B) [PARENT]

4171 FHWA

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 13.648C 2014

2014 Q920 - HIGH PRIORITY PROJ SEC 1602 1.352C 2014

2014 Q920 - HIGH PRIORITY PROJ SEC 1602 .328C 2014

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 16.040C 2015

2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .315P

2012 Q920 - HIGH PRIORITY PROJ SEC 1602 .200P

2012 Q920 - HIGH PRIORITY PROJ SEC 1602 .270R

32.152Total:Highway and Bridge 31.420

Projects Page - 21 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

HOOKSETT

12537 A

US 3 / NH 28 Earmark funding.WIDEN NORTH OF BENTON ROAD SOUTH 0.411 MILES TO THE INTERSECTION WITH MARTIN'S

FERRY ROAD [Section 117 - Designated Project; Demo Id NH031]

4107 FHWA

2011 H660 - GRANTS SUP PLAN HEWY STP, SECTION 117 2.526C 2009

2011 HPER - HIGH PRIORITY .064C 2009

2011 L200 - STP - AREAS LESS THAN 200,000 2.010C

4.600Total:Highway and Bridge 2.800

HOOKSETT

14950

HACKET HILL ROAD Specific project from Statewide

program, Municipal Manged.

RECONSTRUCTION AT NH 3A AND TURNPIKE RAMP

6505 State Aid Highway

2011 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 1.000C 2011

2012 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 1.000C 2012

2.000Total:Highway and Bridge 3.000

HOOKSETT

15463

I-93 Specific project from Statewide

program.

REPLACE CONCRETE SLAB, CANOPY RE-ROOFING AT HOOKSETT SIDE TOLL PLAZA [TRR

Program]

6980 npike Renewal & Replacem

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .900C New Project

.900Total:Highway and Bridge

HOOKSETT

15803

I-93 Specific project from HB 391,

Turnpike Capital Program.

WIDENING AND RETROFIT EXISTING HOOKSETT TOLL FACILITY TO IMPLEMENT HIGHWAY SPEED

(OPEN ROAD) TOLLING {Turnpike}

7384 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 5.000C New Project

2012 TPK - TURNPIKE EXPANSION (State FY) 15.000C

2011 TPK - TURNPIKE EXPANSION (State FY) .050P

20.050Total:Highway and Bridge

HOPKINTON

US 202 / NH 9 Red List Bridge Prioity #64REPLACE BRIDGE OVER HATFIELD ROAD - 056/093 (Red List)

7348 FHWA

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.000C New Project

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .250P

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R

3.300Total:Highway and Bridge

HUDSON

13353

MELENDY ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION OVER HADLEY BROOK - 114/083

2837 State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .100C 2011

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .015P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.120Total:Highway and Bridge 0.120

Projects Page - 22 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

JAFFREY

US 202 New Project, SWRPC priority #2INTERSECTION IMPROVEMENTS (Roundabout) @ MAIN ST (NH 124) & RECONFIGURE US 202

'DOG-LEG'

7442 FHWA

2020 L250 - STP - RURAL AREAS < 5,000k 6.200C New Project

2014 L250 - STP - RURAL AREAS < 5,000k .250P

2015 L250 - STP - RURAL AREAS < 5,000k .250P

2018 L250 - STP - RURAL AREAS < 5,000k .250R

6.950Total:Highway and Bridge

JEFFERSON - RANDOLPH

13602 B

US 2 Scope intended to address

pavement and specific

problem areas.

RECONSTRUCTION, SAFETY IMPROVEMENTS & SHOULDER WIDENING FROM NH 115

INTERSECTION EAST APPROX. 2.3 MILES TO JEFFERSON / RANDOLPH T/L (Construction only)

{National Corridor Preservation & Border Crossing}6036FHWA

2016 L050 - NATIONAL HIGHWAY SYSTEM 3.150C 2016

3.150Total:Highway and Bridge 3.500

KEENE

10309 B

WINCHESTER STREET Formerly considered with

overall Keene-Swanzey project.

In lieu of Keene 12230 West

Street project. Municipal

Managed and 20% match.

RECONSTRUCTION FROM NH 101 ROUNDABOUT NORTH TO PEARL STREET / ISLAND STREET

INCLUDING INTERSECTION AT KEY ROAD

1828

FHWA

2014 L200 - STP - AREAS LESS THAN 200,000 1.800C 2014

2015 L200 - STP - AREAS LESS THAN 200,000 2.200C 2015

2013 L200 - STP - AREAS LESS THAN 200,000 .238P

2014 L200 - STP - AREAS LESS THAN 200,000 .335R

4.573Total:Highway and Bridge 4.238

KEENE

14383

HARRISON STREET Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER BEAVER BROOK - 141/074 {Red List}

5852State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .245C 2010

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.320Total:Highway and Bridge 0.320

KEENE

15345

CHURCH STREET Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BEAVER BROOK - 140/075

6818 State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .365C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.450Total:Highway and Bridge

Projects Page - 23 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

KEENE

15852

EAST SURRY ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER STURTEVANT BROOK - 111/138 [SAB*4216] {State Aid Bridge

Program}

7427 State Aid Bridge

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .240C New Project

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .055P

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.300Total:Highway and Bridge

KEENE

15854

ROXBURY STREET Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BEAVER BROOK - 140/077 [SAB*4216] {State Aid Bridge Program}

7429 State Aid Bridge

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .510C New Project

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .105P

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.625Total:Highway and Bridge

KEENE - SWANZEY

NH 12 / 101 DOT priority list, SWRPC priority

#6

INTERIM INTERSECTION IMPROVEMENTS @ NH 12 (MAIN STREET) (Parent = Keene-Swanzey

10309)

7443 FHWA

2020 L200 - STP - AREAS LESS THAN 200,000 2.500C Previously Programmed Beyond TYP (Deferred)

2016 L200 - STP - AREAS LESS THAN 200,000 .200P

2016 L200 - STP - AREAS LESS THAN 200,000 .050R

2.750Total:Highway and Bridge

KEENE - SWANZEY

10309 J

NH 9 / NH 10 / NH 12 /

NH 101

Incremental/interim

improvement.

INTERIM INTERSECTION IMPROVEMENTS AT 'T' INTERSECTION (Parent = Keene-Swanzey 10309)

5705 FHWA

2017 L050 - NATIONAL HIGHWAY SYSTEM 2.200C 2017

2.200Total:Highway and Bridge 3.000

KEENE - SWANZEY

10309 L

NH 12 / 101 Incremental/interim

improvement.

CONSTRUCTION OF INTERIM WIDENING WITH REPLACEMENT OF THE ASHUELOT RIVER BRIDGE

(Parent = Keene-Swanzey 10309)

5707 FHWA

2015 L050 - NATIONAL HIGHWAY SYSTEM 2.947C 2015

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.310C 2015

5.256Total:Highway and Bridge 4.100

KEENE - SWANZEY

10309 P

NH 9/10/12/101 Incremental/interim

improvement.

CONSTRUCTION OF MULTI-USE TRAIL BRIDGE OVER NH 12/101, AND MITIGATION SITE (Parent

= Keene-Swanzey 10309)

6189 FHWA

2013 L050 - NATIONAL HIGHWAY SYSTEM 3.135C 2010

3.135Total:Highway and Bridge 1.750

Projects Page - 24 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

KINGSTON

14973

NEW BOSTON RD Red List Bridge. Specific project

from Statewide program.

Municipal Managed.

Advanced Constructed in SFY

2008.

BRIDGE REPLACEMENT OVER POWWOW RIVER - 116/113 {Red List}

6688

State Aid Bridge

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .328C 2014

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.333Total:Highway and Bridge 0.625

LACONIA

14826

Specific project from Statewide

program. Municipal managed.

PHASE 2, WINNIPESAUKEE OPECHEE WINNISQUAM (WOW) TRAIL: CONSTRUCT 1.0 MILES OF

SHARED USE PATH IN THE RAILROAD CORRIDOR FROM MAIN STREET IN DOWNTOWN LACONIA

TO THE BELMONT TOWN LINE (TE Program) [06-22TE]6237 FHWA

2011 L220 - STP - TRANSPORTATION ENHANCEMENT .090C TE 2006

2011 NON - OTHER NON PARTICIPATING .300C

.390Total:Bike / Pedestrian 0.391

LACONIA

15303

MAIN STREET Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION OVER WINNIPESAUKEE RIVER - 121/047

6757 State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.050C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .090P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

1.150Total:Highway and Bridge

LANCASTER, NH -

GUILDHALL, VT

US 2 Bridge Priority #93.BRIDGE REHABILITAION AND PAINTING OVER CONNECTICUT RIVER - 111/129 (ROGER'S

RANGER'S BRIDGE #26)

3524 FHWA

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.910C 2017

1.910Total:Highway and Bridge 1.910

LEBANON

I-89 Bridge priority #45, #46, #75

{Red List}, & #76.

1" OVERLAY FROM EXIT 17 TO JUST SOUTH OF EXIT 20 (5.5 MILES) INCLUDES SLIP LINING TWIN

66" PIPES NORTH OF EXIT 17 AND BRIDGE JOINT REHAB [4R]; BRIDGES 158/114, 159/114,

093/109 {Red List}, & 094/1081900 FHWA

2013 L010 - INTERSTATE MAINTENANCE 7.100C 2012

2014 L010 - INTERSTATE MAINTENANCE 7.100C 2012

2011 L010 - INTERSTATE MAINTENANCE .050P

14.250Total:Highway and Bridge 14.000

LEBANON

LEBANON AIRPORT Needed to Plan for Future

Projects

AIRPORT SAFETY ENHANCEMENT DESIGN & PERMITTING

7365 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM 2.000

2.000Total:Aeronautics

Projects Page - 25 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

LEBANON

LEBANON AIRPORT Priority as identified by project

sponsor.

DESIGN & CONSTRUCT TAXIWAY 'C'

2914 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .625

.625Total:Aeronautics

LEBANON

LEBANON AIRPORT Priority as established by project

sponsor.

DESIGN & CONSTRUCT MID FIELD APRON

2915 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .540

.540Total:Aeronautics

LEBANON

LEBANON AIRPORT Priority as established by airport

sponsor.

EXPAND 'SRE' BUILDING WITH 'ARFF'

2913 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .950

.950Total:Aeronautics

LEBANON

LEBANON AIRPORT Equipment purchase;

95% Federal funds, 2.5% Sponsor

match

PURCHASE SNOW REMOVAL EQUIPMENT

3421Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .950

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .500

1.450Total:Aeronautics

LEBANON

LEBANON AIRPORT Priority as established by airport

sponsor.

RECONSTRUCT EMERGENCY ACCESS ROAD

2668 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .200

.200Total:Aeronautics

LEBANON

LEBANON AIRPORT Safety issue. Required by

Federal regulations.

REHABILITATE OBSTRUCTION POLES & LIGHTS, REMOVE OBSTRUCTIONS

2912 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM .600

.600Total:Aeronautics

LEBANON

LEBANON AIRPORT Priority as established by airport

sponsor.

RECONSTRUCT TAXIWAY 'B' EAST

2916 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM 1.650

1.650Total:Aeronautics

Projects Page - 26 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

LEBANON

LEBANON MUNICIPAL

AIRPORT

Mitigate for environmental

impacts.

AIRPORT SAFETY ENHANCEMENT, MITIGATION

6541 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM 1.700

2012 AIP - AIRPORT IMPROVEMENT PROGRAM 1.700

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.700

5.100Total:Aeronautics

LEBANON

LEBANON MUNICIPAL

AIRPORT

Needed to Plan for Future

Projects

AIRPORT MASTER PLAN UPDATE

6668 Airport

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .400

.400Total:Aeronautics

LEBANON

LEBANON MUNICIPAL

AIRPORT

Address Safety and

environmental concerns.

CONSTRUCT AIRPORT SAFETY ENHANCEMENTS

6542 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM 13.380

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 6.689

2014 AIP - AIRPORT IMPROVEMENT PROGRAM 6.689

26.758Total:Aeronautics

LEBANON

LEBANON MUNICIPAL

AIRPORT

Address Safety Concerns.DESIGN AND CONSTRUCT APRON (17 AIRPARK ROAD)

6545 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .250

.250Total:Aeronautics

LEBANON

LEBANON MUNICIPAL

AIRPORT

Address Capacity Concerns.DESIGN & CONSTRUCT TERMINAL BUILDING IMPROVEMENTS

6546 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000

1.000Total:Aeronautics

LEBANON

LEBANON MUNICIPAL

AIRPORT

Needed to meet Federal

requirements.

PURCHASE AIRCRAFT RESCUE AND FIRE FIGHTING VEHICLE (INDEX B)

6543 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .662

.662Total:Aeronautics

LEBANON

LEBANON MUNICIPAL

AIRPORT

Address Safety Concerns.REHABILITATE RUNWAY 7-25

6544 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM 1.200

1.200Total:Aeronautics

Projects Page - 27 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

LEBANON

10034 A

US 4 (MECHANIC STREET) MUNICIPAL MANAGED, 20%

City matched project.

Coordinated with Municipal

water/sewer project.

RECONSTRUCTION FROM HIGH STREET TO I-89 RAMPS INCLUDING REMOVAL OF CONCRETE

UNDERBASE, INSTALLATION OF SIDEWALKS, AND UPGRADE OF STORM DRAINAGE SYSTEM

1890

FHWA

2013 L200 - STP - AREAS LESS THAN 200,000 2.120C 2016

2012 L200 - STP - AREAS LESS THAN 200,000 .200P

2012 L200 - STP - AREAS LESS THAN 200,000 .500R

2.820Total:Highway and Bridge 3.020

LEBANON

13558 A

NH 12A Municipal Managed.BRIDGE REPLACEMENT OVER B&M RAILROAD - 062/117 [MOBRR-221] {Municipal Bridge

Program}

5583 FHWA

2011 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.200C 2011

3.200Total:Highway and Bridge 3.300

LEBANON

13951

US 4 Red List bridge, priority #17.BRIDGE REPLACEMENT OVER MASCOMA RIVER - 188/126 NEAR INTERSECTION OF US 4 AND

NH 4A {Red List}

1875 FHWA

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 5.000C 2011

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 5.050C 2011

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050P

10.100Total:Highway and Bridge 8.575

LEBANON

14552

US 4 & NH 10 Specific project from Statewide

program, Municipal managed.

BRIDGE REHABILITATION OVER MASCOMA RIVER - 120/115

6101 State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .540C 2012

.540Total:Highway and Bridge 0.540

LEBANON, NH -

HARTFORD, VT

I-89 Bridge priorities #59 and #60.REHABILITATION OF BRIDGES OVER CONNECTICUT RIVER - 044/103 & 044/104

2771 FHWA

2017 L010 - INTERSTATE MAINTENANCE 5.000C 2017

2018 L010 - INTERSTATE MAINTENANCE 5.000C 2017

2011 L010 - INTERSTATE MAINTENANCE .111P

2012 L010 - INTERSTATE MAINTENANCE .556P

2014 L010 - INTERSTATE MAINTENANCE .050R

10.717Total:Highway and Bridge 11.272

Projects Page - 28 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

LEBANON, NH -

HARTFORD, VT

14957

US 4 Red List bridge, priority #5.REPLACE BRIDGE OVER CONNECTICUT RIVER - 058/127 {Red List}

2753 FHWA

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.740C 2010

2011 VT - VERMONT'S CONTRIBUTION .760C

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.650C

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .350C

9.500Total:Highway and Bridge 4.250

LINCOLN

15754

I-93 Specific Project from 4R

Program.

COLD PLANE AND OVERLAY WITH FABRIC & 2" PAVEMENT FROM US 3 BRIDGE TO WHITEHOUSE

BRIDGE (4.2 MILES) (4R)

7291 FHWA

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.000C New Project

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .075P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

5.235Total:Highway and Bridge

LITTLETON

15406

HIGHLAND AVENUE Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER BROOK - 227/048 {Red List}

6915State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .450C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.535Total:Highway and Bridge

LITTLETON, NH -

WATERFORD, VT

I-93 Bridge priority #56 {Red List} and

#57.

PAVEMENT REHABILITATION (9 MILES) & BRIDGE REHABILITATION (18 BRIDGES) FROM NORTH

OF EXIT 41 TO VERMONT S/L - 105/135 {Red List}, 104/136 [4R]

2785 FHWA

2017 L010 - INTERSTATE MAINTENANCE 12.000C 2017

2018 L010 - INTERSTATE MAINTENANCE 12.000C 2018

2014 L010 - INTERSTATE MAINTENANCE .500P

24.500Total:Highway and Bridge 24.500

Projects Page - 29 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

LONDONDERRY - SALEM

TRANSIT Boston Urbanized Area FundingCAPITAL

2903 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .219

2.190Total:Transit

LONDONDERRY - SALEM

TRANSIT Boston Urbanized Area FundingCOMMUTER BUS PREVENTATIVE MAINTENANCE

6292 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .281

2.813Total:Transit

LYME, NH - THETFORD, VT

14460

EAST THETFORD ROAD Bridge priority #94.BRIDGE REHABILITATION OVER THE CONNECTICUT RIVER - 053/112

3269 FHWA

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.350C 2016

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .150P

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005R

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .010R

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .015R

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

3.850Total:Highway and Bridge 3.850

Projects Page - 30 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MADISON - CONWAY

11339 J

NH 16 Southern segment of overall

Conway Bypass.

CONWAY BYPASS SOUTHERN SEGMENT, EARTHWORK PROJECT (Parent = Conway 11339B)

[ARRA]

1210 FHWA

2015 L050 - NATIONAL HIGHWAY SYSTEM 11.337C 2015

2016 L050 - NATIONAL HIGHWAY SYSTEM 11.337C 2016

22.673Total:Highway and Bridge 18.753

MADISON - CONWAY

11339 T

CONWAY BYPASS Southern segment of overall

Conway Bypass.

CONSTRUCT BRIDGES OVER PEQUAWKET BROOK, NH 113, PUDDING POND & WOODLAND

ROAD (Parent = Conway 11339B) [ARRA]

3659 FHWA

2016 L050 - NATIONAL HIGHWAY SYSTEM 7.000C 2016

2017 L050 - NATIONAL HIGHWAY SYSTEM 7.529C 2016

14.529Total:Highway and Bridge 10.000

MADISON - CONWAY

11339 U

CONWAY BYPASS- NH 16 Southern segment of overall

Conway Bypass.

SOUTHERN SEGMENT FINAL CONSTRUCTION, CONWAY BYPASS STA. 100+300-STA. 188+00

(Parent = Conway 11339B) [ARRA]

3660 FHWA

2018 L050 - NATIONAL HIGHWAY SYSTEM 13.994C 2018

2019 L050 - NATIONAL HIGHWAY SYSTEM 13.994C 2017

27.987Total:Highway and Bridge 25.503

MANCHESTER

FEE TPK Previous Id# 2745 for New/Full

interchange at Exit 7. Study to

include Exit 6 as well and

interrelated operations.

PLANNING AND ENGINEERING STUDY FOR RECONSTRUCTION OF EXITS 6 & 7

7473

Turnpike Expansion

2013 TPK - TURNPIKE EXPANSION (State FY) 2.000P Previously Programmed Beyond TYP (Deferred)

2.000Total:Highway and Bridge

MANCHESTER

TRANSIT AUTHORITY Annual Program FundingMISCELLANEOUS CAPITAL

6923 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .094

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .099

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .104

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .109

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .114

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .120

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .126

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .132

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .132

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .132

1.162Total:Transit

Projects Page - 31 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MANCHESTER

TRANSIT AUTHORITY Annual Program FundingOPERATING ASSISTANCE FOR FIXED ROUTE SERVICE

602 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 2.700

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 2.812

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 2.925

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.042

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.163

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.290

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.421

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.558

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.558

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 3.558

32.028Total:Transit

MANCHESTER

TRANSIT AUTHORITY Annual Program FundingOPERATING ASSISTANCE FOR CAPITAL MAINTENANCE OF MTA FLEET

2496 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .414

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .434

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .451

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .469

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .488

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .508

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .528

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .549

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .549

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .549

4.940Total:Transit

MANCHESTER

TRANSIT AUTHORITY Annual Program FundingOPERATING ASSISTANCE FOR ADA PARATRANSIT SERVICE

5916 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .265

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .275

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .286

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .297

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .309

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .322

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .335

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .348

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .201

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .209

2.847Total:Transit

Projects Page - 32 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MANCHESTER

TRANSIT AUTHORITY Annual Program FundingREPLACEMENT BUSES

3062 FTA

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .408

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.560

1.968Total:Transit

MANCHESTER

TRANSIT AUTHORITY Annual Program FundingREPLACEMENT OF ADA PARATRANSIT VANS

5917 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .134

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .070

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .162

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .170

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .085

.621Total:Transit

MANCHESTER

TRANSIT AUTHORITY REPLACEMENT OF TRANSIT SERVICE VEHICLES

5919 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .025

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .136

.161Total:Transit

MANCHESTER

13512

Specific project from Statewide

program. Municipal lead.

Supports Capital Corridor.

Nashua-Manchester-Concord

CONSTRUCT 600 SPACE PARK'N RIDE STRUCTURE (CMAQ Program) [00-13CM]

2968

FHWA

2016 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 8.500C CMAQ 2000

2012 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .009P

2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .490P

2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .010R

2014 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .140R

2014 NON - OTHER NON PARTICIPATING .250R

9.399Total:Highway and Bridge 9.399

MANCHESTER

14025 B

GRANITE STREET Breakout project from Granite

Street bridge project (City) and

Statewide program.

RECONSTRUCT CROSSINGS, ROADWAY APPROACHES AND SIGNALS WITH ASSOCIATED WORK

OF SPRING ST (845-631L0, KIDDER ST (845-630E), COMMERCIAL ST (854-629K) AND B&M

RAILROAD [Parent = Manch 14025 & Statewide Railroad-RCS]5595FHWA

2011 H210 - STP - SAFETY .418C

2011 H210 - STP - SAFETY .418C

2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .050C 2009

2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .050C

.935Total:Rail 1.235

Projects Page - 33 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MANCHESTER

14048

CENTRAL TPK Tpk Capital Program. Bridge

Priority #103 & #104.

REHABILITATE TURNPIKE BRIDGE OVER BLACK BROOK BETWEEN EXITS 6 & 7 - 099/066 &

099/067 {Turnpike}

3553 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) .250C 2010

2012 TPK - TURNPIKE EXPANSION (State FY) 2.200C 2010

2013 TPK - TURNPIKE EXPANSION (State FY) 1.200C 2010

3.650Total:Highway and Bridge 3.500

MANCHESTER

14966

I-293 / FEE TPK Turnpike Capital Program,

funding primarily for bridge

repair. Four Red List bridges,

priority #51, #52, #53, and #54.

EXIT 4, BRIDGE REHABILITATIONS OR REPLACEMENTS: 144/066, 146/064, 146/065, 149/063 {All

Red List} {Turnpike}

3294

Turnpike Expansion

2012 TPK - TURNPIKE EXPANSION (State FY) 2.627C 2012

2013 TPK - TURNPIKE EXPANSION (State FY) 13.880C 2013

2014 TPK - TURNPIKE EXPANSION (State FY) 13.880C 2014

2011 TPK - TURNPIKE EXPANSION (State FY) 1.688P

2011 TPK - TURNPIKE EXPANSION (State FY) 1.251R

33.326Total:Highway and Bridge 38.547

MANCHESTER

14966 A

FE EVERETT TURNPIKE (I-

293)

Specific project from Statewide

program. Red List Bridge Priority

#50.

EXIT 4 NB OFF- RAMP BRIDGE REPLACEMENT - 153/061 {Red List} {Turnpike}

7173Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) .703C New Project

2012 TPK - TURNPIKE EXPANSION (State FY) 1.797C

2.500Total:Highway and Bridge

MANCHESTER

15401

GOFFS FALLS ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION OVER B&M RR - 188/092

6901 State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .570C New Project

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.675Total:Highway and Bridge

MANCHESTER

15837

US 3 (ELM STREET) Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION OVER B&MRR - 144/075 [SAB*4216] {State Aid Bridge Program}

7415 State Aid Bridge

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town 2.650C New Project

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .325P

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .025R

3.000Total:Highway and Bridge

Projects Page - 34 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MANCHESTER - HOOKSETT

14604

I-93 Red List Bridges, priority #12 and

#13.

MERRIMACK RIVER BRIDGES IN MANCHESTER NORTH 1 MI TO I-293 IN HOOKSETT; 4R WORK

INCLUDING BRIDGE REHABILITATION @ MERRIMACK RIVER AND NH3A - 059/087 & 060/086

{Both Red List} {Statewide Federal Bridge Program}6196 FHWA

2011 L010 - INTERSTATE MAINTENANCE 5.000C 2010

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 6.000C

11.000Total:Highway and Bridge 5.675

MANCHESTER - HOOKSETT

15849

I-293 Specific project from Statewide

program.

REPLACE MEDIAN BOX BEAM BARRIER WITH CONCRETE BARRIER FROM MILE MARKER 8.5 TO

10.8 [TRR*4042] {TRR Program}

7425 npike Renewal & Replacem

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 2.500C New Project

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .015P

2.515Total:Highway and Bridge

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety Concerns as

established by Manchester

Airport.

AIRPORT ACCESS ROAD INTERSECTION ENHANCEMENTS

7370 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM 10.000

10.000Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety Concerns as

established by Manchester

Airport.

ACQUIRE SNOW-REMOVAL EQUIPMENT

7371 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM .550

2017 AIP - AIRPORT IMPROVEMENT PROGRAM 2.292

2.842Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety Concerns as

established by Manchester

Airport.

CONSTRUCTION ONLY: RELOCATE ROADWAYS AND REPLACE PARKING

7368 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 5.017

5.017Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety Concerns as

established by Manchester

Airport.

DESIGN ONLY: RELOCATE ROADWAYS AND REPLACE PARKING

7367 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .253

.253Total:Aeronautics

Projects Page - 35 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety & Environmental

Concerns as established by

Manchester Airport.

GLYCOL MAMAGEMENT PROGRAM - PHASE II & III

7366 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM 2.333

2012 AIP - AIRPORT IMPROVEMENT PROGRAM 2.100

4.433Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety Concerns as

established by Manchester

Airport.

IMPROVEMENT RUNWAY 6-24 INSTRUMENT APPROACHES

6552 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM 2.373

2.373Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Priority as established by

Manchester Airport.

NORTH TERMINAL APRON / TAXIWAY EXTENSION

4247 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000

2015 AIP - AIRPORT IMPROVEMENT PROGRAM 19.000

20.000Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety ConcernsPROPERTY ACQUISITION

7369 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 6.000

6.000Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety ConcernsRECONSTRUCT EAST AIRCRAFT PARKING APRON

7372 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM 2.930

2.930Total:Aeronautics

MANCHESTER -

LONDONDERRY

MANCHESTER - BOSTON

REGIONAL AIRPORT

Address Safety Concerns.VARIOUS PRIORITIZED CAPITAL IMPROVEMENT PROJECTS

6553 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM 4.000

2019 AIP - AIRPORT IMPROVEMENT PROGRAM 4.000

2020 AIP - AIRPORT IMPROVEMENT PROGRAM 4.000

12.000Total:Aeronautics

Projects Page - 36 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MEREDITH

10430 #

US 3 / NH 25 Earmark funding (partial).

Scope & priorities being

developed with community.

ROADWAY AND INTERSECTION IMPROVEMENTS @ NH 104, NORTH TO NH 25, AND NH 25

FROM US 3, EAST TO THE MEREDITH / CENTER HARBOR T/L [Section 1702 - Designated Project;

Demo Id NH041 (10430), NH060 (10430A), & NH071 (10430B)] [PARENT]6869FHWA

2011 HY10 - HIGH PRIORITY PROJ SEC 1702 .029C 2011

2011 L250 - STP - RURAL AREAS < 5,000k 4.119C 2011

2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .060C 2011

2011 LY60 - HIGH PRIORITY PROJ SEC 112 .792C 2011

5.000Total:Highway and Bridge 6.275

MERRIMACK

13923

MCGAW BRIDGE RD Red List Bridge. Specific project

from Statewide program.

Municipal Managed.

BRIDGE REPLACEMENT OVER BABOOSIC BROOK - 116/137 {Red List}

3804State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .395C 2012

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.460Total:Highway and Bridge 0.460

MERRIMACK

15839

WIRE ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BABOOSIC BROOK - 098/174 [SAB*4216] {State Aid Bridge

Program}

7417 State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .570C New Project

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.675Total:Highway and Bridge

MERRIMACK

15841

BEDFORD ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPAIR/REPLACEMENT OVER BABOOSIC BROOK - 113/159 [SAB*4216 State Aid

Bridge]

7418 State Aid Bridge

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .720C New Project

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .120P

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.850Total:Highway and Bridge

Projects Page - 37 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

METRO PLANNING

085-MP-1

PLANNING & RESEARCH Annual required program.

Reflects anticipated federal

revenues.

MANCHESTER METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED

PLANNING WORK PROGRAMS

667FHWA

2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .625P

6.250Total:Highway and Bridge

METRO PLANNING

085-MP-2

PLANNING & RESEARCH Annual required program.

Reflects anticipated federal

revenues.

NASHUA METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED

PLANNING WORK PROGRAMS

809FHWA

2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .500P

4.996Total:Highway and Bridge

METRO PLANNING

085-MP-3

PLANNING & RESEARCH Annual required program.

Reflects anticipated federal

revenues.

STRAFFORD METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED

PLANNING WORK PROGRAMS

811FHWA

2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .317P

3.173Total:Highway and Bridge

Projects Page - 38 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

METRO PLANNING

085-MP-4

PLANNING & RESEARCH Annual required program.

Reflects anticipated federal

revenues.

ROCKINGHAM METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED

PLANNING WORK PROGRAMS

810FHWA

2011 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2012 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2013 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2014 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2015 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2016 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2017 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2018 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2019 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

2020 L450 - "SAFETEA-LU" - METRO PLANNING 1.25% TAKEDOWN .458P

4.578Total:Highway and Bridge

MILAN

BERLIN REGIONAL

AIRPORT

Address Capacity Concerns.

Priority as identified by project

sponsor.

AIRCRAFT APRON EXPANSION

3432Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .158

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.053

1.211Total:Aeronautics

MILAN

BERLIN REGIONAL

AIRPORT

Address Capacity Concerns.

Priority as identified by project

sponsor.

DESIGN AND INSTALL PERIMETER FENCING

6555Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .150

.150Total:Aeronautics

MILAN

BERLIN REGIONAL

AIRPORT

Address Safety Concerns.

Priority as identified by project

sponsor.

PARALLEL TAXIWAY

3434Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM 1.800

1.800Total:Aeronautics

Projects Page - 39 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

MILAN

BERLIN REGIONAL

AIRPORT

TO BE DETERMINED; 95% Federal

funds, 2.5% Sponsor match. FAA

five year Capital Improvement

Program for projects yet to be

identified by FAA and airport

sponsors.

VARIOUS PRIORITIZED CAPITAL IMPROVEMENT PROJECTS

3439

Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .300

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .300

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .158

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .158

.916Total:Aeronautics

MILFORD

14492 #

NH 101A & NH 13 Earmark funding. Municipal

Managed.

IMPROVEMENTS IN THE AREA KNOWN AS THE "OVAL" TO IMPROVE TRAFFIC FLOW BASED ON

RESULTS OF ONGOING TRAFFIC STUDIES WITHIN THE TOWN [Section 1702 - Designated

Project; Demo Id NH038 (14492) & NH058 (14492A)] [PARENT]4065 FHWA

2011 HPER - HIGH PRIORITY .060C 2011

2011 HPER - HIGH PRIORITY .996C 2011

2011 HPER - HIGH PRIORITY .029C 2011

2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .332C 2011

2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.306C 2011

2.723Total:Highway and Bridge 4.857

MILFORD TO NASHUA

10136

NH 101A Specific Safety & Capacity

improvements at 3 intersections

as determined by corridor

study..

INTERSECTION IMPROVEMENTS AT SEVERAL LOCATIONS BETWEEN NH 101 TO FEE TPK (7.5

MILES); AS DETERMINED BY CORRIDOR STUDY

730

FHWA

2012 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2011

2013 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2013

2011 L050 - NATIONAL HIGHWAY SYSTEM .250P

2011 L050 - NATIONAL HIGHWAY SYSTEM .125R

6.375Total:Highway and Bridge 6.625

NASHUA

BOIRE FIELD Address Safety ConcernsACQUIRE SNOW REMOVAL EQUIPMENT

3447 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM .610

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .300

.910Total:Aeronautics

NASHUA

BOIRE FIELD Needed to Plan for Future

Projects

AIRPORT MASTER PLAN UPDATE

6671 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .300

.300Total:Aeronautics

Projects Page - 40 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NASHUA

BOIRE FIELD Address Safety Concerns.

Priority as identified by project

sponsor.

CONSTRUCT ONLY - PARALLEL TAXIWAY RELOCATION

6560Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM 5.980

5.980Total:Aeronautics

NASHUA

BOIRE FIELD Address Safety Concerns.

Priority as identified by project

sponsor.

DESIGN ONLY - PARALLEL TAXIWAY RELOCATION

6559Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .600

.600Total:Aeronautics

NASHUA

BOIRE FIELD Address Safety Concerns.

Priority as identified by project

sponsor.

RUNWAY RECONSTRUCTION & RELOCATION

3442Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM 8.049

2012 AIP - AIRPORT IMPROVEMENT PROGRAM 6.749

14.798Total:Aeronautics

NASHUA

BOIRE FIELD Address Safety Concerns.

Priority as identified by project

sponsor.

RECONSTRUCT GRASS APRON TO PAVEMENT

3444Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM 2.732

2.732Total:Aeronautics

NASHUA

BOIRE FIELD Address Safety Concerns.

Priority as identified by project

sponsor.

REPLACE CONTROL TOWER

6561Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .350

2018 AIP - AIRPORT IMPROVEMENT PROGRAM 5.000

5.350Total:Aeronautics

NASHUA

EAST HOLLIS STREET MUNICIPAL MANAGED, 20% City

Match. City Urban Compact

project.

RECONSTRUCTION OF EAST HOLLIS STREET FROM MAIN STREET TO HUDSON TOWN LINE TO

IMPROVE CAPACITY

3536FHWA

2017 L200 - STP - AREAS LESS THAN 200,000 2.120C 2016

2015 L200 - STP - AREAS LESS THAN 200,000 .040P

2015 L200 - STP - AREAS LESS THAN 200,000 .040P

2015 L200 - STP - AREAS LESS THAN 200,000 .040P

2015 L200 - STP - AREAS LESS THAN 200,000 .040P

2015 L200 - STP - AREAS LESS THAN 200,000 .040R

2.320Total:Highway and Bridge 2.280

Projects Page - 41 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NASHUA

MAIN STREET MUNICIPAL MANAGED, 20% City

Match. Urban Compact

project.

RECONSTRUCTION FROM HOLLIS STREET TO ORCHARD AVENUE (1.09 Miles)

4049FHWA

2018 L200 - STP - AREAS LESS THAN 200,000 2.200C 2017

2.200Total:Highway and Bridge 2.200

NASHUA

NASHUA TRANSIT SYSTEM Annual Program FundingCAPITAL PLANNING PROGRAM

608 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .160

1.600Total:Transit

NASHUA

NASHUA TRANSIT SYSTEM Annual Program FundingCAPITAL EQUIPMENT [ARRA]

3797 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .065

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .067

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .069

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .072

.274Total:Transit

NASHUA

NASHUA TRANSIT SYSTEM Annual Program FundingOPERATING ASSISTANCE

609 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. 1.455

14.551Total:Transit

Projects Page - 42 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NASHUA

NASHUA TRANSIT SYSTEM Annual Program FundingPREVENTIVE MAINTENANCE

3799 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .420

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .433

2013 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .446

2014 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459

2015 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459

2016 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459

2017 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459

2018 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459

2019 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459

2020 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .459

4.514Total:Transit

NASHUA

10040 G

BALDWIN STREET Earmark funding (partial),

project being re-scoped by

City. Municipal Managed, Red

List bridge priority #89.

RECONSTRUCTION AND EXTENSION FROM AMHERST ST, OVER B&M RAILROAD - 115/120 {Red

List} & FUTURE BROAD ST PARKWAY TO FAIRMOUNT ST, WITH CONNECTOR TO FUTURE

PARKWAY {Red List} [Section 1602 - Designated Project; Demo Id NH003] [Sister Demo

Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)2641

FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 4.653C 2011

2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .032C 2011

4.685Total:Highway and Bridge 4.685

NASHUA

10040 H

BROAD STREET PARKWAY Earmark funding (partial),

project being re-initiated by

City. Municipal Managed.

CONSTRUCTION FROM NASHUA RIVER WESTERLY TO BROAD STREET (TO SUBGRADE ONLY)

[Section 1602 - Designated Project; Demo Id NH003] [Sister Demo Projects: 10040A, G, H, J, S,

T] (Parent = Nashua 10040A)2642FHWA

2012 Q920 - HIGH PRIORITY PROJ SEC 1602 5.611C 2012

5.611Total:Highway and Bridge 5.487

NASHUA

10040 I

BROAD STREET PARKWAY Earmark funding (partial),

project being re-initiated by

City. Municipal Managed.

Bridge Priority #90.

CONSTRUCTION OF BRIDGE OVER NASHUA RIVER; FAIRMOUNT STREET BRIDGE OVER

PARKWAY - 118/118 (Parent = Nashua 10040A)

2643

FHWA

2012 3610 - CONGESTION RELIEF PROJECTS 1.463C 2012

2012 L200 - STP - AREAS LESS THAN 200,000 9.137C 2012

10.600Total:Highway and Bridge 10.600

NASHUA

10040 J

BROAD STREET PARKWAY Earmark funding (partial),

project being re-initiated by

City. Municipal Managed.

CONSTRUCTION FROM WEST HOLLIS STREET TO PINE STREET EXTENSION INCLUDING BRIDGE

OVER CANAL [Section 1602 - Designated Project; Demo Id NH003] [Sister Demo Projects:

10040A, G, H, J, S, T] (Parent = Nashua 10040A)2647FHWA

2011 Q920 - HIGH PRIORITY PROJ SEC 1602 5.100C 2011

5.100Total:Highway and Bridge 5.100

Projects Page - 43 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NASHUA

10040 K

BROAD STREET PARKWAY Earmark funding (partial),

project being re-initiated by

City. Municipal Managed.

BASE COURSES, WEARING COURSES, SIGNING, MARKINGS, RR CROSSING, AND SIGNALS

(Parent = Nashua 10040A)

2648FHWA

2014 L200 - STP - AREAS LESS THAN 200,000 1.200C 2014

1.200Total:Highway and Bridge 1.200

NASHUA

10040 L

BROAD STREET PARKWAY Earmark funding (partial),

project being re-initiated by

City. Municipal Managed.

PROJECT WIDE LANDSCAPING (Parent = Nashua 10040A)

2649FHWA

2016 L200 - STP - AREAS LESS THAN 200,000 .300C 2016

.300Total:Highway and Bridge 0.300

NASHUA

10040 S

BROAD STREET PARKWAY R-O-W Demolition. Earmark

funding appropriated in 1998.

DEMOLITION OF "NIMCO" BUILDING [Section 1602 - Designated Project; Demo Id NH003]

[Sister Demo Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)

3752 FHWA

2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .125R

2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .125R 2007

.250Total:Highway and Bridge

NASHUA

10040 T

BROAD STREET PARKWAY R-O-W Demolition. Earmark

funding appropriated in 1998.

MILLYARD UTILITY RELOCATION [Section 1602 - Designated Project; Demo Id NH003] [Sister

Demo Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)

3753 FHWA

2011 Q920 - HIGH PRIORITY PROJ SEC 1602 .600R 2008

.600Total:Highway and Bridge

NASHUA

10136 A

NH 101A Municipal Managed with State

Match.

WIDENING BETWEEN CELINA AVENUE INTERSECTION TO AMHERST STREET MALL INTERSECTION

(1.5 MILES) TO EXPAND FROM EXISTING FIVE LANES TO SEVEN LANES AS RECOMMENDED BY

CORRIDOR STUDY (Milford to Nashua 10136)3593 FHWA

2012 L200 - STP - AREAS LESS THAN 200,000 3.114C 2012

2012 NON - OTHER NON PARTICIPATING 5.287C

2011 L050 - NATIONAL HIGHWAY SYSTEM .464P

2011 L050 - NATIONAL HIGHWAY SYSTEM 2.250R

11.114Total:Highway and Bridge 6.125

NASHUA

13117

FEE TPK / CAPITAL

CORRIDOR

Specific project from Statewide

program. ROW funds

programmed previously.

Municipal Managed.

CONSTRUCT 1000 SPACE PARK'N'RIDE NEAR B&M RR WITH RAIL PLATFORM; FACILITY WILL BE

USED FOR CAR POOL, VANPOOL, & PASSENGER RAIL MODES (CMAQ Program) [98-13CM]

2344

FHWA

2011 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 2.450C CMAQ 1998

2.450Total:Highway and Bridge 6.500

Projects Page - 44 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NASHUA

13931

NH 130 Municipal Managed and 20%

match.

BROAD STREET RECONSTRUCTION FROM COBURN AVE TO COLISEUM AVE, INCLUDING

DUBLIN AVE, TO PROVIDE SHOULDERS / SAFETY IMPROVEMENTS

3277 FHWA

2016 L200 - STP - AREAS LESS THAN 200,000 4.200C 2016

2014 L200 - STP - AREAS LESS THAN 200,000 .020P 2006

2014 L200 - STP - AREAS LESS THAN 200,000 .020P

2014 L200 - STP - AREAS LESS THAN 200,000 .010P

2015 L200 - STP - AREAS LESS THAN 200,000 .180R

4.430Total:Highway and Bridge 4.390

NASHUA - MANCHESTER -

CONCORD

CAPITAL CORRIDOR Municipal responsibility.

Funding anticipated to be a

mix of Municipal, CMAQ, TIF,

Airport, and other funds. (Also

Manchester 13512)

STATION FACILITIES ALONG CORRIDOR

7200

Rail

2013 FRA - Federal Railroad Grant / Other Funds 7.700C New Project

2014 FRA - Federal Railroad Grant / Other Funds 7.700C

15.400Total:Rail

NASHUA - MANCHESTER -

CONCORD

CAPITAL CORRIDOR Overall Capital Corridor Rail

Service, specific projects and

particular phasing to be

determined dependent on

funding availability and

continued coordination with

NHRTA.

TRACK INFRASTRUCTURE, EQUIPMENT, GRADE CROSSINGS, ENVIRONMENTAL & ENGINEERING

FOR ESTABLISHING RAIL SERVICE

7201

Rail

2011 FRA - Federal Railroad Grant / Other Funds 51.000C New Project

2012 FRA - Federal Railroad Grant / Other Funds 51.000C

2013 FRA - Federal Railroad Grant / Other Funds 51.000C

2014 FRA - Federal Railroad Grant / Other Funds 51.000C

204.000Total:Rail

NASHUA - MANCHESTER -

CONCORD

13514

CAPITAL CORRIDOR Specific project from Statewide

program, Municipal Managed.

PURCHASE PASSENGER RAIL EQUIPMENT (CMAQ Program) [00-12CM]

2959 FHWA

2011 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 5.003C

2012 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 5.000C

2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 5.000C CMAQ 2000

15.003Total:Rail 15.003

Projects Page - 45 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NASHUA - MANCHESTER -

CONCORD

13875

CAPITAL CORRIDOR Specific project from Statewide

program, Municipal managed.

PROVIDE 3 YEARS OPERATING SUPPORT FOR PASSENGER RAIL STARTUP (CMAQ Program) [02-

22CM]

3698 FHWA

2011 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 1.750P CMAQ 2002

2012 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 1.750P

2013 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 1.750P

5.250Total:Rail

NEW BOSTON

14771

GREGG MILL ROAD Specific project from Statewide

program, Municipal managed.

BRIDGE REPLACEMENT OVER SOUTH BRANCH PISCATAQUOG RIVER - 132/138

6343 State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .920C 2012

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .110P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

1.035Total:Highway and Bridge 1.035

NEW BOSTON

15505

TUCKER MILL ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER MID BRANCH PISCATAQUOG RIVER - 087/150

6988 State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .490C New Project

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.575Total:Highway and Bridge

NEW CASTLE - RYE

NH 1B Bridge Priority #41{Red List}.REHABILITATE SINGLE LEAF BASCULE MOVEABLE BRIDGE OVER LITTLE HARBOR - 066/071 {Red

List}

5558 FHWA

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.750C 2013

4.750Total:Highway and Bridge 4.750

NEW DURHAM

15398

DAVIS CROSSING Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER ELA RIVER - 228/091 (NEW)

6898 State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .295C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.365Total:Highway and Bridge

NEW IPSWICH

14465

NH 123 / 124 Bridge Priority #18 {Red List}.REPLACE BRIDGE OVER SOUHEGAN RIVER - 157/093 {Red List}

2757 FHWA

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.750C 2012

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .110P

2.860Total:Highway and Bridge 2.650

Projects Page - 46 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NEW LONDON

NH 114 (Main St) DOT priority list, UVLSRPC priorityRECONSTRUCTION, NH 11 (CROCKETT'S CORNER) NORTHERLY TO NEWPORT ROAD (HOMAN'S

CORNER)

3526 FHWA

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.775C Previously Programmed Beyond TYP (Deferred)

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050R

2.000Total:Highway and Bridge

NEWINGTON

11238 M

NH 16 / US 4 / SPLDG TPK Specific Project Breakout from

Newington-Dover 11238

EXIT 3 INTERCHANGE CONSTRUCTION [PARENT = N-D 11238]

7075 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 8.834C New Project

2012 TPK - TURNPIKE EXPANSION (State FY) 15.143C

2013 TPK - TURNPIKE EXPANSION (State FY) 15.143C

2014 TPK - TURNPIKE EXPANSION (State FY) 2.524C

41.644Total:Highway and Bridge

NEWINGTON

11238 N

NH 16 / US 4 / SPLDG TPK Specific Project Breakout from

Newington-Dover 11238

EXIT 4 RAMPS AND MAINLINE TURNPIKE CONSTRUCTION [PARENT = N-D 11238]

7076 Turnpike Expansion

2012 TPK - TURNPIKE EXPANSION (State FY) 6.196C New Project

2013 TPK - TURNPIKE EXPANSION (State FY) 7.436C

2014 TPK - TURNPIKE EXPANSION (State FY) 2.479C

16.111Total:Highway and Bridge

NEWINGTON - DOVER

11238

NH 16 / US 4 / SPLDG TPK Turnpike Capital Program -

overall project for Little Bay

bridge and Newington

interchange construction, pe, &

row. Specific Construction

projects broken out separately

and include earmark federal

funding.

WIDEN TURNPIKE INCLUDING LITTLE BAY BRIDGES FROM GOSLING ROAD TO DOVER TOLL

1191

Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 3.713C 2010

2011 TPK - TURNPIKE EXPANSION (State FY) 3.400P

2012 TPK - TURNPIKE EXPANSION (State FY) 3.400P

2013 TPK - TURNPIKE EXPANSION (State FY) 3.200P

2011 TPK - TURNPIKE EXPANSION (State FY) 2.200R

2012 TPK - TURNPIKE EXPANSION (State FY) 1.443R

17.356Total:Highway and Bridge

Projects Page - 47 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NEWINGTON - DOVER

11238 O

NH 16 / US 4 / SPLDG TPK Specific Project Breakout from

Newington-Dover 11238

REHABILITATION OF EXISTING LITTLE BAY BRIDGE & BRIDGE APPROACH CONSTRUCTION

[PARENT N-D 11238]

7077 Turnpike Expansion

2014 TPK - TURNPIKE EXPANSION (State FY) 9.751C New Project

2015 TPK - TURNPIKE EXPANSION (State FY) 16.717C

2016 TPK - TURNPIKE EXPANSION (State FY) 6.965C

33.433Total:Highway and Bridge

NEWINGTON - DOVER

11238 P

SPLDG TPK / LITTLE BAY

BRIDGES

Specific project from HB 391,

Turnpike Capital Program.

SOUNDWALL CONSTRUCTION NORTH OF EXIT 6

7227 Turnpike Expansion

2013 TPK - TURNPIKE EXPANSION (State FY) 1.140C New Project

2014 TPK - TURNPIKE EXPANSION (State FY) 1.425C

2.565Total:Highway and Bridge

NEWINGTON - DOVER

11238 Q

SPLDG TPK / LITTLE BAY

BRIDGES

Specific project from HB 391,

Turnpike Capital Program.

EXIT 6 INTERCHANGE RECONSTRUCTION

7228 Turnpike Expansion

2014 TPK - TURNPIKE EXPANSION (State FY) 13.220C New Project

2015 TPK - TURNPIKE EXPANSION (State FY) 15.864C

2016 TPK - TURNPIKE EXPANSION (State FY) 5.288C

34.372Total:Highway and Bridge

NEWINGTON - DOVER

11238 R

SPAULDING TURNPIKE /

LITTLE BAY BRIDGES

Specific project from HB 391,

Turnpike Capital Program.

TURNPIKE MAINLINE RECONSTRUCTION FROM LBB TO TOLL PLAZA

7229 Turnpike Expansion

2015 TPK - TURNPIKE EXPANSION (State FY) 5.635C

2016 TPK - TURNPIKE EXPANSION (State FY) 6.761C New Project

2017 TPK - TURNPIKE EXPANSION (State FY) 2.254C

14.650Total:Highway and Bridge

NEWINGTON - DOVER

11238 S

SPAULDING TURNPIKE /

LITTLE BAY BRIDGES

Specific project from HB 391,

Turnpike Capital Program.

GENERAL SULLIVAN BRIDGE REHABILITATION

7233 Turnpike Expansion

2015 TPK - TURNPIKE EXPANSION (State FY) 9.327C New Project

2016 TPK - TURNPIKE EXPANSION (State FY) 15.988C

2017 TPK - TURNPIKE EXPANSION (State FY) 6.662C

31.977Total:Highway and Bridge

NEWPORT

14969

PARADISE ROAD Specific project from Statewide

program. Municipal Managed.

BRIDGE REPLACEMENT OVER SUGAR RIVER - 177/117

6683 State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .560C 2014

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .100P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.665Total:Highway and Bridge 0.525

Projects Page - 48 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

NEWPORT

15597

REED'S FARM ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER BROOK - 167/148 {Red List}

7096State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .080C New Project

.080Total:Highway and Bridge

NORTH HAMPTON

15848

NH 111 Specific project from Statewide

program.

BRIDGE REHABILITATION OVER I-95 - 081/093 [TRR*4042] {TRR Program}

7424 npike Renewal & Replacem

2012 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 1.400C New Project

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .100P

1.500Total:Highway and Bridge

NORTHFIELD

I-93 Red List Bridge Prioity #61 & 62REHABILITATE BRIDGES OVER WINNISPESAUKEE RIVER - 117/157 & 118/158 (Red List)

7357 FHWA

2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.000C New Project

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .250P

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R

3.300Total:Highway and Bridge

NOTTINGHAM

15720

DEERFIELD ROAD Specific project from Statewide

program, Municipal Managed.

Advanced Constructed in SFY

2009.

BRIDGE REPLACEMENT OVER BACK CREEK - 102/085 (NEW)

7258

State Aid Bridge

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .349C New Project

.349Total:Highway and Bridge

OSSIPEE

10431

NH 16 Scope intent, address

pavement condition and

problem intersections only.

PAVEMENT REHABILITATION & INTERSECTION IMPROVEMENTS FROM NH 28 NORTH 3.36 MILES

95FHWA

2015 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2015

2011 L050 - NATIONAL HIGHWAY SYSTEM .125P

2013 L050 - NATIONAL HIGHWAY SYSTEM .188P

2013 L050 - NATIONAL HIGHWAY SYSTEM .250R

3.563Total:Highway and Bridge 3.563

Projects Page - 49 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

OSSIPEE

13910

NH 16, NH 25, NH 41 Scope reduction. Immediate

Intersection needs.

INTERSECTION IMPROVEMENTS IN WEST OSSIPEE AT THE INTERSECTION OF NH 16 AND NH 25

1888 FHWA

2015 L050 - NATIONAL HIGHWAY SYSTEM 1.060C 2015

2015 L050 - NATIONAL HIGHWAY SYSTEM .530C 2015

2011 L050 - NATIONAL HIGHWAY SYSTEM .065P

2012 L050 - NATIONAL HIGHWAY SYSTEM .150P

2011 L050 - NATIONAL HIGHWAY SYSTEM .030R

2012 L050 - NATIONAL HIGHWAY SYSTEM .250R

2.085Total:Highway and Bridge 2.085

OSSIPEE

14749

NH 16 / NH 25 Scope intent to address bridges

and pavement condition only.

Red List Bridge priorities #37,

#38, and #39

ROADWAY RESURFACING AND REHABILITATE 4 BRIDGES, BEGINNING AT THE LOVELL RIVER

BRIDGE, RUNNING NORTH 3.22 MILES TO THE CHOCORUA RIVER - 137/299, 137/297, 152/268,

123/324 (All Red List)2762

FHWA

2016 L200 - STP - AREAS LESS THAN 200,000 5.000C 2016

2017 L200 - STP - AREAS LESS THAN 200,000 4.000C

2012 L110 - BRIDGE PROGRAM - OFF SYSTEM .110P

2014 L050 - NATIONAL HIGHWAY SYSTEM .094P

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .156P

2013 L110 - BRIDGE PROGRAM - OFF SYSTEM .080R

2015 L110 - BRIDGE PROGRAM - OFF SYSTEM .188R

9.628Total:Highway and Bridge 5.643

PELHAM

MAIN STREET Red List Bridge Priority # 42REHABILITATE BRIDGE OVER BEAVER BROOK - 110/090 (Red List)

7436 FHWA

2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.500C New Project

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .150P

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .040R

1.690Total:Highway and Bridge

PELHAM

14491 #

NH 111A Earmark fundingIMPROVEMENTS TO TWO INTERSECTIONS: MAIN STREET / NASHUA ROAD AND OLD BRIDGE

STREET / COMMON STREET [Section 1702 - Designated Project; Demo Id NH055 (14491) &

Demo Id NH072 (14491A)] [PARENT]6859 FHWA

2011 HPER - HIGH PRIORITY .996C 2010

2011 HPER - HIGH PRIORITY .008C 2010

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .188C 2010

2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.016C 2010

2011 LY60 - HIGH PRIORITY PROJ SEC 112 .743C 2010

2.950Total:Highway and Bridge 3.588

Projects Page - 50 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

PEMBROKE

14477 A#

US 3 / PEMBROKE HILL

RD

Earmark fundingINTERSECTION IMPROVEMENT PROJECT [Section 1702 - Designated Project; Demo Id NH042

(14477A) & NH061 (14477B] [PARENT]

3782 FHWA

2011 HPER - HIGH PRIORITY .020C 2010

2011 HPER - HIGH PRIORITY .042C 2010

2011 HPER - HIGH PRIORITY .697C 2010

2011 HY20 - HIGH PRIORITY PROJ SEC 1702 .350C 2010

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .059C 2010

2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .104C 2010

2011 LY20 - HIGH PRIORITY PROJ SEC 1702 1.053C 2010

2011 LY10 - HIGH PRIORITY PROJ SEC 1702 .100R

2.425Total:Highway and Bridge 2.135

PETERBOROUGH

14935

UNION STREET Red List Bridge. Specific project

from Statewide program,

Municipal managed.

REPLACE BRIDGE OVER NUBANUSIT RIVER - 057/108 {Red List}

6489State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town 1.150C 2013

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .150P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .015R

1.315Total:Highway and Bridge 1.315

PETERBOROUGH

15879

US 202 / NH 101 Bridge Priority #67 {Red List}REHABILITATE BRIDGE INCLUDING REPLACE DECK AND PAINT GIRDERS OVER CONTOOCOOK

RIVER - 087/077 {Red List}

6779 FHWA

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .945C 2018

.945Total:Highway and Bridge 1.000

PINKHAMS GRANT

NH 16 Prioity Corridor Weight

Restricted Bridge (E1)

REHABILITATE / REPLACE BRIDGE OVER NEW RIVER - 058/048

7359 FHWA

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C New Project

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .040R

1.140Total:Highway and Bridge

PITTSFIELD

14972

SHAW RD Specific project from statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER KELLY BROOK - 089/135

6685 State Aid Bridge

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .260C 2014

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.325Total:Highway and Bridge 0.325

Projects Page - 51 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

PLAISTOW

10044 G

NH 125 Specific project breakout

project from Plaistow-Kingston

project.

RECONSTRUCT EAST RD TO OLD RD (Parent = Plaistow-Kingston 10044B)

6371FHWA

2013 L050 - NATIONAL HIGHWAY SYSTEM 5.975C 2013

5.975Total:Highway and Bridge 3.900

PLAISTOW - KINGSTON

10044 B

NH 125 Original overall project,

construction now programmed

in specific projects.

RECONSTRUCTION FROM EAST ROAD IN PLAISTOW NORTHERLY APPROX. 6.0 +/- MILE TO NH

125 & MAIN STREET INTERSECTION IN KINGSTON

24FHWA

2011 L230 - STP - URBANIZED AREAS OVER 200,000 .820R

.820Total:Highway and Bridge

PLAISTOW - KINGSTON

10044 E

NH 125 Specific project breakout

project from Plaistow-Kingston

project.

RECONSTRUCT FROM 1/4 MI SOUTH OF PLAISTOW / KINGSTON T/L NORTHERLY APPROX 1.2 MI

INCLUDING EXTENSION OF KINGSTON RD. (PE & ROW FUNDING INCLUDED UNDER PLAISTOW-

KINGSTON 10044B) (PARENT=KINGSTON 10044B)3898FHWA

2018 L050 - NATIONAL HIGHWAY SYSTEM 7.500C 2017

2019 L050 - NATIONAL HIGHWAY SYSTEM 7.680C 2017

15.180Total:Highway and Bridge 8.200

PLYMOUTH

15882

NH 25 / NH 3A Bridge Priority #34 {Red List}REHABILITATE BRIDGE OVER BAKER RIVER - 117/143 (Red List)

6780 FHWA

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.945C 2015

1.945Total:Highway and Bridge 2.000

PORTSMOUTH

13455 A

US 1 BYPASS Red List Bridge Priority #25.

Breakout from 13455

REMOVE US 1 SOUTH BOUND BRIDGE OVER US 1 BYPASS -173/071 (Red List) (Pe & Row in

Parent 13455)

7431 FHWA

2011 L200 - STP - AREAS LESS THAN 200,000 3.200C 2011

3.200Total:Highway and Bridge

PORTSMOUTH

13455 B

US 1 BYPASS Red List Bridge Priority #27 & 28.

Breakout from 13455

REPLACE BRIDGES {Red List} (183/087) MIDDLE ROAD AND (188/097) ISLINGTON STREET OVER

US 1 BYPASS (Pe & Row in Parent 13455)

7432 FHWA

2012 L200 - STP - AREAS LESS THAN 200,000 4.900C 2011

4.900Total:Highway and Bridge

PORTSMOUTH

13455 C

US 1 BYPASS Red List Bridge Priority #26.

Breakout from 13455

REPLACE MAPLEWOOD AVENUE BRIDGE OVER US 1 BYPASS - 227/112 {Red List} (Pe & Row in

Parent 13455)

7433 FHWA

2013 L200 - STP - AREAS LESS THAN 200,000 4.500C 2013

4.500Total:Highway and Bridge

Projects Page - 52 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

PORTSMOUTH

14193

OCEAN ROAD Specific project from Statewide

program, Municipal Manged.

RECONSTRUCT & RECLASSIFY AS A CITY STREET. (SAH Funding Capped Per Year; Excess Of

Grand Total [$1,200,000] Will Be 50/50 Match)

5576 State Aid Highway

2011 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town .150C 2011

.150Total:Highway and Bridge 1.050

PORTSMOUTH

14493

NH 1A Specific project from Statewide

program. Municipal Managed.

BRIDGE REHABILITATION OVER SAGAMORE CREEK - 198/034 [MOBRR-221] {Municipal Bridge

Program}

6053 FHWA

2011 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.000C 2011

3.000Total:Highway and Bridge 3.125

PORTSMOUTH

15760

I-95 Specific project from HB 391,

Turnpike Capital Program

INSTALL SOUND WALL ALONG SB SIDE OF I-95 IN PORTSMOUTH ADJACENT TO ATLANTIC

HEIGHTS NEIGHBORHOOD (APPROX 2,000 LF) {Turnpike}

7297 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 1.500C New Project

2012 TPK - TURNPIKE EXPANSION (State FY) .500C

2011 TPK - TURNPIKE EXPANSION (State FY) .020P

2011 TPK - TURNPIKE EXPANSION (State FY) .005R

2.025Total:Highway and Bridge

PORTSMOUTH - KITTERY

13678 D

US 1 Breakout from overall

Portsmouth-Kittery 13678

QUALITY ASSURANCE SHOP INSPECTION CONTRACT FOR THE MEMORIAL BRIDGE PROJECT (PE

charged to Parent 13678)

6948 FHWA

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050C

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .450C New Project

2011 ME - MAINE'S CONTRIBUTION .450C

.950Total:Highway and Bridge

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety Concerns.

Priority as identified by project

sponsor.

DESIGN AND CONSTRUCT RUNWAY 34 END REHABILITATION & TAXIWAY 'A2' REHABILITATION

6571 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 7.789

7.789Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety Concerns.

Priority as identified by project

sponsor.

DESIGN AND CONSTRUCT RUNWAY 16 END REHABILITATION

6572 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM 3.000

3.000Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety Concerns.

Priority as identified by project

sponsor.

DESIGN AND CONSTRUCT APRON - AREA 5 (ASR REPLACEMENT)

6672 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM 4.210

4.210Total:Aeronautics

Projects Page - 53 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety Concerns.

Priority as identified by project

sponsor.

DESIGN AND CONSTRUCT APRON - AREA 7 (ASR REPLACEMENT)

6674 Airport

2020 AIP - AIRPORT IMPROVEMENT PROGRAM 11.500

11.500Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety Concerns.

Priority as identified by project

sponsor.

DESIGN ONLY: NORTH APRON REHABILITATION

7377 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM 2.500

2.500Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Planning ProjectENVIRONMENTAL ASSESSMENT

7373 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM 1.052

1.052Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Planning ProjectFAR PART 150 AIRCRAFT NOISE STUDY

7375 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .316

.316Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Provide equipment for winter

operations.

PURCHASE SNOW-REMOVAL EQUIPMENT

6568 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM 1.530

2016 AIP - AIRPORT IMPROVEMENT PROGRAM .737

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .295

2019 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000

3.562Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Required to Meet Federal

Requirements

RESIDENTIAL SOUND INSTALLATION PROGRAM - GROUP V

3983 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .526

.526Total:Aeronautics

Projects Page - 54 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety ConcernsREHABILITATE RUNWAY 16-34 - CENTER

7374 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM 8.632

8.632Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety ConcernsSOUTH DEICING EFFLUENT DISPOSAL SYSTEM

7378 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM 5.750C

5.750Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address Safety ConcernsTAXIWAY 'N' & SOUTH DEICING EFFLUENT DISPOSAL SYSTEM

7376 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM 11.500

11.500Total:Aeronautics

PORTSMOUTH -

NEWINGTON

PORTSMOUTH

INTERNATIONAL

AIRPORT AT PEASE

Address aircraft noise

complaints.

UPDATE AIRCRAFT NOISE EXPOSURE MAP

6570 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM .105

.105Total:Aeronautics

PORTSMOUTH, NH -

KITTERY, ME

13678 F

US 1 Bridge Priority #1 {Red List},

contingent on Maine funding

availability. Discretionary Grant

funding being pursued.

MEMORIAL BRIDGE OVER PISCATAQUA RIVER - 247/084 {Red List} , BASED ON CONNECTION

STUDY. REPLACEMENT OF SCOTT AVENUE BRIDGE AND REHABILITATION OF THE KITTERY

APPROACH SPANS

7262FHWA

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.000C 2010

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000C 2009

2011 ME - MAINE'S CONTRIBUTION 1.000C 2010

2011 ME - MAINE'S CONTRIBUTION 2.000C 2010

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 4.000C 2009

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 14.000C 2009

2012 ME - MAINE'S CONTRIBUTION 14.000C 2010

2012 ME - MAINE'S CONTRIBUTION 1.000C 2010

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 14.000C

2013 ME - MAINE'S CONTRIBUTION 14.000C

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.750P

2011 ME - MAINE'S CONTRIBUTION 1.750P

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005R

2011 ME - MAINE'S CONTRIBUTION .005R

70.510Total:Highway and Bridge 39.727

Projects Page - 55 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

PORTSMOUTH, NH -

KITTERY, ME

15731

US 1 BYPASS Red List bridge, priority #4,

contingent on Maine funding

availability.

REHABILITATE & PAINT BRIDGE OVER PISCATAQUA RIVER - 251/108 (Sarah Mildred Long

Bridge) (Red List)

5559 FHWA

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 10.000C 2012

2015 ME - MAINE'S CONTRIBUTION 10.000C 2012

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 10.000C 2013

2016 ME - MAINE'S CONTRIBUTION 10.000C 2013

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .075P

2012 ME - MAINE'S CONTRIBUTION .075P

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000P

2013 ME - MAINE'S CONTRIBUTION 1.000P

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.000P

2014 ME - MAINE'S CONTRIBUTION 1.000P

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005R

2013 ME - MAINE'S CONTRIBUTION .005R

44.160Total:Highway and Bridge 15.000

ROCHESTER

SKYHAVEN AIRPORT Address Capacity Concerns.CONSTRUCTION ONLY - SOUTH APRON WITH TIEDOWNS

6578 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM 1.000

1.000Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT Address Safety ConcernsCONSTRUCT ONLY - 500-FT. EXTENSION TO RUNWAY 33 AND RSA EXTENSION

6675 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM 2.200

2.200Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT Address Safety ConcernsCONSTRUCTION ONLY - 500-FT. EXTENSION TO RUNWAY 15 AND RSA EXTENSION

7379 Airport

2020 AIP - AIRPORT IMPROVEMENT PROGRAM 1.550

1.550Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT 95% Federal funds, 5% State

match. FAA requirement.

Runway rehabilitation.

DESIGN & RECONSTRUCTION OF RUNWAY 15/33

3462Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.263

1.263Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT Address Capacity Concerns.DESIGN ONLY - SOUTH APRON WITH TIEDOWNS

6577 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .250

.250Total:Aeronautics

Projects Page - 56 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

ROCHESTER

SKYHAVEN AIRPORT Address Safety Concerns.DESIGN ONLY - 500-FT. EXTENSION TO RUNWAY 33 AND RSA EXTENSION

6582 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .600

.600Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT Address Safety ConcernsDESIGN ONLY - 500-FT. EXTENSION TO RUNWAY 15 AND RSA EXTENSION

6676 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .400

.400Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT Address Safety ConcernsINSTALL PERIMETER FENCING

3466 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .316

.316Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT 95% Federal funds, 5% State

match. FAA requirement.

Safety issue.

REHABILITATE EXISTING TIEDOWN APRON

4111Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM 1.263

1.263Total:Aeronautics

ROCHESTER

SKYHAVEN AIRPORT Address Safety Concerns.SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT

6581 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .158

.158Total:Aeronautics

ROCHESTER

10620 J

SPAULDING TPK Turnpike Priority Capital ProgramCONSTRUCTION OF 2nd BARREL THROUGH EXIT 16 (Chestnut Hill Connector) - PHASE 4

{Turnpike}

2105 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 3.800C 2011

2012 TPK - TURNPIKE EXPANSION (State FY) 13.684C 2012

17.484Total:Highway and Bridge 17.484

ROCHESTER

10620 L

SPAULDING TPK Turnpike Priority Capital

Program. Bridge Priority #55

{Red List}.

SPAULDING TURNPIKE EXPANSION FROM EXIT 14, INCLUDING BRIDGE 117/088, TO EXIT 15,

INCLUDING TEN ROD ROAD, FARMINGTON ROAD AND PHASE 2 MITIGATION (Red List)

{Turnpike}3973Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) 12.600C 2011

2012 TPK - TURNPIKE EXPANSION (State FY) 14.400C 2011

27.000Total:Highway and Bridge 35.988

Projects Page - 57 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

ROCHESTER

14350

NH 202A (WALNUT

STREET)

Municipal Managed, 20% city

match.

INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD SQUARE, NORTH

MAIN, & WASHINGTON STREETS

2750 FHWA

2015 H280 - STP - HAZARD ELIMINATION PROGRAM .700C 2015

2012 H280 - STP - HAZARD ELIMINATION PROGRAM .525R

1.225Total:Highway and Bridge 1.725

ROCHESTER

15863

PICKERING ROAD Specific project from Statewide

program.

RECLAIM, EXCAVATE AND REPLACE CRUSHED GRAVEL AND PAVEMENT [BET-RSR*6730]

{Betterment}

7456 Betterment

2011 BET - BETTERMENT (State FY) .433C New Project

.433Total:Highway and Bridge

ROXBURY - SULLIVAN

10439

NH 9 Scope intent to address

pavement and safety

improvement on existing

alignment. Bridge Priority #73

{Red List}.

RECONSTRUCT SHOULDERS & WIDEN FROM EAST SULLIVAN, SOUTH 2.04 MI; 093/061 (Red List)

102

FHWA

2017 L050 - NATIONAL HIGHWAY SYSTEM 4.250C 2017

2011 L050 - NATIONAL HIGHWAY SYSTEM .025P

2012 L050 - NATIONAL HIGHWAY SYSTEM .019P

2012 L050 - NATIONAL HIGHWAY SYSTEM .100P

2013 L050 - NATIONAL HIGHWAY SYSTEM .025P

2014 L050 - NATIONAL HIGHWAY SYSTEM .025P

2011 L050 - NATIONAL HIGHWAY SYSTEM .025R

2012 L050 - NATIONAL HIGHWAY SYSTEM .300R

2013 L050 - NATIONAL HIGHWAY SYSTEM .025R

2014 L050 - NATIONAL HIGHWAY SYSTEM .300R

5.094Total:Highway and Bridge 4.994

RUMNEY

14472

NH 25 Specific project from Statewide

program.

STABILIZE ROADWAY EMBANKMENT ALONG APPROX 720 FT. OF THE BAKER RIVER LOCATED

APPROX 1500 FT NORTH OF THE POLAR CAVES [BET-HIRI*3639] {Betterment}

5975 Betterment

2013 BET - BETTERMENT (State FY) .500C 2013

.500Total:Highway and Bridge 0.500

Projects Page - 58 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SALEM

12334

NH 28 Municipal jurisdiction at 20%

match.

RECONSTRUCT INTERSECTION, MAIN STREET @ DEPOT STREET, INCLUDING SIGNALS, LEFT TURN

LANES & APPROACHES

630 FHWA

2016 L230 - STP - URBANIZED AREAS OVER 200,000 2.500C 2015

2013 L230 - STP - URBANIZED AREAS OVER 200,000 .100P

2014 L230 - STP - URBANIZED AREAS OVER 200,000 .150P

2014 L230 - STP - URBANIZED AREAS OVER 200,000 .010P

2015 L230 - STP - URBANIZED AREAS OVER 200,000 .010P

2013 L230 - STP - URBANIZED AREAS OVER 200,000 .150R

2014 L230 - STP - URBANIZED AREAS OVER 200,000 .350R

2015 L230 - STP - URBANIZED AREAS OVER 200,000 .250R

3.520Total:Highway and Bridge 3.520

SALEM

14881

EMERSON WAY Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER WIDOW HARRIS BROOK - 114/108 {Red List}

6416State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .733C 2009

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .126P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .025R

.884Total:Highway and Bridge 0.884

SALEM

15592

CLUFFS CROSSING Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

Advanced Constructed in SFY

2009.

REPAIR / REPLACEMENT OF BRIDGE OVER POLICY BROOK - 094/060 {Red List}

7089

State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .706C New Project

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.716Total:Highway and Bridge

SALEM

15596

PELHAM ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER PORCUPINE BROOK - 058/074 (NEW)

7095 State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .468C New Project

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .066P

.534Total:Highway and Bridge

SALEM

15772

NORTH MAIN STREET Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER WIDOW HARRIS BROOK - 115/115 [SAB*4216] {State Aid Bridge

Program}

7308 State Aid Bridge

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .549C

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .095P

2015 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.654Total:Highway and Bridge

Projects Page - 59 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SALEM TO MANCHESTER

10418 C

I-93 Overall, corridor project overall

for PE & ROW, construction

broken out to individual

projects.

RECONSTRUCT & WIDEN MAINLINE, ENVIRONMENTAL IMPACT STUDY AND FINAL DESIGN

FROM MASS S/L IN SALEM TO I-293 IN MANCHESTER (PE & ROW Only) [Section 1602 -

Designated Project; Demo Id NH014]69

FHWA

2011 L010 - INTERSTATE MAINTENANCE 4.783P

2011 L010 - INTERSTATE MAINTENANCE 7.397P

2011 L010 - INTERSTATE MAINTENANCE 4.000R

2011 L010 - INTERSTATE MAINTENANCE 5.570R

2011 L010 - INTERSTATE MAINTENANCE 1.100R

22.850Total:Highway and Bridge

SALEM TO MANCHESTER

10418 C #

I-93 See Section 5 of HB 2010. While

Priority improvements are

funded, facilitated by GARVEE

bonds, these further capacity

improvements, totaling

approximately $250M, are not

fully funded due to financial

constraint.

PHASE II CAPACITY IMPROVEMENTS, RECONSTRUCTION AND WIDENING FROM NORTH OF EXIT

3 TO I-293 (Excluding Exit 5)

7560

FHWA

2014 L010 - INTERSTATE MAINTENANCE .000C

.000Total:Highway and Bridge

SALEM TO MANCHESTER

10418 H

I-93 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate

construction program.

PARK & RIDE @ EXIT 3 (Windham) (CMAQ Program) [Part of 04-33CM]

3138

FHWA

2014 L010 - INTERSTATE MAINTENANCE 1.053C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 4.099C CMAQ 2004

2014 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT .364C

5.516Total:Highway and Bridge 8.330

SALEM TO MANCHESTER

10418 T

I-93 Service to help manage

incidents and reduce delay.

CORRIDOR SERVICE PATROL (Salem to Manchester)

7112 FHWA

2011 L010 - INTERSTATE MAINTENANCE .075P

.075Total:Highway and Bridge

Projects Page - 60 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SALEM TO MANCHESTER

10418 W

I-93 Earmark funds to help address

salt issues.

WATER QUALITY STUDY [Section 1702 - Designated Project; Demo Id NH054]

6052 FHWA

2011 LY20 - HIGH PRIORITY PROJ SEC 1702 .743P

2012 LY20 - HIGH PRIORITY PROJ SEC 1702 .774P

2013 LY20 - HIGH PRIORITY PROJ SEC 1702 .778P

2014 LY20 - HIGH PRIORITY PROJ SEC 1702 .703P

2015 LY20 - HIGH PRIORITY PROJ SEC 1702 .361P

2016 LY20 - HIGH PRIORITY PROJ SEC 1702 .313P

3.670Total:Highway and Bridge

SALEM TO MANCHESTER

13933 D

I-93 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate

construction program. Red list

bridges priorities #2 and #3

MAINLINE, EXIT 1 TO STA. 1130 & NH38 (Salem), INCLUDES BRIDGES 073/063 & 077/063 {Both

Red List} [Partial Garvee Bonded Project] (Parent = Salem to Manchester 13933*)

3818

FHWA

2011 L050 - NATIONAL HIGHWAY SYSTEM 3.353C 2010

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 10.022C

2012 L050 - NATIONAL HIGHWAY SYSTEM 16.050C 2010

2012 L050 - NATIONAL HIGHWAY SYSTEM 1.605C 2010

2013 L050 - NATIONAL HIGHWAY SYSTEM 4.494C 2010

35.524Total:Highway and Bridge 22.800

SALEM TO MANCHESTER

13933 E

I-93 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate

construction program. Red list

bridges priorities #10 and #11.

EXIT 2 INTERCHANGE RECONSTRUCTION, INCLUDING I-93 MAINLINE & NH97, INCLUDES

BRIDGES 068/078 & 070/079 {Both Red List} (Salem) (Parent = Salem to Manchester)

3819

FHWA

2012 L050 - NATIONAL HIGHWAY SYSTEM 7.593C 2011

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 9.325C 2011

2013 L010 - INTERSTATE MAINTENANCE 11.175C 2011

2013 L050 - NATIONAL HIGHWAY SYSTEM 12.000C 2011

2014 L010 - INTERSTATE MAINTENANCE 3.404C

2014 L050 - NATIONAL HIGHWAY SYSTEM 3.404C

46.900Total:Highway and Bridge 41.800

SALEM TO MANCHESTER

13933 F

I-93 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate

construction program. Red List

Bridge Priority #102.

BROOKDALE ROAD, BRIDGE REPLACEMENT - 058/089 & APPROACHES (Salem) {Red List}

5728

FHWA

2011 L050 - NATIONAL HIGHWAY SYSTEM 5.619C From Previous Plan Prior To 2009

2011 L110 - BRIDGE PROGRAM - OFF SYSTEM .899C

6.518Total:Highway and Bridge

Projects Page - 61 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SALEM TO MANCHESTER

13933 I

I-93 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate

construction program.

EXIT 3 AREA, RECONSTRUCT SOUTHBOUND BARREL FROM BROOKDALE ROAD TO NORTH OF

NH111, INCLUDING THE SOUTHBOUND ON RAMP AND THE NORTH BOUND ON RAMP

(WINDHAM) [Parent = Sal-Man 13933*]3820

FHWA

2013 L050 - NATIONAL HIGHWAY SYSTEM 7.758C Previously Programmed Beyond FY2018

2014 L050 - NATIONAL HIGHWAY SYSTEM 23.219C Previously Programmed Beyond FY2018

2015 L050 - NATIONAL HIGHWAY SYSTEM 23.219C Previously Programmed Beyond FY2018

2016 L050 - NATIONAL HIGHWAY SYSTEM 23.219C Previously Programmed Beyond FY2018

2017 L050 - NATIONAL HIGHWAY SYSTEM 15.676C Previously Programmed Beyond FY2018

93.090Total:Highway and Bridge

SALEM TO MANCHESTER

14633 F

I-93 Reflects current construction

sequencing and costs. GARVEE

bonding to facilitate

construction program. 4 Red list

bridges priorities #6, #7, #8,

and #9.

EXIT 5 AREA, RECONSTRUCT INTERCHANGE INCLUDING NORTH BOUND AND SOUTH BOUND

MAINLINE AND NORTH BOUND OFF-RAMP, INCLUDES BRIDGES 096/163, 097/163, 099/160, &

100/160 {All Red List} (Londonderry) (Garvee Bonded) (Parent = Salem to Manchester 13933*)6338

FHWA

2011 L050 - NATIONAL HIGHWAY SYSTEM .072C 2009

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 16.869C 2009

2012 L050 - NATIONAL HIGHWAY SYSTEM 18.060C 2009

2013 L050 - NATIONAL HIGHWAY SYSTEM 18.060C Additional Funds

53.062Total:Highway and Bridge 43.300

SALEM TO MANCHESTER

14800 *

I-93 GARVEE Bond debt service,

approximately $24 million

annually through 2026.

"DEBT SERVICE PROJECT" FOR: RECONSTRUCTION & WIDENING FROM S/L TO MANCHESTER

[Garvee Bonded Projects - 2005 NH Legislature Approved]

4110FHWA

2012 L050 - NATIONAL HIGHWAY SYSTEM 2.029C

2013 L050 - NATIONAL HIGHWAY SYSTEM 6.674C 2013

2014 L050 - NATIONAL HIGHWAY SYSTEM 11.891C 2014

2015 L050 - NATIONAL HIGHWAY SYSTEM 14.911C 2015

2016 L050 - NATIONAL HIGHWAY SYSTEM 17.894C 2016

2017 L050 - NATIONAL HIGHWAY SYSTEM 21.250C 2017

2018 L050 - NATIONAL HIGHWAY SYSTEM 24.000C 2018

2019 L050 - NATIONAL HIGHWAY SYSTEM 24.000C Previously Programmed Beyond FY2018

2020 L050 - NATIONAL HIGHWAY SYSTEM 24.000C Previously Programmed Beyond FY2018

146.649Total:Highway and Bridge 144.000

SEABROOK

15769

NH 107 Specific project from HB 391,

Turnpike Capital Program.

Supplemental to developer

improvements.

BRIDGE WIDENING OVER I-95 {Turnpike}

7305

Turnpike Expansion

2013 TPK - TURNPIKE EXPANSION (State FY) 2.000C

2.000Total:Highway and Bridge

Projects Page - 62 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SHARON

15513

CROSS ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER TOWN LINE BROOK - 071/099

7000 State Aid Bridge

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .365C New Project

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P

2014 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.450Total:Highway and Bridge

SOMERSWORTH, NH -

BERWICK, ME

12228

NH 9 Municipal Managed.REHAB BRIDGE OVER SALMON FALLS RIVER - 101/114

417 FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .368C 2010

2011 ME - MAINE'S CONTRIBUTION .368C 2010

.735Total:Highway and Bridge 0.735

SPR #1

Planning & Research Federal specified funding for

data gathering, long range

planning, special studies. Cost

reflects anticipated federal

funding.

STATE PLANNING & RESEARCH - PART #1 "PLANNING"

665

FHWA

2011 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2012 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2013 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2014 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2015 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2016 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2017 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2018 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2019 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

2020 L550 - "SAFTEA-LU"-STATE PLAN'N & RSRCH-PART 1 "PLAN'N"2% 2.864P

28.645Total:Highway and Bridge

Projects Page - 63 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SPR #2

Planning & Research Federal specified funding for

research activities involving

construction materials and

processes.

STATE PLANNING & RESEARCH - PART #2 "RESEARCH"

666

FHWA

2011 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2012 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2013 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2014 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2015 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2016 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2017 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2018 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2019 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

2020 L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY .612P

6.122Total:Highway and Bridge

STATEWIDE

12563 *

ADMINISTRATION Program Funding for

Departmental Training.

ANNUAL TRAINING PROGRAM (Annual Project)

451 FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

2.000Total:Highway and Bridge

STATEWIDE SPECIAL

10336 *

ADMINISTRATION Federal specified funding for

disadvantaged business

enterprises.

IN HOUSE ADMINISTRATION OF THE FHWA SUPPORTIVE SERVICES PROGRAM: "DBE"

COMPLIANCE MONITORING (Annual Program)

45FHWA

2011 H480 - DBE - SUPPORTIVE SERVICES .090P

2012 H480 - DBE - SUPPORTIVE SERVICES .090P

2013 H480 - DBE - SUPPORTIVE SERVICES .090P

2014 H480 - DBE - SUPPORTIVE SERVICES .090P

2015 H480 - DBE - SUPPORTIVE SERVICES .090P

2016 H480 - DBE - SUPPORTIVE SERVICES .090P

2017 H480 - DBE - SUPPORTIVE SERVICES .090P

2018 H480 - DBE - SUPPORTIVE SERVICES .090P

2019 H480 - DBE - SUPPORTIVE SERVICES .090P

2020 H480 - DBE - SUPPORTIVE SERVICES .090P

.900Total:Highway and Bridge

Projects Page - 64 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE-TRAC

13668

ADMINISTRATION Program Funding for 'Education

Outreach' Working with Local

High Schools.

IMPLEMENT AND PARTICIPATE IN AASHTO TRAC PROGRAM IN LOCAL HIGH SCHOOLS TO

ENCOURAGE STUDENTS TO EXPLORE OPPORTUNITIES IN TRANSPORTATION CAREERS (Annual

Program)3512FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .021P

.208Total:Highway and Bridge

STATEWIDE

AIRPORTS Address Safety Concerns.INSTALL INSTRUMENT LANDING SYSTEM IN THE NORTH COUNTRY

6584 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM 4.210

4.210Total:Aeronautics

STATEWIDE

AIRPORTS Performed in accordance with

Pavement Management

System.

PAVEMENT MAINTENANCE

3472Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2013 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2016 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .100

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .100

1.000Total:Aeronautics

Projects Page - 65 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

AIRPORTS Planning document; 5% State

match. Allows for updated

management of the dynamic

system of NH Open to the

Public Airports.

STATE AIRPORT SYSTEM PLANNING

3473

Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2013 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2016 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2018 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .150

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .150

1.500Total:Aeronautics

STATEWIDE DISTRICTS

BET-BRPI *

BETTERMENT Small State System Projects.BRIDGE REHABILITATION, PRESERVATION & IMPROVEMENT PROJECTS

4212 Betterment

2011 BET - BETTERMENT (State FY) .600C

2012 BET - BETTERMENT (State FY) .600C

2013 BET - BETTERMENT (State FY) .600C

2014 BET - BETTERMENT (State FY) .600C

2015 BET - BETTERMENT (State FY) .600C

2016 BET - BETTERMENT (State FY) .600C

2017 BET - BETTERMENT (State FY) .600C

2018 BET - BETTERMENT (State FY) .600C

2019 BET - BETTERMENT (State FY) .600C

2020 BET - BETTERMENT (State FY) .600C

6.000Total:Highway and Bridge

STATEWIDE DISTRICTS

BET-FA *

BETTERMENT Force Account Through District

Staff

DISTRICTS FORCE ACCOUNT WORK @ VARIOUS LOCATIONS [Parent] (Annual Project)

789 Betterment

2011 BET - BETTERMENT (State FY) 1.800C

2012 BET - BETTERMENT (State FY) 1.800C

2013 BET - BETTERMENT (State FY) 1.800C

2014 BET - BETTERMENT (State FY) 1.800C

2015 BET - BETTERMENT (State FY) 1.800C

2016 BET - BETTERMENT (State FY) 1.800C

2017 BET - BETTERMENT (State FY) 1.800C

2018 BET - BETTERMENT (State FY) 1.800C

2019 BET - BETTERMENT (State FY) 1.800C

2020 BET - BETTERMENT (State FY) 1.800C

18.000Total:Highway and Bridge

Projects Page - 66 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE DISTRICTS

BET-HIRI *

BETTERMENT Small State System Projects.HAZARDOUS INTERSECTION AND ROADWAY IMPROVEMENTS (Annual Project)

3639 Betterment

2011 BET - BETTERMENT (State FY) 1.200C

2012 BET - BETTERMENT (State FY) 1.200C

2013 BET - BETTERMENT (State FY) .700C

2014 BET - BETTERMENT (State FY) 1.200C

2015 BET - BETTERMENT (State FY) 1.200C

2016 BET - BETTERMENT (State FY) 1.200C

2017 BET - BETTERMENT (State FY) 1.200C

2018 BET - BETTERMENT (State FY) 1.200C

2019 BET - BETTERMENT (State FY) 1.200C

2020 BET - BETTERMENT (State FY) 1.200C

11.500Total:Highway and Bridge

STATEWIDE

15263 A

ENG & ROW Consultant Services to Provide

Periodic Specialized Inspection

Needs.

COMPLEX BRIDGE INSPECTION (PARENT=CBI*7237)

3570FHWA

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .750P

.750Total:Highway and Bridge

STATEWIDE

CS-LRTP *

ENG & ROW Implement strategic inter-

regional corridor studies.

CORRIDOR STUDIES [Parent] {Long Range Transportation Plan}

6781 FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.000P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 1.500P

15.500Total:Highway and Bridge

Projects Page - 67 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE M & R

ACTIVITIES

13921 *

ENG & ROW Means of Servicing

Sophisticated Electronic Lab &

Materials Equipment used on

Federal Aid Highway & Bridge

Projects

EQUIPMENT SERVICE & CALIBRATION AGREEMENTS AND PROJECT RELATED CONSUMABLES

(Annual Project)

3801

FHWA

2011 L200 - STP - AREAS LESS THAN 200,000 .050C

2012 L200 - STP - AREAS LESS THAN 200,000 .050C

2013 L200 - STP - AREAS LESS THAN 200,000 .050C

2014 L200 - STP - AREAS LESS THAN 200,000 .050C

2015 L200 - STP - AREAS LESS THAN 200,000 .050C

2016 L200 - STP - AREAS LESS THAN 200,000 .050C

2017 L200 - STP - AREAS LESS THAN 200,000 .050C

2018 L200 - STP - AREAS LESS THAN 200,000 .050C

2019 L200 - STP - AREAS LESS THAN 200,000 .050C

2020 L200 - STP - AREAS LESS THAN 200,000 .050C

2011 L200 - STP - AREAS LESS THAN 200,000 .045P

2012 L200 - STP - AREAS LESS THAN 200,000 .045P

2013 L200 - STP - AREAS LESS THAN 200,000 .045P

2014 L200 - STP - AREAS LESS THAN 200,000 .045P

2015 L200 - STP - AREAS LESS THAN 200,000 .045P

2016 L200 - STP - AREAS LESS THAN 200,000 .045P

2017 L200 - STP - AREAS LESS THAN 200,000 .045P

2018 L200 - STP - AREAS LESS THAN 200,000 .045P

2019 L200 - STP - AREAS LESS THAN 200,000 .045P

2020 L200 - STP - AREAS LESS THAN 200,000 .045P

.950Total:Highway and Bridge

STATEWIDE SPECIAL

10909 *

ENG & ROW For Funding Shared (MA & NH)

USGS Geodectic Survey Advisor

Position & Coordination

GEODETIC ADVISOR, COOPERATIVE AGREEMENT BETWEEN US DEPT of COMMERCE NATIONAL

OCEAN SERVICES & NHDOT (Annual Project)

2683FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .047P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .049P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .051P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .054P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .060P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .062P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .066P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .069P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .072P

.586Total:Highway and Bridge

Projects Page - 68 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE P.E.

ENG & ROW Available PE funding as

required for specific projects for

which the scope of work (and

the depth of engineering) is yet

to be defined.

PRELIMINARY ENGINEERING (Annual Funding)

3531

FHWA

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.000P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.250P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 8.375P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.750P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.750P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.500P

44.125Total:Highway and Bridge

STATEWIDE R.O.W.

ENG & ROW Available ROW funding as

required for specific projects for

which the scope of work (and

the amount of ROW) is yet to be

defined.

RIGHT OF WAY ACQUISITIONS (Annual Funding)

3532

FHWA

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 10.500R

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 9.750R

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 10.500R

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 12.500R

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 7.500R

80.750Total:Highway and Bridge

Projects Page - 69 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

UBI *

ENG & ROW Consultant services for

underwater bridge inspections.

UNDERWATER BRIDGE INSPECTION (Annual Project)

186 FHWA

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .030P

.300Total:Highway and Bridge

STATEWIDE

15469

I-93, I-95, F.E. EVERETT

TPK

Specific project from Statewide

program.

REPLACE TOLL PLAZA GENERATOR, TRANSFER SWITCH AND CANOPY LIGHTS

6986 npike Renewal & Replacem

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .350C New Project

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .020P

.370Total:Highway and Bridge

Projects Page - 70 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

P8903 *

LOW VOLUME

CORRIDORS

Specified Funding for

Recreational Trail Program

Administered by DRED.

RECREATIONAL TRAILS FUND ACT- PROJECTS SELECTED ANNUALLY

2570FHWA

2011 L940 - RECREATIONAL TRAILS .775C

2012 L940 - RECREATIONAL TRAILS .775C

2013 L940 - RECREATIONAL TRAILS .775C

2014 L940 - RECREATIONAL TRAILS .775C

2015 L940 - RECREATIONAL TRAILS .775C

2016 L940 - RECREATIONAL TRAILS .775C

2017 L940 - RECREATIONAL TRAILS .775C

2018 L940 - RECREATIONAL TRAILS .775C

2019 L940 - RECREATIONAL TRAILS .775C

2020 L940 - RECREATIONAL TRAILS .775C

2011 L940 - RECREATIONAL TRAILS .005P

2012 L940 - RECREATIONAL TRAILS .005P

2013 L940 - RECREATIONAL TRAILS .005P

2014 L940 - RECREATIONAL TRAILS .005P

2015 L940 - RECREATIONAL TRAILS .005P

2016 L940 - RECREATIONAL TRAILS .005P

2017 L940 - RECREATIONAL TRAILS .005P

2018 L940 - RECREATIONAL TRAILS .005P

2019 L940 - RECREATIONAL TRAILS .005P

2020 L940 - RECREATIONAL TRAILS .005P

2011 L940 - RECREATIONAL TRAILS .001R

2012 L940 - RECREATIONAL TRAILS .001R

2013 L940 - RECREATIONAL TRAILS .001R

2014 L940 - RECREATIONAL TRAILS .001R

2015 L940 - RECREATIONAL TRAILS .001R

2016 L940 - RECREATIONAL TRAILS .001R

2017 L940 - RECREATIONAL TRAILS .001R

2018 L940 - RECREATIONAL TRAILS .001R

2019 L940 - RECREATIONAL TRAILS .001R

2020 L940 - RECREATIONAL TRAILS .001R

7.810Total:Bike / Pedestrian

Projects Page - 71 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

SBCM *

LOW VOLUME

CORRIDORS

Federal specified funding for

Highways designated as scenic

byways.

SCENIC BYWAYS CORRIDOR MANAGEMENT, PLANNING, AND DEVELOPMENT OF FACILITIES,

TO ENHANCE SCENIC QUALITIES OF NEW HAMPSHIRE (Annual Project)

1155FHWA

2011 L970 - SCENIC BYWAYS PROGRAM .100C

2012 L970 - SCENIC BYWAYS PROGRAM .100C

2013 L970 - SCENIC BYWAYS PROGRAM .100C

2014 L970 - SCENIC BYWAYS PROGRAM .100C

2015 L970 - SCENIC BYWAYS PROGRAM .100C

2016 L970 - SCENIC BYWAYS PROGRAM .100C

2017 L970 - SCENIC BYWAYS PROGRAM .100C

2018 L970 - SCENIC BYWAYS PROGRAM .100C

2019 L970 - SCENIC BYWAYS PROGRAM .100C

2020 L970 - SCENIC BYWAYS PROGRAM .100C

2011 L970 - SCENIC BYWAYS PROGRAM .100P

2012 L970 - SCENIC BYWAYS PROGRAM .100P

2013 L970 - SCENIC BYWAYS PROGRAM .100P

2014 L970 - SCENIC BYWAYS PROGRAM .100P

2015 L970 - SCENIC BYWAYS PROGRAM .100P

2016 L970 - SCENIC BYWAYS PROGRAM .100P

2017 L970 - SCENIC BYWAYS PROGRAM .100P

2018 L970 - SCENIC BYWAYS PROGRAM .100P

2019 L970 - SCENIC BYWAYS PROGRAM .100P

2020 L970 - SCENIC BYWAYS PROGRAM .100P

2011 L970 - SCENIC BYWAYS PROGRAM .100R

2012 L970 - SCENIC BYWAYS PROGRAM .100R

2013 L970 - SCENIC BYWAYS PROGRAM .100R

2014 L970 - SCENIC BYWAYS PROGRAM .100R

2015 L970 - SCENIC BYWAYS PROGRAM .100R

2016 L970 - SCENIC BYWAYS PROGRAM .100R

2017 L970 - SCENIC BYWAYS PROGRAM .100R

2018 L970 - SCENIC BYWAYS PROGRAM .100R

2019 L970 - SCENIC BYWAYS PROGRAM .100R

2020 L970 - SCENIC BYWAYS PROGRAM .100R

3.000Total:Highway and Bridge

Projects Page - 72 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

EFH *

LOW VOLUME

CORRIDORS

TO ENHANCE NATIONAL BENEFITS BY PROVIDING CONSTRUCTION & MAINTENANCE OF

FOREST HIGHWAYS (Annual Project)

444 FHWA

2011 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2012 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2013 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2014 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2015 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2016 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2017 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2018 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2019 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2020 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .675C

2011 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2012 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2013 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2014 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2015 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2016 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2017 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2018 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2019 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2020 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .050P

2011 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2012 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2013 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2014 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2015 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2016 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2017 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2018 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2019 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

2020 F150 - FOREST HIGHWAY FUNDS FOR "STEA03" .005R

7.300Total:Highway and Bridge

Projects Page - 73 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

13763 *

MISCELLANEOUS Annual Statewide Wild Flower

Program

ANNUAL STATEWIDE PROGRAM FOR THE EXPANDED WILD FLOWER ESTABLISHMENT PROGRAM

FOR USE IN PLANTING NATIVE WILD FLOWERS (License Plate Program)

4229 Other

2011 NON - OTHER NON PARTICIPATING .037C

2012 NON - OTHER NON PARTICIPATING .037C

2013 NON - OTHER NON PARTICIPATING .037C

2014 NON - OTHER NON PARTICIPATING .037C

2015 NON - OTHER NON PARTICIPATING .037C

2016 NON - OTHER NON PARTICIPATING .037C

2017 NON - OTHER NON PARTICIPATING .037C

2018 NON - OTHER NON PARTICIPATING .037C

2019 NON - OTHER NON PARTICIPATING .037C

2020 NON - OTHER NON PARTICIPATING .037C

2011 NON - OTHER NON PARTICIPATING .003P

2012 NON - OTHER NON PARTICIPATING .003P

2013 NON - OTHER NON PARTICIPATING .003P

2014 NON - OTHER NON PARTICIPATING .003P

2015 NON - OTHER NON PARTICIPATING .003P

2016 NON - OTHER NON PARTICIPATING .003P

2017 NON - OTHER NON PARTICIPATING .003P

2018 NON - OTHER NON PARTICIPATING .003P

2019 NON - OTHER NON PARTICIPATING .003P

2020 NON - OTHER NON PARTICIPATING .003P

.400Total:Highway and Bridge

Projects Page - 74 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

14899

MISCELLANEOUS $0.15 million annual program.MAINTENANCE AND UPGRADES FOR REST AREAS

6127 FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .135C

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .015P

1.500Total:Highway and Bridge

STATEWIDE

CMNA *

MUNICIPAL Specific CMAQ Projects

Occupy the Vacant FY's &

Below Normal FY Funding

CMAQ PROJECTS MUST BE IN NON-ATTAIN AREAS (Annual Project)

446FHWA

2015 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 6.852C

2016 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 8.352C

2017 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C

2018 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C

2019 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C

2020 L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT 10.000C

55.203Total:Highway and Bridge

Projects Page - 75 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

MOBRR *

MUNICIPAL Special Municipal Projects

Occupy the Vacant FYs &

Below Normal FY Funding.

MUNICIPAL OWNED BRIDGE REHABILITATION & REPLACEMENT PROJECTS (Federal, State,

Local Funds) (Annual Project)

221FHWA

2015 L110 - BRIDGE PROGRAM - OFF SYSTEM 1.750C

2016 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C

2017 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C

2018 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C

2019 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C

2020 L110 - BRIDGE PROGRAM - OFF SYSTEM 3.770C

2015 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P

2016 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P

2017 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P

2018 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P

2019 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P

2020 L110 - BRIDGE PROGRAM - OFF SYSTEM .320P

2015 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R

2016 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R

2017 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R

2018 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R

2019 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R

2020 L110 - BRIDGE PROGRAM - OFF SYSTEM .160R

23.480Total:Highway and Bridge

STATEWIDE

MUPCA

MUNICIPAL Specific Projects occupy

vacant FY's & below normal FY

funding.

MUNICIPAL URBAN PROJECTS - COMPACT AREAS [Annual Project]

450FHWA

2011 L230 - STP - URBANIZED AREAS OVER 200,000 5.720C

2012 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C

2013 L230 - STP - URBANIZED AREAS OVER 200,000 6.350C

2014 L230 - STP - URBANIZED AREAS OVER 200,000 6.040C

2015 L230 - STP - URBANIZED AREAS OVER 200,000 3.460C

2017 L230 - STP - URBANIZED AREAS OVER 200,000 4.400C

2018 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C

2019 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C

2020 L230 - STP - URBANIZED AREAS OVER 200,000 6.600C

52.370Total:Highway and Bridge

Projects Page - 76 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

SABP

MUNICIPAL Specific Projects Occupy the

Vacant FY's & Below Normal FY

Funding. State program

mandated by RSA 234 to assist

municipalities with bridge

needs. Uses 20% local match /

80% state funds.

STATE AID BRIDGE PROJECTS

4216

State Aid Bridge

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .738C

2018 SAB - STATE AID BRIDGE (State FY), 20% = Town 5.120C

2019 SAB - STATE AID BRIDGE (State FY), 20% = Town 8.000C

2020 SAB - STATE AID BRIDGE (State FY), 20% = Town 8.000C

21.858Total:Highway and Bridge

STATEWIDE

SAHP

MUNICIPAL Specific Projects Occupy the

Vacant FY's & Below Normal FY

Funding. State program

mandated by RSA 235: 10-:21

for constructing or

reconstructing Class I, II, III

highways when requested by

municipalities. Uses 1/3 local

match / 2/3 state funds.

STATE AID HIGHWAY PROJECTS

4217

State Aid Highway

2011 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.299C

2012 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 1.510C

2013 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

2014 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

2015 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

2016 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

2017 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

2018 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

2019 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

2020 SAH - STATE AID HIGHWAY (State FY), 33.3% = Town 2.537C

24.108Total:Highway and Bridge

Projects Page - 77 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE SPECIAL

10344 *

MUNICIPAL Federal specified funding for

providing technical assistance

on transportation issues to

municipalities.

TECHNICAL ASSISTANCE PROGRAM TO RURAL COMMUNITIES AND ORGANIZATIONS

THROUGH-OUT THE STATE - (LTAP) (Annual Project)

58

FHWA

2011 L890 - TRANSPORTATION AST. 50% .300P

2012 L890 - TRANSPORTATION AST. 50% .300P

2013 L890 - TRANSPORTATION AST. 50% .300P

2014 L890 - TRANSPORTATION AST. 50% .300P

2015 L890 - TRANSPORTATION AST. 50% .300P

2016 L890 - TRANSPORTATION AST. 50% .300P

2017 L890 - TRANSPORTATION AST. 50% .300P

2018 L890 - TRANSPORTATION AST. 50% .300P

2019 L890 - TRANSPORTATION AST. 50% .300P

2020 L890 - TRANSPORTATION AST. 50% .300P

3.000Total:Highway and Bridge

STATEWIDE

TE *

MUNICIPAL TE program, $4 million annually.TRANSPORTATION ENHANCEMENT PROJECTS (Annual Project)

3747 FHWA

2012 L220 - STP - TRANSPORTATION ENHANCEMENT 2.249C

2013 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

2014 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

2015 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

2016 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

2017 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

2018 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

2019 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

2020 L220 - STP - TRANSPORTATION ENHANCEMENT 4.000C

34.249Total:Highway and Bridge

Projects Page - 78 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

IPPP *

PAVEMENT Interstate paving program,

average of $6 million annually

for preservation needs.

INTERSTATE MAINTENANCE & INTERSTATE PAVEMENT PRESERVATION PROGRAM (Annual

Program)

3927FHWA

2011 L010 - INTERSTATE MAINTENANCE 5.920C

2012 L010 - INTERSTATE MAINTENANCE 5.920C

2013 L010 - INTERSTATE MAINTENANCE 5.920C

2014 L010 - INTERSTATE MAINTENANCE 5.920C

2015 L010 - INTERSTATE MAINTENANCE 5.920C

2016 L010 - INTERSTATE MAINTENANCE 5.920C

2017 L010 - INTERSTATE MAINTENANCE 5.920C

2018 L010 - INTERSTATE MAINTENANCE 5.920C

2019 L010 - INTERSTATE MAINTENANCE 5.920C

2020 L010 - INTERSTATE MAINTENANCE 5.920C

2011 L010 - INTERSTATE MAINTENANCE .100P

2012 L010 - INTERSTATE MAINTENANCE .100P

2013 L010 - INTERSTATE MAINTENANCE .100P

2014 L010 - INTERSTATE MAINTENANCE .100P

2015 L010 - INTERSTATE MAINTENANCE .100P

2016 L010 - INTERSTATE MAINTENANCE .100P

2017 L010 - INTERSTATE MAINTENANCE .100P

2018 L010 - INTERSTATE MAINTENANCE .100P

2019 L010 - INTERSTATE MAINTENANCE .100P

2020 L010 - INTERSTATE MAINTENANCE .100P

60.200Total:Highway and Bridge

Projects Page - 79 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

PRRCS *

PAVEMENT Federal Resurfacing program.

$16 million annually for

preservation needs.

PAVEMENT RESURFACING, REHABILITATION & CRACKSEAL PROGRAM & RELATED WORK

(Annual Federal Resurfacing Program)

452FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 15.775C

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .375P

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .025R

161.750Total:Highway and Bridge

Projects Page - 80 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE DISTRICTS

BET-RES *

PAVEMENT Yearly paving by contract from

Statewide Betterment

Resurfacing Program.

RESURFACE @ VARIOUS LOCATIONS (Annual Advertised Projects)

581Betterment

2011 BET - BETTERMENT (State FY) 18.000C

2012 BET - BETTERMENT (State FY) 18.000C

2013 BET - BETTERMENT (State FY) 18.000C

2014 BET - BETTERMENT (State FY) 18.000C

2015 BET - BETTERMENT (State FY) 18.000C

2016 BET - BETTERMENT (State FY) 18.000C

2017 BET - BETTERMENT (State FY) 18.000C

2018 BET - BETTERMENT (State FY) 18.000C

2019 BET - BETTERMENT (State FY) 18.000C

2020 BET - BETTERMENT (State FY) 18.000C

180.000Total:Highway and Bridge

STATEWIDE DISTRICTS

BET-RL *

PAVEMENT Force Account Through District

Staff. Yearly pavement leveling.

ROADWAY LEVELING @ VARIOUS LOCATIONS FOR NEXT FISCAL YEAR RESURFACING (Annual

Project)

792 Betterment

2011 BET - BETTERMENT (State FY) 4.200C

2012 BET - BETTERMENT (State FY) 4.200C

2013 BET - BETTERMENT (State FY) 4.200C

2014 BET - BETTERMENT (State FY) 4.200C

2015 BET - BETTERMENT (State FY) 4.200C

2016 BET - BETTERMENT (State FY) 4.200C

2017 BET - BETTERMENT (State FY) 4.200C

2018 BET - BETTERMENT (State FY) 4.200C

2019 BET - BETTERMENT (State FY) 4.200C

2020 BET - BETTERMENT (State FY) 4.200C

42.000Total:Highway and Bridge

STATEWIDE HWY

REHABILITATION

BET-RSR

PAVEMENT Specific Project from Statewide

Program

REHABILITATION OF SECONDARY ROUTES & OTHER RELATED WORK, TREATMENT TO VARY

[Parent] {Betterment}

6730 Betterment

2011 BET - BETTERMENT (State FY) 6.000C

2012 BET - BETTERMENT (State FY) 6.000C

2013 BET - BETTERMENT (State FY) 6.000C

2014 BET - BETTERMENT (State FY) 6.000C

2015 BET - BETTERMENT (State FY) 6.000C

2016 BET - BETTERMENT (State FY) 6.000C

2017 BET - BETTERMENT (State FY) 6.000C

2018 BET - BETTERMENT (State FY) 6.000C

2019 BET - BETTERMENT (State FY) 6.000C

2020 BET - BETTERMENT (State FY) 6.000C

60.000Total:Highway and Bridge

Projects Page - 81 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

SSRR *

PAVEMENT Secondary road rehabilitation

program, $3 million annually for

preservation needs.

SECONDARY SYSTEM RECLAMATION / REHAB WITH VARIOUS PAVEMENT TREATMENTS [Parent]

4148FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 2.895C

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

29.985Total:Highway and Bridge

STATEWIDE

14936

PE & ROW Specific Project from Statewide

Program

PROJECT PROVIDES PAINT INSPECTION AND CONSULTING SERVICES AS NEEDED FOR ALL

BRIDGE RELATED CONTRACTS ON A STATEWIDE BASIS [HBRRP, BETTERMENT & TURNPIKE]

6490 Betterment

2011 BET - BETTERMENT (State FY) .005P

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .005P

2011 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) .005P

.015Total:Highway and Bridge

Projects Page - 82 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE DISTRICTS

BET-BPAINT *

PRESERVATION BRIDGE PAINTING AT VARIOUS LOCATIONS [Parent] (Annual Project)

2092 Betterment

2011 BET - BETTERMENT (State FY) 1.800C

2012 BET - BETTERMENT (State FY) 1.800C

2013 BET - BETTERMENT (State FY) 1.800C

2014 BET - BETTERMENT (State FY) 1.800C

2015 BET - BETTERMENT (State FY) 1.800C

2016 BET - BETTERMENT (State FY) 1.800C

2017 BET - BETTERMENT (State FY) 1.800C

2018 BET - BETTERMENT (State FY) 1.800C

2019 BET - BETTERMENT (State FY) 1.800C

2020 BET - BETTERMENT (State FY) 1.800C

18.000Total:Highway and Bridge

Projects Page - 83 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

BRPPI *

PRESERVATION Bridge preservation program $8

million annually for preservation

needs.

BRIDGE REHABILITATION, PAINTING, PRESERVATION & IMPROVEMENT PROJECTS (Federal

Program)

6601FHWA

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 5.880C

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 7.880C

2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 6.380C

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .100P

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2014 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2018 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

2020 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .020R

68.520Total:Highway and Bridge

Projects Page - 84 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

CRDR *

PRESERVATION Culvert replacement program

$1 million annually for

preservation needs.

CULVERT REPLACEMENT/REHABILITATION & DRAINAGE REPAIRS (Annual Project)

4157FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .870C

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .030R

10.000Total:Highway and Bridge

Projects Page - 85 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

GRR *

PRESERVATION Guardrail Replacement

program, $2 million annually for

preservation needs.

GUARDRAIL REPLACEMENT [Federal Aid Guardrail Improvement Program] (Annual Project)

785FHWA

2011 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2012 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2013 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2014 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2015 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2016 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2017 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2018 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2019 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2020 H280 - STP - HAZARD ELIMINATION PROGRAM 1.880C

2011 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2012 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2013 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2014 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2015 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2016 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2017 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2018 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2019 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2020 H280 - STP - HAZARD ELIMINATION PROGRAM .150P

2011 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2012 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2013 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2014 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2015 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2016 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2017 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2018 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2019 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

2020 H280 - STP - HAZARD ELIMINATION PROGRAM .005R

20.350Total:Highway and Bridge

Projects Page - 86 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE DISTRICTS

BET-GRL *

PRESERVATION GUARDRAIL REPLACEMENT @ VARIOUS LOCATIONS [Parent] {Annual Betterment}

2365 Betterment

2011 BET - BETTERMENT (State FY) 1.200C

2012 BET - BETTERMENT (State FY) 1.200C

2013 BET - BETTERMENT (State FY) 1.200C

2014 BET - BETTERMENT (State FY) 1.200C

2015 BET - BETTERMENT (State FY) 1.200C

2016 BET - BETTERMENT (State FY) 1.200C

2017 BET - BETTERMENT (State FY) 1.200C

2018 BET - BETTERMENT (State FY) 1.200C

2019 BET - BETTERMENT (State FY) 1.200C

2020 BET - BETTERMENT (State FY) 1.200C

12.000Total:Highway and Bridge

Projects Page - 87 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

HSIP *

PRESERVATION Federal specified funding for

safety projects in accordance

with the Highway Safety

Improvement Program.

HIGHWAY SAFTEY IMPROVEMENT PROGRAM (HSIP) [PARENT]

6767

FHWA

2011 LS30 - HWY SAFETY PROG 5.500C

2012 LS30 - HWY SAFETY PROG 6.000C

2013 LS30 - HWY SAFETY PROG 5.500C

2014 LS30 - HWY SAFETY PROG 5.500C

2015 LS30 - HWY SAFETY PROG 5.500C

2016 LS30 - HWY SAFETY PROG 5.500C

2017 LS30 - HWY SAFETY PROG 5.500C

2018 LS30 - HWY SAFETY PROG 5.500C

2019 LS30 - HWY SAFETY PROG 5.500C

2020 LS30 - HWY SAFETY PROG 5.500C

2011 LS30 - HWY SAFETY PROG .600P

2012 LS30 - HWY SAFETY PROG .600P

2013 LS30 - HWY SAFETY PROG .600P

2014 LS30 - HWY SAFETY PROG .600P

2015 LS30 - HWY SAFETY PROG .600P

2016 LS30 - HWY SAFETY PROG .600P

2017 LS30 - HWY SAFETY PROG .600P

2018 LS30 - HWY SAFETY PROG .600P

2019 LS30 - HWY SAFETY PROG .600P

2020 LS30 - HWY SAFETY PROG .600P

2011 LS30 - HWY SAFETY PROG .050R

2012 LS30 - HWY SAFETY PROG .050R

2013 LS30 - HWY SAFETY PROG .050R

2014 LS30 - HWY SAFETY PROG .050R

2015 LS30 - HWY SAFETY PROG .050R

2016 LS30 - HWY SAFETY PROG .050R

2017 LS30 - HWY SAFETY PROG .050R

2018 LS30 - HWY SAFETY PROG .050R

2019 LS30 - HWY SAFETY PROG .050R

2020 LS30 - HWY SAFETY PROG .050R

62.000Total:Highway and Bridge

Projects Page - 88 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

RR-REPD *

RAIL Force Account with Railroad.

To improve safety of railroad

crossings.

REMOVE EXISTING PROTECTIVE DEVICES & RELOCATE @ CROSSINGS (Annual Project)

637FHWA

2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .150C

2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .020P

2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .010R

1.800Total:Rail

Projects Page - 89 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

RR-RCS *

RAIL Force Account with Railroad to

improve safety of railroad

crossings.

RECONSTRUCTION OF CROSSINGS, SIGNALS, & RELATED WORK (Annual Project)

1147FHWA

2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2011 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2012 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2012 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2013 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2013 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2014 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2014 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2015 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2015 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2016 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2016 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2017 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2017 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2018 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2018 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2019 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2019 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2020 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .400C

2020 LS50 - STP - RAIL-HWY PROTECTIVE DEVICES .400C

2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2012 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2013 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2014 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2015 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2016 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2017 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2018 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2019 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2020 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .030P

2011 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2012 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2013 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2014 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2015 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2016 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2017 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2018 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2019 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

2020 LS40 - STP - RAIL-HWY CROSSING HAZARD ELIM .010R

8.400Total:Rail

Projects Page - 90 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

RAIL Proceeds from repayment of

outstanding loans to eligible

railroads. Discrete

improvements in infrastructure

or equipment. Self funded

through repayment of loans.

REVOLVING LOAN FUND FOR SHORTLINE RAILROADS

3493

Rail

2011 RAIL - RAILROAD .400R

2013 RAIL - RAILROAD .400R

2015 RAIL - RAILROAD .400R

1.200Total:Rail

STATEWIDE

RAIL Maintenance on State-Owned

Railroads. Fund to repair State-

owned Railroad lines. Funded

by Railroad operators.

SPECIAL RAILROAD FUND

3494

Rail

2011 RAIL - RAILROAD .400C

2012 RAIL - RAILROAD .400C

2013 RAIL - RAILROAD .400C

2014 RAIL - RAILROAD .400C

2015 RAIL - RAILROAD .400C

2016 RAIL - RAILROAD .400C

2017 RAIL - RAILROAD .400C

2018 RAIL - RAILROAD .400C

2019 RAIL - RAILROAD .400C

2020 RAIL - RAILROAD .400C

4.000Total:Rail

STATEWIDE CONSULTANT

TRAFFIC Sign frame structures require in

depth inspection every 5 years

to assure structural capacity for

safety purposes.

INSPECTION OF SIGN STRUCTURES ON ALL STATE MAINTAINED HIGHWAYS

2681

FHWA

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .200P

.200Total:Highway and Bridge

Projects Page - 91 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

12223 *

TRAFFIC Annual pavement striping

program funding.

PAVEMENT MARKING (Annual Project)

1146 FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 3.100C

31.000Total:Highway and Bridge

STATEWIDE DISTRICTS

BET-ISU

TRAFFIC Small State System Signal

Improvement Project.

SIGNAL EQUIPMENT UPGRADES @ VARIOUS LOCATIONS (Bureau of Traffic)

3833 Betterment

2011 BET - BETTERMENT (State FY) .120C

2012 BET - BETTERMENT (State FY) .120C

2013 BET - BETTERMENT (State FY) .120C

2014 BET - BETTERMENT (State FY) .120C

2015 BET - BETTERMENT (State FY) .120C

2016 BET - BETTERMENT (State FY) .120C

2017 BET - BETTERMENT (State FY) .120C

2018 BET - BETTERMENT (State FY) .120C

2019 BET - BETTERMENT (State FY) .120C

2020 BET - BETTERMENT (State FY) .120C

1.200Total:Highway and Bridge

STATEWIDE

TMC *

TRAFFIC Programmatic operational

funding support for TMC.

TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (ITS, CARS-511)

4227 FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .250P

2.500Total:Highway and Bridge

Projects Page - 92 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

USSS *

TRAFFIC Signing Replacement /

Upgrade Program. $0.5M

annually for preservation needs.

UPDATE SIGNING ON STATE SYSTEM (Annual Project)

2735FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .500C

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .010P

5.100Total:Highway and Bridge

STATEWIDE

TRANSIT CAPITAL EQUIPMENT FOR I-93 AND I-95

6926 FTA

2011 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .535

2012 FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN. .575

1.110Total:Transit

Projects Page - 93 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

TRANSIT Replaces deficient vehicles

serving elderly and disabled

people. Uses local match.

Cost decrease reflects

anticipated federal revenue.

ELDERLY AND PERSONS WITH DISABILITIES TRANSPORTATION PROGRAM

3505

FTA

2011 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .866

2012 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2013 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2014 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2015 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2016 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2017 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2018 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2019 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

2020 FT14 - FTA SECTION 5310 DISABILITIES PROGRAM .931

9.245Total:Transit

STATEWIDE

TRANSIT Supports transportation services

providing access to

employment.

JOB ACCESS & REVERSE COMMUTE

6290FTA

2011 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2012 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2013 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2014 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2015 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2016 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2017 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2018 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2019 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

2020 FT21 - FTA SECTION 5316 - JARC PROGRAM .700

7.000Total:Transit

Projects Page - 94 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

TRANSIT Supports transportation services

for persons with disabilities.

NEW FREEDOMS INITIATIVE

6291 FTA

2011 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2012 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2013 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2014 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2015 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2016 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2017 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2018 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2019 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

2020 FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM .680

6.800Total:Transit

STATEWIDE

TRANSIT Continues transit service in

communities outside urbanized

areas. Uses local match.

RURAL PUBLIC TRANSIT

3506FTA

2011 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 5.613

2012 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2013 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2014 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2015 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2016 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2017 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2018 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2019 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

2020 FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING 7.000

68.613Total:Transit

STATEWIDE

15729

TURNPIKE SYSTEM Specific project from Statewide

program.

STATEWIDE TOLL COLLECT. CONSULT FOR T&R,EZPASS RECON.,TOLL SYSTEM INTERGRATION

SUPPORT, SYSTEM TRAFFIC ANALYSIS, EQUITY STUDIES & BOND SALES

7259 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) .167P

2012 TPK - TURNPIKE EXPANSION (State FY) .167P

.333Total:Highway and Bridge

STATEWIDE

15730

TURNPIKE SYSTEM Specific project from Statewide

program.

TOLL COLLECT, CONSULT. FOR T&R, EZPASS RECON., TOLL SYSTEM INTERGRATION SUPPORT,

SYSTEM TRAFFIC ANAYLSIS EQUITY STUDIES & BOND SALES

7260 Turnpike Expansion

2011 TPK - TURNPIKE EXPANSION (State FY) .350P

2012 TPK - TURNPIKE EXPANSION (State FY) .300P

.650Total:Highway and Bridge

Projects Page - 95 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STATEWIDE

TRR *

TURNPIKES Turnpike funding for routine

preservation work on Turnpike

System as required by bond

covenants.

PROJECTS TO BE DETERMINED ON TURNPIKE SYSTEM (Annual Project)

4042

npike Renewal & Replacem

2012 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 8.000C

2013 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 9.800C

2014 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 10.500C

2015 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 10.800C

2016 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 11.600C

2017 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 11.500C

2018 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 11.850C

2019 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 12.000C

2020 TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY) 12.000C

98.050Total:Highway and Bridge

STATEWIDE

14932 *

VARIOUS Federal program under SAFETEA-

LU.

SAFE ROUTES TO SCHOOL PROGRAM [Parent] [SRTS 14932*] {Safe Routes To School Program}

3965 FHWA

2011 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .825C

2011 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .075C

2012 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .825C

2012 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .075C

2011 LU10 - SAFE ROUTES TO SCHOOL PROG .045P

2011 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .175P

2012 LU10 - SAFE ROUTES TO SCHOOL PROG .045P

2012 LU30 - SAFE ROUTES TO SCHOOL PROG EITHER .175P

2011 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .050R

2012 LU20 - SAFE ROUTES TO SCHOOL PROG INFR .050R

2.340Total:Highway and Bridge

STEWARTSTOWN

NH 145 Bridge Priority #19 {Red List}REPLACE BRIDGE OVER BISHOP BROOK - 121/114 (Red List)

6782 FHWA

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 1.800C 2016

1.800Total:Highway and Bridge 1.800

Projects Page - 96 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

STEWARTSTOWN, NH -

CANAAN, VT

15838

BRIDGE STREET Red List Bridge Priority #15.BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 054/163 {Red List}

7416 FHWA

2015 L110 - BRIDGE PROGRAM - OFF SYSTEM 5.000C New Project

2016 L110 - BRIDGE PROGRAM - OFF SYSTEM 1.000C

2011 L110 - BRIDGE PROGRAM - OFF SYSTEM .075P

2012 L110 - BRIDGE PROGRAM - OFF SYSTEM .050P

2013 L110 - BRIDGE PROGRAM - OFF SYSTEM .025P

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .025P

2011 L110 - BRIDGE PROGRAM - OFF SYSTEM .025R

2012 L110 - BRIDGE PROGRAM - OFF SYSTEM .020R

2013 L110 - BRIDGE PROGRAM - OFF SYSTEM .010R

2014 L110 - BRIDGE PROGRAM - OFF SYSTEM .010R

6.240Total:Highway and Bridge

STODDARD - ANTRIM -

HILLSBOROUGH

NH 9 ROW for corridor protection /

control of access per original

intent.

CAPACITY, SAFETY IMPROVEMENTS, & ACQUIRE CONTROLLED ACCESS R.O.W. FROM JUST

EAST OF NH 123 TO WESTERLY END OF HILLSBOROUGH BYPASS TO IMPROVE ROADWAY

GEOMETRICS AND ALIGNMENT (APPROX. 10 MILES)

3272 FHWA

2012 L050 - NATIONAL HIGHWAY SYSTEM .250P

2015 L050 - NATIONAL HIGHWAY SYSTEM 1.000R

2017 L050 - NATIONAL HIGHWAY SYSTEM 1.000R

2.250Total:Highway and Bridge

STRAFFORD

14790

HUCKINS ROAD Specific project from Statewide

program, Municipal managed.

BRIDGE REPLACEMENT - 125/090

6360 State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .364C 2012

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .055P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.424Total:Highway and Bridge 0.424

Projects Page - 97 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SUMMER YOUTH

LANDSCAPE PROGRAM

12500 *

ADMINISTRATION Program Funding for Summer

Landscaping Youth Program.

ESTABLISHMENT OF SUMMER LANDSCAPING YOUTH PROGRAM TO PERFORM MAINTENANCE &

OTHER RELATED WORK STATEWIDE [Annual Project]

1766 FHWA

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2014 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2015 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2016 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2017 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2018 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2019 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

2020 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .057C

.570Total:Highway and Bridge

SUNAPEE

15836

LOWER MAIN STREET Specific project from Statewide

program, Municipal Managed.

REPAIR / REPLACE BRIDGE OVER SUGAR RIVER - 094/100 [SAB*4216] {State Aid Bridge

Program}

7414 State Aid Bridge

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .387C

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P

.447Total:Highway and Bridge

SUTTON

15346

MORSE LOOP ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER BROOK - 170/024 {Red List}

6821State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .572C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .085P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.662Total:Highway and Bridge

SUTTON - NEW LONDON

15748

I-89 PAVEMENT REHABILITATION FROM EXIT 10 TO EXIT 11 (4 MILES) [4R]

3256 FHWA

2015 L010 - INTERSTATE MAINTENANCE 6.000C 2015

2016 L010 - INTERSTATE MAINTENANCE 5.340C

2011 L010 - INTERSTATE MAINTENANCE .118P

11.458Total:Highway and Bridge 11.673

SWANZEY

DILLANT-HOPKINS

AIRPORT

Planning document.AIRPORT MASTER PLAN UPDATE

6590 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .110

.110Total:Aeronautics

Projects Page - 98 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SWANZEY

DILLANT-HOPKINS

AIRPORT

Address Safety Concerns.CONSTRUCTION ONLY - RECONSTRUCTION OF RUNWAY 2-20

6589 Airport

2016 AIP - AIRPORT IMPROVEMENT PROGRAM 3.800

3.800Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Address Safety Concerns.DESIGN ONLY - RECONSTRUCTION OF RUNWAY 2-20

6587 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .350

.350Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Safety and Security issue.INSTALL PERIMETER FENCING

3480 Airport

2020 AIP - AIRPORT IMPROVEMENT PROGRAM .250

.250Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Address Safety Concerns.NEW PARALLEL TAXIWAY 'B' TO RUNWAY 2-20

6593 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM 1.400

1.400Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Address Safety ConcernsOBSTRUCTION REMOVAL

7380 Airport

2011 AIP - AIRPORT IMPROVEMENT PROGRAM .150

.150Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Provide equipment for winter

operations.

PURCHASE SNOW-REMOVAL EQUIPMENT

6591 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .350

.350Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Safety Issue. Planned

rehabilitation based on

Pavement Management

System.

RUNWAY 14/32 RECONSTRUCTION

3479

Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 1.829C

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .421P

2.250Total:Aeronautics 1.650

Projects Page - 99 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

SWANZEY

DILLANT-HOPKINS

AIRPORT

Address Safety Concerns.REHABILITATE HAZARD BEACONS

6588 Airport

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .120

.120Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Priority as identified by airport

sponsor.

TERMINAL APRON EXPANSION

3482 Airport

2015 AIP - AIRPORT IMPROVEMENT PROGRAM 1.300

1.300Total:Aeronautics

SWANZEY

DILLANT-HOPKINS

AIRPORT

Address Safety ConcernsTAXIWAY 'A' EXTENSION & TAXIWAY 'T' RELOCATION

7381 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM 1.800

1.800Total:Aeronautics

SWANZEY

14918

COBBLE HILL ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENT OVER CALIFORNIA BROOK - 082/115 {Red List}

6474State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .320C 2013

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.375Total:Highway and Bridge 0.503

SWANZEY

15348

WARMAC ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER PERRY ROAD - 135/068 {Red List}

6823State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .290C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.360Total:Highway and Bridge

TAMWORTH

15831

VARIOUS ROUTES Earmark funding. Municipal

Managed.

SAFETY IMPROVEMENTS (Demo Ids NH077 & NH081)

7410 FHWA

2011 56A0 - SURFACE TRANSPORTATION PRIORITIES .475C New Project

2011 LY90 - HIGH PRIORITY SURFACE TRANSPORTATION S129 .400C

.875Total:Highway and Bridge

Projects Page - 100 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

TEMPLE

14937

PUTNAM ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

BRIDGE REPLACEMENTS - 116/139 & 117/138 {Red List}

6491State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .245C 2013

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.300Total:Highway and Bridge 0.300

TILTON - NORTHFIELD

14839

Specific project from Statewide

program. Municipal managed.

MODIFICATIONS TO THE WINNIPESAUKEE RIVER TRAIL PHASE 2: CONSTRUCT A STEEL ARCH

BRIDGE OVER THE WINNIPESAUKEE RIVER SUITABLE FOR PEDESTRIANS AND BICYCLES WHICH IS

ADA COMPLIANT. THE NEW BRIDGE WOULD BE BUILT UPSTREAM (TE Program) [06-55TE]6249 FHWA

2011 L220 - STP - TRANSPORTATION ENHANCEMENT .240C TE 2006

.240Total:Bike / Pedestrian 0.240

TILTON - SANBORNTON

15887

NH 132 Specific project from Statewide

program.

ROADWAY AND DRAINAGE IMPROVEMENTS ALONG NH 132 FROM BUSINESS PARK DRIVE IN

TILTON TO POUND ROAD IN SANBORNTON [BET-RSR*6730] {Betterment}

7478 Betterment

2011 BET - BETTERMENT (State FY) .210C New Project

.210Total:Highway and Bridge

WAKEFIELD

14088

NH 16 Specific Project from Statewide

Program

EXTEND SHOULDER TO 12 FOOT ACCELERATION & DECELERATION LANES FOR THE NH 16 SB

TRAFFIC AT THE JUNCTION OF WILSON ROAD [BET-FA*789] {Betterment}

3917 Betterment

2011 BET - BETTERMENT (State FY) .062C 2008

2011 BET - BETTERMENT (State FY) .030P

2011 BET - BETTERMENT (State FY) .010R

.102Total:Highway and Bridge

WALPOLE - CHARLESTOWN

14747

NH 12 Formerly Charlestown in

previous TYP's construction

programmed per comment

Advisory Task Force

coordination.

RECONSTRUCTION FROM MAIN STREET IN WALPOLE TO NH 12A IN CHARLESTOWN, REMOVE

CONCRETE BASE, ADD SHOULDERS AND IMPROVE DRAINAGE

1891

FHWA

2012 L250 - STP - RURAL AREAS < 5,000k 4.000C 2010

2013 L250 - STP - RURAL AREAS < 5,000k 4.000C 2013

2015 L250 - STP - RURAL AREAS < 5,000k 5.000C

2012 L250 - STP - RURAL AREAS < 5,000k .275P

2011 L250 - STP - RURAL AREAS < 5,000k .264R

13.539Total:Highway and Bridge 9.468

Projects Page - 101 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

WALPOLE, NH -

ROCKINGHAM, VT

12905

BRIDGE STREET Bridge Priority #16 {Red List}VILAS BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 062/052 {Red List}

1877 FHWA

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.092C 2015

2015 LZ20 - EQUITY BONUS EX LIMITATION 1.208C 2015

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .055P

2012 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .055P

2013 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .061P

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .006R

3.476Total:Highway and Bridge 2.775

WARNER

I-89 1" OVERLAY FROM EXIT 8 TO EXIT 9 (4 MILES) [4R]

3258 FHWA

2014 L010 - INTERSTATE MAINTENANCE 8.000C 2014

2011 L010 - INTERSTATE MAINTENANCE .100P

2012 L010 - INTERSTATE MAINTENANCE .050P

8.150Total:Highway and Bridge 8.250

WARNER - SUTTON

15747

I-89 PAVEMENT REHABILITATION FROM EXIT 9 TO EXIT 10 (7 MILES) [4R]

3253 FHWA

2013 L010 - INTERSTATE MAINTENANCE 5.000C 2013

2016 L010 - INTERSTATE MAINTENANCE 5.500C 2016

2017 L010 - INTERSTATE MAINTENANCE 5.500C 2016

16.000Total:Highway and Bridge 16.200

WENTWORTH

14516

EVANS ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

REPLACE BRIDGE OVER SOUTH BRANCH BAKER RIVER - 136/053 {Red List}

6252State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .700C 2011

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.785Total:Highway and Bridge 0.785

WENTWORTH

14518

DUFOUR ROAD Red List Bridge. Specific project

from Statewide program,

Municipal managed.

REHAB BRIDGE OVER SOUTH BRANCH BAKER RIVER - 162/072 {Red List}

6254State Aid Bridge

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .370C 2013

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .060P

2013 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.435Total:Highway and Bridge 0.435

Projects Page - 102 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

WHITEFIELD

MT. WASHINGTON

AIRPORT

Replace Aging EquipmentACQUIRE SNOW-REMOVAL EQUIPMENT

7382 Airport

2012 AIP - AIRPORT IMPROVEMENT PROGRAM .525

.525Total:Aeronautics

WHITEFIELD

MT. WASHINGTON

AIRPORT

Planning document; 95%

Federal funds, 2.5% Sponsor

match. Necessary Federal

Environmental Requirements for

development PLANNING

DOCUMENT.

ENVIRONMENTAL ASSESSMENT

3487

Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM .200

.200Total:Aeronautics

WHITEFIELD

MT. WASHINGTON

AIRPORT

Address Capacity ConcernsEXPAND AIRCRAFT PARKING APRON

7383 Airport

2017 AIP - AIRPORT IMPROVEMENT PROGRAM .500C

.500Total:Aeronautics

WHITEFIELD

MT. WASHINGTON

REGIONAL AIRPORT

Address Safety Concerns.EXTEND RUNWAY 28 BY 500 FEET AND EXTEND PARALLEL TAXIWAY

6596 Airport

2013 AIP - AIRPORT IMPROVEMENT PROGRAM 2.250

2019 AIP - AIRPORT IMPROVEMENT PROGRAM .400

2.650Total:Aeronautics

WHITEFIELD

MT. WASHINGTON

REGIONAL AIRPORT

Address Safety ConcernsEXTEND PARTIAL PARALLEL TAXIWAY TO RUNWAY 28

6680 Airport

2018 AIP - AIRPORT IMPROVEMENT PROGRAM 2.925

2.925Total:Aeronautics

WHITEFIELD

MT. WASHINGTON

REGIONAL AIRPORT

Address Capacity Concerns.T-HANGARS

6595 Airport

2014 AIP - AIRPORT IMPROVEMENT PROGRAM .158

2015 AIP - AIRPORT IMPROVEMENT PROGRAM .158

2016 AIP - AIRPORT IMPROVEMENT PROGRAM .158

.474Total:Aeronautics

Projects Page - 103 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

WHITEFIELD

15732

WATER STREET Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

REPAIR / REPLACEMENT OF BRIDGE - 106/106 [PARENT #4216] {Red List}

7261State Aid Bridge

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .435C New Project

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .080P

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .010R

.525Total:Highway and Bridge

WILTON

NH 31 Red List Bridge Prioity #47REHABILITATE BRIDGE OVER SOUHEGAN RIVER - 129/126 (Red List)

7346 FHWA

2019 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.500C New Project

2016 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .200P

2017 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM .050R

2.750Total:Highway and Bridge

WILTON

15767

KING BROOK ROAD Specific project from Statewide

program, Municipal Managed.

BRIDGE REHABILITATION, BR 074/060 OVER KING BROOK [SAB*4216] {State Aid Bridge

Program}

7303 State Aid Bridge

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .245C New Project

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .050P

2017 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.300Total:Highway and Bridge

WILTON

15768

OLD COUNTY FARM

ROAD

Specific project from Statewide

program, Municipal Managed.

BRIDGE REPLACEMENT OVER BLOOD BROOK - 060/118 [SAB*4216] {State Aid Bridge Program}

7304 State Aid Bridge

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .170C New Project

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .045P

2016 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.220Total:Highway and Bridge

WILTON - MILFORD -

AMHERST - BEDFORD

13692

NH 101 Interim safety improvementsSAFETY IMPROVEMENTS @ VARIOUS LOCATIONS FROM WILTON TO WALLACE RD IN BEDFORD

AS DETERMINED BY CORRIDOR STUDY

2739 FHWA

2013 L050 - NATIONAL HIGHWAY SYSTEM 3.000C 2013

2020 L050 - NATIONAL HIGHWAY SYSTEM 7.000C 2018

2011 L050 - NATIONAL HIGHWAY SYSTEM .236P

2012 L050 - NATIONAL HIGHWAY SYSTEM .080R

10.316Total:Highway and Bridge 10.426

Projects Page - 104 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

WINCHESTER

12906

NH 10 Bridge Priority #24 {Red List}BRIDGE REPLACEMENT OVER ASHUELOT RIVER - 152/181 [Designated Demo Id NH007] {Red

List}

1873 FHWA

2011 3650 - RURAL ACCESS PROJECTS .493C 2011

2011 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 3.588C 2011

4.081Total:Highway and Bridge 3.850

WINCHESTER

15316

BROAD BROOK ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER BROAD BROOK - 070/106 {Red List}

6769State Aid Bridge

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .305C New Project

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .065P

2012 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.375Total:Highway and Bridge

WINCHESTER

15317

OLD WESTPORT ROAD Red List Bridge. Specific project

from Statewide program,

Municipal Managed.

BRIDGE REPLACEMENT OVER WHEELOCK BROOK - 133/163 {Red List}

6770State Aid Bridge

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .846C New Project

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .075P

2011 SAB - STATE AID BRIDGE (State FY), 20% = Town .005R

.926Total:Highway and Bridge

WINCHESTER

15881

NH 119 Bridge Priority #49 {Red List}BRIDGE REPLACEMENT OVER ASHUELOT RIVER - 113/077 {Red List}

6783 FHWA

2015 L1C0 - BRIDGE PROGRAM - ON/OFF SYSTEM 2.445C 2015

2.445Total:Highway and Bridge 2.500

WINDHAM - SALEM

10075

NH 111 BYPASS (HB 1092 - '88 ACT);

CONSTRUCTION PROJECTS

IDENTIFIED IN 10075A - 10075G

CONSTRUCT BYPASS AROUND SHADOW LAKE. NH 28 FROM LAKE STREET TO JONES ROAD [Pe

& Row Only]

34FHWA

2012 LZ10 - EQUITY BONUS - EXEMPT LIM .094P

.094Total:Highway and Bridge

WOODSTOCK - LINCOLN

15755

I-93 Previous Lincoln id 3254RECLAIM AND OVERLAY FROM EXIT 32 TO EXIT 33 (2 MILES) [4R]

7292 FHWA

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 5.833C

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA 6.667C

2011 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .050P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .100P

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .075P

2012 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

2013 L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA .005R

12.735Total:Highway and Bridge

Projects Page - 105 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section

Previous

Prog. Yr

Project Name/#

Transportaion Mode Route/Road: Location; Scope of Work Comments / Funding Category$(M)Previous

Total$

3619.810 TYP Grand Total:

Projects Page - 106 of 106Phase: C = Construction P = Preliminary Engineering R = Right of Way

2011-2020_TYP.mdb: rpt_TYP_Alpha_11-20_ALL_with_Section