Telecommunications Grounding and
Bonding Generic
Chandrashekar
Technical Manager (India & SW Asia)
-
7/26/2019 Telecommunications Grounding
2/24
Purpose and scope of TIA-607-BTIA-607-B grounding is normative
and applies to entire building, not
just data center
TIA-607-B, Generic
Telecommunications
Bonding and
Grounding (Earthing)
for Customer
Premises, is now
approved!
Scopenow
includes
groundingof
ITE
-
7/26/2019 Telecommunications Grounding
3/24
What is TIA-607-B?
Scope:Specifiesrequirementsforagenerictelecommunicationsbondingandgroundinginfrastructure,andits
interconnectiontoothersystems,forlocationswheretelecommunicationsequipmentwillbeorareinstalled
MajorrevisionofJSTD607A:
IncludesG&Boftelecommunicationsspaces(distributorsandcomputerrooms)
Continuedharmonizationefforts(as
practicable)onterminologyandpracticeswithinternationalstandards
ScopeofTIA607B
TBB
Distributors
ComputerRooms
TGB
TMGB
-
7/26/2019 Telecommunications Grounding
4/24
Equipment in Cabinets and Racks
Rather
than
relying
ontheacpowercord
groundwire,itis
desirablethat
equipment
begroundedinaverifiable
mannerasdescribedin
thisStandard.
Figure7Exampleofthreemethodstobond
equipmentandrackstoground
TIA-607-B:
-
7/26/2019 Telecommunications Grounding
5/24
Telecommunications Bonding Backbone (TBB)
PurposeofTBBistoreduce
potentialdifferencesbetweeninterconnected
telecommunicationssystemson
differentfloors
OriginatesatTMGBandextendsthroughoutbuildingusing
telecompathways
ConnectsTGBs
that
exist
ineach
distributor
-
7/26/2019 Telecommunications Grounding
6/24
6
TIA-607-B TBB sizing
-
7/26/2019 Telecommunications Grounding
7/24
Conductor sizing isnt only about electrical issues
Size matters!
Standards call for a minimum #6
AWG for mechanical strength
Source: Picture from Internet
-
7/26/2019 Telecommunications Grounding
8/24
Supplemental bonding grid construction per TIA-607-B
#6AWGroundwireor2widecopperstripsbonded
atintersections
Minimumgriddensityis3
m(10ft)centers
Minimum1/0bondto
TGB/TMGB
Examplesupplementalbondinggrid
-
7/26/2019 Telecommunications Grounding
9/24
Example SBG construction
Make aisle grounds
convenient to racks
and cabinets
Cross aisle grounds
every 10 feet
Use #6 AWG wireUse pedestal
grounding clamps at
conductor
intersections
Bond to AC powerground through a
local TGB
-
7/26/2019 Telecommunications Grounding
10/24
TEBC to rack connector TIA-607-BOnly 2-hole mechanical is allowed for this
application. Concerns:
(1) Vibration test was done at one amplitude and
frequency, which is different from what datainstallations experience
(2) No consideration for temperature fluctuation
(3) No consideration for stress relaxation
-
7/26/2019 Telecommunications Grounding
11/24
Mesh-BN: a collection of components (As per CENELEC documents, includes
TIA-942s Data Center Grounding Infrastructure as the SupplementalBonding Network and IEEE Std 1100 calls the MCBN), per TIA-607-B
Information
technology
equipment(ITE)
Racksand
cabinets
Cabling
pathways
(notshown)
Buildingsteel
Supplemental
bondinggrid
(SBG)
Conduits
Rackbonding
conductor
(RBC)
-
7/26/2019 Telecommunications Grounding
12/24
Preventing loose busbar connections
12
Two-hole
compression
lugs required
on TGB &
TMGB
(Type LCC-W)
BICSI-607 stainless steel TGB hardware
stack-up (requires locking washer, and
stainless or SiBr hardware)
(Parts HDW1/4-KT, HDW3/8-KT)
-
7/26/2019 Telecommunications Grounding
13/24
13
BICSI Telecommunications Distributions Methods Manual(12th) on the TGB andTMGB
The same
considerations as are
found in TIA-607-B
-
7/26/2019 Telecommunications Grounding
14/24
14
ANSI/NECA/BICSI-607-2011 busbars
Panduit
recommendation
on busbar holepatterns: pick a
pattern and stick
with it. Its
confusing to have
multiple holepatterns later.
Recommend using
the BICSI/TIA hole
pattern, as it is well
defined and knownin industry.
-
7/26/2019 Telecommunications Grounding
15/24
What else needs to be bonded?
IEEEstudieshaveindicatedthatthepointofdiminishingfinancial
returnswithrespecttolightningstrikesis2meters(6feet)
Bondanythingthatcouldbecomechargedthatapersoncould
bumpwhileworkingonarack/cabinetforsafety
Therefore,bondanyconductivepathwithinsixfeetofyourracks/cabinets
-
7/26/2019 Telecommunications Grounding
16/24
Bond cable tray and ladder rack sections
Split bolts use tin plated if
outdoors (SBC & SBCT,
respectively)
#6 AWG conductor,
green w/yellow jacket OR
Wyr-Grid and GRIDRUNNER
hardware automatically bonds
sections, eliminating the need for
jumper wires
Specify systems that
automatically bond toreduce chances of error
-
7/26/2019 Telecommunications Grounding
17/24
Remote zone enclosures and TIA-607-B
TIA607B
DistributorsneedTGB/TMGB
ReferencesTIA568C.0fordefinition
TIA568C.0,4.4DistributorsDistributorsprovidealocationforadministration,reconfiguration,connectionof
equipment,andfortesting.Distributorscanbeconfiguredasinterconnectionsorcross
connections
Figure3ofthesamedocumentshowsdistributorsstartingatActiveequipment
MyconclusionIfithasactiveequipment,thenitneedsgrounding
Sizingtheconductor
ATBB,perTIA607B,originatesattheTMGB.ItbondsTGBstotheTMGB(5.2.4)
ATEBCconnectsrackstotheTMGB/TGB(7.1)
TGBislocatedascloseaspracticabletothepanelboard
TheTEBCshallbeacontinuouscopperconductorthatissizednotlessthanaNo.6
AWGorasthelargestsizeequipmentgroundingconductorinheacbranchpowercircuit(s)servingtheracks/cabinetlineup.
17
-
7/26/2019 Telecommunications Grounding
18/24
Panduit grounding research
Panduitresearchoverthelasttwoyearshasfoundthepresenceofphaseimbalanceon
thetelecommunicationsgroundingsysteminthesteadystate
Frequenciesarepowerlineandthefirstcoupleofharmonics
Observations: High building
steel currents
UPSs are at end
of line-up creating
power imbalancein the ground
conductor
No noticed
network
degradation on thepart of network
operators
-
7/26/2019 Telecommunications Grounding
19/24
19Episodic/transient research
7MHztransientmeasuredonACEGatCRAH,butnotdetectableatclosestrack
Conclusionsofar:meshbondingandseparatecircuitsfromtheACpanelareeffective
meansofmitigatingissueswithtransients
Flatbraidshavenotbeenshowntoofferatangiblebenefitforthisapplication
TektronixTPS2024
CRAC
Panel
AHSystemsBCP512Probe
(highbandwidth)
Rackbondingconductor
-
7/26/2019 Telecommunications Grounding
20/24
Grounding rules of thumb for optimum surge suppression
OptimumperformanceofsurgeprotectorsisachievedatfiveOhmsorbelow.Several
manufacturersofelectronicequipmentalsorequirefivetotenOhms asamaximum
resistancefortheirgeartoworkcorrectly.
DitekTechnicalWhitePaper:Grounding101
20
-
7/26/2019 Telecommunications Grounding
21/24
Twocategoriesoffacility:
1. Minimumrequirements:maintain25throughoutyear,recommendsatleasttwo
electrodes
2. Enhancedrequirementsforcriticalfacilities:designedtohave10orless(and
preferably5orless)
Publicsafetyfacilities
Militaryinstallations
Datacenters
Webhostingfacilities
Centraloffices
Wheretelecommunicationsequipmentisdistributedthroughoutastructure and
may
be
interconnected
by
metallic
links,
the
minimally
required
grounding
system
maynotbeadequate.Facilitieswithadvancedrequirementsordistributed
equipmentwillbenefitfromtheadditionofabuildingperimetergroundloop.
21
TIA-607-B-1 - External Grounding*TR42.16votedtoadoptasnormativeonJune6,2012
-
7/26/2019 Telecommunications Grounding
22/24
Design specifications, per TIA-607-B-1
Commissionasoilresistivitystudy
Themostcommonmethodofmeasuringaveragesoilresistivityisthefourpointmethod
Requireaseriesofreadingsindifferentlocationstogetabetterideaofthesoilconditions
Require
measurements
of
the
ground
system
resistance
as
verification
of
the
design 3polefallofpotentialmethod(ifroomisavailable,andthegroundisnotconnectedtothe
powersystem)
Clamponmeter
22
-
7/26/2019 Telecommunications Grounding
23/24
TIA-607-B-1 potential equalization design highlights
23
-
7/26/2019 Telecommunications Grounding
24/24
Summary