    Telecommunications Grounding and

    Bonding Generic

    Chandrashekar

    Technical Manager (India & SW Asia)

  • 7/26/2019 Telecommunications Grounding

    2/24

    Purpose and scope of TIA-607-BTIA-607-B grounding is normative

    and applies to entire building, not

    just data center

    TIA-607-B, Generic

    Telecommunications

    Bonding and

    Grounding (Earthing)

    for Customer

    Premises, is now

    approved!

    Scopenow

    includes

    groundingof

    ITE

  • 7/26/2019 Telecommunications Grounding

    3/24

    What is TIA-607-B?

    Scope:Specifiesrequirementsforagenerictelecommunicationsbondingandgroundinginfrastructure,andits

    interconnectiontoothersystems,forlocationswheretelecommunicationsequipmentwillbeorareinstalled

    MajorrevisionofJSTD607A:

    IncludesG&Boftelecommunicationsspaces(distributorsandcomputerrooms)

    Continuedharmonizationefforts(as

    practicable)onterminologyandpracticeswithinternationalstandards

    ScopeofTIA607B

    TBB

    Distributors

    ComputerRooms

    TGB

    TMGB

  • 7/26/2019 Telecommunications Grounding

    4/24

    Equipment in Cabinets and Racks

    Rather

    than

    relying

    ontheacpowercord

    groundwire,itis

    desirablethat

    equipment

    begroundedinaverifiable

    mannerasdescribedin

    thisStandard.

    Figure7Exampleofthreemethodstobond

    equipmentandrackstoground

    TIA-607-B:

  • 7/26/2019 Telecommunications Grounding

    5/24

    Telecommunications Bonding Backbone (TBB)

    PurposeofTBBistoreduce

    potentialdifferencesbetweeninterconnected

    telecommunicationssystemson

    differentfloors

    OriginatesatTMGBandextendsthroughoutbuildingusing

    telecompathways

    ConnectsTGBs

    that

    exist

    ineach

    distributor

  • 7/26/2019 Telecommunications Grounding

    6/24

    6

    TIA-607-B TBB sizing

  • 7/26/2019 Telecommunications Grounding

    7/24

    Conductor sizing isnt only about electrical issues

    Size matters!

    Standards call for a minimum #6

    AWG for mechanical strength

    Source: Picture from Internet

  • 7/26/2019 Telecommunications Grounding

    8/24

    Supplemental bonding grid construction per TIA-607-B

    #6AWGroundwireor2widecopperstripsbonded

    atintersections

    Minimumgriddensityis3

    m(10ft)centers

    Minimum1/0bondto

    TGB/TMGB

    Examplesupplementalbondinggrid

  • 7/26/2019 Telecommunications Grounding

    9/24

    Example SBG construction

    Make aisle grounds

    convenient to racks

    and cabinets

    Cross aisle grounds

    every 10 feet

    Use #6 AWG wireUse pedestal

    grounding clamps at

    conductor

    intersections

    Bond to AC powerground through a

    local TGB

  • 7/26/2019 Telecommunications Grounding

    10/24

    TEBC to rack connector TIA-607-BOnly 2-hole mechanical is allowed for this

    application. Concerns:

    (1) Vibration test was done at one amplitude and

    frequency, which is different from what datainstallations experience

    (2) No consideration for temperature fluctuation

    (3) No consideration for stress relaxation

  • 7/26/2019 Telecommunications Grounding

    11/24

    Mesh-BN: a collection of components (As per CENELEC documents, includes

    TIA-942s Data Center Grounding Infrastructure as the SupplementalBonding Network and IEEE Std 1100 calls the MCBN), per TIA-607-B

    Information

    technology

    equipment(ITE)

    Racksand

    cabinets

    Cabling

    pathways

    (notshown)

    Buildingsteel

    Supplemental

    bondinggrid

    (SBG)

    Conduits

    Rackbonding

    conductor

    (RBC)

  • 7/26/2019 Telecommunications Grounding

    12/24

    Preventing loose busbar connections

    12

    Two-hole

    compression

    lugs required

    on TGB &

    TMGB

    (Type LCC-W)

    BICSI-607 stainless steel TGB hardware

    stack-up (requires locking washer, and

    stainless or SiBr hardware)

    (Parts HDW1/4-KT, HDW3/8-KT)

  • 7/26/2019 Telecommunications Grounding

    13/24

    13

    BICSI Telecommunications Distributions Methods Manual(12th) on the TGB andTMGB

    The same

    considerations as are

    found in TIA-607-B

  • 7/26/2019 Telecommunications Grounding

    14/24

    14

    ANSI/NECA/BICSI-607-2011 busbars

    Panduit

    recommendation

    on busbar holepatterns: pick a

    pattern and stick

    with it. Its

    confusing to have

    multiple holepatterns later.

    Recommend using

    the BICSI/TIA hole

    pattern, as it is well

    defined and knownin industry.

  • 7/26/2019 Telecommunications Grounding

    15/24

    What else needs to be bonded?

    IEEEstudieshaveindicatedthatthepointofdiminishingfinancial

    returnswithrespecttolightningstrikesis2meters(6feet)

    Bondanythingthatcouldbecomechargedthatapersoncould

    bumpwhileworkingonarack/cabinetforsafety

    Therefore,bondanyconductivepathwithinsixfeetofyourracks/cabinets

  • 7/26/2019 Telecommunications Grounding

    16/24

    Bond cable tray and ladder rack sections

    Split bolts use tin plated if

    outdoors (SBC & SBCT,

    respectively)

    #6 AWG conductor,

    green w/yellow jacket OR

    Wyr-Grid and GRIDRUNNER

    hardware automatically bonds

    sections, eliminating the need for

    jumper wires

    Specify systems that

    automatically bond toreduce chances of error

  • 7/26/2019 Telecommunications Grounding

    17/24

    Remote zone enclosures and TIA-607-B

    TIA607B

    DistributorsneedTGB/TMGB

    ReferencesTIA568C.0fordefinition

    TIA568C.0,4.4DistributorsDistributorsprovidealocationforadministration,reconfiguration,connectionof

    equipment,andfortesting.Distributorscanbeconfiguredasinterconnectionsorcross

    connections

    Figure3ofthesamedocumentshowsdistributorsstartingatActiveequipment

    MyconclusionIfithasactiveequipment,thenitneedsgrounding

    Sizingtheconductor

    ATBB,perTIA607B,originatesattheTMGB.ItbondsTGBstotheTMGB(5.2.4)

    ATEBCconnectsrackstotheTMGB/TGB(7.1)

    TGBislocatedascloseaspracticabletothepanelboard

    TheTEBCshallbeacontinuouscopperconductorthatissizednotlessthanaNo.6

    AWGorasthelargestsizeequipmentgroundingconductorinheacbranchpowercircuit(s)servingtheracks/cabinetlineup.

    17

  • 7/26/2019 Telecommunications Grounding

    18/24

    Panduit grounding research

    Panduitresearchoverthelasttwoyearshasfoundthepresenceofphaseimbalanceon

    thetelecommunicationsgroundingsysteminthesteadystate

    Frequenciesarepowerlineandthefirstcoupleofharmonics

    Observations: High building

    steel currents

    UPSs are at end

    of line-up creating

    power imbalancein the ground

    conductor

    No noticed

    network

    degradation on thepart of network

    operators

  • 7/26/2019 Telecommunications Grounding

    19/24

    19Episodic/transient research

    7MHztransientmeasuredonACEGatCRAH,butnotdetectableatclosestrack

    Conclusionsofar:meshbondingandseparatecircuitsfromtheACpanelareeffective

    meansofmitigatingissueswithtransients

    Flatbraidshavenotbeenshowntoofferatangiblebenefitforthisapplication

    TektronixTPS2024

    CRAC

    Panel

    AHSystemsBCP512Probe

    (highbandwidth)

    Rackbondingconductor

  • 7/26/2019 Telecommunications Grounding

    20/24

    Grounding rules of thumb for optimum surge suppression

    OptimumperformanceofsurgeprotectorsisachievedatfiveOhmsorbelow.Several

    manufacturersofelectronicequipmentalsorequirefivetotenOhms asamaximum

    resistancefortheirgeartoworkcorrectly.

    DitekTechnicalWhitePaper:Grounding101

    20

  • 7/26/2019 Telecommunications Grounding

    21/24

    Twocategoriesoffacility:

    1. Minimumrequirements:maintain25throughoutyear,recommendsatleasttwo

    electrodes

    2. Enhancedrequirementsforcriticalfacilities:designedtohave10orless(and

    preferably5orless)

    Publicsafetyfacilities

    Militaryinstallations

    Datacenters

    Webhostingfacilities

    Centraloffices

    Wheretelecommunicationsequipmentisdistributedthroughoutastructure and

    may

    be

    interconnected

    by

    metallic

    links,

    the

    minimally

    required

    grounding

    system

    maynotbeadequate.Facilitieswithadvancedrequirementsordistributed

    equipmentwillbenefitfromtheadditionofabuildingperimetergroundloop.

    21

    TIA-607-B-1 - External Grounding*TR42.16votedtoadoptasnormativeonJune6,2012

  • 7/26/2019 Telecommunications Grounding

    22/24

    Design specifications, per TIA-607-B-1

    Commissionasoilresistivitystudy

    Themostcommonmethodofmeasuringaveragesoilresistivityisthefourpointmethod

    Requireaseriesofreadingsindifferentlocationstogetabetterideaofthesoilconditions

    Require

    measurements

    of

    the

    ground

    system

    resistance

    as

    verification

    of

    the

    design 3polefallofpotentialmethod(ifroomisavailable,andthegroundisnotconnectedtothe

    powersystem)

    Clamponmeter

    22

  • 7/26/2019 Telecommunications Grounding

    23/24

    TIA-607-B-1 potential equalization design highlights

    23

  • 7/26/2019 Telecommunications Grounding

    24/24

    Summary