teguh sdn bhd 05042018.pdf · 2018. 4. 5. · pejabat pengurus besar negeri (pahang), bahagian...
TRANSCRIPT
-
Infrastructure Solutions Provider
A19, LORONG PERAMU AMAN 30,
JALAN TG LUMPUR,
26060 KUANTAN
PAHANG DARUL MAKMUR, MALAYSIA
CONTACTS :(HP) +6012-9876551, +6017-7282786,
+6012-9005365
(O) +609-534 8119
FAX : +609-534 8110
Via Email : [email protected]
www.anroteguh.com
mailto:[email protected]://www.anroteguh.com/
-
ANRO TEGUH SDN BHD (ATSB) was formally known as KUASA TIGA ENTERPRISE (KTE)which has been form on 16th April 2003. On the year, 2012 KTE has been renewed withCompanies Commission of Malaysia under business registration act 1956. Since then,ANRO Teguh Sdn Bhd (1024127A) was formed .
Fully own by Bumiputera, and with 13 years of experience and expertise . ATSB aim tograb the opportunities to become one of the best infrastructure solution provider.
ATSB are license in :-
◦ Building Contractors
◦ Transmissions Line
◦ Substation
◦ Telecommunication Towers
◦ Furniture, laboratory furniture and equipment of wood/rattan/fabric/metal/ plastic
◦ Office machines and accessories
◦ Electrical appliances and accessories
◦ Equipment's / public facilities
◦ Building materials
◦ Road safety equipment / street furniture
◦ Motor and transformer / spare part
◦ Electricity and cable-management accessories
◦ Electricity cable and accessories
◦ Supply of electrical and air-conditioners (window / split)
◦ Paint
◦ Security-tool, protection and control of protection
◦ Equipment dealers and workshops
◦ Machinery and special equipment
◦ Power generator
◦ Component and accessory electrical / electronic
◦ Cleaning area, building, beach
◦ Decorations street / area
◦ Buy scrap (do not need a permit)
-
Infrastructure Solution Provider is our nature of business, with it we gain experience,knowledge & work wise on equipment, project planning, assemble & disassemble, foundationconstruction, erection, stringing and many more. Power Line and Telecommunication Towerare our core project and we always implement Australian Safety and Work Procedure.
VISION
“ to be an establish, trusted and dependable infrastructure
solution provider in power line and telecommunication
tower”
MISION
“ we are committed to provide the best quality in safety
and services with a best time duration to our client”
-
AZIZ BIN OMAR
15 years experience in Islamic Banking as a
Executive Officer and a part a team who set up Islamic
Banking “System Concept” to all branches.
Since joining KTE in 2003 ,he gain his experience with
multiple and various Power Line Project from 33kV to
500kV and also Telecommunications Project.
MOHD NADZRI BIN OMAR
Co founder of ATSB & KTE. With 25 years
experience with substation task (PMU). As a founder
ATSB he’s responsible in numbers of project in power
line and telecommunication local and over sea .
-
ATSB are powered by 40 strong and divided by departments, knowledge and
experienced. All of our workers especially high & low voltage team are certified
with Malaysian /Local authority such as NIOSH,CIDB,NTSP and Working at
height (rigger).
Our team are in average 15 to 20 years experienced in Power Line and
Telecommunications. They are all lead by our Senior Project Supervisor whom
has a wide range of experienced.
PROJECT DIRECTOR – RAMLI BIN OMAR
Before joining ATSB, Mr. Ramli Omar was working
with a few oversea company and he is highly rated.
John Holland PTY Ltd, United Group PTY Ltd,
Transfield PTY Ltd and Abengoa Spain are among
his previous employer. His experience and
knowledge are Transmission Line and
Telecommunications Sector.
-
Properties• Store Yard ~ 10,000sqf• Main Office• Shop lot• Workers home
Transportations• 1 unit ~ Land cruiser• 2 unit ~ Toyota Hilux Double Cab• 1 unit ~ Toyota Hilux Single Cab• 1 unit ~ Toyota Cargo 3 tone Lorry 4x4• 2 unit ~ Mitsubishi Van• 2 unit ~ Mitsubishi Pajero• 1 unit ~ Toyota Fortuner• 1 unit ~ Mitsubishi Van 4x4• 1 unit ~ 1 tone Lorry
ANRO Teguh are fully equip and ready to perform. Among it are:
• Tower Erection Equipment • Survey Equipment• Electrical Tools & Machine• Safety Tools & Gear• Communication Tools and Gear
-
Project - JIMAH 2 X 700MW COAL FIRED POWER PLANT FOR 500Kv TRANSMISSION WORKS PROJECT•Achievement - Safety Campaign Overall Winner •Awarded by - FUJIKARA Ltd.
Project - 3 x 700 MW Coal-Fired Power Plant. Tanjung Bin. Johor Project •Achievement - Certified of Appreciation in recognition towards 6,000,000 man-hours without LTI on• Awarded by - SUMITOMO – ZELAN CONSORTIUM
Project - TNB 489/2011 PROJECT •Achievement - Best HSE performing contractor •Awarded by - TRENERGY INFRASTRUCTURE SDN. BHD.
SAFETY AWARDAs our mission to provide the best quality in safety, we have been awarded by multiple companies.
OUR TEAMTo achieve our vison to be an establish, trusted, and dependable infrastructure solutionprovider in power line and telecommunication tower, we had built up a brilliant andprofessional team to execute our task with the best quality for our client satisfaction.
•100 % of our team are registered with Construction Industry Development Board (CIDB)
•60 % of our team had obtained a working at height license.
•60 % of our team is registered under NIOSH-TNB SAFETY PASSPORT (NTSP)
-
REGISTRATIONVENDOR – TENAGA NASIONAL BERHAD MALAYSIA
-
REGISTRATIONVENDOR – TELEKOM MALAYSIA
-
REGISTRATIONVENDOR – ENERGY COMMISSION OF MALAYSIA
-
REGISTRATIONVENDOR – KUANTAN DISTRICT COUNCIL OF MALAYSIA
-
REGISTRATIONCOMPETENT
-
PREVIOUS PROJECT
NO PRINCIPAL/ MAINCON DESCRIPTIONS DATE
1 APL TECH INDUSTRY SDN BHDTOWER ERECTION WORKS (TELECOMMUNICATIONS TOWER 3L 60M), JALAN GUAL PERIUK, DAERAH RANTAU PANJANG, KELANTAN
MAR 2018
2 ROHAS-EUCO INDSTRIES BHDTOWER ERECTION WORKS (TELECOMMUNICATIONS TOWER 3L 45M), KG BECHAH MENERONG, KEDAH
MAR 2018
3 ROHAS-EUCO INDSTRIES BHDCUT OFF TOWERS (TELECOMMUNICATIONS TOWER 3L), MUKIM SUNGAI DAUN, KEDAH
FEB 2018
4 P.E.S.B ENGINEERING SDN. BHD.STRINGING CONDUCTOR DOUBLE CIRCUIT 132kV LINE KAWA - INKA
JAN 2018
5 TENAGA SWITCHGEAR DISMANTLE TOWER 500kV -PASIR GUDANG JAN 2018
6 ROHAS-EUCO INDSTRIES BHDTOWER ERECTION WORKS (TELECOMMUNICATIONS TOWER 3L 45M), FELCRA BELIMBING, KUALA NERANG, KEDAH.
DEC 2017
7 APL TECH INDUSTRY SDN BHDTOWER ERECTION WORKS (TELECOMMUNICATIONS TOWER 3L 76M), KG CHANGKAT SETOL, CHANGLUN, KEDAH.
NOV 2017
8 ROHAS-EUCO INDSTRIES BHDTOWER ERECTION WORKS (TELECOMMUNICATIONS TOWER 3L 45M), KG CHAROK BEMBAN, MUKIM PULAI, KEDAH.
NOV 2017
9 JABATAN PENDIDIKAN DAERAH PAHANGKERJA-KERJA PENDAWAIAN DAN PENGGANTIAN PERALATAN ELEKTRIK DI SMK KERDAU (TEMERLOH), SK KEDAIK (ROMPIN) & SMK TERSANG (RAUB)
OCT 2017
10 ALLOY MTDPROPOSED TO REPLACE GUTTER AND CEILING AT KUANTAN TOL PLAZA
AUG 2017
-
PREVIOUS PROJECT
NO PRINCIPAL/ MAINCON DESCRIPTIONS DATE
11 MAJLIS PERBANDARAN KUANTANKERJA-KERJA PENDAWAIAN ELEKTRIK BAGI UNIT RUMAH KOSONG DI PAKR PAK MAHAT
JUL 2017
12 SYSTEM PROTECTION & MAINTENANCE SDN. BHD. (SPM)SUPPLY AND INSTALL SITE OFFICE AT RAPID PENGERANG, JOHOR.
JUN 2017
13 APL TECH INDUSTRY SDN BHDPROPOSED MODIFICATION OF EXISTING 86M TOWER AT AMPANGAN TM MICROWAVE STATION, SERAWAK
APR 2017
14 ALAN DICK & COMPANY (B) SDN BHDMANPOWER SUPPLY IN BRUNEI DARUL SALAM - RIGGER SPECIALIST
APR 2017
15 TENAGA NASIONAL BERHADPEMBEKALAN PERABOT & PERALATAN UNTUK KEGUNAAN PEJABAT PENGURUS BESAR NEGERI (PAHANG), BAHAGIAN PEMBAHAGIAN TNB
FEB 2017
16 MAJLIS PERBANDARAN KUANTAN MEMBEKAL, MEMASANG & MENGUJI FEEDER PILLAR E.G 1.5M MAC 2017
17 TRENERGY INFRASTRUCTURE SDN BHD INSTALLATION LED AVIATION LIGHT FOR LATTICE TOWER DEC 2016
18 APL TECH INDUSTRY SDN BHD LEGGED LIGHT DUTY TOWER AT KG. WANG PERAH, KEDAH NOV 2016
19 TRENERGY INFRASTRUCTURE SDN BHDTRANSPORTATION SERVICE MONOPOLE TO SITE ONCLUDING MANPOWER, LORRY AND CRANE, PENGERANG, JOHOR
OCT 2016
20 APL TECH INDUSTRY SDN BHD TOWER ERRECTION WORKS AT KG PONG UTARA DALAM, KEDAH SEP 2016
-
PREVIOUS PROJECT
NO PRINCIPAL/ MAINCON DESCRIPTIONS DATE
21 MAJLIS PERBANDARAN KUANTAN
PENYELENGGARAAN KOMPREHENSIF ELEKTRIK BAGI LAMPU JALAN DAN LAMPU TAMAN PERUMAHAN MPK SECARA PECAHAN ZON (B) ZON 2 - KAWASAN TANAH PUTIH -GAMBANG
AUG 2016
22 MN POWER TRANSMISSION SDN BHDERECTION WORKS FOR GANTRY MONOPOLE AND EQUIPMENT STRUCTURE AT PM 275KV PENGERANG SUBSTATION
MAY 2016
23 GALITIX TECHNOLOGIESINSTALLATION EARTHING WORKS FOR PETRONAS RAPID PROJECT
MAY 2016
24 GALITIX TECHNOLOGIESINSTALLATION EARTHING WORKS FOR PETRONAS RAPID PROJECT
APR 2016
25 MN POWER TRANSMISSION SDN BHDERECTION WORKS FOR GANTRY MONOPOLE FOR PMU 132KV PENGERANG SUBSTATION, JOHOR
MAR 2016
26 TRENERGY INFRASTRUCTURE SDN BHDERECTION WORKS FOR MONOPOLE (SECTION 1-13 LOCATIONS) PROJECT OF PENGERANG 275KV OVERHEAD TRANSMISSION LINE
MAR 2016
27 ALAN DICK & COMPANY (B) SDN BHD SUBCONTRACTORS MANPOWER MANAGEMENT SERVICES FEB 2016
28 TRENERGY INFRASTRUCTURE SDN BHDERECTION FOR LATTICE TOWER AND MONOPOLE EARTHING INSTALLATION TO TNB PROJECT PENGERANG 275KV OVERHEAD TRANSMISSION LINE
NOV 2015
29 TRENERGY INFRASTRUCTURE SDN BHDERECTION WORKS FOR LATTICE TOWER (SECTION 2&4)TNB PROJECT OF PENGERANG 275KV OVERHEAD TRANSMISSION LINE
NOV 2015
30 HG POWER TRANSSMISSION SDN BHD UPGRADING 132KV TRANSMISSION LINE BENTONG-KUALA LIPIS MAY 2015
-
PREVIOUS PROJECT
NO PRINCIPAL/ MAINCON DESCRIPTIONS DATE
31 ALAN DICK & COMPANY (B) SDN BHDMANPOWER SUPPLY TO DISMANTLING ANTENNA FOR TELBRU AT BRUNEI DARUL SALAM
FEB 2015
32 LARICO INFRASTRUCTURE SDN BHDPROPOSED 275KV DOUBLE CIRCUIT TRANSMISSION LINE FROM ULU JELAI TO PMU TAPAH
NOV 2014
33 LARICO INFRASTRUCTURE SDN BHDPROPOSED 275KV DOUBLE CIRCUIT TRANSMISSION LINE FROM ULU JELAI TO PMU TAPAH
SEP 2014
34 ALAN DICK & COMPANY (B) SDN BHDMANPOWER SUPPLY FOR SITE FOLEC DMR AT BRUNEI DARUL SALAM
SEP 2014
35 HG POWER TRANSSMISSION SDN BHD UPGRADING 132KV TRANSSMISSION LINE BENTONG-BENTA FEB 2014
36 TRENERGY INFRASTRUCTURE SDN BHDPROPOSED 132KV DOUBLE CIRCUIT TRANSMISSION LINE T-OFF BUKIT TAMBUN SG. KECHIL TO PMU BATU KAWAN NO.1 USING MONOPOLE TOWER
NOV 2013
37 TRENERGY INFRASTRUCTURE SDN BHDPROPOSED 132KV DOUBLE CIRCUIT TRANSMISSION LINE T-OFF BUKIT TAMBUN SG KECHIL TO PMU BATU KAWAN NO. 1 USING MONOPOLE TOWER
NOV 2013
38 ALAN DICK & COMPANY (B) SDN BHDMANPOWER SUPPLY FOR FOLEC DMR PROJECT AT BRUNEI DARUL SALAM
SEP 2013
39 ALAN DICK & COMPANY (B) SDN BHDMANPOWER SUPPLY FOR FOLEC DMR PROJECT AT BRUNEI DARUL SALAM
AUG 2013
40 UTG GENERATION SDN BHDINSTALLING 132KV TOWER IN KUALA LIPIS, INCLUDING THE DELIVERY OF STORE LOCATIONS UTG KUALA LIPIS TO SITE
APR 2013
-
PREVIOUS PROJECT
NO PRINCIPAL/ MAINCON DESCRIPTIONS DATE
41 INSTALACIONES INABENSA ABU DHABI S.AMANPOWER FOR THE PROJECT 132KV OHL FUJAIRAH -DIBBA / FUJIARAH TAYWEEN
MAR 2012
42 FUJIKURA LTDERECTION OF TOWER FOR 500KV T/L JIMAH LENGGENG OLEK LEMPIT
MAY 2007
43 FUJIKURA LTD500KV TRANSMISSION LINES FOR CONNECTING JIMAH POWER PLANT TO LENGGENG S/S AND OLAK LEMPIT S/S
MAY 2007
44 FUJIKURA LTDERECTION OF TOWER FOR 500KV T/L JIMAH LENGGEK OLEK LEMPIT
MAR 2007
45 FUJIKURA LTDDISMANTLING OF EXISTING 33KV T/L TRANSMISSION LINES FOR 3 X 700MW POWER PROJECT AT JIMAH
JUL 2006
46 FUJIKURA LTDTOWER ERECTION WORKS 500KV TRANSMISSION LINES FOR CONNECTING JIMAH POWER PLANT TO LENGGENG S/S AND OLAK LEMPIT S/S
APR 2006
47 FUJIKURA LTDTOWER AIR NAVIGATION OBSTRUCTION PAINTING FOR 500KV TANJUNG BIN PROJECT JOHOR
SEP 2005
48 ANTARA JURUTERA PERUNDING & RENTAK JITU SDN BHDTOWER & CONDUCTOR INSPECTION 500KV AT TANJUNG BIN JOHOR
AUG 2005
49 MAINTANANCE ENGINEERING SDN BHDIMPLEMENTATION OF 33KV DISTRIBUTION LINES FROM PMU BALING TO PMU PENGKALAN HULU, PERAK
OCT 2003
50 MAINTANANCE ENGINEERING SDN BHDPROPOSED 275KV TRANSMISSION LINE RECONFIGURATION AT AYER TAWAR SUBSTATION
AUG 2003
-
SNAPSHOTS – PREVIOUS JOBSTRANSMISSION LINE
-
SNAPSHOTS – PREVIOUS JOBSTELECOMUNICATION TOWER
-
SNAPSHOTS – PREVIOUS JOBSOFFSHORE TELECOMUNICATION
-
SNAPSHOTS – PREVIOUS JOBSELECTRICAL & STREET LIGHT INSTALATION
-
SNAPSHOTS – PREVIOUS JOBSTOWER ERECTION & MONOPOLE
-
AWARDS
-
COURSES & TRAINING