Page 1: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013

Technology Trends and Workload Forecast

Presented to the Atlanta Chapters of:

Society of American Military Engineers (SAME) American Society of Civil Engineers (ASCE)

Brian Kimsey, AIA Regional Chief Architect

Page 2: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 2

Presentation Outline

• Technology Trends at GSA – Building Information Modeling (BIM)

• Conceptualization / Visualization

• Studies

• Circulation / Security Validation / Phasing

• Design

• Coordination / Clash Detection

• Fabrication

• Scheduling

• Cost Estimating

• Spatial Data Management

• Facility Management

– Laser Scanning • Limited Scope Scanning

• Full Scope - Laser Scanning Plan

• Steps

• Results

Page 3: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 3

Presentation Outline

• GSA A-E and Construction Services and Workload Forecast – Locating Opportunities for GSA Services

– Design and Construction Services Used in PBS • Small Projects

• Large (Capital) Projects

• Lease-Construct Projects

– GSA Region 4 Workload Trends

– Locating Opportunities for GSA Services

– Five-Year Courthouse Project Plan

– Federal Business Opportunities (FedBizOpps)

– GSA Project Subcontracting Opportunities

– My Prognostications

Page 4: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 4

BIM for Conceptualization / Visualization

Able to provide easily understandable solutions for

space recapturing.

Enticing options provided to customers to promote movement back into federal buildings from

leased spaces.

Page 5: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 5

BIM for Structural and PV Studies

Able to determine the number of panels the parking deck could handle. Performed structural

analysis to establish the PV system could be supported.

Created a sunlight analysis to determine the amount of energy that could be produced with a PV

canopy system.

Page 6: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 6

BIM for Feasibility Studies

Provided options to the clients so they could gather a better

understanding of the requirements before sending out

to bid for conceptual design.

Internally able to work out issues with the design and feasibility of

the structure before beginning the conceptual designs.

Page 7: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 7

BIM for Feasibility Studies

Provided options to the clients so they could gather a better

understanding of the requirements before sending out

to bid for conceptual design.

Internally able to work out issues with the design and feasibility of

the structure before beginning the conceptual designs.

Page 8: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 8

BIM for Feasibility Study / Visualization

TTV- Gene Snyder - Preferred Option - VRML 9-23-11 (1).mov

Page 9: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 9

BIM for Feasibility Studies – Charlotte, NC

Page 10: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 10

BIM for Feasibility Studies – Charlotte, NC

Page 11: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 11

BIM for Feasibility Studies – Charlotte, NC

Page 12: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 12

BIM for Circulation/Security Validation - Solibri

Page 13: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 13

BIM for Phasing / Swing Space Coordination

Page 14: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 14

BIM in Design – Complex Geometry

Page 15: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 15

BIM in Design – Complex Geometry

Complex structural, architectural, and mechanical elements can be accurately coordinated within the

model.

Using 3D models and BIM technology, the designer is able to accurately convey design intent.

Page 16: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 16

BIM in Design - Rendering from 3D model

Page 17: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 17

BIM in Design – Final photos

Page 18: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 18

BIM in Design – Final photos

Page 19: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 19

BIM for Coordination - Navisworks

Page 20: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 20

BIM for Coordination - Navisworks

Page 21: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 21

BIM for Fabrication

Steel Fabrication Model Steel Construction

Page 22: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 22

BIM for Scheduling – Navisworks & Synchro

Page 23: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 23

BIM for Cost Estimating - Innovaya

Page 24: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 24

BIM for Spatial Data Management

Page 25: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 25

BIM for Facility Management

Page 26: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 26

BIM for Facility Management

Page 27: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 27

Laser Scanning for Verifying Existing Model

Page 28: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 28

Laser Scanning for As-Built Verification

Laser scans are used to verify design models during renovations.

This scan shows that the existing conditions in the design model

were slightly off from actual conditions. Scanning prevented

multiple field conflicts and change orders.

Page 29: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 29

Laser Scanning Plan

Scan Locations are laid out on existing CAD plans. Further verification of scan locations is done in Google Earth, and on-site.

Page 30: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 30

Laser Scanning - Leica - TruView

Laser scanning collects color data during the scan which produces

photo-like scans. Measurements, mark-ups and visual verification are possible

within the scan.

Laser Scan and Total Station survey equipment is used to accurately survey and scan

existing conditions.

Page 31: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 31

Laser Scanning - Leica - Cyclone

Page 32: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 32

Atlanta Federal Campus - Revit Model

Page 33: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 33

Atlanta Federal Campus - Revit Model

Page 34: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 34

Atlanta Federal Campus - Revit Model

Page 35: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 35

Atlanta Federal Campus - Revit Model

Page 36: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 36

“Big Room” Collaboration

All players together in one room collaborating. Live model review

and coordination meetings.

Possible to use VTC, WEBEX, etc.. as an alternative ,or in addition to,

the “Big Room”.

Page 37: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 37

Paperless Construction Site

Digital drawing sets loaded on portable projectors for use on site.

Drawings can be loaded as often as needed to reflect current revisions. Reduces printing.

Page 38: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 38

Design and Construction Services used in PBS

• Projects under the Prospectus Limit – Prospectus threshold for 2013 is $2.79 million

– Design services via Brooks Act IDIQ contracts

– Construction contracts via sealed bid, IDIQ or Source Selection

• Major (above Prospectus Limit) Contracts – Above $2.79 million, and up to $200 million +

– Design services via Brooks Act “Design Excellence” program

– Construction contracts typically via Source Selection

• Lease-Construct Contracts – These are in essence Developer-lead Design-Build

– Designers and contractors are part of team submitted by Developer

Page 39: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 39

A: A GSA Workload Forecast

Carnac the Magnificent

Page 40: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 40

Q: What changes faster than Atlanta Weather?

Page 41: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 41

GSA Region 4 Small Project Trend

$48

$60 $60

119 120 123

$-

$20

$40

$60

$80

$100

$120

$140

FY10 FY11 FY12

Non-Prospectus Workload

$

# of all projects

includes in design, construction, closeout, and in pre-planning

Page 42: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 42

GSA Region 4 Large Project Trend

$1.02

$0.95

$0.87

$0.99 $1.00

$0.75

$0.80

$0.85

$0.90

$0.95

$1.00

$1.05

FY11 FY12 FY13 FY14 FY15

Capital Project Growth in billions

13

13 16

14 14

Capital Project Growth

FY # proj.%over prev

yr

$ Value

Billions%over

prev yr Capital Program

2011 13 0% $1.02 0 $1,022

2012 13 0% $0.95 -7% $953

2013 16 23% $0.87 -8% $866

2014 14 -13% $0.99 14% $988

2015 14 0% $1.00 1% $1,006

FY11 FY12 FY13 FY14 FY15

$1.02 $0.95 $0.87 $0.99 $1.00

# proj. $ Value Billions

Page 43: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 43

GSA Region 4 Leasing Support Trend

$58

$114 $115 $126

$103

1

375

168

197

170

$-

$50

$100

$150

$200

$250

$300

$350

$400

FY11 FY12 FY13 FY14 FY15

Leasing Support (as known today)

($000)

# of projects known today

Page 44: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 44

Region 4 PBS Total Project Cost Trend

-$100

$0

$100

$200

$300

$400

$500

$600

$700

$800

FY 11 FY 12 FY 13 FY 14 FY 15

BA 54 Des+Form.

BA 54 Constr+Compl

ARRA SmProj BA 04 Design/Builds Des

ARRA SmProj BA 04 Design/Builds Constr

BA 80 not incl AFRH Des

BA 80 not incl AFRH Constr

BA 51 Des incl. Pre-Des

BA 51 Constr

BA 55 Des incl. Pre-Des

BA 55 Constr

ARRA Mod & Limited Scope BA 03 Des

$1,717 $1,755 $1,894 $1,889

Total Program Breakdown in D & C using Total Project Cost (Billions)

Page 45: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 45

Total Program by Number of D&C Projects

0

50

100

150

200

250

300

350

400

FY 11 FY 12 FY 13 FY 14 FY 15

BA 54 Des+Form.

BA 54 Constr+Compl

ARRA SmProj BA 04 Des

ARRA SmProj BA 04 Constr

BA 80 not incl AFRH 07 Des

BA 80 not incl AFRH 07 Constr

BA 51 Des incl. Pre-Des

BA 51 Constr

BA 55 Des incl. Pre-Des

BA 55 Constr

ARRA Mod & Limited Scope BA 03 Des

53

Page 46: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 46

Locating Opportunities for GSA Services

• GSA Forecast of Contracting Opportunities http://www.gsa.gov/portal/category/25544

GS

A O

rga

niz

ati

on

Reg

ion

Aw

ard

Sta

tus

Pro

du

ct

or

Se

rvic

e D

es

cri

pti

on

Pro

cu

rem

en

t C

las

sif

ica

tio

n C

od

e

Pla

ce

of

Pe

rfo

rma

nc

e

(City)

Pla

ce

of

Pe

rfo

rma

nc

e

(Sta

te)

Pri

ma

ry N

AIC

S C

od

e

So

cio

ec

on

om

ic C

ate

go

ry

Co

ntr

ac

t T

yp

e

Ac

qu

isit

ion

Str

ate

gy

So

cio

ec

on

om

ic a

nd

Ac

qu

isit

ion

Str

ate

gy R

ati

on

ale

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Solicitation Services Admin Support

R-Professional, administrative, and

management support services Various Cities GA 561110 Section 8(a) Firm Fixed Price Negotiated

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned

HVAC Upgrades/Humidity

Control

Z-Maintenance, repair, and

alteration of real property Statesboro

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned

Budget Item: Elevator

Renovations

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned Structural (Non-Corbel)

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned USPS Space Buildout

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned CM Roof Replacement

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned

ADA upgrades; sidewalks&

restrooms

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned Chimney Repairs (Lightning)

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned

Third Floor Piggy Back Air

Handler

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned Automation Controls Repair

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned Upgrade Fire Alarm Panel

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned Basement Painting

Z-Maintenance, repair, and

alteration of real property Savannah

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned Switchgear

Z-Maintenance, repair, and

alteration of real property Statesboro

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned Switchgear

Z-Maintenance, repair, and

alteration of real property Dublin

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned 4-pipe HVAC Overhaul

Z-Maintenance, repair, and

alteration of real property Columbus

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned

Budget Line Item - FAS

Alteration ATL-Central

Z-Maintenance, repair, and

alteration of real property Atlanta

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

PBS-Public Buildings

Service

R4-Southeast Sunbelt

Region Planned

Domestic Water Line ATL-

Central

Z-Maintenance, repair, and

alteration of real property Atlanta

GA 236220

Small Business Firm Fixed Price To Be Determined To Be Determined

GSA Forecast of Contracting Opportunities FY 2013

Page 47: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 47

Five-Year Courthouse Project Plan

http://www.gsa.gov/graphics/pbs/Courthouse_Project_Plan_FY13_17.pdf

FY 2013 Cost Score Approved by Executive Committee

1 Mobile, AL* Add'l. C $140.30 59.8 on Behalf of the Judicial Conference

2 Nashville, TN Add'l, S&D/C $142.00 67.3

3 Savannah, GA Add'l C $95.50 61.3 2/1/2012

$377.80

(estimated dollars in millions)

FY 2014 Cost Score

1 San Antonio, TX C $112.00 61.3

2 Charlotte, NC C $126.40 58.5

3 Greenville, SC C $80.00 58.1

4 Harrisburg, PA C $76.50 56.8

$394.90

FY 2015 Cost Score

1 Norfolk, VA C $104.70 57.4

2 Anniston, AL Add'l D/C $41.00 57.1

3 Toledo, OH C $109.30 54.4

$255.00

FY 2016 Cost Score

1 Chattanooga, TN S&D $21.50 37.3

2 Des Moines, IA S&D $43.00 35.3

$64.50 S= Site; D = Design; C = Construction;Addl. = Additional

All Cost estimates subject to final verification with GSA

FY 2017 Cost Score

*Congress provided $50.00 out of $190.3 million

$0.00 needed for Mobile, AL in December 2009

Page 48: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 48

Federal Business Opportunities (FedBizOpps)

https://www.fbo.gov/

Page 49: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 49

GSA Project Subcontracting Opportunities

• Subcontracting Directory for Small Businesses http://www.gsa.gov/portal/service/SubContractDir/category/102831/hostUri/portal

The GSA Subcontracting Directory list large prime contractors who, by law, are required to establish plans and goals for subcontracting with small business firms.

Download the Subcontracting Directory (Excel file) Updated 02/16/2012 3M COMPANY

COMPANY ADDRESS: 3M CENTER BLDG 220 11W 02, SAINT PAUL, MINNESOTA, 55144-1001 PERFORMANCE PLACE: LOS ANGELES, CA PRODUCT OR SERVICE CODE: 5120 NAICS CODE: 444110 DATE SIGNED: 10/07/2010 ACTION OBLIGATION: $372,000.00

VENDOR PHONE: (866) 556-5712 PIID: GS21F0075X P/S DESCRIPTION: HAND TOOLS, NONEDGED, NONPOWERED NAICS DESCRIPTION: HOME CENTERS EFFECTIVE DATE: 10/07/2010 EST. COMPLETION: 08/02/2011

3M COMPANY

COMPANY ADDRESS: 3M CENTER BLDG 220 11W 02, SAINT PAUL, MINNESOTA, 55144-1001 PERFORMANCE PLACE: CHICAGO, IL PRODUCT OR SERVICE CODE: 5120 NAICS CODE: 444110 DATE SIGNED: 09/14/2011 ACTION OBLIGATION: $364,495.00

VENDOR PHONE: (866) 556-5712 PIID: GS21F0075X P/S DESCRIPTION: HAND TOOLS, NONEDGED, NONPOWERED NAICS DESCRIPTION: HOME CENTERS EFFECTIVE DATE: 09/14/2011 EST. COMPLETION: 12/31/2014

Page 50: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 50

My Prognostications

• New Federal building starts will decline

• Annexes to existing Federal buildings will increase

• Total space occupied by GSA agencies will decrease

• Occupant density in Federal buildings will increase

• GSA leased space percentage will decrease

• Telework in Federal agencies will increase

• Agency consolidations will require space build-outs

• Major renovations to existing FBs will have to increase

Page 51: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 51

Contact:

John Brian Kimsey, AIA Regional Chief Architect Design and Construction Division

GSA Public Buildings Service Southeast Sunbelt Region

U.S. General Services Administration

77 Forsyth St.

Atlanta, GA 30303

[email protected]

404.331.5330

Page 52: Technology Trends and Workload Forecast€¦ · U.S. GENERAL SERVICES ADMINISTRATION 3 MARCH 1, 2013 Presentation Outline • GSA A-E and Construction Services and Workload Forecast

U.S. GENERAL SERVICES ADMINISTRATION MARCH 1, 2013 52

Questions?