technical support 2008 1 6/5/08 phenix weekly planning 6/5/2008 don lynch
TRANSCRIPT
![Page 1: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/1.jpg)
1
Tech
nica
l Support 2
00
8
6/5/08
PHENIX WEEKLY PLANNING
6/5/2008 Don Lynch
![Page 2: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/2.jpg)
2
Tech
nica
l Support 2
00
8
6/5/08
Shutdown ’08 ScheduleShutdown Prep Done
Mu Trigger, RPC Prototype Installation,New Beampipe, CM Crane, Sta. 1 and MMNScaffolding Reviews All Done, Action Items in progressRPC Prototype C tests (in tent) in progressInstall/field fit CM access stairs in progress Build MMN scaffolding in progressBuild Sta. 1 N. scaffolding in progressMuTr Decapacitations (Sta. 1 N and MMN) ready to start 6/5 RPC Prototype D tests (in tent) in progress Design RPC installation fixtures & MuTrigger FEE platforms in progressPrep work for Mutrgr platforms (water/elec) in progressPrep work for RPC proptotype install June
move (7) MuID pipes
move gap 5 south cable tray End of run Party May 30
![Page 3: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/3.jpg)
3
Tech
nica
l Support 2
00
8
6/5/08
Shutdown ’08 Schedule, cont’d
Prep RPC Proto, MuTrggr FEE N&S Racks in progress RPC engineering & safety review ~mid JulyMuTrigger FEE N Install July -Aug. Install MuTrigger N cooling water & air July - Aug. RPC prototype gas system July - AugMove shielding for RPC prototype installation July - Sep RPC prototype cable routing & support July - Aug Modify crystal palace & vapor barrier July - AugInstall MuTrigger FEE N platform&Rack July 15 – Aug 1 RPC prototype install Sep.-Oct. (RPC2 – PHENIX)
(RPC3 – C. Pearson)Install RPC prototype rack in tunnel south Sep. Install Mutrigger FEE’s in MMS for RPC test Sep. Install MuTrigger FEE South platform Sep.Install MuTrgr S rack cooling & electric Sep.HBD Install Sep.-Oct.Connect electronics/gas/water/air for RPC Sep. – Nov. PC1 west work (needs planning) Sep. – Nov. CM Crane Install Oct.DC East?/West Repairs Oct. – Nov. Replace tunnel shielding Nov. (C. Pearson)
![Page 4: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/4.jpg)
4
Tech
nica
l Support 2
00
8
6/5/08
Shutdown ’08 Schedule, cont’d
Remove all inst’n equipment(e.g. scaffolds) Oct. - NovGap 5 north piping and cable tray re-loc. Oct. – Dec.Gap 2 north cable tray & crate re-mounts Oct. – DecFan Tray maintenance Oct. - Dec.Prep for shutdown 2009 Nov. - DecPrep for run 9 DecClose shield wall start shifts Dec.Start physics Jan 1
![Page 5: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/5.jpg)
5
Tech
nica
l Support 2
00
8
6/5/08
MMN Scaffolding under construction
![Page 6: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/6.jpg)
6
Tech
nica
l Support 2
00
8
6/5/08
CM Crane, Station 1 scaffolding
CM Crane procurement postponed Until FY09
Sta 1 scaffolding is here. To be built next week
![Page 7: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/7.jpg)
Muon Trigger Updated Installation Schedule
RIKEN/RBRC
Itaru Nakagawa
![Page 8: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/8.jpg)
6/5/08 8
MuTrig Installation Schedule
![Page 9: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/9.jpg)
6/5/08 9
Major Items
• LV/Optical Cable Bundle/Install Week 2 ~ 4, July
• Chassis Installation Week 2, August ~
• Chamber Cables Install & Noise Check Week 2, August ~
• ADTX Install Week 4, August ~
![Page 10: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/10.jpg)
10
Tech
nica
l Support 2
00
8
6/5/08
Exploring alternative configurations no obvious solutions
![Page 11: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/11.jpg)
11
Tech
nica
l Support 2
00
8
6/5/08
Detector upgrade Rack allotments
New Platform
HBD/RXNP(not shown)
MuTrgrFEE N
MuTrgrFEE S
VTX Power
FVTX NCC N
NCC S
RPC1 S
RPC1 N
New Platform
RPC1 NS
VTX FEM
![Page 12: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/12.jpg)
12
Tech
nica
l Support 2
00
8
6/5/08
Detector upgrade Rack layouts
![Page 13: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/13.jpg)
13
Tech
nica
l Support 2
00
8
6/5/08
MuTrigger RacksNorth South
Mike L. & Frank have begun prepping these. Need info on RPC prototype rack.
![Page 14: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/14.jpg)
14
Tech
nica
l Support 2
00
8
6/5/08
MuTrigger FEE Rack Utilities
Need to install Tee’s on supply and return lines: both s/b ¾ to supply Mu Trigger North rack and future rack
![Page 15: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/15.jpg)
15
Tech
nica
l Support 2
00
8
6/5/08
RPC Absorber Concept
![Page 16: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/16.jpg)
16
Tech
nica
l Support 2
00
8
6/5/08
RPC Absorber Concept
Uses 112 2x4x8 PB bricks, 22 need to be cut
12 inches deep (RPC group requsted 35 mm (13.8 in)
![Page 17: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/17.jpg)
17
Tech
nica
l Support 2
00
8
6/5/08
To match absorber and prototype RPC’s, we need to install new FEE upgrades in these 5 MuTR FEE’s
We will develop a plan to access these for installation and testing from a custom work platform (to be designed).
MuTrigger FEE upgrades in MMS in support of RPC prototypes
![Page 18: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/18.jpg)
18
Tech
nica
l Support 2
00
8
6/5/08
CM Access
![Page 19: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/19.jpg)
19
Tech
nica
l Support 2
00
8
6/5/08
New Beampipe Design & Review
SS/Be central beampipe
1-5/8” to 3” transitions
Drawings Done
Ready to place order when funding is available
![Page 20: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/20.jpg)
20
Tech
nica
l Support 2
00
8
6/5/08
Safety & Engineering Review Action Item
Status
1. New Beampipe
2. Mu Trigger FEE upgrade installation
3. RPC Prototype Installation
4. MuTr MMN & Station 1 scaffolding
5. CM Crane
![Page 21: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/21.jpg)
21
Tech
nica
l Support 2
00
8
6/5/08
1) Upgrade Crane switch:arc flash mitigation-remotely operated contactor which will feed the IR crane disconnect switch
2) Mixing house safety bucket rewiring 2) Install HVAC cooling and/or fan power circuits into RPC tent. Install fans/cooling units.
3) Run Power to new MuTrgr FEE racks on MMN and MMS
4) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks.
5) Install power feeds to RPC north & south tunnel racks from IR power panels.
NOTE: MuTr north power panel has no available breakers to feed north tunnel racks (south panel has spare breakers for use). More engineering analysis is required to determine if the north power panel should be increased in size or for installation of a sub panel branch can be accomplished.
6) Assist in signal cable installation for MuTr/RPC upgrades as necessary.
7) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads.
a) Remove existing 15KVA transformer and install 45KVA unit.b) Install new (larger size) power cable from rack room to Central
Magnet distribution breaker panels.
8) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room).
Shutdown ’08 Electrician Work
![Page 22: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/22.jpg)
22
Tech
nica
l Support 2
00
8
6/5/08
Work Permit Requirements
• CM Crane Installation
• RPC Prototype Installation
• HBD re-installation
• PC1 Repairs
These WP’s not needed until Sept.
(More will be needed – to be added to the list as appropriate)
![Page 23: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/23.jpg)
23
Tech
nica
l Support 2
00
8
6/5/08
Shutdown Work $$$
Projects Include:
1. CM Crane2. New 40 mm ID beampipe 3. RPC Factory 4. RPC Prototype Installation 5. RPC Final Installation 6. MuTrigger FEE Upgrade 7. CM Access Stairs 8. MuTr Decapitations 9. Gas House Reorganizationmaintenance 10.Bridge Rework 11.HBD Re-installation 12.DC East & West Repairs 13.PC1 Repair 14.Rack room UPS upgrade 15.Bridge Power upgrade 16.Rack Room Update 17.Detector Rack Fan tray replacement18.Safety System Upgrade19.Cooling Water system upgrade20.DAQ/Trigger Upgrade21.DCM II Development 22.VTX support23.FVTX support24.NCC support
PHENIC Engineering and Technical Support Group
Spreadsheets updated, please review/correct/return to D. Lynch ASAP. Next Integration meeting tomorrow
![Page 24: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/24.jpg)
24
Tech
nica
l Support 2
00
8
6/5/08
RPC Prototype
Rec’d dim’s and lifting points from Larry B.
Need to decide on prototype orientation and alignment for Sta 1 & 2 based on absorber location.
![Page 25: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/25.jpg)
25
Tech
nica
l Support 2
00
8
6/5/08
RPC Factory Support, cont.
(2) ~3 Ton thru-the-wall AC’s available from CA-D
208V Need isolated electrical source
Supplemental portable 1-1/4 ton unit ordered
Storage Shelving: 2 additional sets rec’d. Assembly is done.
![Page 26: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/26.jpg)
26
Tech
nica
l Support 2
00
8
6/5/08
New Beampipe Design & Review
SS/Be central beampipe
1-5/8” to 3” transitions
Drawings Done, C-A gettingQuotes for NEG coating
BP designs at SAES for NEG quote. Meet w/ Brush Wellman 5/19
![Page 27: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/27.jpg)
27
Tech
nica
l Support 2
00
8
6/5/08
Safety, Security, etc.
3 die in Fla. after container gas leak, police say
'They lost their lives trying to help one another' co-worker says
Fort Lauderdale Fla. A classic confined space accident
Ar (odorless/colorless/ non toxic but displaces oxygen) leak in container ship: One went to investigate was overcome, 2 more tried to help and were overcome.
ISO 18001 & 14001 Registration Audit. : week of June 16
ISO14001: Environmental Management: compliance, pollution prevention, waste minimization, assurance
ISO18001: OHS/ISM Management: planning for hazard identification, risk assessment and risk control
![Page 28: Technical Support 2008 1 6/5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch](https://reader035.vdocuments.site/reader035/viewer/2022062517/56649ec05503460f94bcb263/html5/thumbnails/28.jpg)
28
Tech
nica
l Support 2
00
8
6/5/08
Where To Find PHENIX Engineering
Info
Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site:
http://www.phenix.bnl.gov/WWW/INTEGRATION/ME&Integration/DRL_SSint-page.htm