Upper Cisokan Pumped Storage Power Plant Tender T/F team, DAW JV. 2014-11-10 정보(문서)대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다. CONFIDENTIAL 1. Project location 2. Organization chart 3. Temporary facilities & Access roads 4. Working conditions 5. Construction schedule 6. Batching / mixing plan 7. Construction plan – Upper dam 8. Construction plan – Lower dam 9. Construction methology – Water way 10. Construction methology – P/H Contents

Upload: ferdinand-yesaya-napitupulu

Post on 27-Jan-2016

218 views

Category:

Documents


1 download

DESCRIPTION

Cisokan

TRANSCRIPT

Page 1: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

Upper Cisokan Pumped Storage Power Plant

Tender T/F team, DAW JV.

2014-11-10

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

CONFIDENTIAL

1. Project location

2. Organization chart

3. Temporary facilities & Access roads

4. Working conditions

5. Construction schedule

6. Batching / mixing plan

7. Construction plan – Upper dam

8. Construction plan – Lower dam

9. Construction methology – Water way

10. Construction methology – P/H

【 Contents 】

Page 2: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

1. Project location

UCPSPP project

Page 3: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

1. Project location

Page 4: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

UPPER DAM

LOWER DAM

SWITCHYARD

SURGE TANK

OUTLET

INTAKE

ADMINISTRATION BUILDING

UNDER GROUND POWERHOUSE

HEADRACE TUNNEL

TAILRACE TUNNEL

PENSTOCK

ACCESS ROAD BY PLN ( 5.8Km )

ACCESS ROAD BY PLN ( 2.0Km )

MAIN ACCESS ROAD ( 19.6Km )

1. Project location

Page 5: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

2. Organization chart

UCPSPP project

Page 6: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

2. Organization chart

DPM

Project Coordinator QA / QC

Contract

LOT 1A

LOT 1B

1A + 1B

• PM / DPM 2 2 2

• Project Coordinator 1 1 1

• Contract manager 1 1 1

• Section manager 3 3 3

• QA/QC 4 4 4

• Site Activity 24 32 54

• Cost 5 6 7

• Administration 16 17 17

S/T 56 66 89

LOT 1A

• Survey • Main Dams

LOT 1B

• Survey • Waterway • PHC • Admin BLDG • Switch Yard

PD

PM

Construction Management

• Planning • Schedule • Cost Control • Design

Planning / Cost Management

• Administration • HSE • Equipment

Administration

COMMITTEE

Staff Plan

• DEALIM 6 6 6

• ASTALDI 4 4 4

• WIKA 10 10 10

• JV 36 46 69

Page 7: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

3. Temporary facilities & Access roads

UCPSPP project

Page 8: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

3. Temporary facilities & Access roads

B/P 1A #1

C/P 1A

ACCESS ROAD #1 BY OTHER ( 5.4Km )

TAR 1A #1

B/P 1A #2

TAR 1A #2

TAR 1A #3

TAR 1A #4

TAR 1A #5

EXPLOSIVES MAGAZINES

MAIN OFFICE

LOWERDAM SITE OFFICE

ACCESS ROAD #2 BY OTHER ( 2.0Km )

B/P 1B#1 C/P

1B

UPPERDAM SITE OFFICE

TAR 1B #4

TAR 1B #2

TAR 1B #3

TAR 1B #1

TAR 1B #5

TAR 1B #6 HEADRACE SITE OFFICE

POWERHOUSE SITE OFFICE

B/P 1B#2

MAIN ACCESS ROAD #3 BY OTHER ( 19.6Km )

LEGEND LOT 1A

LOT 1B

Page 9: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

3. Temporary facilities & Access roads

PLAN Road Name Location

LOT 1A

•TAR 1A #1 B=8m L= 1,831m •Lower Dam Down Stream → B/P 1A #1

•TAR 1A #2 B=8m L= 1,281m •Lower Dam Up Stream → Access Road #1

•TAR 1A #3 B=8m L= 2,019m •Upper Dam Down Stream → Middle Adit

•TAR 1A #4 B=8m L= 2,785m •Upper Dam Down Stream → Access Road #2

•TAR 1A #5 B=8m L= 2,216m •Upper Dam Up Stream → B/P 1A #2

LOT 1B

•TAR 1B #1 B=8m L= 2,435m •B/P 1B #1 → Outlet Structure

•TAR 1B #2 B=8m L= 497m •To Switch Yard

•TAR 1B #3 B=8m L= 169m •To Administration Building

•TAR 1B #4 B=8m L= 979m •To Middle Adit

•TAR 1B #5 B=8m L= 540m •Upper Dam Crest → Inspection Adit

•TAR 1B #6 B=8m L= 896m •Upper Dam Crest → Surge Tank Portal

Page 10: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

4. Working conditions

UCPSPP project

Page 11: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

4. Working conditions

Working time

Flood season : November to March (5 months)

Half flood season : April to June (3 months)

Dry season : July to October (4 months)

Working hours at surface area

Flood season : 6Hours/Shift, 2Shift/day (6Hours/shift x 2shift/day x 5M x 26 days = 1,248 Hours)

Half flood season : 8Hours/Shift, 2Shift/day (8Hours/shift x 2shift/day x 3M x 26 days = 1,248 Hours)

Dry season : 10Hours/Shift, 2Shift/day (10Hours/shift x 2shift/day x 4M x 26 days = 2,080 Hours)

≒ 20days/month (10Hours/shift x 2shift/day x 20 days/month x 12month/year = 4,800 Hours

Working hours at u/g tunnel

2shift/day, 26days/month, 10hours/shift

4,888 Hours

Page 12: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

5. Construction schedule

UCPSPP project

Page 13: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Construction Progress Schedule – Lot 1A

5. Construction schedule

6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

M01

M02

M03

M04

M05

M06

M07

M08

M09

M10

M11

M12

M13

M14

M15

M16

M17

M18

M19

M20

M21

M22

M23

M24

M25

M26

M27

M28

M29

M30

M31

M32

M33

M34

M35

M36

M37

M38

M39

M40

M41

M42

M43

M44

M45

M46

M47

M48

M49

M50

M51

M52

M54

M55

M55

1. Key-Dates

1.1 NTP (1st. July, M1)

1.1.1 Completion of Upper Dam (M26)

1.1.2Completion of Lower Dam(Ready for Impounding)

(M34)

1.1.4 Completion of The Whole Works (M45)

2. Upper Dam

2.1 Mobilization(M1~M5.5)

2.2 Diversion Channel(M10~M11)

2.3 Dam Excavation & Consolidation(M6~M15)

2.4 RCC-Dam body(M16~M23)

2.5 Spill way work(M18~M24)

3. Lower Dam

3.1 Diversion Tunnel(M14~M16)

3.2 Dam Excavation & Consolidation(M14~M25)

3.3 RCC-Dam body(M26~M33)

3.4 Spill way work(M26~M34)

2018 2019

No. Description

2015 2016 2017

Page 14: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Construction Progress Schedule – Lot 1B

5. Construction schedule

6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

M01

M02

M03

M04

M05

M06

M07

M08

M09

M10

M11

M12

M13

M14

M15

M16

M17

M18

M19

M20

M21

M22

M23

M24

M25

M26

M27

M28

M29

M30

M31

M32

M33

M34

M35

M36

M37

M38

M39

M40

M41

M42

M43

M44

M45

M46

M47

M48

M49

M50

M51

M52

M54

M55

M55

1. Key-Dates

1.1 NTP (1st. July, M1)

1.1.1 Completion of Penstock(tunnel exca.)(M27)

1.1.2 Completion of PH Cavern(M30.5)

1.1.3 Completion of Switch Yard(M30.5)

1.1.4 Completion of The Whole Works(M50)

2. Waterway

2.1 Mobilization

2.2 Headrace Tunnel(M11~M25)

(Lining, M26~M35)

2.3 Inspection Adit

2.4 Surge Tanks (M11~M14)

(M12~M15(Lining, M15~M17)

2.5 Penstock Tunnel(M11~M26)

(Lining, M27~M34)

3. Power House Cavern

3.1 Ventilation Tunnel(M8~M10)

3.2 Power House Cavern(M10~M27)

(Lining, M28~M41)

3.3 Access Tunnel(M6~M14)

3.4 Tailrace Tunnel(M11~M14)

(M15~M17)(Lining, M16~M29)

2018 2019

No. Description

2015 2016 2017

Page 15: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

6. Batching/Mixing plan

UCPSPP project

Page 16: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

6. Con’c production & supply plan

BP#2

BP#3

CP#2

U/G PH

BP#1

150m3/HR x 2units for RCC 100m3/HR x 1unit for CVC

Quarry

CP#1 200/HR x 2units =100,000 ton/month

<Lot1a>

General plot plan for aggregate process and batching / mixing

<Lot1b>

CP#1 200/HR x 1unit=50,000 ton/month

200m3/HR x 1unit, Coarse aggregate 100m3/HR x 2units

for CVC

Page 17: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

6. Con’c production & supply plan

Aggregates Processing Plan

Item Lot1a or Lot1b Combination

Crushing Processing

Plan

• Lot1a(Q=2,708,400ton) - CP (200ton/HR x 2units) - 100,000ton/month x 27months - Location : Quarry

• Lot1b(Q=674,000ton) - CP (200ton/HR x 1unit) - 50,000ton/month x 14months - Location : Quarry

• Lot1a(Q=2,708,400ton) - CP (200ton/HR x 2units) - 100,000ton/month x 27months - Location : Quarry - Fine/ coarse aggregates

• Lot1b(Q=674,000ton) (253,000t+421,000t) - CP (200ton/HR x 1unit) - 50,000ton/month x 14months - Location : at site - Only coarse aggregates

Transportation

• Quarry CP BP(L=27km) - Lot1a : 2,708,400 ton - Lot1b : 674,000 ton

• Quarry CP BP (L=27km) - Lot1a : 2,708,400 ton - Lot1b : 253,000 ton

• Site CP BP (L=2km) - Lot1b : 421,000 ton

S/T U$ 32,136,000 U$ 28,858,000 (Δ U$3,278,000)

Page 18: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

6. Con’c production & supply plan

Batching & Mixing Plan

Item Lot1a or Lot1b Combination

Concrete Volume

Lot 1a : 994,700 m3

Lot 1b : 316,500 m3

(RCC : 914,200 m3)

Lot 1a : 994,700 m3

Lot 1b : 316,500 m3

(RCC : 914,200 m3)

BP Operation plan

• Lot 1a BP : 150m3/HR x 2units (RCC) BP : 100m3/HR x 1unit (CVC) • Lot 1b, BP : 100m3/HR x 2units (CVC)

• Lot 1a : 150m3/HR x 2units (RCC) • Lot1a : 100m3/HR x 2units (CVC) Lot1b

Cost

Page 19: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

7. Construction plan - Upper dam

UCPSPP project

Page 20: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

7. Construction plan - Upper dam

General layout Plan

Access Road

Upper Dam

B/P

A=20,000㎡ (150㎥/hr × 2unit)

Conveyor Belt L=500m

Inspection Road L=1,200m W=8m

Access Road

Page 21: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

①. Q = 34,700㎥ M16 / EL 735.6

②. Q = 104,100㎥ M17 / EL 748.5

③. Q = 151,200㎥ M18 / EL 755.7

④. Q = 198,300㎥ M19 / EL 762.6

⑤. Q = 245,460㎥ M20 / EL 769.5

⑥. Q = 292,600㎥ M21 / EL 777.3

⑦. Q = 339,710㎥ M22 / EL 788.4

⑧. Q = 387,000㎥ M23 / EL 800.5

Upper dam progress Plan

7. Construction plan - Upper dam

6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

M01

M02

M03

M04

M05

M06

M07

M08

M09

M10

M11

M12

M13

M14

M15

M16

M17

M18

M19

M20

M21

M22

M23

M24

M25

M26

M27

M28

M29

M30

M31

M32

M33

M34

M35

M36

M37

M38

M39

M40

M41

M42

M43

M44

M45

M46

M47

M48

M49

M50

M51

M52

M54

M55

M55

2. Upper Dam (Competion of Upper Dam)

2.1 Mobilization(M1~M5.5)

2.2 Diversion Channel(M10~M11)

2.3 Dam Excavation & Consolidation(M6~M15)

2.4 RCC-Dam body(M16~M23)

2.5 Spill way work(M18~M24)

2018 2019

No. Description

2015 2016 2017

Page 22: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

8. Construction plan - Lower dam

UCPSPP project

Page 23: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

8. Construction plan - Lower dam

General layout Plan

Access Road

Lower Dam

B/P

A=20,000㎡ (150㎥/hr × 2unit)

Conveyor Belt L=500m

Inspection Road L=1,076m W=8m

Page 24: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

①. Q = 65,060㎥ M26 / EL 417.0

②. Q = 151,800㎥ M27 / EL 429.6

③. Q = 238,500㎥ M28 / EL 442.2

④. Q = 325,300㎥ M29 / EL 454.2

⑤. Q = 374,100㎥ M30 / EL 461.9

⑥. Q = 422,860㎥ M31 / EL 469.2

⑦. Q = 471,650㎥ M32 / EL 478.5

⑧. Q = 520 ㎥ M33 / EL 503.0

8. Construction plan - Lower dam

Lower dam progress Plan

6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

M01

M02

M03

M04

M05

M06

M07

M08

M09

M10

M11

M12

M13

M14

M15

M16

M17

M18

M19

M20

M21

M22

M23

M24

M25

M26

M27

M28

M29

M30

M31

M32

M33

M34

M35

M36

M37

M38

M39

M40

M41

M42

M43

M44

M45

M46

M47

M48

M49

M50

M51

M52

M54

M55

M55

3. Lower Dam (Competion of Lower Dam)

3.1 Diversion Tunnel(M14~M16)

3.2 Dam Excavation & Consolidation(M14~M25)

3.3 RCC-Dam body(M26~M33)

3.4 Spill way work(M26~M34)

2018 2019

No. Description

2015 2016 2017

Page 25: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Resource Mobilization Plan (for Dam)

Classification Detail Quantity Remarks

Equipment

• BP (150m3/HR, RCC) • BP (100m3/HR, CVC) • Conveyor belt system • Dump truck (15ton)

• Excavator with cutter • Bull dozer (19ton) • Vibro roller (12~15ton) • Placement roller (1ton)

2units 1unit 1unit 3units

(50units) 1unit 3units 3units 5units

• Sinohydro • Soma • Direct management

Manpower

• Fore mam • Operation for conveyor belt • Operation for equipment • Operation for BP • Driver • Skilled worker • Unskilled worker

Peak : 1,184man AVE. : 581man

• 2shift work

8. Construction plan

Page 26: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

9. Construction methology – Water way

UCPSPP project

Page 27: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

9. Construction methology – water way

General layout Plan

HEADRACE TUNNEL Φ=8.6m

L1=1,217m L2=1,157m

SURGE TANK ID=Φ15m, OD=Φ17.5m

H=53m

INSPECTION ADIT B=8.5m, H=8.5m,

L=374m

PENSTOCK TUNNEL Φ=5.37m L=385m

MIDDLE ADIT B=4.5m, H=4.8m

INTAKE

BIFURCATION TUNNEL

Concrete lining

Steel lining

Page 28: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

9. Construction methology – water way

Tunnel Excavation Plan Headrace & Penstock tunnel

Inspection adit (L=374m) Surge tank tunnel (L=35m x 2 lines)

Headrace tunnel (L=1,217m, 1,157m)

Cross tunnel (L=40m)

at 600m

• Option 1 (By Astaldi)

Inspection adit (L=374m) Surge tank tunnel (L=35m x 2 lines)

Headrace tunnel (L1=600m, L2=600m)

• Tunnel excavation - Option 2&3

Headrace tunnel (L1=617m, L2=557m)

Option I (Astaldi) Option II (Subcontractor) Option III (Subcontractor)

[ 3 Boom jumbo ] • Advance rate : 167m/month(AVE.) • Duration : 15months+2.5months • 1 working crew

[ 3 Boom jumbo ] • Advance rate : 156m/month(AVE.) • Duration : 15months+2.5months • 1 working crew

[ Leg drill ] • Advance rate : 90m/month(AVE.) • Duration : 14months+4.5months • 2 working crew

Page 29: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

9. Construction methology – water way

Surge tank

• Dimension (ID : Φ15m, OD : Φ17.5m, H=53.3m, 58.3m)

• Method : Raise boring machine will be adapted in these vertical shaft

Phase I Phase II Phase III

• A pilot tunnel(Φ216mm) will be performed from top to down.

(Equipment ; $200,000)

• Enlargement(Φ1400mm) along pilot tunnel as shown above will be performed.

• Full tunnel excavation will be carried out by means of leg drill from top to down, spoil materials will be removed to spoil through head race tunnel and inspection adit(or spoil bank area)

Page 30: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

9. Construction methology – water way

Middle adit Penstock upper part Penstock lower part

Penstock tunnel

• Construction sequences

HEADRACE TUNNEL

PENSTOCK TUNNEL

MIDDLE ADIT TUNNEL

By jumbo drill

By RBM (for pilot tunnel) + Leg Drill (Enlargement)

Upper p

art Lo

wer p

art

Page 31: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

9. Construction methology – water way

Penstock tunnel

1st phase

Pilot tunnel, Φ 216 (Raise Boring Machine)

2nd phase

Enlargement of the pilot tunnel (Φ > 2.0m)

(Raise Boring Machine)

3rd phase

Tunnel excavation will be completed by means of leg drill and spoil material will be disposed from bottom through access tunnel #2

Page 32: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

10. Construction methology – U/G Power House Cavern

UCPSPP project

Page 33: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

General layout Plan

10. Construction methology – U/G power house cavern

ACCESS TUNNEL B=7.0m, H=6.0m

POWERHOUSE B=26m, H=51m,

L=165m

AQUIFER TUNNEL B=3.1m, H=3.3m

TAILRACE TUNNEL B=6.0m, H=6.0m

VENTILATION TUNNEL

B=5.4m, H=5.4m CABLE TUNNEL B=4.1,m H=5.1m

WORK 2 TUNNEL B=7.0m, H=6.0m

TRANSFORMER TUNNEL B=7.0m, H=6.25m

WORK 1,1A TUNNEL B=4.5m, H=5.1m

TRANSFORMER B=18m, H=6.5,

L=170m

Page 34: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

10. Construction methology – U/G power house cavern

TAILRACE TUNNEL ( EL 433.85 )

ACCESS TUNNEL ( EL 461 )

VENTILATION TUNNEL ( EL 479 )

VENTILATION TUNNEL

TAILRACE TUNNEL

ACCESS TUNNEL

U/G Power house cavern

Page 35: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

10. Construction methology – U/G power house cavern

Cavern excavation sequence

• Power house will be divided into 7 stages for excavation

1st stage

1A1B2A3A (V/T)

• Excavation sequence plan

2nd stage

2B3B (V/T)

3rd stage

47 (V/T or A/T)

4th stage

5689 (A/T)

5th stage

111410 (T/T)

6th stage

1213 (T/T)

7th stage

1516 (T/T)

* ( ) ; Mucking V/T – Ventilation tunnel A/T – Acess tunnel T/T – Tailrace tunnel

Access Tunnel

Tailrace Tunnel

Page 36: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Appendix-1 Dam concrete work : Conveyor belt systems

UCPSPP project

Page 37: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Appendix-1 Dam concrete work : Conveyor belt systems

Page 38: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Appendix-1 Dam concrete work : Conveyor belt systems

Page 39: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Appendix-1 Dam concrete work : Conveyor belt systems

Page 40: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Appendix-2 Equipment lists

UCPSPP project

Page 41: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Equipment lists – Lot1A

Item Equipment Name Size Required Number

Status

Partner Subcon. Others

Aggregate producing

CP 200ton/HR 2 2

Batching/ Mixing

BP (RCC) BP (CVC)

Chiller Plant Cement silo

150m3/HR 100m3/HR

3500ton

2 1 3 1

2 1 1 1

Transportation Conveyor belt

Telescopic conveyor system

540m 36m

1 1

1 1

Placing Dozer

Vibro Roller

10~15ton 3 5

3 5

Others Tower crane Mobile crane

73m x 5ton 50ton

1 1

1 2

Appendix-2 Equipment lists

Page 42: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Equipment lists – Lot1B

Item Equipment Name Size Required Number

Status

Partner Subcon. Others

Drilling/ Blasting

2 Boom Jumbo 3 Boom Jumbo

Surface drill RBM

~198m2

64~102mm

200m

4 1 4 2

4 1

2

4

Mucking Mini Excavator Wheel loader

Articulated dumper

0.3m3

4.3m3

27ton

2 2 10

2 2

10

Supporting/ Lining

S/C spraying machine BP (CVC)

Mixer truck Con’c pump

30m3/h 100m3/h

7m3

65m3/h

2 2 5 1

1 1

2 5

Others Ventilation

Electric supply 1 L/S 1 L/S

1 L/S 1 L/S

Appendix-2 Equipment lists

Page 43: Technical Presentation 10th NOV 2014 Upper Cisokan Rev Fin-1

이 정보(문서)는 대림산업의 자산으로서, 허가 없는 사외반출을 금지합니다.

Thank you for your attention !

UCPSPP project