technical guide appendix: core - texas housers · 07/04/2017 · appendix - core 01 core pre-fab...
TRANSCRIPT
APPENDIX - CORE 01
CORE PRE-FAB & ASSEMBLYThe CORE a the temporary housing unit for the RAPIDO Demonstration Project. The CORE contains essential living facilities. Families will reside in their core until resources and time allow for expansion, at which point, homes will be added upon to accommodate long-term family needs and desires (referred to as the “expanded home”).
The RAPIDO CORE meets the follwing requirements:• Cost Effective: the CORE is reused as part of the permanent
housing solution reducing waste in funds and materials.
• Size: At 480 sq.ft., the CORE is compact enough to be placed in diverse homeowner sites but including enough space for everyday activities.
• Ease of Construction and Assembly: CORE panels are easy to construct making them ideal for disaster recovery. Each panel is built from lumber which can be managed by local labor.
• Ease of Deployment: The flat-pack design of the CORE allow contractors to deploy the CORE easily in a standard flatbed trailer.
• Quality of Space: Within ’s timeline, families will be living in the CORE for at least 4 months. The outdoor design of the CORE ease the interior crowdedness of temporary units and also provide a space for the family to gather.
• Accessibility: COREs will exceed visitability standards.
• Quality of Space: Families will be living in the CORE for at least 4 months. The outdoor design of the CORE ease the interior crowdedness of temporary units and also provide a space for the family to gather.
• Expandability: The CORE facilitates expansion, accommodating the the families long term spatial needs and aesthetic preferences.
APPENDIX - CORE 03
Safe
Hou
seCo
re b
uilt
as “s
afe
hous
e” w
ith e
xtra
rigi
d sh
ear
wal
ls a
nd c
onne
ctio
ns s
houl
d “a
fter
shoc
k”
disa
ster
occ
ur w
hile
fam
ilies
are
pa
rtic
ular
ly v
ulne
rabl
e
WA
LL A
SSEM
BLIE
SSi
mpl
e, re
petit
ive
asse
mbl
ies
use
stic
k fr
amin
g m
etho
ds a
ble
to b
e co
nstr
ucte
d by
loca
l bui
lder
s. P
anel
s ca
n be
rem
oved
to a
ccom
mod
ate
wid
e va
riety
of h
ome
desi
gns
ELEC
TRIC
AL
Elec
tric
al c
hase
s bu
ilt in
to w
all
desi
gn. F
amili
es a
nd c
ontr
acto
rs
are
able
to m
odify
at a
ny p
oint
of
addi
tion.
ELEV
ATED
CO
NST
RUCT
ION
Elev
ated
con
stru
ctio
n al
low
s
are
revi
sed
post
-dis
aste
r. Re
duce
s en
viro
nmen
tal r
isk
for f
amili
es.
WET
WA
LLPl
umbi
ng a
nd m
ajor
ity o
f el
ectr
ical
com
pone
nts
loca
ted
in
wet
wal
l. C
abin
ets
inst
alle
d la
st
CORE
FEA
TURE
S
APPENDIX - CORE 05
The CORE design is flexible to adapt its outdoor design (porch space, storage space and ramp/stair) to the local context. The aesthetic preference of the residents will vary, depending on the economic resources available in the local jurisdiction prior the disaster. The materials used in the outdoor design should be durable and designed to be part of the CORE flat-pack. The outdoor space should be easy to remove to allow expansion construction.
CORE DESIGN OPTIONS
CORE EXPANSION OPTIONSRAPIDO PILOT
2 B
EDRO
OM
(9
72-1
,010
sq
ft)
3 B
EDRO
OM
(1,1
59 -
1,19
3)
4 B
EDRO
OM
(1,3
25 -
1,40
0)
LIVING DINING KITCHEN
PORCHPO
RCH
CORE
CORE
PORCH
LIVING
DINING
KITCHEN
PORCH
CORE
PORCH
PORCH
LIVING
DINING
KITCHEN
LIVINGDINING
KITCHEN
BEDROOM
PORCH
PORCH
CORECORE
PORCH
BEDROOM
KITCHEN
DINING
LIVING
PORCH
BEDROOM
KITCHEN
DINING
LIVING
PORCH
CORE
PORCH
KITCHEN+ DININGLIVING
CORE
1/2BATHBEDROOM BEDROOM
CORE
1/2BATHBEDROOM BEDROOM
KITCHEN+ DINING
LIVING
PORCH
BEDROOM
1/2BATH
BEDROOM
LIVINGDINING
KITCHEN
PORCH
CORE
APPENDIX - CORE 06
CORE
FU
RNIT
URE
KIT
CORE
furn
iture
kit
The
CO
RE fu
rnitu
re k
it is
part
of t
he C
ORE
’s fla
tpac
k an
d it
rem
ains
as c
lose
ts
for t
he b
edro
oms o
f the
CO
RE’s
addi
tion.
The
furn
iture
kit
allo
ws f
or st
orag
e an
d an
add
ition
al b
ed sp
ace.
The
CORE
fur
nitu
re k
it is
par
t of
the
CO
RE’s
flatp
ack
and
it re
mai
ns
as c
lose
ts fo
r th
e b
edro
oms
of t
he C
ORE
’s ad
ditio
n. T
he fu
rnitu
re k
it al
low
s fo
r sto
rage
and
an
addi
tiona
l bed
sp
ace.
CORE
furn
iture
kit
The
CO
RE fu
rnitu
re k
it is
part
of t
he C
ORE
’s fla
tpac
k an
d it
rem
ains
as c
lose
ts
for t
he b
edro
oms o
f the
CO
RE’s
addi
tion.
The
furn
iture
kit
allo
ws f
or st
orag
e an
d an
add
ition
al b
ed sp
ace.
APPENDIX - CORE 20
CORE: focus group resultsCORE ACTIVITIESBASED ON COMMUNITY INPUT FROM FIVE WORKSHOPS CONDUCTED IN CAMERON COUNTY, TEXAS, THE FOLLOWING ACTIVITIES HAVE BEEN IDENTIFIED AS BEING ESSENTIAL TO THE HOME AFTER A DISASTER. IN DESCENDING ORDER, BEGINNING WITH THE ACTIVITY THAT WAS THE MOST FREQUENTLY SELECTED, ACTIVITIES ARE: EAT, SLEEP, WASH, TOILET, COOK, SHOWER, GATHER, LAUNDRY, AND WORK (DANCE, GRILL, PARTY, GARDEN, AND STUDY WERE ALSO PROVIDED OPTIONS BUT WERE NOT SELECTED). THESE NINE CRITICAL ACTIVITIES, AS IDENTIFIED BY RESIDENTS, WILL BE ACCOMMODATED WITHIN THE HOME’S INITIAL CORE AND WILL BE DEPLOYED IMMEDIATELY AFTER A DISASTER OCCURS.
ORGANIZATION OF COREWITHIN THE CORE, DIFFERENT ACTIVITIES REQUIRE ACCESS TO DIFFERENT RESOURCES. GROUPING ACTIVITIES THAT REQUIRE SIMILAR RESOURCES TOGETHER, CREATES AREAS THAT ARE SPATIALLY EFFICIENT, COST LESS TO BUILD, AND ARE FASTER TO CONSTRUCT. THE NINE CORE ACTIVITIES CAN BE DIVIDED INTO THE FOLLOWING THREE RESOURCE CATEGORIES: NO RESOURCES REQUIRED, WATER SOURCE REQUIRED, OR WATER AND HEAT SOURCES REQUIRED. THESE CATEGORIES BREAK DOWN AS FOLLOWS: 1. NO RESOURCES REQUIRED (THEREFORE THE EASIEST ACTIVITIES TO RELOCATE): EAT, SLEEP, GATHER, WORK 2. WATER SOURCE REQUIRED (THEREFORE THE ACTIVITIES THAT CANNOT BE EASILY RELOCATED): WASH, TOILET, SHOWER, LAUNDRY 3. WATER AND HEAT SOURCES REQUIRED (THEREFORE THE ACTIVITIES THAT ARE THE HARDEST TO RELOCATE): COOK
OVERLAPPING SPATIAL ACTIVITY PATTERNS WITHIN THE HOME (AS DICTATED BY FEEDBACK FROM COMMUNITY WORKSHOPS IN WHICH RESIDENTS WERE ASKED TO LOCATE ACTIVITIES WITHIN THEIR IDEAL HOME) AND WITHIN EACH CATEGORY, REVEALS TRENDS IN ACTIVITY ADJACENCIES AND LOCATION. EACH OF THE THREE CATEGORIES ABOVE HAVE STRONG SPATIAL ASSOCIATIONS:
1. NO RESOURCES REQUIRED: THESE ACTIVITIES TEND TO TAKE PLACE EVENLY THROUGHOUT THE HOME YET ARE MOST CONCENTRATED AROUND THE HOME’S EDGES. 2. WATER SOURCE REQUIRED: THESE ACTIVITIES ARE MOST FREQUENTLY LOCATED WITHIN THE BACK TWO CORNERS OF THE HOME. 3. WATER AND HEAT SOURCES REQUIRED: THESE ACTIVITIES PREDOMINANTLY TAKE PLACE ALONG THE HOME’S TWO SIDES.
THE GENERAL ORGANIZATION OF INTERIOR SPACES WILL ADHERE TO THESE LAYOUT PATTERNS.
CORE EXPANSIONTHE MOST ‘PERMANENT’ OF THE NINE CORE ACTIVITIES, THOSE THAT REQUIRE ACCESS TO WATER AND/OR HEAT, WILL BE DEPLOYED WITHIN THE CORE AND WILL BE DESIGNED AND PLACED AS PERMANENT FIXTURES WITHIN THE HOME. HOME EXPANSION WILL TAKE PLACE AROUND THE CORE AS ADDITIONAL ACTIVITIES ARE ADDED, BASED ON THE FAMILY’S NEEDS AND INDIVIDUAL DESIGN CONSULTATION. THE LOCATION AND PROGRAM OF THESE SPACES WILL BE DERIVED FROM RESIDENT INPUT.
Design Intentions1| SOCIALTHIS PROJECT SHOULD CONTRIBUTE T TING A LIVING ENVIRONMENT THAT ACCOMODATES THE NEEDS OF RESIDENTS; TAKING INTO CONSIDERATION FAMILY STRUCTURE, SOCIAL PATTERNS, AND COMMUNITY INTERACTIONS. THIS PROJECT SHOULD ALSO CONTRIBUTE POSITIVELY TO ITS SURROUNDINGS AND NEIGHBORHOOD BY ADAPTING TO VARIOUS SITE CONDITIONS AND CONNECT TO THE EXISTING NEIGHBORHOOD.
2| ECONOMICTHIS PROJECT SHOULD ENABLE FAMILIES TO INCREMENTALY IMPROVE AND EXPAND UPON THEIR LIVING CONDITIONS AS RESOUCRES AND TIME PERMIT. THE DESIGN SHOULD BE AFFORDAGLE FOR THOSE WITHIN THE LOWEST INCOME BRACKET.
3| ENVIRONMENTALTHIS PROJECT SHOULD ACHIEVE A HIGH DEGREE OF ENVIRONMENTAL SUSTAINABILITY WITH AN EMPHASIS ON THE HEALTH OF ITS INHABITANTS AND THE SUCCESS OF LOCAL ECOSYSTEMS.
4| DURABILITYTHIS PROJECT SHOULD INCREASE A NEIGHBORHOOD’S SENSE OF SECURITY BY PROVIDING HOUSING THAT EXCEEDS LOCAL CODE REQUIREMENTS AND IS DURABLE ENOUGH TO WITHSTAND FUTURE NATURAL DISASTERS WITH MINIMAL DAMAGE.
APPENDIX - CORE 21
Sizing Program
1| EAT | SLEEP | GATHER | WORK
OBJECTS
FEMA MINIMUM REQUIREMENTS
OBJECTS
CDCB COLONIAS TYPICAL SPECIFICATIONS** NOTES
2| WASH | TOILET | SHOWER | LAUNDRY
OBJECTSSINK: WALL SUPPORTED 13”X13”TOILET: RESIDENTIATL NO HOLDING TANKSHOWER: TRANSFER SHOWER 36”X36”BATHTUB: NOT REQUIREDLAUNDRY: NOT REQUIRED
OBJECTS
3| COOK
OBJECTSCOOK TOP: ELECTRIC 2 BURNER 12”X20”REFRIGERATOR: 14CU RESIDENTIAL 28”X32”SINK: NOT REQUIRED
OBJECTSCOOK TOP AND OVEN: 4 BURNER 29”X36”REFRIGERATOR: 14CU 28”X32”SINK: DOUBLE BOWL 33”X22”MICROWAVE: NOT REQUIRED
ALL THREE SPECIFICATIONS FEMA, HUD | IRC, AND CDCB COLONIAS TYPICAL CONSTRUCTION ARE SIZED TO SLEEP A FAMILY OF FOUR ADULTS. SPATIAL BREAK DOWNS ARE BASED ON THE CORE PROGRAM’S NEED TO ACCESS THE SPECIFIC RESOURCES BELOW.
ACCESS TO RESOURCES
1. NO RESOURCES REQUIRED: EAT, SLEEP, GATHER, WORK . . . . . . . . . . . . . . . . . . . . . .
2. WATER SOURCE REQUIRED: WASH, TOILET, SHOWER, LAUNDRY . . . . . . . . . . . . . .
3. WATER AND HEAT SOURCES REQUIRED: COOK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ASSOCIATED SPACES
DINING ROOM, BEDROOM, LIVING ROOM
BATHROOM
KITCHEN
SFBED SPACE 1: 1 FULL BEDBED SPACE 2: 1 FULL SLEEPER SOFATABLE SPACE: TABLE FOR FOUR
28SF28SF12SF
BED SPACE 1: NO REQUIREMENTSBED SPACE 2: NO REQUIREMENTSTABLE SPACE: NO REQUIREMENTS
-- -- --
ROOMS SPECIFY AS HOME EXPANDS:
LIVING SPACE DOESN’T INCLUDE SLEEPINGADDITIONAL DINING SPACE INCLUDEDADDITIONAL SLEEPING SPACE INCLUDED
BATH FUNCTIONS REMAIN RELATIVELY THE SAME:
ADDITIONAL LAUNDRY SPACE INCLUDED
KITCHEN EXPANDS AND BECOMES A SPACE:
APPLICANCES INCREASE IN SIZEACTIVITIES ARE CONTAINED IN A SPACEADDITIONAL COOKING SPACE INCLUDED
GREATER AMOUNT OF GROSS SF IS CONTRIBUTED TO CIRCULATION
CONTRIBUTED TO CIRCULATION
SF
SF1SF
3.5SF9SF
SINK: YESTOILET: RESIDENTIATL SHOWER: TRANSFER SHOWER 30”X30”BATHTUB: NOT REQUIREDLAUNDRY: WASHER AND DRYER
1SF3.5SF
9SF
18SF
SF
SF1.5SF
6SF --
MICROWAVE: 1.2CU 9”X15” 1.5
SF7SF6SF5SF --
BEDROOM:SLEEPS 2
LIVING AREA:SLEEPS 2
BEDROOM:SLEEPS 2
LIVING AREA:SLEEPS 0
BEDROOM:SLEEPS 2 DINING
BATHROOM BATHROOM LAUNDRY
KITCHEN
KITCHEN
TOTAL
48SF
150SF
100SF
100SF
150SF
30SF 40SF18SF
60SF
8SF
240SF
864SF
100SF
IRC**R304.1 MINIMUM AREA: EVERY DWELLING UNIT SHALL HAVE AT LEAST ONE HABITABLE ROOM THAT SHALL HAVE NOT LESS THAN 120SF OF GROSS FLOOR AREA.R304.2 OTHER ROOMS: OTHER HABITATBE ROOMS SHALL HAVE A FLOOR ARE OF NOT LESS THAN 70SF (EXCEPTION KITCHEN)R304.3 MINIMUM DIMENSIONS: HABITABLE ROOMS SHALL NOT BE LSS THAN 7FT IN ANY HORIZONTAL DIMENSION (EXCEPTION KITCHEN)
FINAL HOMES (RFP)
2 BEDROOM/1-2 BATH: 1,000-1,330SF
3 BEDROOM/1-2 BATH: 1,331-1,425SF
4 BEDROOM/2 BATH: 1,426-1,500SF
APPENDIX - CORE 22
side
side
Most coMMonly referenced as the Most private activity within the hoMe
Activity coMMunity MeMbers were asked to place activities on a lot representative of their ‘ideal new hoMe’s layout.’ residents were given 17 activities coMMonly perforMed around the house and were instructed to add additional activities that are pertinent to their faMily’s lifestyle. while placing activities, people thought about activity adjacencies, position within lot, position within hoMe, the nuMber of people who engage in each action, and issues of privacy.
this activity took approxiMately 25 Minutes. this included tiMe to discuss activity placeMent and priorities.
activities provided (Most to least used)
Sleep|dorMir
eat|coMer Gather|reunion
Garden|jardin Shower|banar
Cook|cocinar play|jugar relax|relajar
party|fiesta
waSh|banar
Cook|cocinar pray|rezar
work|trabajar
0 - 20% 20 - 40% 40 - 60% 60 - 80% 80 - 100% 100%
InsIde outsIde
Front
back
side
side
CENTER
activity placeMent diagraM
100 | 0%
100 | 0%
activity placeMent frequency
63 | 37%
0 | 100%
0 | 100%
0 | 90%
0 | 100%
96 | 4%
9 | 91%
92 | 8%
97 | 3%
96 | 4%
84 | 16%
Front
back
#1
#2
#3
#5
#4
inside | outside
Most public indoor and outdoor activity. neighbors gather across yards
second Most private activity. private areas tend to occur along back and side of hoMes.
play typically occurs in the back, as far froM street traffic as possible. safety concerns.
Most iMportant activity within the hoMe.
large gatherings are accoMModated in either the front or back yard.
Most coMMonly referenced as the activity that people spend the Most tiMe doing at hoMe.
occurs throughout the hoMe, praying is not location based.
APPENDIX - CORE 23
activities added by coMMunity (Most to least used)
porCh|portiCo
GaraGe|garaje
waSh|lavadero
drive|entrada
deCk|cubierta
weiGht|giMnasia
tv|television
Shed|cobertizo
StoraGe|alMace Sew|coser
danCe|bailar
Study|estudiar
read|leer work|trabajar
Spa|balneario
bar|cantina
80 | 20%
5 | 95%
64 | 36%
0 |100%
0 |100%
33 | 67%
100 | 0%
100 | 0%
0 | 100%
100 | 0%
100 | 0%
100 | 0%
6 | 94%
94 | 6%
100 | 0%
6 | 94%
inside | outside
reading isn’t tied to a specific location. it takes place in both public and private areas.
large gatherings are accoMModated in either the front or back yard.
coMMonly referred to as a carport or any exterior space that has a shading structure
occurs both indoors and outdoors. laundry is preferred to be close to clothes line.
garage May house a car or serve as additional closed in living space.
access to hoMe is iMportant. handicapped accessibility is a priority for soMe.
APPENDIX - CORE 24
COMERCOMEREAT
COCINARCOCINARCOOK
REUNIONREUNIONGATHER
JUGARJUGARPLAY
JARDINJARDINGARDEN
COCINARCOCINARCOOK BAÑARBAÑAR
WASHBAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
REZARPRAY
REZARDORMIRRSLEEP
PORCH
JARDINJARDINGARDEN
REUNIONREUNIONGATHER
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
COMERCOMEREAT
BAÑARBAÑARBATHE
JUGARJUGARPLAY
BAÑARBAÑARWASH
LEERLEERREAD
REZARREZAR
DORMIRDORMIRSLEEP
JARDINJARDINGARDEN
DORMIRDORMIRSLEEP
JUGARJUGARPLAY
LAUNDRYCOVERED
PORCH
JUGARJUGARPLAY
JARDINJARDINGARDEN
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
BAÑARBAÑARWASH
ESTUDIARESTUDIARSTUDY
RELAJARRELAJARRELAX
REZARPRAY
REZAR COCINARCOCINARCOOK
COMERCOMEREAT
REUNIONREUNIONGATHER
TRABAJARTRABAJARWORK
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
COMERCOMEREAT
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
REUNIONREUNIONGATHER
REZARPRAY
REZAR
RELAJARRELAJARRELAX
DORMIRDORMIRSLEEP
LAUNDRY
BAÑARBAÑARBATHE
BAILARBAILARDANCE
COCINARCOCINARCOOK
JUGARJUGARPLAY
FIESTAFIESTAPARTY
JARDINJARDINGARDEN
COCINARCOCINARCOOKPORCHJARDINJARDIN
GARDENBAILARBAILARDANCE
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
COMERCOMEREAT
LEERLEERREAD
FIESTAFIESTAPARTY
BAÑARBAÑARBATHE
TV
JUGARJUGARPLAY
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
LAUNDRY
TRABAJARWORK
1 2 3
4 5JARDINJARDIN
GARDEN
JUGARJUGARPLAY
COCINARCOCINARCOOK
COMERCOMEREAT
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
TRABAJARWORK
REUNIONREUNIONGATHER
BAÑARBAÑARWASH
RELAJARRELAJARRELAX
REZARPRAY
REZARTRABAJARTRABAJARWORK
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
TRABAJARTRABAJARWORK
GARAGEDORMIRDORMIRSLEEP
BATH #2 RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COMERCOMEREAT
ESTUDIARESTUDIARSTUDY
TRABAJARWORK
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
REZARPRAY
REZAR
SPABAÑARBAÑARWASH
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
JUGARJUGARPLAY
COCINARCOCINARCOOK
BAILARBAILARDANCE
REUNIONREUNIONGATHER
RELAJARRELAJARRELAX
COMERCOMEREAT
COCINARCOCINARCOOK
REZARPRAY
REZAR
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
ESTUDIARESTUDIARSTUDYLAUNDRY
PORCH
2NDENTRY
JARDINJARDINGARDEN
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
JUGARJUGARPLAY
BAILARBAILARDANCE
TRABAJARWORK
1
2 3 4
JARDINJARDINGARDEN
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
DORMIRDORMIRSLEEP
LEERLEERREAD
ESTUDIARESTUDIARSTUDY
JUGARJUGARPLAY
COMERCOMEREAT
COCINARCOCINARCOOK
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
COCINARCOCINARCOOK
BAILARBAILARDANCE
BAÑARBAÑARWASH
JUGARJUGARPLAY
CAM
ERO
N P
ARK
SOU
THM
OST
Activity coMMunity MeMbers were asked to place activities on a lot representative of their ‘ideal new hoMe’s layout.’ residents were given 17 activities coMMonly perforMed around the house and were instructed to add additional activities that are pertinent to their faMily’s lifestyle. while placing activities, people thought about activity adjacencies, position within lot, position within hoMe, the nuMber of people who engage in each action, and issues of privacy.
this activity took approxiMately 25 Minutes. this included tiMe to discuss activity placeMent and priorities.
board gaMes
COMERCOMEREAT
COCINARCOCINARCOOK
REUNIONREUNIONGATHER
JUGARJUGARPLAY
JARDINJARDINGARDEN
COCINARCOCINARCOOK BAÑARBAÑAR
WASHBAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
REZARPRAY
REZARDORMIRRSLEEP
PORCH
JARDINJARDINGARDEN
REUNIONREUNIONGATHER
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
COMERCOMEREAT
BAÑARBAÑARBATHE
JUGARJUGARPLAY
BAÑARBAÑARWASH
LEERLEERREAD
REZARREZAR
DORMIRDORMIRSLEEP
JARDINJARDINGARDEN
DORMIRDORMIRSLEEP
JUGARJUGARPLAY
LAUNDRYCOVERED
PORCH
JUGARJUGARPLAY
JARDINJARDINGARDEN
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
BAÑARBAÑARWASH
ESTUDIARESTUDIARSTUDY
RELAJARRELAJARRELAX
REZARPRAY
REZAR COCINARCOCINARCOOK
COMERCOMEREAT
REUNIONREUNIONGATHER
TRABAJARTRABAJARWORK
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
COMERCOMEREAT
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
REUNIONREUNIONGATHER
REZARPRAY
REZAR
RELAJARRELAJARRELAX
DORMIRDORMIRSLEEP
LAUNDRY
BAÑARBAÑARBATHE
BAILARBAILARDANCE
COCINARCOCINARCOOK
JUGARJUGARPLAY
FIESTAFIESTAPARTY
JARDINJARDINGARDEN
COCINARCOCINARCOOKPORCHJARDINJARDIN
GARDENBAILARBAILARDANCE
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
COMERCOMEREAT
LEERLEERREAD
FIESTAFIESTAPARTY
BAÑARBAÑARBATHE
TV
JUGARJUGARPLAY
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
LAUNDRY
TRABAJARWORK
1 2 3
4 5JARDINJARDIN
GARDEN
JUGARJUGARPLAY
COCINARCOCINARCOOK
COMERCOMEREAT
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
TRABAJARWORK
REUNIONREUNIONGATHER
BAÑARBAÑARWASH
RELAJARRELAJARRELAX
REZARPRAY
REZARTRABAJARTRABAJARWORK
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
TRABAJARTRABAJARWORK
GARAGEDORMIRDORMIRSLEEP
BATH #2 RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COMERCOMEREAT
ESTUDIARESTUDIARSTUDY
TRABAJARWORK
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
REZARPRAY
REZAR
SPABAÑARBAÑARWASH
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
JUGARJUGARPLAY
COCINARCOCINARCOOK
BAILARBAILARDANCE
REUNIONREUNIONGATHER
RELAJARRELAJARRELAX
COMERCOMEREAT
COCINARCOCINARCOOK
REZARPRAY
REZAR
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
ESTUDIARESTUDIARSTUDYLAUNDRY
PORCH
2NDENTRY
JARDINJARDINGARDEN
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
JUGARJUGARPLAY
BAILARBAILARDANCE
TRABAJARWORK
1
2 3 4
JARDINJARDINGARDEN
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
DORMIRDORMIRSLEEP
LEERLEERREAD
ESTUDIARESTUDIARSTUDY
JUGARJUGARPLAY
COMERCOMEREAT
COCINARCOCINARCOOK
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
COCINARCOCINARCOOK
BAILARBAILARDANCE
BAÑARBAÑARWASH
JUGARJUGARPLAY
CAM
ERO
N P
ARK
SOU
THM
OST
Activity coMMunity MeMbers were asked to place activities on a lot representative of their ‘ideal new hoMe’s layout.’ residents were given 17 activities coMMonly perforMed around the house and were instructed to add additional activities that are pertinent to their faMily’s lifestyle. while placing activities, people thought about activity adjacencies, position within lot, position within hoMe, the nuMber of people who engage in each action, and issues of privacy.
this activity took approxiMately 25 Minutes. this included tiMe to discuss activity placeMent and priorities.
board gaMes
APPENDIX - CORE 25
TRABAJARTRABAJARWORK
JUGARJUGARPLAY
BAILARBAILARDANCE
DORMIRDORMIRSLEEP
BAÑARBAÑARWASH
DORMIRDORMIRSLEEP
LEERLEERREAD
DORMIRDORMIRSLEEP
REZARPRAY
REZAR
COMERCOMEREAT
BAÑARBAÑARBATHE
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COCINARCOCINARCOOK FIESTAFIESTA
PARTY
COCINARCOCINARCOOK
REUNIONREUNIONGATHER
PORCH
CARPORT JARDINJARDINGARDEN
JARDINJARDINGARDEN
COCINARCOCINARCOOK
COMERCOMEREAT
TRABAJARWORK
BAÑARBAÑARBATHE
BAÑARBAÑARWASH
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
REZARPRAY
REZAR RELAJARJARRELAX
LEERLEERREAD
REUNIONREUNIONGATHER
BAILARBAILARDANCE
JUGARJUGARPLAY
FIESTAFIESTAPARTY
TRABAJARTRABAJARWORK
PORCH
5 6
COCINARCOCINARCOOK
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
BAÑARBAÑARWASH
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COMERCOMEREAT
JUGARJUGARPLAY
JARDINJARDINGARDEN
BAILARBAILARDANCE
FIESTAFIESTAPARTY
REUNIONREUNIONGATHER
COCINARCOCINARCOOKPORCH
DRIVEWAY
7
DRIVEWAY ESTUDIARESTUDIARSTUDY
LEERLEERREAD
JARDINJARDIN
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
PORCH
COMERCOMEREAT
COCINARCOCINARCOOK
REUNIONREUNIONGATHER
FIESTAFIESTAPARTY
COCINARCOCINARCOOK
BAÑARBAÑARWASH
DORMIRDORMIRSLEEP
BAILARBAILARDANCE
JUGARJUGARPLAY
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
BAÑARBAÑARWASH
DORMIRDORMIRSLEEP
REZARPRAY
REZAR REUNIONREUNIONGATHER
JARDINJARDINGARDEN
TRABAJARWORK
REUNIONREUNIONGATHER
COMERCOMEREAT
COCINARCOCINARCOOK
BATH RM.
JARDINJARDINGARDEN
REUNIONREUNIONGATHER
REZARPRAY
REZAR RELAJARRELAJARRELAX
COMERCOMEREAT
COCINARCOCINARCOOK
COCINARCOCINARCOOK
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
LEERLEERREAD
TRABAJARWORK
DORMIRDORMIRSLEEP
FIESTAFIESTAPARTY
BAÑARBAÑARWASH
REUNIONREUNIONGATHER
JUGARJUGARPLAY
BAILARBAILARDANCE
TRABAJARTRABAJARWORK
JARDINJARDINGARDEN
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
LEERLEERREAD
PORCH
RELAJARRELAJARRELAX
TRABAJARWORK
BAÑARBAÑARWASH
DORMIRDORMIRSLEEP
REUNIONREUNIONGATHER
REZARPRAY
REZAR
COMERCOMEREAT
COCINARCOCINARCOOK
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
TRABAJARTRABAJARWORK
BAILARBAILARDANCE
JUGARJUGARPLAY
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
GARAGE
DRIVE-WAY
POOL
JARDINJARDINGARDEN
COCINARCOCINARCOOK
BAÑARBAÑARBATHE
REUNIONREUNIONGATHER
COMERCOMEREAT PORCH
LAUNDRY
RELAJARRELAJARRELAX
TRABAJARWORK
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
COCINARCOCINARCOOK
JUGARJUGARPLAY
BAILARBAILARDANCE
FIESTAFIESTAPARTY
8 9 10
11 12TRABAJAR
WORK
JARDINJARDINGARDEN
REUNIONREUNIONGATHER
COMERCOMEREAT
BATH #2
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
REZARPRAY
REZAR FIESTAFIESTAPARTY
BAÑARBAÑARWASH
BAILARBAILARDANCE
COCINARCOCINARCOOK
COCINARCOCINARCOOK
REUNIONREUNIONGATHER
CARPORT
JUGARJUGARPLAY
RELAJARRELAJARRELAX
TRABAJARWORK
FRONTPORCH JARDINJARDIN
GARDEN
REUNIONREUNIONGATHER
LEERLEERREAD
RELAJARRELAJARRELAX
REZARPRAY
REZAR
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
BAÑARBAÑARWASH
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
BATH #2
DECK
TRABAJARTRABAJARWORK JUGARJUGAR
PLAYCOCINARCOCINAR
COOK
COCINARCOCINARCOOK
COMERCOMEREAT
BAILARBAILARDANCE
FIESTAFIESTAPARTY
COCINARCOCINARCOOK
REUNIONREUNIONGATHER
JUGARJUGARPLAY
JARDINJARDINGARDEN
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
COMERCOMEREAT
COCINARCOCINARCOOK
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
TRABAJARWORK
DORMIRDORMIRSLEEP
EXERCISESPACE
BATH
DORMIR
REZARPRAY
REZAR
JARDINJARDINGARDEN
RELAJARRELAJARRELAX
ESTUDIARESTUDIARSTUDY
LEERLEERREAD
COMERCOMEREAT
REUNIONREUNIONGATHER
TRABAJARWORK
COCINARCOCINARCOOK
LAUNDRY
BATH #2 DORMIRDORMIRSLEEP
REZARPRAY
REZAR DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
JUGARJUGARPLAY
FIESTAFIESTAPARTY
BAILARBAILARDANCE
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
PORCH
14 1 2
13
LOS
FRES
NO
S
APPENDIX - CORE 26
JARDINJARDINGARDEN
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
TRABAJARWORK
COMERCOMEREAT
COCINARCOCINARCOOK
BAÑARBAÑARWASH
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
REZARPRAY
REZAR
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
JUGARJUGARPLAY
FIESTAFIESTAPARTY
BAILARBAILARDANCE
COCINARCOCINARCOOK
JARDINJARDINGARDEN
LEERLEERREAD
RELAJARRELAJARRELAX
TRABAJARWORK
REZARPRAY
REZAR
BAÑARBAÑARWASH
BAÑARBAÑARBATHE
COCINARCOCINARCOOK
TRABAJARTRABAJARWORK
COCINARCOCINARCOOK
COMERCOMEREAT
JUGARJUGARPLAY
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
FIESTAFIESTAPARTY
ESTUDIARESTUDIARSTUDY
REUNIONREUNIONGATHER
4 5
JARDINJARDINGARDEN
COMERCOMEREAT
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
BAILARBAILARDANCE
RELAJARRELAJARRELAX
REUNIONREUNIONGATHER
LEERLEERREAD
ESTUDIARESTUDIARSTUDY
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
JUGARJUGARPLAYBATH #2TRABAJAR
WORK
LAUNDRY REZARPRAY
REZAR
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
TRABAJARTRABAJARWORK
PORCH
JARDINJARDINGARDEN
COMERCOMEREAT
COCINARCOCINARCOOK
BAÑARBAÑARWASH
FIESTAFIESTAPARTY
REUNIONREUNIONGATHER
REZARPRAY
REZAR
RELAJARRELAJARRELAX
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
PRIVATE
TRABAJARTRABAJARWORK
TOOLROOM
COCINARCOCINARCOOK
FIESTAFIESTAPARTY
REZARPRAY
REZARDORMIRDORMIRSLEEP
RELAJARRELAJARRELAX
LEERLEERREAD
COMERCOMEREAT
JARDINJARDINGARDENDORMIRDORMIR
SLEEPESTUDIARESTUDIAR
STUDY
REUNIONREUNIONGATHER
BAÑARBAÑARBATHE
BAÑARBAÑARWASH
DORMIRDORMIRSLEEP
WEIGHTROOM
PRIVATE
JARDINJARDINGARDEN
REUNIONREUNIONGATHER
RELAJARRELAJARRELAX
COCINARCOCINARCOOK
COMERCOMEREAT
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
BAÑARBAÑARWASH
BIGKITCHEN COMERCOMER
EAT
COCINARCOCINARCOOK
RELAJARRELAJARRELAX
TRABAJARWORK
DORMIRDORMIRSLEEP
DORMIRDORMIRSLEEP
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
JARDINJARDINGARDEN
FIESTAFIESTAPARTY
COCINARCOCINARCOOK
JUGARJUGARPLAY
TRABAJARTRABAJARWORK
HA
RLIN
GEN
1
2 3 4
5
BAÑARBAÑARBATHE
RELAJARRELAJARRELAX
LEERLEERREAD
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
COMERCOMEREAT
TRABAJARWORK
BAÑARBAÑARBATHE
DORMIRDORMIRSLEEP
ESTUDIARESTUDIARSTUDY
DORMIRDORMIRSLEEP
LAUNDRYREZARPRAY
REZARDORMIRDORMIRSLEEP
BATH
JARDINJARDINGARDEN
JUGARJUGARPLAY
COCINARCOCINARCOOK
REUNIONREUNIONGATHER
PORCHREUNIONREUNIONGATHER
STORAGE
REUNIONREUNIONGATHER
RELAJARRELAJARRELAX
TRABAJARWORK
DORMIRDORMIRSLEEP
REZARPRAY
REZARBAÑARBAÑARBATHE
LEERLEERREAD
DORMIRDORMIRSLEEP
COMERCOMEREAT
BAILARBAILARDANCE
FIESTAFIESTAPARTY
BAR
REUNIONREUNIONGATHER
COCINARCOCINARCOOK
BAÑARBAÑARWASH BATH #2
JUGARJUGARPLAY
COCINARCOCINARCOOK
JARDINJARDINGARDEN
PORCH
REZARPRAY
REZAR RELAJARRELAJARRELAX
DORMIRDORMIRSLEEP
COMERCOMEREATSEWBAÑARBAÑAR
BATHEDORMIRDORMIR
SLEEP
LAUNDRYUTILITYCOCINARCOCINAR
COOKCOCINARCOCINAR
COOK
REUNIONREUNIONGATHER
FIESTAFIESTAPARTY
JARDINJARDINGARDEN
TRABAJARTRABAJARWORK
JUGARJUGARPLAY
1 2 3LA
GU
NA
HEI
GH
TS
APPENDIX - CORE 27
Survey coMMunity MeMbers were asked survey questions in relation to deMographic inforMation and their expectations in the case of a natural disaster.
deMographic inforMation
natural disaster event
in the event of a natural disaster how long would you expect to be dispalced for?
after a disaster occurs what are the three functions that are Most essential to your hoMe life?
1 - 8 weekS26 | 33 participants
2 - 6 monthS3 | 33 participants
6+ monthS 4 | 33 participants
Sleep|dorMir
eat|coMer
Gather|reunion
work|trabajar
waSh|banar
Cook|cocinar
waSh|lavadero
toilet|inodoro
Shower|banar
28
23
10 9 9 9
4 3 2
1 - 5 people12 | 31 participants
6 - 10 people4 | 31 participants
11 - 20 people 15 | 31 participants
people in faMily people who live in hoMe children who live in hoMe
1 - 3 people17 | 31 participants
4 - 8 people14 | 31 participants
9 - 12 people 0 | 31 participants
0 - 2 Children23 | 31 participants
3 - 6 Children7 | 31 participants
7 - 10 Children1 | 31 participants
one thing about the place where you live
APPENDIX - CORE 28
DOT Size + Weight RestrictionsSCENARIO NAME
BASIC STAGING STEPS
ELEMENTS INCLUDED IN ‘CORE’
ELEMENTS INCLUDED IN ‘PERMANANT HOME’
MATERIALS/ASSEMBLIES TRANSPORTED
TRANSPORTATION DISTANCE
VOLUME REQUIREMENTS FOR TRANSPORT
LOCAL SKILLED WORKERS REQUIRED
LOCAL UNSKILLED WORKERS REQUIRED INTUITION OF ASSEMBLY PROCESS
LIFTING REQUIREMENTS
TOOL REQUIREMENTS
LOCAL FACILITY REQUIREMENTS
TOTAL PREDICTED COST
NOTES/DIAGRAMING
Transportation Weight LimitsPERSONAL TRUCK + TRAILER CARRYING CAPACITYPICKUP TRUCK 10,000 LBSPICKUP TRUCK TOWING CAPACITY 30,000 LBSBUMPER PULL TRAILER 12,000 LBSGOOSENECK TRAILER 30,000 LBSFIFTH WHEEL TRAILER 30,000 LBSBUMPER PULL TILT BED TRAILER 5,000LBS +
PERSONAL TRAILER SIZESBUMPER PULL UP TO 40’ LONGGOOSENECK UP TO 40’ LONGFIFTH WHEEL UP TO 40’ LONGTILT BED TRAILER UP TO 40’ LONG
SEMI TRUCK + TRAILER CARRYING CAPACITYPLATFORM FLATBED N/ADROP DECK FLATBED N/AFLATBED W/MOFFETT 5500 LB FORK LIMIT
SEMI TRAILER DIMENSIONSPLATFORM FLATBED 48’ X 102” STANDARDDROP DECK FLATBED 48’ X 102”FLATBED W/MOFFETT 45’ X 102” FORKLIFT CARRYING CAPACITY* WEIGHT IS NOT MUCH OF AN ISSUE; DEPENDING ON SIZE CAN HANDLE UP TO 160,000 LBS* FORK MUST EXTEND PAST HALFWAY POINT IN LIFTING LOAD* 96”-144” FORKS AVAILABLE* MACHINERY BOOM AVAILABLE- LIFT FROM ABOVE* 26’ VERTICAL LIFT* 12-14’ HORIZONTAL EXTENSION* REQUIRE FLAT HARD PACK SURFACE OR WILL GET STUCK, NOT GOOD ON BARE EARTH* REQUIRE ONE OPERATOR AND ONE PERSON TO GUIDE
APPENDIX - CORE 29
DOT Size + Weight RestrictionsSCENARIO NAME
BASIC STAGING STEPS
ELEMENTS INCLUDED IN ‘CORE’
ELEMENTS INCLUDED IN ‘PERMANANT HOME’
MATERIALS/ASSEMBLIES TRANSPORTED
TRANSPORTATION DISTANCE
VOLUME REQUIREMENTS FOR TRANSPORT
LOCAL SKILLED WORKERS REQUIRED
LOCAL UNSKILLED WORKERS REQUIRED INTUITION OF ASSEMBLY PROCESS
LIFTING REQUIREMENTS
TOOL REQUIREMENTS
LOCAL FACILITY REQUIREMENTS
TOTAL PREDICTED COST
NOTES/DIAGRAMING
DOT Size + Weight RestrictionsMAXIMUM WIDTH LIMITSINTERSTATE 16’ EXCEPT FOR MANUF. HOUSINGWITHOUT A ROUTE AND TRAFFIC STUDY AND CERTIFICATION 20’MANUFACTURED HOUSING NO LIMIT
* ONE ESCOURT REQUIRED FOR LOADS BETWEEN 14’ AND 16’; TWO ESCOURTS REQUIRED FOR LOADS EXCEEDING 16’
MAXIMUM HEIGHT LIMITSLEGAL HEIGHT LIMIT 14’WITHOUT A ROUTE AND TRAFFIC STUDY AND CERTIFICATION < 19’
* ESCOURT REQUIRED FOR LOADS EXCEEDING 17’ IN HEIGHT
MAXIMUM LENGTH LIMITSTRUCK OR SINGLE VEHICLE 45’TRUCK AND TRAILER 65’SEMI + TRAILER WITHOUT ROUTE AND TRAFFIC STUDY AND CERTIFICATION 125’SEMI MAXIMUM OVERALL LENGTH 180’
*ONE ESCOURT REQUIRED FOR LOADS BETWEEN 110’ AND 125’; TWO ESCOURTS REQUIRED FOR LOADS EXCEEDING 125’
MAXIMUM WEIGHT LIMITSPER AXLE 20,000 LBSGROSS WEIGHT 80,000 LBS
APPENDIX - CORE 30
C
ompa
rison
o
f O
vera
ll S
izes
of
Var
ying
T
empo
rary
H
ousi
ng
Solu
tions
D
ata:
ABT
Ass
ocia
tes
2009
c -
G
raph
ic: G
CC
DS,
edi
ted
by b
cWO
RKSH
OP
FEM
ATR
AIL
ER25
6 sq
ft
HU
D C
OD
EM
IN.
320
sq ft
.AH
PPpa
rk m
odel
396
sq ft
.
RAPI
DO
co
re43
2 sq
ft(c
ondi
tined
)
Bayo
ula
Bat
re81
9 sq
ft
Stan
dard
M
arke
t Tr
aile
r83
0 sq
ft
MEM
A92
2 sq
ft
APPENDIX - CORE 31
Precedent Studies-Units are easy to construct, by unskilled labor, making them ideal solutions for diaster recovery-Units are easy to move, expand, or repair-Exterior frame can be built in 3.5 hours-Most �at-packs can be delivered on one trailer-Most are con�gurable to any site -Menu of components-Con�guration options
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
Flat-Pack Construction
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
-A�ordable, easy to build, and highly customizable -Units can be buit individually, or combine modules to create larger spaces -Domestical shipping is relatively inexpensive -Modules are manufactured in bulk, reducing cost price -Most are con�gurable to any site -Con�guration options
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
Modular Construction_kit of parts
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
*meets all criteria, with more than half on the mid-high spectrum
*to increase on-site labor, oder parts of the �at-pack, and complete with skilled labor
*increase in on-site labor, will increase in the use of local building materials
-Self sustaning housing solutions -Can be instaled in hours -Requires minimal crew, tools, or skills -rapid on-demand deployment -Most are con�gurable to any site -Fully transportabe
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
Mobile Construction
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
*meets few criteria, and others are not applicable
*most mobile/triler’s are used on a temporary basis
*high ability to relocate, proves mobile construction is not meant for a permanent building type
*meets all criteria, with more than half on the mid-high spectrum
*increased on-site labor, becuase majority of kit of parts are of exterior shells, interiors have to be constructed/built
*due to increase labor, use of local building materials will increase
-less chances of construction happening in a controlled environment -Can take 2-3 months to complete construction-Requires high percentage of local labor-Requrires high percentage of use of local materials -Decrease in tranportation costs
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
On-Site Construction
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
*meets all criteria, with more than half on the mid-high spectrum
*large increase in local labor, and use of local materials
*very low o�-site labor required
* very low chance of re-locating
OFF-SITE LABOR REQUIREMENTS
LOCAL LABOR REQUIREMENTS
LOCAL LABOR REQUIREMENTS
LOCAL LABOR REQUIREMTNS
LOCAL LABOR REQUIREMENTS
APPENDIX - CORE 32
Precedent Studies-Units are easy to construct, by unskilled labor, making them ideal solutions for diaster recovery-Units are easy to move, expand, or repair-Exterior frame can be built in 3.5 hours-Most �at-packs can be delivered on one trailer-Most are con�gurable to any site -Menu of components-Con�guration options
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
Flat-Pack Construction
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
-A�ordable, easy to build, and highly customizable -Units can be buit individually, or combine modules to create larger spaces -Domestical shipping is relatively inexpensive -Modules are manufactured in bulk, reducing cost price -Most are con�gurable to any site -Con�guration options
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
Modular Construction_kit of parts
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
*meets all criteria, with more than half on the mid-high spectrum
*to increase on-site labor, oder parts of the �at-pack, and complete with skilled labor
*increase in on-site labor, will increase in the use of local building materials
-Self sustaning housing solutions -Can be instaled in hours -Requires minimal crew, tools, or skills -rapid on-demand deployment -Most are con�gurable to any site -Fully transportabe
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
Mobile Construction
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
*meets few criteria, and others are not applicable
*most mobile/triler’s are used on a temporary basis
*high ability to relocate, proves mobile construction is not meant for a permanent building type
*meets all criteria, with more than half on the mid-high spectrum
*increased on-site labor, becuase majority of kit of parts are of exterior shells, interiors have to be constructed/built
*due to increase labor, use of local building materials will increase
-less chances of construction happening in a controlled environment -Can take 2-3 months to complete construction-Requires high percentage of local labor-Requrires high percentage of use of local materials -Decrease in tranportation costs
EASE OF CONSTRUCTION
SPEED OF CONSTRUCTION
EASE OF TRANSPORT
EASE OF FUTURE ADAPTABILITY
USE OF LOCAL BUILDING MATERIALS
CONSISTANCE WITH LOCAL BUILDING PRACTICES
ABILITY TO RELOCATE
PREDICTED COST
On-Site Construction
EVALUATION CRITERIA LOW HIGH RECOMENDATIONS
*meets all criteria, with more than half on the mid-high spectrum
*large increase in local labor, and use of local materials
*very low o�-site labor required
* very low chance of re-locating
OFF-SITE LABOR REQUIREMENTS
LOCAL LABOR REQUIREMENTS
LOCAL LABOR REQUIREMENTS
LOCAL LABOR REQUIREMTNS
LOCAL LABOR REQUIREMENTS