technical evaluation rig matrix rev 1
DESCRIPTION
MAtrixTRANSCRIPT
Minimum RequirementWater Depth Rating 80 m for Hippo North Well (264ft)Variable Deck LoadCantilever Outreach 15m MinimumCantilever Transverse (from centre line) 3m Minimum
Drawworks Rating
Drawworks Drum HP 1,320 HP (Pulling 9 5/8” casing)
Derrick Gross Nominal Rating
Combined Setback and Hoisting loads
Top Drive Rotary Torque (Pipe handler)33,810 ft-lbs (85,000 ft-lbs)
Rotary HP 629 HPDrilling Line Size 1-1/2” IP (Drill with returns phase)BOP Pressure Rating 10,000 psi
Pumps
Rig PowerDrilling Fluid Storage (Mud tanks) 3,000 bblBase Oil Storage 800 bblFluid Storage (Brine tanks) 1,200 bbl Fresh Water Storage 1,000 bblBulk CementBulk MudSack Storage
Sea Water Supply
Mud mix system efficiency
Mix system flexibility
Mud Shakers 3x linear motion (minimum)Accomodation (Personnel)Date of ManufactureLast UpgradeRig Rate US$/DayAvailabilityPresent Location
2,332 MT (Well TD phase)
Conductor tensioning system (for free standing wells)
100 tonnes working load capability over stroke at least 12″.671,500 lbs (Pulling 9 5/8” casing with 100klb overpull)
1,295,300 lbs (Drill with returns phase)
1,166,525 lbs (Drill with returns phase)
3 Triplex pumps – 1,600 HP (Minimum)
Direct feed to mud pump (1,800 GPM minimum).Should be able to mix & weigh 1,000 bbl in 8hrs
Should be able to mix into active and reserve systems simultaneously