Page 1: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Teamcenter UpdateMay 2012

Agenda What is Teamcenter Benefits Status Planned Next Steps

Page 2: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

What is Teamcenter?

What is Teamcenter? Teamcenter is a commercial Product Lifecycle Management (PLM) software owned by

Siemens PLM is the process of managing the entire lifecycle of a product from its conception, through

design and manufacture, to service and disposal Teamcenter is used by

more than 6,400 customers across about 9,900 operations with 5 million licensed seats. DESY for the XFEL project (TC Enterprise), and also at Jefferson Lab (TC Unified)

Who will Teamcenter affect? Scientists, engineers, designers, technicians, machinists, QC, ES&H & procurement

personnel Mechanical, electrical, and civil disciplines

Goals Common access point for engineering related documents – one Engineering Database

Management System (EDMS) Easily find engineering information, engineering reports, analysis on previous designs… Enhance Collaboration between internal groups and external Labs, Universities, others… Lab wide workflow processes for reviews and signoffs

Page 3: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Benefits

Facilitates Collaboration Can handle SolidWorks files

Project X – PXIE LBNL ANL JLAB

IIFC Existing India CAD Models

Benefit Allows us to collaborate with other labs on common projects

Page 4: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Benefits

Visualization New Functionality at Lab View, Measure and

Markup Benefit

Allow for easier project collaboration and better understanding of issues

Page 5: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Benefits

Provides High Quality Imaging This helps increase

communication and understanding prior to manufacturing

Examples 650 Mhz Cavity IB3 Proposed improvements

Only Computer Images

Page 6: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Benefits

Reuse Benefit - Having a repository of “Common Items”

(flanges, bolts, etc.) allows significant amount of use.

Flanges Cap

ScrewsStructural Components

Page 7: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Status

Current StatusPhase 1 –

Went live January 20, 2012 Currently ~4 users per day (~20 users per day at

peak) logged in to production More than 17,000 Common Items created More than 650 Models/Drawings created to date Crystal Collimator completion April 2012

Page 8: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Status

DesignItems Current Status

Total Items created in Production > 650 since January 20th First Pilot Project Examples

Page 9: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Status

Phase 1 New Projects using NX and Teamcenter

Technical Division SC Magnets - 11 Tesla Magnet SRF - Research Test Cryostat LBNE – Trim Dipole Assembly

Particle Physics Division SCDMS - Adsorber Mounting Vessel LBNE – LArk 6 Kton Detector Beamline - LBAR Timing Detector

Accelerator Division Crystal Collimator PXIE – Facilities

Phase 2 Portfolio Management Team (PMT)

Approved implementation of Teamcenter – Phase 2 Detailed planning in progress

Page 10: Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps

Next Steps

Short Term Fix Production “Work Arounds” identified by Pilot Team Migration of Mechanical Ideas CAD Data to NX and Teamcenter

2012 / 2013 On-Boarding for LBNE, Mu2E and Project X Create Remaining Item Types (for Engineering Manual Documents) FESS Workflow AutoCAD Integration for FESS and Electrical Electronic Sign-off Requirements Management Change Management ECAD Integration Migrate Data (Electrical, FESS, others)