Team Hindalco
Welcomes You All
Hindalco Industries Limited, Renukoot
Team Member
1. Mr. Anuj Kumar Verma
2. Mr. Vivek Agrawal
Hindalco Industries Limited, Renukoot 2
Aspect of Energy Saving
Ensuring Energy Security.
Climate Change Concerns.
Statutory requirement like PAT , RPO
etc.
Methodology
By Enhancing Energy Efficiency.
By Energy Conservation Hindalco Industries Limited, Renukoot
3
To increase steam economy of
Evaporation Unit II by 0.5 T/T.
Target Project
Hindalco Industries Limited, Renukoot 4
INDEX
Hindalco Renukoot – Profile & Process introduction
Background of the Project
Concept of the Project
Innovation in the Project
Project Savings & Economics
Challenges faced in implementation
Measurement and Verification
Potential for Horizontal Application
Estimated Life of the Project
Hindalco Industries Limited, Renukoot 5
Hindalco, the flagship company of the Aditya Birla Group and industry leader in
aluminium and copper has consolidated turnover of US$17 billion & having
footprint in 13 countries outside India.
Finish Product
Aluminium
Bauxite Alumina
Captive Power
800 MW
Hindalco-Renukoot: Fully integrated Operation
Hindalco Renukoot: Profile
Hindalco Industries Limited, Renukoot 6
ALUMINA REFINERY
ALUMINA
BAUXITE RED MUD
STORAGE
ASH STORAGE COAL
CAUSTIC FURNACE OIL LIME SPECIALITY CHEMICALS
Po
we
r
WATER
Mud Cake
Ste
am
Co
nd
en
sate
Slurry
Alumina Refinery: Renukoot
Hindalco Industries Limited, Renukoot 7
“Caring for Energy…………….”
Background of the Project : Energy Consumption Trend
Hindalco Industries Limited, Renukoot 8
LTD
Unit-II
145 OC
Flash Tank
HTD Unit-I 245 OC
HTD Unit-III
245 OC
HTD Unit-IV 245 OC
Pressu
re
decan
ter
Bauxite
Slurry
HRD
DCW
Mud To washer
Precipita-tion
Calcina-tion
Alumina To smelter
Evaporation-III
Evaporation-I
Evaporation-IV
Evaporation-II
Steam: ~60 TPH
Steam
Steam
FO
Sp
en
t Liq
uor
Strong Liquor
Kelly Press
Spent Liquor
Evaporation-II
“Evaporation is essential step in increasing process liquor concentration & maintaining refinery water balance.”
Make Up Caustic
Total Steam Consumption:
~250 TPH
Background of the Project
Hindalco Industries Limited, Renukoot 9
Renukoot refinery operates on 4 evaporation units.
Evaporation unit-II is the oldest unit among all four with
steam economy ~2.92 T/T while Evap-I & newly installed GEA
Messo Evap-IV runs on ~3.8 T/T.
Steam economy of Evap-II unit has been the perennial
problem and could not be solved by several initiatives taken
in the past.
Liquor flashing unit was installed in May-12 to reduce
evaporation load of existing evaporation units. As a
consequence one out of two bay of Evaporation unit-II
stopped.
Performance of evaporation unit is measured by “Steam Economy”. (Evaporation Rate/Steam)
Background of the Project
Hindalco Industries Limited, Renukoot 10
Evaporation Unit-II operating with two bays i.e “HID” and “Evaporator”
Post liquor flashing Unit installation, “Evaporator” side bay stopped & “HID”
side bay kept in operation.
Performance with this setups.
Background of the Project
Hindalco Industries Limited, Renukoot 11
Several Brainstorming session held with cross functional teams, subject
experts and vendors to improve the Evaporation-II steam economy.
There recommendation was to replace existing unit with latest
technology energy efficient units ( Expensive option).
Fact finding mission was done to explore any stretch in key variables
and team arrived at “Is it possible to add additional effects for
improving heat recovery thus increase in steam economy?”.
To evaluate the viability of the idea and establishing key
engineering/process specification, process simulation model developed
on SYSCAD software & series of simulations carried out.
Various Simulations were carried out to find out no. of optimum effects
along with the HID circuit and it emerged that adding 3 nos. effects is
techno-feasible solution.
Concept of the Project
Hindalco Industries Limited, Renukoot 12
Total duration 4 Weeks (complete flow-sheeting & programming).
No. of Simulation Run i.e. 20 ( with different setups/combinations (including Base case).
07/28/13 18:35:36 Project : Production_Upgradation
09Change09FC12 Evap (E:\Ameet SysCAD
Work\SysCAD Projects\Final\Production_Upgradation
09Change09FC12 Evap.spf\)
UMO
Base
Case 01
(with 2
Evap
Effect)
Case 02
(with 3
Evap
Effect)
Case 03
(with 4 Evap
Effect)
HID body in line 3 3 3 3
Evaporation Body In line 0 2 3 4
Total Effect In Line 3 5 6 7
Liquor flow to New FF Tak m3/hr 600 600 600 600
Liquor Feed Flow to Evaporation m3/hr 320 320 320 320
Liquor Feed TemperatureOC 65.98 65.98 65.98 65.98
Liquor Feed Caustic Conc. gpl 246 246 246 246
Liquor Exit Temp From effect Heater to LSHOC 107.3 111.5 112.9 114.0
LSH Htr Exit TemperatureOC 130 130 130 130
Liquor Exit Temp From last effect Flash
chamber (Evaporation Discharge)OC
91.16 86.57 85.04 83.83
Liquor Caustic Conc. From last effect Flash
chamber (Evaporation Discharge)
gpl 266.0 268.3 269.1 269.7
Vacuum on Barometric Condenser mmHg 600 600 600 600
Total vapor load on BC TPH 18.1 17.8 17.6 17.6
Water Required for BC @35 degC m3/hr 482 473 470 471
Water out from BC m3/hr 508 498 488 493
Water out Temp from BC deg C 56 56 56 56
Total Condansate out m3/hr 38.6 38.7 38.7 38.8
Condansate TempOC 61.5 61.5 61.5 61.5
Total Evaporation Rate (Evap+FFTk) TPH 33.2 35.9 36.7 37.4
Toatl steam Consumption TPH 15.7 12.8 11.8 11.0
Steam Economy T/T 2.12 2.81 3.11 3.39
Evaporation-II Phase-II (SYSCAD simulation Results)
Case no. 2 (i.e. 3 nos. Evaporator effects in line with the HID circuit) was selected for modification and implementation in the area
Concept of the Project
Hindalco Industries Limited, Renukoot 13
Engineering done to feed input stream from evaporator side instead of earlier arrangement of HID
side. This resulted into:
- Lower pressure drop because of its configuration (~1.1 Kg/cm2)
- Improved heat recovery as bigger Heat transfer area effects (i.e. HID effects) at highest
temperature end.
Innovation in Project
Evaporation Unit # 2 New Scheme ( HID side with Add. Effects in Operation – Phase II
Hindalco Industries Limited, Renukoot 14
Another major challenge was vacuum system for evaporator effects with this configuration:
- Evaporator side vacuum system can not be taken in line due to conflicting configuration.
- Possibility was worked out to utilized HID side vacuum circuit, technical feasibility
worked out and found suitable & implemented.
Innovation in Project
Evaporation Unit # 2 New Scheme ( HID side with Add. Effects in Operation – Phase II
Hindalco Industries Limited, Renukoot 15
Another area requiring engineering modifications was flexibility to revert in old
configuration as during rainy season evaporation load may increase. Facility
implemented with suitable provisions.
Innovation in Project
Evaporation Unit # 2 New Scheme ( HID side with Add. Effects in Operation – Phase II
Hindalco Industries Limited, Renukoot 16
Saving Achieved
Hindalco Industries Limited, Renukoot 17
Saving realization after Project completion
S # Parameters UMO Before After
Total Diff
(After- Before) Dec-12 to Apr-14 May-14 to May-
15
1 Steam Economy t/t 2.95 3.42 0.47
2 Steam Consumption TPH 13.4 10.9 -2.46
3 LSH Temperature OC 130 130 0.06
4 Evaporation Flow m3/hr 315 325 9.65
Power Saving:
Saving Achieved
Hindalco Industries Limited, Renukoot
Pumps Pump Nos./HP Pumps Running (Nos.) Pumps Motor, HP Before After Before After
VT pumps 2 * 60 HP
3 NIL 310 0 2 * 125 HP
Circulation Pump 270 + 250 HP 1 1 270 270 Discharge pump 1 * 40 HP 1 1 40 40
FF Tk. (N) Feed pump 2 * 75 HP 1 1 75 75
HID Feed Pump 2 * 215 HP 1 1 215 215 PLD Pump 2 * 40 HP 1 1 40 40 HID cond. Pump 2 * 10 HP 1 1 10 10 Evap cond. Pump 2 * 20 HP 1 1 20 20 IWR pumps 3 * 180 HP 3 2 540 360
Total 13 9 1520 1030
Power Savings (Before - After), HP (Motor loading assumed 85 %) 417 Power Savings (Before - After), KW 311
18
A. Investment:
S # Item Size
Quantity Cost
(Rs/Unit) Rs (lacs)
Dia Length, mtr 1 Sh-40 Pipe 12" 50 3520 1.76
2 Sh-40 Pipe 10" 40 3433 1.37
3 T/F flange 12" 10 1236 0.12
4 T/F flange 10" 10 1236 0.12
5 Pipe Fabrication and Erection cost 12" 50 325.4 0.16
6 Pipe Fabrication and Erection cost 10" 40 271.8 0.11
7 Miscellaneous 0.10
Total Investment in Rs Lacs 3.75
Total Investment in $ ( 1 $ = 66.30 Rs as on 01-01-2016) $5,659 B. Steam Saving Acquired
1 Steam Saving (Saving for 10
months from May-14 to May-15) 2.46 TPH 890 157.9
Total Saving in MTOE 1467 Total saving in $ ( @ 300 USD / MTOE) $4,40,100
C. Power Saving Acquired
1 Power Saving (For 275 days per year) 310.71 KW 2.89 59.3
Total Saving in MTOE 176.36 Total saving in $ ( @ 300 USD / MTOE) 52908
Total Saving ( B + C ), $ USD/Annum $4,93,008
Pay Back Period (Days) 4.0
Project Economics
Hindalco Industries Limited, Renukoot 19
Flexibility to revert on earlier configuration.
Cost economics
Challenges Faced in Implementation
Space constraint
Congested Layout of the unit
Hindalco Industries Limited, Renukoot 20
Potential for Horizontal Application: Yes
Estimated Life of the Project : Recurring
Key Parameters UMO Measurement Formula/Reference Verification
Method
Steam Economy T/T Calculated = Evaporation Rate (TPH) / Steam Consumption (TPH)
Evaporation Rate TPH Calculated = Feed Flow – [ Feed Flow * (Caustic in / Caustic Out)]
Feed Flow M3/hr Flow Element Online Data from PHD Log Sheet: Doc No: DIG-LS-09-R2
FE Calibrated mid of the Month
Caustic IN (Feed) gpl LAB instrument Sample Analysis in the LAB, Frequency: Every 4 hrs
LAB: Potentiometric Titration Calibrated with Std. Solution.
Caustic Out (Discharge)
gpl LAB instrument Sample Analysis in the LAB, Frequency: Every 4 hrs
LAB: Potentiometric Titration Calibrated with Std. Solution.
Steam Consumption
TPH Mass flow meter Online Data from PHD Log Sheet: Doc No: DIG-LS-09-R2
FE Calibrated mid of the Month
Measurement and Verification Arrangement
Hindalco Industries Limited, Renukoot 21