team assignment 03

18
Company LOGO Team assignment 03 Team 04 K15T02

Upload: carol

Post on 22-Feb-2016

54 views

Category:

Documents


0 download

DESCRIPTION

Team assignment 03. Team 04 K15T02. Members…. Hoàng Thị Kim Dâng Thái Thanh Nhã Trần Thị Mộng Hà Trần Tiễn Hưng Chu Thị Thu Hương Từ Huỳnh Thắng. Agenda. 1. Introduce. 2 . Viking project and ABC System. 3 . What is productivity? . 4. GQM chart. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Team assignment 03

Company

LOGO Team assignment 03

Team 04 K15T02

Page 2: Team assignment 03

Members…

1. Hoàng Thị Kim Dâng2. Thái Thanh Nhã3. Trần Thị Mộng Hà4. Trần Tiễn Hưng5. Chu Thị Thu Hương6. Từ Huỳnh Thắng

Page 3: Team assignment 03

Agenda

1. Introduce

2. Viking project and ABC System

3. What is productivity?

4. GQM chart

Page 4: Team assignment 03

Viking project and ABC System

No. Measure

Goal Question Metric Explain

1 Cost - Total project cost does not exceed 10% initial budget

- How do we know total project cost does not exceed 10% initial budget?- Is the project on budget?

- Actual cost/ planed cost- Actual cost of task/ planed cost - Actual time/planed-Number of change

- Provides tracking of actual costs against estimated costs and predicts future costs.- To know how many money we spend for project activities and control the project’s budget

- Labor cost/ hours 

- To estimate cost to pay for employee and control cost status per project’s budget

Page 5: Team assignment 03

No.

Measure

Goal Question Metric Explain

2 Right product

- The product is delivered with a customer satisfaction.

- How do we know the product is delivered with a customer satisfaction?- How do we know if the intended use of the software meets the customer’s needs?- How do we know if the requirements accurately describe the customer’s needs?- Can we validate that the architecture supports the requirements

- Acceptation test/ function- Number of feedbacks/phase- Number of completed requirements/ total requirements.

- To assist the project team identified more effort for the features of the system, showing the priority and importance, the expectations, the customer’s attention to features of the system

Page 6: Team assignment 03

No.

Measure

Goal Question Metric Explain

3 Quality

- Viking supports defined quality criteria and test measures- All high – priority functionality defined in the requirement specification is delivered in the first release.

- How do we know the Viking supports defined quality criteria and test measures?- How do we know all high – priority functionality defined in the requirement specification is delivered in the first release?How will you validate quality for your project?- Is Quality an Accident?

Defect/KLOC (Number of defects/1000 source line of code)Number fixed defect/ number fined defect

- To assist the project team tight control defects of the system, empowering the enterprise and the quality of the product when launched, system development for the future 

Page 7: Team assignment 03

No. Measure

Goal Question Metric Explain

4 Schedule

- Total project time does not exceed 20% of the initial time.

- How do we know total project time does not exceed 20% of the initial time?- How much will it cost?  

-Actual time/ planed time-Actual time of task/ estimate-Actual time of phase / planed time -Employee hours / function-Number of tasks completed/ number of tasks planed

- Helps administrators to control the progress of the project, evaluation of team performance, manage risk changes to take appropriate decisions when project progress is slower than planned, in addition is a document to the report, explained to the stakeholders why the project was delayed.

Page 8: Team assignment 03

Agenda

1. Introduce

2. Viking project and ABC System

3. What is productivity?

4. GQM chart

Page 9: Team assignment 03

Productivity

• Productivity is defined as Output over input. Output is the value delivered Input is the resources spent to generate

the output, the influences of environment factors (complexity, quality constraints, time constraints, process capability, team distribution, interrupts, feature churn, tools, design)

Page 10: Team assignment 03

Productivity

• A systems perspective Productivity for which customer pays

for. Relates to solution and tangible value. Independent of influences of lower levels.

Productivity within supplier. This relates to product development, thus defined as functional size over engineering effort.

Page 11: Team assignment 03

Agenda

1. Introduce

2. Viking project and ABC System

3. What is productivity?

4. GQM chart

Page 12: Team assignment 03

Improve productivity by 10%

GQM chart Goal

Page 13: Team assignment 03
Page 14: Team assignment 03

Question and metrics

• Question 1 : How to improved productivity ?• Metrics:• Estimated size (or functionality)/effort per

deliverable• Actual size (or functionality)/effort per deliverable• Deliverable quality. Answer how we satisfy the

customer by collecting feedback from customer?• If we out of estimated effort of each member,

project may lead to be late , delay, it would decrease our productivity

Page 15: Team assignment 03

Question and metrics

• Question 2: What is current productivity?Metrics:

– Current KLOC . Ex: 1.5 KLOC/ 1 hour– Current Effort of team member. Ex: 8 hours/

1 business day– Current average time to finish a function

point . Ex: 6 hours/ 1 function point.• We can know where we are on productivity

scale, we baseline this metrics and compare with new baseline weekly, monthly, yearly and so forth

Page 16: Team assignment 03

Question and metrics

• Question 3: How do you know when you've achieved optimal productivity (10%) ?

Metrics:Current effort of team member bias past effort.Ex: MeasureCurrent effort : 8hours/ dayHistory effort : 7 hours/ dayOperation: Current Effort / History Effort= 8/7 * 100%= 114%So we improve 14% effort of team member.Current time to finish a function point bias past .

Page 17: Team assignment 03

Question and metrics

• Question 4 : Project schedules: do we overcommit?

• Metrics:– Estimated effort per function point: 6 hours/ 1

function point– Current effort per function point : 7 hours/ 1

function point.• If we out of estimated schedule , project

may lead to be late , delay, it would decrease our productivity.

Page 18: Team assignment 03

Thanks for your listening!!!