te-mpe-em design office
DESCRIPTION
TE-MPE-EM Design Office. William Billereau. Structure. Design, manufacturing and assembly. Design Office. Planning and subcontracting Technological and commercial choices Ordering, collecting components, tracking Invoicing. 2 staff/ 2 FSU. 1 staff / 10 FSU. Repair. MPGD. - PowerPoint PPT PresentationTRANSCRIPT
TE-MPE-EMDesign Office
William Billereau
29/11/2012 1
Fine-pitch photolithography facility -
PCB manufacturin
g
Industry
Design Office
Assembly Workshop
Planning and subcontractingTechnological and commercial choices
Ordering, collecting components, tracking Invoicing
RepairMPGD
Design, manufacturing and assembly
Structure
29/11/2012 2
2 staff/ 2 FSU
1 staff / 10 FSU
4 Staff8 staff/ 12 FSU
Design Office Mission Ressources Workload Quality Documents
329/11/2012
Mission Design of products
Standard PCB 2 to 16 layers, rigid, flex, flex-rigid
Related mechanical parts front panels, boxes
Crates and racks Readout for MPGD
Design of CAD libraries Schematic diagram Footprints
429/11/2012
1 team leader (staff) 8 technicians: the design of standard and
special PCB (FSU) 2 technicians: in CAD libraries (100% FSU
since 2010)
5
Resources
29/11/2012
6
Equipment
CAD stations (Cadence, Altium) AutoCAD CAD to CAM software (Fabmaster, Aegis)
29/11/2012
Workload
7
2008 2009 2010 2011 2012 (11m)
050
100150200250300350400
General situation25 jobs in progress,15 in the pipelineVisibility max 2 months
29/11/2012
230*220mm 2-sided, PTH, BGA,
QFN, 0402 1325 components 5500 solder joints
8
BE/RF - LHC 1 Turn Delay Feedback
29/11/2012
EN/EL Incomer Crate
929/11/2012
Quality Design rules: IPC standard
Layout Librairies
Crosschecks (librairie and layout) Internal reviews Feedback from manufacturing EDMS Release system
1029/11/2012
Documentation
PCB manufacturing files (Gerber, drilling) PCB specification Detailed drawing of all mechanical parts Detailed drawing of harnesses Assembly documents for PCB (Drawing,
BOM) Assembly documents for crates (3D drawing,
BOM)
1129/11/2012
12
PCB manufacturing files (Gerber, drilling)PCB specification
29/11/2012
13
Detailed drawing of mechanical parts
29/11/2012
14
Detailed drawing of harnesses
29/11/2012
15
Assembly documents for PCB (Drawing, BOM)
29/11/2012
16
Assembly documents for crates (3D drawing, BOM)
29/11/2012
17
Assembly documents for crates (3D drawing, BOM)
29/11/2012
18
EDMS Release system
Released statusNo more change possibleProduction allowedAvailable to subcontractor
29/11/2012
19
Any question?
29/11/2012