Rydens Enterprise School & Sixth Form College
T D S M I D L A N D S - C A S E S T U D Y
Hersham, Walton-on-Thames
Education
Structural Steelwork
S I T E :
T Y P E :
S E R V I C E S :
T D S M I D L A N D S
Tekla
Stru
ctur
es
Telford Enterprise Hub
Hadley Park East
Telford
Shropshire
TF1 6QJ Tel: 01952 225835
www.tdsmidlands.co.uk
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
HDrawn
Drawing No.
Contract
Client
Rev.
Date Scale @ A1
Drawing Status:
General Notes:
5179-GA26 C3
RL 14.12.2016 1:100
5179RES REPLACEMENT SCHOOL PROJECT
TDS No:
BAM CONSTRUCTION
3D PICTORIAL VIEW - PHASE C-1 OF 2 (ZONE 1)Drawing Title
Execution Class:
Finishes:
A1
C3 RESIN EMBEDMENT DETAILS SHOWN. ISSUED FOR CONSTRUCTION27.03.2017C2 CORE 5 BEAMS FINALISED. ISSUED FOR CONSTRUCTION 15.03.2017C1 ISSUED FOR CONSTRUCTION 20.02.2017P3 UPDATED TO SUIT ARUP COMMENTS, CONNECTIONS ADDED. FOR APP08.02.2017P2 UPDATED TO SUIT ARUP REVISIONS. FOR APPROVAL. 18.01.2017P1 PRELIMINARY ISSUE. FOR APPROVAL. 12.01.2017
Rev. DateRevision DescriptionRev. Mark
9
9
8
8
H
J
7
A
B
C
4
3
2
1
K
N
D
D
L
5
6
E
F
G
H
T D S M I D L A N D S
Rydens Enterprise School & Sixth Form College
undertook a huge redevelopment of their site to
create a state-of-the-art facility to deliver 21st
Century education, consisting of seven buildings.
TDS Midlands were on hand to design & detail the
complexed 385 tonne steelwork frame.
The geometry of the architectural design presented
the largest challenge in designing the corresponding
geometry of the steelwork. In particular, fulfilling
the complex asymmetrical pyramid shape of the
library roof used a considerable amount of detailing
resource. Careful consideration was taken when
detailing the complex connections as we had to make
sure the connections would be structurally acceptable
together with ensuring that the fabricator would be
able to manufacture and erect the structure.
The Project
Tekla’s ability to import IFC models issued by the
design team was invaluable when setting out the
complex geometry of the steelwork frame. The
design of the structure was modified throughout the
duration of the project. Importing the amended IFC
models allowed us to overlay them onto our model
and alter our steel frame accordingly. Due to the size
of the project, phasing and lotting was imperative
when issuing steelwork for manufacture and erection.
Tekla allowed us to segregate areas of the structure in
approximately 25 tonne lots in order to ensure each
lot was deliverable to site in one single visit.
T D S M I D L A N D S
T D S M I D L A N D S
From fabrication drawing point of view, this was one of the most
challenging projects that TDS have undertaken, the most complex
assembly drawings used up to 4 hours of drawing office time.
Without the power of Tekla, the detailing of the assembly drawings
would have taken considerably longer, allowing us to complete the
fabrication drawings in a cost efficient time scale.
Throughout the project, Tekla’s ability to generate 3D BIM models in
order to issue to the Design Team to review has been a considerable
advantage to all contractors involved. Architects were able to
review the aesthetics of the steelwork, Engineers could interrogate
connections and steelwork arrangements and the fabricator &
main contractor used the 3D models to plan fabrication schedules
and erection techniques. Together with Tekla BIMSight, the use
of Snapshots were used when raising queries to the design team.
Creating a visual of the query in question enabled us to translate
our question to the design team in a more specific manner. The
connection design received from the engineer was generated in a 2D
format. In order to translate the 2D connection design into a complex
3D geometry format, we had to issue a number of queries regarding
geometrics and buildability.
TDS Midlands, Scott Brownrigg Architects and Arup Engineers