TD18 – post mortem analysis

1

1093766

Inspection 11WDSDVG1KEK SLAC

Page 2: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

TD18 - analysis

• RF check made at CERN (confirmation of previous results from SLAC, EDMS: 1090704 )

• Straightness measurement• Cutting: see next slides• Visual inspection (EDMS:1093766)• SEM (localization of breakdowns)• Dimensional control (EDMS: 1099135)

2

Page 3: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

3

Page 4: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

4

Page 5: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

5

Page 6: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

6

Page 7: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

7

Page 8: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

8

Page 9: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

9

Page 10: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

10

Page 11: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

11

For the straightness measurement we have cut 2 couplers

Page 12: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

12

Page 13: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

13

The engraved lign is not to be lost in the orientation of the discs after the cuts

Page 14: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

G. Riddone, 20100816 14

Preparation for the measurement of straightness for the cells after bonding and of the couplers after brazing

Mesures 1

Mesures 2

Alignment of cells 0 and 20 is 0 in the vertical and horizontal axis

Page 15: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

15

DISQUES MICRONS

COUPLEUR 0D.0 0D.1 0D.2 -9D.3 -5D.4 3D.5 3D.6 4D.7 -19D.8 -18D.9 -16

D.10 -17D.11 -14D.12 -8D.13 -5D.14 -3D.15 3D.16 2D.17 -15D.18 -12D.19 -9D.20 0

COUPLEUR 10

COUPLEUR D.1 D.3 D.5 D.7 D.9

D.11D.13

D.15D.17

D.19

COUPLEUR

-25

-20

-15

-10

-5

0

5

10

15

mesures1

Results after 4 passes with a micron comparator

Page 16: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

16

DISQUES MICRONS

COUPLEUR 2D.0 0D.1 -1D.2 -4D.3 2D.4 6D.5 1D.6 -6D.7 -15D.8 0D.9 -10

D.10 -3D.11 -13D.12 -13D.13 -6D.14 -9D.15 -7D.16 -10D.17 0D.18 -2D.19 -10D.20 0

COUPLEUR 12

COUPLEUR D.1 D.3 D.5 D.7 D.9

D.11D.13

D.15D.17

D.19

COUPLEUR

-20

-15

-10

-5

0

5

10

15

Mesures 2

Results after 4 passes with a micron comparator at 90 degrees of the first measurement

Page 17: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

17

COUPLEUR D.1 D.3 D.5 D.7 D.9

D.11D.13

D.15D.17

D.19

COUPLEUR

-25

-20

-15

-10

-5

0

5

10

15

Mesure 1

Mesures 2

Mesures1: 23 microns for the disc bonding from 0 to 20 30 microns with the coupler brazing

Mesures 2 : 21 microns for the disc bonding from 0 to 20 28 microns with the coupler brazing

Superposition of the values of two measurements

Page 18: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

18

Cutting sections for analyses

Page 19: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

19

5 cuts: Iris shall be not damaged 16,17,18,19 and 20STEP 1

Cut 5 Cut 1

Part

A

Part

B

Part

C

Part

D

Part

Ethe irises should not be damaged

Les disques seront gravés A,B,C,D et E

Page 20: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

G. Riddone, 20100816 20

STEP 2.1

Cut 6Coupe disque 10

Page 21: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

21

STEP 2.2

Cut 7

Part F

Part G

Longitudinal section of the discs 11 to 15

Page 22: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

22

Page 23: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

23

Page 24: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

24

Page 25: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

25

Page 26: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

26

Page 27: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

27

Page 28: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

28

Page 29: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

29

Dimensional control disk N 18 (EDMS: 1099135)

Diameter of the iris is 5.4024 mm before BONDING

Page 30: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

30

Dimensional control (EDMS: 1099135)

Diameter after BONDING is 5.403 mm difference is 0.6 microns

Diameter of the iris is 5.4024 mm before BONDING

Page 31: TD18 – post mortem analysis 1 1093766 Inspection 11WDSDVG1KEK SLAC

31

SEM (localization of breakdowns) by

Markus