T&D Management Solutions Outlook -
A Sanity Check
Randy Rhodes
Manager, Network Planning
PacifiCorp
InfoNetrix TDMS Executive Market Summit Dallas, Texas
September 7, 2003
© 2
003
PA
CIF
ICO
RP
| P
AG
E 2
Agenda
– Brief Corporate Background– Power Delivery Business Technology Processes
CAPEX Strategy Formulation Project Planning & Development Project Review & Approvals IT Project Management Post-Investment Appraisal EAI Standards
– Current Major Project Examples– Sanity Check w/InfoNetrix
© 2
003
PA
CIF
ICO
RP
| P
AG
E 3
33%
8%44%
4% 8% 3% Oregon
Washington
Utah
Idaho
Wyoming
California
FY-2003Oregon 505,098 Washington 119,666 Utah 680,163 Idaho 58,171 Wyoming 122,576 California 42,699
Total Customers 1,528,373
Customers by State
PacifiCorp’s Service Territory
Portland
Salt Lake City
633 Miles
Glasgow
London
352 Miles
Distribution 69,400Transmission 15,000
Line Miles
© 2
003
PA
CIF
ICO
RP
| P
AG
E 4
Power Delivery Key Facts
– $2.4B Retail Revenues in FY04
– 135,000 Square Miles Of Service Territory Covering Six States
– Approximately 2,900 Employees in Power Delivery
– 39,000 New Customer Connects Projected for FY04
– Asset Breakdown
– Average Annual Projected Ten-year Energy Sales Growth Of 2.6%.
Oregon 1.5% Idaho 1.0%Washington 1.9% Wyoming 1.6%Utah 4.0% California 1.3%
FY-2003 Year-End Assets - Billions $ Gross Net
Distribution $3.90 $2.50Transmission $2.30 $1.50Other $0.90 $0.50Total T&D $7.10 $4.50
© 2
003
PA
CIF
ICO
RP
| P
AG
E 5
PD I/T CAPEXPower Delivery’s FY04
Capital Expenditure Plan (US GAAP)
Investment Reasons
FY04 T & D Plan
Driver
Discretionary?
Comments
New Customer Connects
20% Obligation to serve new customer
Non-discretionary
39,000 new connections forecasted for FY04
Delivery System Reinforcements
29% Inability of delivery system to meet increasing load requirement
Non-discretionary
Includes Quantum Leap Project
Public Accommodations
5% Regulatory or jurisdictional requirements
Non-discretionary
Mandated undergrounding of lines, relocations for highway projects
Asset Replacements
27% Deterioration or obsolescence of aging delivery system and failed assets
Mix of Non-Discretionary (failed assets) and Discretionary 1/
Some replacements required by code or Commission rules
System Upgrades / Reliability
10% Company objectives to improve delivery system reliability or economics
Partially discretionary
Includes merger commitments to improve reliability
Information Technology
9% Primarily completion of existing replacement and economic projects
Partially discretionary
Includes EMS/SCADA and SPS
Total FY04 > $0.3B
1/ Note: Items that are discretionary in the short-term build risk exposure and are non-discretionary in the long-term.
© 2
003
PA
CIF
ICO
RP
| P
AG
E 6
PD Business Technology CAPEX Budget Process
Project Prioritization• Business Strategy
– Safety– Customer Service / Reliability– Efficiency / EBIT
• PD Organizational Alignment• Technology Blueprint Alignment
PD IT Strategy
BusinessUnit
Needs
CorporateCAPEX
Allocation
PD IT Budget
© 2
003
PA
CIF
ICO
RP
| P
AG
E 7
Ten-Year PD I/T Budget – Areas of Focus
Project Forecasts Come From Business Unit Project Needs, Are Prioritized by Business Unit Strategy, and Depend on Corporate CAPEX Allocation
Power Delivery IT-Enabled Projects FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13EMS/SCADASingle Person SchedulingPole Attachment Data Management SystemTransmission Wholesale Billing SystemMapping & Connectivity EnablerOutage Management System UpgradesAsset Inspection/Reporting SystemsGraphical Information / Asset Register SystemsCrew & Resource Work ManagementCustomer Service Systems Upgrades/ReplacementsOther Distribution Systems Upgrades/ReplacementsOther Transmission Systems Upgrades/ReplacementsPower Delivery Systems Upgrades/Replacements
% of PD I/T CAPEX0 - 10%
10 - 20%20 - 30%
> 30%
© 2
003
PA
CIF
ICO
RP
| P
AG
E 8
PD IT Project Approval Process
– Business Units Sponsor New Projects
– PD Controller & PD Business Technology Director
Allocate Project Planning And Development Seed Money For Preliminary Project Cost, Schedule, Scope, And Business Case
Assign Project Manager
– Power Delivery Technology Strategy Committee (PDTSC)
Directs Strategy And Priorities. Reviews And Approves Projects
Based On Strategy Alignment, Business Case, And CAPEX Allocation
PD ControllerEVP Power
Delivery & CIO
CEO - PacifiCorp
Largest Projects Are Reviewed by PacifiCorp Board, or Scottish Power Board
PDTSC PIC
© 2
003
PA
CIF
ICO
RP
| P
AG
E 9
Power Delivery IT Project Life CycleAnnual
CorpPlanningProcess
? Sets PD
project budgetfor fiscal year.
Project Brief& SeedMoney
Request
? Request to
fund BusinessCasePreparation.
? Task plan todevelopproject
approvalpackage.
PD BT
Approval
? Approval for
seed moneyto developBusiness
Case.
BusinessCase
? Proof of business
concept.? Data quality impacts
on budget must be
considered.? Financial analysis.? Cost benefit
worksheet.? End-to-end schedule
with detailed task
plan throughalternative analysisplus placeholders.
PDTSCApproval
ProjectDefinition
Document
? Formal Project Plan-
High-level work break-down and schedule.
? Risks identified.
? Resources & costsforecasted.
? "As Is" and "To Be"
business process mapsdocumented at theBusiness Line
Processes level.(Business DynamicModel-BDM)
? Data qualitycomponents identified.
PDDSign-Off
? Proj. Mgr. &
Proj. Sponsoragree to PDDcontract.
? Risk & changemanagementcontrols activated.
? (If cost, schedule,scope, or benefitsdifferent than
approved BusinessCase, must returnto PDTSC for
change approval.)
Detailed UserRequirements
? Funding
ApprovalthroughAlternatives
Analysis.? Set schedule,
benefits, scope,
and costexpectations forentire project.
? Data quality key
elements andmetrics defined.
? "To Be" business
process maps at theOperationalProcesses level
(System DynamicsModel-SDM) withApplication
integration pointsnoted. (GenericModel-GEN).
? Detailed task planand work packagesdefined.
OngoingProjects
SystemsFramework
Study
New ProjectProposals
TransitionInitiatives
? Go/No-GoFunding
Decision? May also
require
GTC andGITECapproval
BusinessFunctional
Specifications
Training
? Hand-overpreparation
completed.? Formal review
of
deliverablesto businessfunctional
specifications.
BusinessAcceptance
Implementation- Cutover
ProjectClose
PostInvestment
Appraisal
CBS
IT Work Stream
TechnicalDesign
Build Test
? Unit? System
? Integration
AlternativesAnalysis
? Compiling &evaluating
custom &vendor (RFP)solutions.
? SolutionRecommend-ation.
? Vendor Packagefunctional gapanalysis.
PDTSCApproval
UserAcceptance
Testing
Implementation - Cutover
"Go Live"Cut Over
CommissioningFormal
Certification
Staging
? Walk-through andformal sign-off to
assure thatTechnical Designwill deliver
BusinessFunctionalSpecifications
before Buildphase begins.
? Data Quality key
elements andmetrics designed.
? "To Be"business process
maps at theWork Procedurelevel (Function
DynamicsModel-FDM)with data
elementsmodeled onGeneric Model
for RationalRoseconversion.
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
0
PD IT Project Management
– Business Units Have Project Ownership Project Sponsor Is Primary Stakeholder Who Owns Outcomes,
Benefits, & Business Process.
– Project Management Is Performed by PD Project Management Office (PMO) PD PMO Reports On Approved Cost, Schedule, Requirements,
Expectations, Risk And Quality Professional PMs (Often PMI Certified)
– PD Technology Strategy Committee Sets Strategy, Assigns Priority, Approves Projects Risk Is Reduced By:
• Rigorous Planning And Definition Of Projects Up Front
• Focused Tracking Of Progress Against Expenditures for The Life Of The Project
Power DeliveryTechnology Strategy Committee
Power Delivery IT Project Governance
Power Delivery BusinessTechnology
ProjectMgr.
ProjectSponsor
P.D.D."CONTRACT"
ProjectPlanner
InformationTechnology
ProjectComponents
FunctionalArea "A"Non-IT
Components
FunctionalArea "Z"Non-IT
Components
CBS ITLead
ProjectMgr.
ProjectSponsor
P.D.D."CONTRACT"
ProjectPlanner
InformationTechnology
ProjectComponents
FunctionalArea "A"Non-IT
Components
FunctionalArea "Z"Non-IT
Components
CBS ITLead
ProjectMgr.
ProjectSponsor
P.D.D."CONTRACT"
ProjectPlanner
InformationTechnology
ProjectComponents
FunctionalArea "A"Non-IT
Components
FunctionalArea "Z"Non-IT
Components
CBS ITLead
CBS IT Power Delivery Systems
CIO
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
2
After PD IT Projects Are Implemented...
– Upon Completion, Project Sponsor And Project Manager Presents Project Close-out To PDTSC Review Of Project Implementation Lessons Learned ID Areas For Future Development
– Business Improvement Groups Track On-going Benefit KPI’s And Business Process Improvement Implementation
– Business Units Become System Experts And Identify Incremental System Capabilities To Leverage For Further Benefits
– Post Investment Appraisals Required For Selected Projects 1-Year Following Implementation To Validate On-going Benefits,
And Process Improvements, With New Recommendations As Needed.
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
3
DataWarehouse
SubstationAutomation
Outage Management
DistWiresModel
Transmission WiresModel
SCADA
CSS
VRU
AM/FM/GIS
DistributionAutomation
HumanResources
OutageReporting
The “Integration Bus” = EAI + Common Language
InformationExchange
Model
Event History WorkManagement
...
EMS
= Application Connector
The “common language” is based on the common information model (CIM) specified in IEC standards. The meta data for this language is maintained In the information exchange model (IEM). The physical implementation of the IEM varies based on selected technologies.
Standards and EAI at PacifiCorp
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
4
Power Delivery CIM Implementation
– Pacificorp Has Successfully Used The CIM To Model Both Interfaces And Databases For Power Delivery
– We Are Well-positioned To Continue Using This Model
– CIM Has Been Used In Power Delivery Projects Retail Access OCHIP – Outage Call Handling Improvement Project Single Person Scheduling Transmission Wholesale Billing System Enterprise Data Warehouse SCHOOL – Substation And Circuit History of Operational Loading
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
5
Example Project: SCADA/EMS Replacement
KWH
ROUTER
Firewall
ICCPGateway
ROUTER
FEP
ETAG
DTS
PDS
CADOPS
OASIS
PCCEMS/SCADA
WCC FEP
To RTU
Corporate WAN
Dispatch WAN
To WCC FEP
To SCC
3 T 1 and 256 K
256 K and 56 K
ROUTER
PCC EMS LAN
WSCCHCC
BPA
256 K and 56K
CADOPS
ROUTER
FEP
Corporate WAN
ICCPGateway
RTO West SALMS
BPA
To PCCROUTER
3 T 1 and 256 K
SCC EMS LAN
HCC
Firewall
To RTU
To WCC FEP
256 K and 56K
RTO WestCAL ISO
To RTU
ROUTER
WSCC
CAL ISO
SCCEMS/SCADA
Existing Obsolete Systems:
– 7 Disparate Systems
– Not Supported By Vendor
– 20-year Old Technology
– No Integration Capability
– SCADA Components Failing
– Spare Parts Not Available
New State Of The Art System:
– Single EMS System At Each Location With Disaster Recovery Capability
– Fully Integrated With Existing Systems
– Adaptable To Future Business Change
– Vendor Supported Integration With Outage Management Systems
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
6
Example Project: Single Person Scheduling
SAN / DataWarehouse
Dispatch
Workstations
Planner
Workstations
PacificCorpLAN / WANConnection
Mobility ConfigurationPacificCorp SPS System
District One
District x
ClickAnalyze ReportingOLAP Server
Street-LevelRoutingServer
Scheduling
Server
DispatchServer
TIBCO - XML
Test - Development & Emergency Backup Environment
CIS
Backup
Mobility Router
SAN / Data
Warehouse
Backup
DispatchServer Webserver
Backup
Webserver
BackupScheduling
Server
Backup
SL RoutingServer
MobilityRouter
SchedulingServer
Mobility Router
ClickAnalyze ReportingOLAP Server
BackupOLAP Server
DispatchServer
SL Routing
Server
Off-Site Location
Dispatch
Workstations
PlannerWorkstations
BackupComms Server
Mirrored Backup
Emergency Backup /Development & Test
Host Systems
Production
Color Code
Comms
Server
Webserver Comms
Server
Mirror
Connection
CDPD
Radio Tower
WirelessLAN 802.11
Proprietary and Competition Sensitive - Theinformation contained within this documentis competition sensitive and containsinformation proprietary to AxiomCorporation. This information is not to bedisclosed
21
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
7
Example Project: SCHOOL
– What Is SCHOOL? Substation/Circuit History Of Operational Loading Essentially, a Load Data Historian to the Asset Management Desktop Built on OSIsoft PI Software Platform
• Off-the-Shelf Software Designed for Efficient Storage and Fast Retrieval of Time Series Data
• 45 Gigabytes of Load Data Inspected and Imported
• 65,000 Tags of Load Information
– Benefits: No Data Ambiguity Easy Access and Navigation Powerful Analytical Tools Replaces Paper Reporting and
Thousands of Excel Files Used for Transformer Load Analysis
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
8
CADOPS
Windows 2000
Analysis Workstation
Load History, Hourly Averages
MV-90MVStar
(Ver. 3.1 - SP 2)
Modem Bank
Industrial
Meters & Recorders
Windows 2000
Field Workstation / Analysis
Substation Load & Operating Parameters
(50 workstations)
Area / DIstrict Offices
Windows 2000
OSI-PI Serve r(Production)
LCT Data Center
Windows 2000
OSI-PI Server(Development)
LCT Data Center
OC/S (PCC)Ingress DB
(Ver. 2.1.0.6)
1 minute interval
1 Minute Interval
Substation / Circuit History of Operational Loading
(SCHOOL)(Phase 1: Interim State - (3/03 - 11/03)
Substation
Windows CE 3.0 or PocketPC
Handheld Device
Auto download
(50 Handheld Devices)
PI Server Modules (50,000 tags)
Data Archive
UDS
MDB
Performance Equations Data Access Pack – ODBC, OLEDB, SDK
Batch Server
Real-Time SQC Server
PI Clients
DataLink
ProcessBookBatchView
ODBC ClientReal-Time SQC
Profiles
ActiveView
PI Clients with Handheld Device
DataLink
ProcessBookBatchViewODBC Client
Real-Time SQC
Profiles
ActiveView
Handheld Terminal
Manual Logger
Time Series Datav Analog
v DigitalAutomated Hourly Load Data - (Minimum)
Time Series Data
v Analogv Digital
Monthly Peak Load Data - (Minimum)
Time Series Datav Analogv Digital
Automated Load Data - (Hourly / Minimum)(CSV File Transfer via TIBCO)
PI Server Modules (1,000 tags)
Data Archive
UDS
MDB
Performance Equations
Data Access Pack – ODBC, OLEDB, SDK
Batch Server
Real-Time SQC Server
PI Interface
Batch
TCP / IP
TCP / IP
TCP / IP
OC/S (SCC)Ingress DB
(Ver. 2.1.0.6)
PI to PI Integration
PI Integration via TIBCO
SLC Operations Data Center
RTU
RTU
RTU
RTU
RTU
RTU
SCADA (SCC)
L & G 8500
EMS (SCC)
VAX
SCADA (PCC)
L & G 6800
EMS (WCC)
VAX
EMS (PCC)VAX
RTU
1
2
3
4
RTU
Printer
Commercial
PI Integration via TIBCO
LCT Data Center
Xcellenet - Afaria
Handheld Software Distribution Mgmt.
(UNDER REVIEW)
SCHOOL Project Architecture
© 2
003
PA
CIF
ICO
RP
| P
AG
E 1
9
SCHOOL – Integration with New EMS
CADOPS
Analysis
Load History, HourlyAverages
(Excel)
Analysis
Load Forecasting , SpecialReports
( PTI)
AnalysisLoad History, Hourly
Averages(ProcessBook / DataLink
MV-90MVStar
Modem Bank
Industrial
Meters & Recorders
Power OperationsOracle
PacifiCorp
Transmission & Distribution Network
AnalysisMV-90 Load History
AnalysisSubstation Load & Operating
Parameters
Substation / Circuit History of Operational Load
(SCHOOL)(Future State - (11/03 - Future)
OSI-PI Server(Production)
SAP(Work Management)
OSI PI Historian(Inside Firewall)PCC EMS (ABB Ranger)
Refer to Detailed Configuration Diagrams
OSI PI Server(Development)
SCC EMS (ABB Ranger)Refer to Detailed Configuration Diagrams
OSI PI Historian(Outside Firewall )
OSI PI Historian(Inside Firewall)
OSI PI Historian(Outside Firewall )
RTU
RTU
RTU
RTU
RTU
RTU
RTU
RTU
EMS / SCADA Replacement Project
Frontline Project
Substation
Handheld Device
Auto download
Printer
Commercial
© 2
003
PA
CIF
ICO
RP
| P
AG
E 2
0
SCHOOL System Future Development
– Special Load Studies Load Research Using
Deployable Monitors Improved Forecast
Granularity– Improved Asset Utilization
Support for Monitoring and Dynamic Rating of Transformers
Substation Equipment Inspection Using SCHOOL System Handhelds
© 2
003
PA
CIF
ICO
RP
| P
AG
E 2
1
InfoNetrix Predictions – A Sanity Check
InfoNetrix Says PacifiCorp’s Position
Record Levels of Project Activity Are Coming Soon
Economy is On the Upturn – but Capital Markets Are Still Tight for Us
Top Market Factor Is Regulatory Policy & Governance
Our 6-State Regulatory Environment + RTO Development Is a Key Factor
Brain Drain Will Affect Utilities’ Ability to Implement Technology
Absolutely. Response: Power-Learning Centers, First-Career Programs
System Reliability Emphasis Will Drive Automation Requirements
Yes, But Not Immediately – Still Getting Asset Management in Place
Future Stress on the Power Grid May Produce Events Mandating Emergency Measures
Bingo!!!
Stay Tuned!!!