Below is a flowchart describing 40 CFR Part 63, Subpart EEE. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to
40 CFR Part 63, Subpart EEE(1 of 191)
Start
40 CFR 63, Subpart EEE does not apply.
Yes End
Is the sourcea hazardous waste
combustor and either an areasource or a major
source?
Yes
No
§63.1200§63.1200(a)
Does thecombustor meet thecriteria in Table 1 of
§63.1200(b)?
§63.1200(b)
No
1
Is the combustor a hazardous waste
incinerator?
§63.1219
No
Isthe combustor
a hazardous wasteburning cement
kiln?§63.1220
No
Is theincinerator an existing
source?101
201
Yes
§63.1219(a)
No
Is thekiln an existing
source?301
401
Yes
§63.1220(a)
No
Yes
Yes
09/30/2010 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(2 of 191)
Is thecombustor a hazardous waste burning lightweight aggregate
kiln?
1
§63.1221
No
Is the combustor a solid fuel boiler that burns
hazardous waste?
§63.1216
No
Is the combustor a liquid fuel boiler that burns
hazardous waste?
§63.1217No
Is thecombustor a HCl production
furnace that burns hazardouswaste?
§63.1218
No
40 CFR 63, Subpart EEE does not apply.
End
501
601
Yes
§63.1221(a)
No
Yes
Is theboiler an existing
source?701
801
Yes
§63.1216(a)
No
Yes
Is thekiln an existing
source?
Is theboiler an existing
source?901
1001
Yes
§63.1217(a)
No
Yes
Is thefurnace an existing
source?1101Yes
§63.1218(a)
No
Yes
1301
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(3 of 191)
Dioxins,Furans
101
Pb, Cd, Se
103
106
Applicant must go through the flowchart for each
pollutant group.
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
107
108
111Total
Chlorine
113
112
POHC
115
PM
Hg
Have allpollutant paths been
completed? End
§63.1219
No
Continue through next path.
102
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(4 of 191)
Is the incineratorequipped with either a wasteheat boiler or dry air pollution
control system?
103
§63.1219(a)(1)(i)
No
Yes
Is thecombustion gas
temperature at the inletto the initial particulate matter
control device 400 deg. F or lowerbased on the average of
the test runaverages?
§63.1219(a)(1)(i)(B)
No
105
104
Yes
Comply with the following:Standard
§63.1219(a)(1)(ii)[G]§63.1206(c)(6)(iii)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1219(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3), (g)(1)(i)(A)
§63.1207(g)(1)(i)(B), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(5 of 191)
104
Comply with the following:Standard
§63.1219(a)(1)(i)(A)[G]§63.1206(c)(6)(iii)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1219(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3), (g)(1)(i)(A)
§63.1207(g)(1)(i)(B), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1219(a)(1)(i)(B)[G]§63.1206(c)(6)(iii)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1219(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3), (g)(1)(i)(A)
§63.1207(g)(1)(i)(B), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
105
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(6 of 191)
106
Comply with the following:Standard
§63.1219(a)(2)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1219(d)
Monitoring/Testing[T]§63.1207(c)(3), (g)(1)(i)(B), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
Yes
No
Comply with the following:Standard
§63.1209(l), (l)(1)(i)Monitoring/Testing§63.1209(l), (l)(1)(i)
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(7 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
107
§63.1219(e)(1)
Yes
In lieu of complying with particulate matter standard in §63.1219(a)(7), you may elect to comply with alternative metal emission
control requirements.
Comply with the following:Standard
§63.1219(a)(3)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1219(e)(2)(i)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(e)(4)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
109
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(8 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
108
§63.1219(e)(1)
Yes
In lieu of complying with particulate matter standard in §63.1219(a)(7), you may elect to comply with alternative metal emission
control requirements.
Comply with the following:Standard
§63.1219(a)(4)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1219(e)(2)(ii)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(e)(4)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
No
110
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(9 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
109
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii)Monitoring/Testing§63.1209(n)(2)(ii)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
110
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii), (n)(2)(vi)Monitoring/Testing
§63.1209(n)(2)(ii), (n)(2)(vi)
Yes
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(10 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
111
§63.1219(a)(5)(i)
No
Comply with the following:Standard
§63.1219(a)(5)(i)[G]§63.1206(c)(6)(iii)
§63.1219(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1219(a)(5)(ii)[G]§63.1206(c)(6)(iii)
§63.1219(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Yes
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(11 of 191)
112
Comply with the following:Standard
§63.1219(a)(6)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i), [G](o)(2)-(3)
§63.1209(o)(4)§63.1219(d)
Monitoring/Testing[T]§63.1207(c)(3), (f)(1)(xi), (g)(2)(iii)
[G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii)
[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)§63.1210(b)(3)(i), (c)(1)(i)
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(12 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
113
§63.1219(e)(1)
Yes
In lieu of complying with particulate matter standard in §63.1219(a)(7), you may electto comply with alternative metal emission
control requirements.
Comply with the following:Standard
§63.1219(a)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iii)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (m)(3), (n)(3)
§63.1219(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3), (g)(1)(i)(C), (g)(2)(iv)
§63.1208(b)(6)§63.1209(a)(1)(iii), (a)(5), (m), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2), (m)(3)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(i), (c)(1)(i)
114
102
No
Comply with §63.1219(e)(2)(i) and (ii) found in the appropriate
metals paths.
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(13 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
No
Comply with the following:Standard
§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
114
Yes
Yes No
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(14 of 191)
Does the incinerator burn the
dioxin-listed hazardous wastes F020, F021, F022, F023, F026,
or F027?
115
§63.1219(c)(2)
Comply with the following:Standard
§63.1219(c)(1)[G]§63.1206(c)(6)(iii)
[G]§63.1209(j)§63.1219(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii), (f)(1)(xix)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1219(c)(2)[G]§63.1206(c)(6)(iii)
[G]§63.1209(j)§63.1219(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii), (f)(1)(xix)
§63.1210(b)(3)(i), (c)(1)(i)
116
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(15 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste
at a location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
116
117
117
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(16 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)
§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
117
102
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(17 of 191)
Dioxins,Furans
201
Pb, Cd, Se
203
204
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
205
206
209Total
Chlorine
211
210
POHC
213
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
Have allpollutant paths been
completed? End
§63.1219
No
Continue through next path.
202
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(18 of 191)
Is the incineratorequipped with either a wasteheat boiler or dry air pollution
control system?
203
§63.1219(b)(1)(i)
Yes
Comply with the following:Standard
§63.1219(b)(1)(ii)[G]§63.1206(c)(6)(iii)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1219(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3), (g)(1)(i)(A)
§63.1207(g)(1)(i)(B), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
215
Comply with the following:Standard
§63.1219(b)(1)(i)[G]§63.1206(c)(6)(iii)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1219(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3), (g)(1)(i)(A)
§63.1207(g)(1)(i)(B), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(19 of 191)
204
Comply with the following:Standard
§63.1219(b)(2)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1219(d)
Monitoring/Testing[T]§63.1207(c)(3), (g)(1)(i)(B), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
Yes
No
Comply with the following:Standard
§63.1209(l), (l)(1)(i)Monitoring/Testing§63.1209(l), (l)(1)(i)
215
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(20 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
205
§63.1219(e)(1)
Yes
In lieu of complying with particulate matter standard in §63.1219(b)(7), you may elect to comply with alternative metal emission
control requirements.
Comply with the following:Standard
§63.1219(b)(3)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1219(e)(3)(i)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(e)(4)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
207
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(21 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
206
§63.1219(e)(1)
Yes
In lieu of complying with particulate matter standard in §63.1219(B)(7), you may elect to comply with alternative metal emission
control requirements.
Comply with the following:Standard
§63.1219(b)(4)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1219(e)(3)(ii)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1219(e)(4)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(1)(i)(B)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
208
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(22 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
207
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii)Monitoring/Testing§63.1209(n)(2)(ii)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
208
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii), (n)(2)(vi)Monitoring/Testing
§63.1209(n)(2)(ii), (n)(2)(vi)
215
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(23 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
209
§63.1219(b)(5)(i)
Comply with the following:Standard
§63.1219(b)(5)(i)[G]§63.1206(c)(6)(iii)
§63.1219(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1219(b)(5)(ii)[G]§63.1206(c)(6)(iii)
§63.1219(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Yes No
215
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(24 of 191)
210
Comply with the following:Standard
§63.1219(b)(6)[G]§63.1206(c)(6)(iii)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i)[G]§63.1209(o)(2)-(3), (o)(4)
§63.1219(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(2)(iii)[G]§63.1207(m)(1)-(2)
[G]§63.1208(b)(5)(i), (b)(5)(ii)[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
215
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(25 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
211
§63.1219(e)(1)
Yes
In lieu of complying with particulate matter standard in §63.1219(b)(7), you may elect to
comply with alternative metal emission control requirements.
Comply with the following:Standard
§63.1219(b)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iii)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (m)(3), (n)(3)
§63.1219(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3), (g)(1)(i)(C), (g)(2)(iv)
§63.1208(b)(6)§63.1209(a)(1)(iii), (a)(5), (m), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2), (m)(3)
Recordkeeping[G]§63.1212(c)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
212
202
No
Comply with §63.1219(e)(3)(i) and (ii) found in the appropriate
metals paths.
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(26 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
No
Comply with the following:Standard
§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
212
Yes
NoYes
215
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(27 of 191)
213
§63.1219(c)(2)
Comply with the following:Standard
§63.1219(c)(1)[G]§63.1206(c)(6)(iii)
[G]§63.1209(j)§63.1219(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii), (f)(1)(xix)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1219(c)(2)[G]§63.1206(c)(6)(iii)
[G]§63.1209(j)§63.1219(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii), (f)(1)(xix)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
214
Does the incinerator burn the
dioxin-listed hazardous wastes F020, F021, F022, F023,
F026, or F027?
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(28 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at
a location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
214
215
215
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(29 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)
§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
215
202
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(30 of 191)
Dioxins,Furans
301
Pb, Cd, Se
303
304
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
307
308
311Total
Chlorine
318
317
POHC
321
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
PM(Opacity) 320
Have allpollutant paths been
completed? End
§63.1220
No
Continue through next path.
302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(31 of 191)
303
Is the combustion gas temperature at the inlet
to the initial particulate matter control device 400 deg. F or lower based on
the average of the test run averages?
§63.1220(a)(1)(ii)
Comply with the following:Standard
§63.1220(a)(1)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1220(f)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3), (g)(1)(i)(A)
§63.1207(g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
[G]§63.1209(k)(3), [G](k)(8)Recordkeeping
[G]§63.1209(k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1220(a)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1220(f)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3), (g)(1)(i)(A)
§63.1207(g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
[G]§63.1209(k)(3), [G](k)(8)Recordkeeping
[G]§63.1209(k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
303A
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(32 of 191)
Does the kilnhave in-line kiln raw mill
with dual stacks?Yes
Comply with the following:Standard
§63.1220(d)(1)(iv)Monitoring/Testing§63.1220(d)(1)(v)
Reporting§63.1220(d)(1)(v)
No
§63.1220(d)
303A
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(33 of 191)
304
Comply with the following:Standard
§63.1220(a)(2)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(4)§63.1220(f)
Monitoring/Testing[T]§63.1207(c)(3), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
Has an alternativestandards petition for Hg
been submitted to theAdministrator?
§63.1206(b)(10)(i)
No
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
Yes
302
Is theMTEC used as a
limit?
§63.1220(a)(2)(ii)(B)
Comply with the following:Standard
§63.1220(a)(2)(ii)(B)
Comply with the following:Standard
§63.1220(a)(2)(ii)(A)305
306
No
Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(34 of 191)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
305
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)Monitoring/Testing
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
306
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)
[G]§63.1209(l)(1)(iii)(C)-(D)Monitoring/Testing
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)
[G]§63.1209(l)(1)(iii)(C)-(D)
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(35 of 191)
307
Comply with the following:Standard
[G]§63.1220(a)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1220(f)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(3)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(i), (c)(1)(i)
309
Has analternative standards
petition for semivolatile metals been submitted to theAdministrator?
§63.1206(b)(10)(i)
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
YesNo
302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(36 of 191)
308
Comply with the following:Standard
[G]§63.1220(a)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1220(f)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(4)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(i), (c)(1)(i)
310
Has analternative standards
petition for low volatile metals been submitted to theAdministrator?
§63.1206(b)(10)(i)
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
YesNo
302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(37 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
309
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iii)Monitoring/Testing
[G]§63.1209(n)(2)(iii)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
310
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iii)§63.1209(n)(2)(vi)Monitoring/Testing
[G]§63.1209(n)(2)(iii), (n)(2)(vi)
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(38 of 191)
311
Does thecement kiln feed
hazardous waste at a locationother than the end where products are
normally discharged and wherefuels are normally
fired?
§63.1206(b)(13)
Yes
Is hazardouswaste only fired upstream
of the bypass duct and at the kilnend where products
are discharged?
§63.1206(b)(13)(i)(A)(3)
Yes
314
No
Are hydrocarbonsmonitored at the by-pass duct and
preheater tower?
§63.1206(b)(13)(i)(A)(2)
Yes
315
No
316
Is the kilnequipped with a by-pass duct
or midkiln gas samplingsystem?
§63.1220(a)(5)(i)
Yes
312
313
No
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(39 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
312
§63.1220(a)(5)(i)(A)
Comply with the following:Standard
§63.1220(a)(5)(i)(A)[G]§63.1206(c)(6)(iv)
§63.1220(f)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1220(a)(5)(i)(B)[G]§63.1206(c)(6)(iv)
§63.1220(f)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Yes No
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(40 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
313
§63.1220(a)(5)(ii)(B)
No
Comply with the following:Standard
§63.1220(a)(5)(ii)(B)[G]§63.1206(c)(6)(iv)
§63.1220(f)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1220(a)(5)(ii)(A)[G]§63.1206(c)(6)(iv)
§63.1220(f)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Yes
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(41 of 191)
314
Comply with the following:Standard
§63.1206(b)(13)(i)(A)(3)[G]§63.1206(c)(6)(iv)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
315
Comply with the following:Standard
§63.1206(b)(13)(i)(A)(2)[G]§63.1206(c)(6)(iv)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(42 of 191)
316
Comply with the following:Standard
§63.1206(b)(13)(i)(A)(1)[G]§63.1206(c)(6)(iv)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(43 of 191)
317
Comply with the following:Standard
§63.1220(a)(6)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i)[G]§63.1209(o)(2)-(3), (o)(4)
§63.1220(f)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), (g)(2)(iii)[G]§63.1207(m)(1)-(2)
[G]§63.1208(b)(5)(i), (b)(5)(ii), (b)(5)(ii)(A)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)§63.1210(b)(3)(i), (c)(1)(i)
Has an alternativestandards petition for
hydrogen chloride/chlorine gas been submitted to the
Administrator?
§63.1206(b)(10)(i)
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
YesNo
323
302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(44 of 191)
318
Comply with the following:Standard
§63.1220(a)(7)(i)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (n)(3)
§63.1220(f)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3), (g)(1)(i)(C), (g)(1)(iii)(B)
§63.1207(g)(2)(iv)§63.1208(b)(6)
§63.1209(a)(1)(iii), (a)(5), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2)
Recordkeeping§63.1207(g)(1)(iii)(B)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(i), (c)(1)(i)
319
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(45 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
NoComply with the following:
Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
319
NoYes
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(46 of 191)
Is the sourceequipped with leak detection
under §63.1206(c)(8) or particulatematter detection under
§63.1206(c)(9)?
320
§63.1220(a)(7)(ii)
Yes
Comply with the following:Standard
§63.1220(a)(7)(ii)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1220(f)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3)
§63.1208(b)(9)§63.1209(a)(2)
Reporting[G]§63.1206(b)(8)(iii)§63.1207(f)(1)(xvii)
§63.1210(b)(3)(i), (c)(1)(i)
Sources equipped with a bag leak detection system under
§63.1206(c)(8) or a particulate matter detection system under §63.1206(c)(9) are not subject
to opacity standards.
No
323
302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(47 of 191)
Does theincinerator burn the
dioxin-listed hazardous wastes F020, F021, F022, F023, F026,
or F027?
321
§63.1220(c)(2)
Comply with the following:Standard
§63.1220(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1220(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)
Reporting§63.1207(f)(1)(ii)(D)
§63.1207(f)(1)(xvii), (f)(1)(xix)§63.1210(b)(3)(i)-(ii), (c)(1)(i)-(ii)
Comply with the following:Standard
§63.1220(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1220(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)
Reporting§63.1207(f)(1)(ii)(D)
§63.1207(f)(1)(xvii), (f)(1)(xix)§63.1210(b)(3)(i)-(ii), (c)(1)(i)-(ii)
322
YesNo
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(48 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at a
location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A)[G]§63.1206(b)(7)(ii)(B)(1)
§63.1206(b)(7)(ii)(B)(2)
Yes
§63.1206(b)(7)(ii)
No
322
323
323
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(49 of 191)
323
324
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)
§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(50 of 191)
Does thekiln have in-line kiln
raw mill?
§63.1220(d)Yes
Is the kilnpreheater or preheater/
precalciner kiln withdual stacks?
324
Comply with the following:Monitoring/Testing
§63.1220(d)(1)(i), (d)(1)(iii)Recordkeeping
§63.1220(d)(1)(ii)
§63.1220(e)
Yes
Comply with the following:Monitoring/Testing
§63.1220(e)(1)
No
No
302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(51 of 191)
Dioxins,Furans
401
Pb, Cd, Se
403
404
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
407
408
411Total
Chlorine
418
417
POHC
421
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
PM(Opacity) 420
Have allpollutant paths been
completed? End
§63.1220
No
Continue through next path.
402
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(52 of 191)
403
Is thecombustion gas
temperature at the inlet to theinitial particulate matter control device 400
deg. F or lower based on the average of the test run
averages?
§63.1220(b)(1)(ii)
Comply with the following:Standard
§63.1220(b)(1)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1220(f)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
[G]§63.1209(k)(3), [G](k)(8)Recordkeeping
[G]§63.1209(k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1220(b)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1220(f)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
[G]§63.1209(k)(3), [G](k)(8)Recordkeeping
[G]§63.1209(k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
403A
YesNo
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(53 of 191)
Does the kilnhave in-line kiln raw mill with
dual stacks?Yes
Comply with the following:Standard
§63.1220(d)(1)(iv)Monitoring/Testing§63.1220(d)(1)(v)
Reporting§63.1220(d)(1)(v)
No
§63.1220(d)
403A
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(54 of 191)
404
Comply with the following:Standard
§63.1220(b)(2)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(4)§63.1220(f)
Monitoring/Testing[T]§63.1207(c)(3), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Has an alternativestandards petition for Hg
been submitted to theAdministrator?
§63.1206(b)(10)(i)
No
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
Yes
402
405Is the
MTEC used as alimit?
§63.1220(b)(2)(ii)(B)
YesComply with the following:
Standard§63.1220(b)(2)(ii)(B)
Comply with the following:Standard
§63.1220(b)(2)(ii)(A)No
406
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(55 of 191)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
405
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)Monitoring/Testing
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
406
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)
[G]§63.1209(l)(1)(iii)(C)-(D)Monitoring/Testing
§63.1209(l), [G](l)(1)(iii)(A)§63.1209(l)(1)(iii)(B)
[G]§63.1209(l)(1)(iii)(C)-(D)
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(56 of 191)
407
Comply with the following:Standard
[G]§63.1220(b)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1220(f)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(3)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
409
Has analternative standards
petition for semivolatile metals been submitted to theAdministrator?
§63.1206(b)(10)(i)
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
Yes
402
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(57 of 191)
408
Comply with the following:Standard
[G]§63.1220(b)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1220(f)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(4)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
410
Has analternative standards
petition for low volatile metals been submitted to theAdministrator?
§63.1206(b)(10)(i)
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
Yes
402
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(58 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
409
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iii)Monitoring/Testing
[G]§63.1209(n)(2)(iii)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
410
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iii)§63.1209(n)(2)(vi)Monitoring/Testing
[G]§63.1209(n)(2)(iii), (n)(2)(vi)
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(59 of 191)
411
Does thecement kiln feed
hazardous waste at a locationother than the end where products are
normally discharged and wherefuels are normally
fired?
§63.1206(b)(13)
Yes
Is hazardouswaste only fired upstream
of the bypass duct and at the kilnend where products
are discharged?
§63.1206(b)(13)(i)(B)(3)
Yes
414
No
Are hydrocarbonsmonitored at the by-pass duct and
preheater tower?
§63.1206(b)(13)(i)(B)(2)
Yes
415No
416
Is the kilnequipped with a by-pass duct
or midkiln gas samplingsystem?
§63.1220(b)(5)(i)
Yes
412
413
No
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(60 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
412
§63.1220(b)(5)(i)(A)(1)
Yes
No
Comply with the following:Standard
§63.1220(b)(5)(i)(A)(1)[G]§63.1206(c)(6)(iv)
§63.1220(f)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1220(b)(5)(i)(A)(2)[G]§63.1206(c)(6)(iv)
§63.1220(f)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Was thekiln constructed
after April 19, 1996 at asite where a cement kiln
did not previouslyexist?
§63.1220(b)(5)(i)(B)
Yes
No
Comply with the following:Standard
§63.1220(b)(5)(i)(B)423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(61 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
413
§63.1220(b)(5)(ii)(B)(1)
Yes
No
Comply with the following:Standard
§63.1220(b)(5)(ii)(B)(1)[G]§63.1206(c)(6)(iv)
§63.1220(f)§63.1220(b)(5)(ii)(B)(2)
Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1220(b)(5)(ii)(A)[G]§63.1206(c)(6)(iv)
§63.1220(f)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Was thekiln constructed
after April 19, 1996 at asite where a cement kiln
did not previouslyexist?
§63.1220(b)(5)(ii)(B)(3)
Yes
No
Comply with the following:Standard
§63.1220(b)(5)(ii)(B)(3)
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(62 of 191)
414
Comply with the following:Standard
§63.1206(b)(13)(i)(B)(3)(i)[G]§63.1206(c)(6)(iv)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
415
Comply with the following:Standard
§63.1206(b)(13)(i)(B)(2)(i)[G]§63.1206(c)(6)(iv)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
§63.1206(b)(13)(i)(B)(2)(ii)
Was thekiln constructed
after April 19, 1996 at asite where a cement kiln
did not previouslyexist?
Yes
No
Comply with the following:Standard
§63.1206(b)(13)(i)(B)(2)(ii)423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(63 of 191)
416
Comply with the following:Standard
§63.1206(b)(13)(i)(B)(1)[G]§63.1206(c)(6)(iv)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(64 of 191)
417
Comply with the following:Standard
§63.1220(b)(6)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i), [G](o)(2)-(3)
§63.1209(o)(4)§63.1220(f)
Monitoring/Testing[T]§63.1207(c)(3), (f)(1)(xi)
§63.1207(g)(2)(iii), [G](m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii), (b)(5)(ii)(A)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Has an alternativestandards petition for
hydrogen chloride/chlorine gas been submitted to the
Administrator?
§63.1206(b)(10)(i)
Comply with the following:Standard
§63.1206(b)(10)(i)§63.1206(b)(10)(iii), [G](b)(10)(vii)
Reporting[G]§63.1206(b)(10)(iv), (b)(10)(v)-(vi)
Yes
402
No
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(65 of 191)
418
Comply with the following:Standard
§63.1220(b)(7)(i)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (n)(3)
§63.1220(f)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3), (g)(1)(i)(C), (g)(1)(iii)(B)
§63.1207(g)(2)(iv)§63.1208(b)(6)
§63.1209(a)(1)(iii), (a)(5), (m), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2)
Recordkeeping§63.1207(g)(1)(iii)(B)
[G]§63.1212(c)Reporting
[G]§63.1206(b)(8)(iii)§63.1207(f)(1)(xvii), (f)(1)(xxiii)
[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
419
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(66 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
No Comply with the following:Standard
§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
419
Yes No
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(67 of 191)
Is the sourceequipped with leak detection
under §63.1206(c)(8) or particulatematter detection under
§63.1206(c)(9)?
420
§63.1220(a)(7)(ii)
Yes
Comply with the following:Standard
§63.1220(b)(7)(ii)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1220(f)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3)
§63.1208(b)(9)§63.1209(a)(2)Recordkeeping[G]§63.1212(c)
Reporting[G]§63.1206(b)(8)(iii)§63.1207(f)(1)(xvii)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Sources equipped with a bag leak detection system under
§63.1206(c)(8) or a particulate matter detection system under §63.1206(c)(9) are not subject
to opacity standards.
402
No
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(68 of 191)
Does theincinerator burn
the dioxin-listed hazardous wastes F020, F021, F022,
F023, F026,or F027?
421
§63.1220(c)(2)
Comply with the following:Standard
§63.1220(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1220(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1220(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1220(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
422
YesNo
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(69 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at
a location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A)[G]§63.1206(b)(7)(ii)(B)(1)
§63.1206(b)(7)(ii)(B)(2)
Yes
§63.1206(b)(7)(ii)
No
422
423
423
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(70 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)
§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
423
424
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(71 of 191)
Does thekiln have in-line kiln
raw mill?
§63.1220(d)Yes
Is the kilnpreheater or preheater/
precalciner kiln withdual stacks?
424
Comply with the following:Monitoring/Testing
§63.1220(d)(1)(i), (d)(1)(iii)Recordkeeping
§63.1220(d)(1)(ii)
§63.1220(e)
Yes
Comply with the following:Monitoring/Testing
§63.1220(e)(1)402
No
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(72 of 191)
Dioxins,Furans
501
Pb, Cd, Se
503
504
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
509
510
513Total
Chlorine
515
514
POHC
517
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
Have allpollutant paths been
completed? End
§63.1221
No
Continue through next path.
502
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(73 of 191)
503
§63.1221(a)(1)(ii)
Comply with the following:Standard
§63.1221(a)(1)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(ii), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1221(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
519
Comply with the following:Standard
§63.1221(a)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(ii), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1221(d)
Monitoring/Testing[T][G]§63.1207(b)(2)-(3), [T](c)(3)
§63.1207(g)(1)(i)(A)§63.1207(g)(2)(ii), (g)(2)(v)
[G]§63.1208(b)(1)§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)
Recordkeeping§63.1209(k)(2)(i), [G](k)(3)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
YesNo
Is thecombustion gas
temperature at the inlet to theinitial particulate matter control device 400
deg. F or lower based on theaverage of the test run
averages?
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(74 of 191)
504
Has an alternativestandards petition for Hg
been submitted to theAdministrator?
§63.1206(b)(9)(i)
No
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
Yes
502
Is the kiln meeting a maximum theoretical emission concentration
(MTEC)?
§63.1221(a)(2)(ii)
No
Yes
505
506
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(75 of 191)
Comply with the following:Standard
§63.1221(a)(2)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(4)§63.1221(d)
Monitoring/Testing[T]§63.1207(c)(3), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1221(a)(2)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(4)§63.1221(d)
Monitoring/Testing[T]§63.1207(c)(3), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
507 508
505 506
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(76 of 191)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
507
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), (l)(1)(iv)(A)Monitoring/Testing
§63.1209(l), (l)(1)(iv)(A)
519
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
508
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), [G](l)(1)(iv)(B)-(C)Monitoring/Testing
§63.1209(l), [G](l)(1)(iv)(B)-(C)
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(77 of 191)
509
Comply with the following:Standard
[G]§63.1221(a)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1221(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(3)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(i), (c)(1)(i)
511
Has an alternative standards
petition for semivolatile metals been submitted to the
Administrator?
§63.1206(b)(9)(i)
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
Yes
502
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(78 of 191)
510
Comply with the following:Standard
[G]§63.1221(a)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1221(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(4)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(i), (c)(1)(i)
512
Has analternative standards
petition for low volatile metals been submitted to the
Administrator?
§63.1206(b)(9)(i)
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
Yes
502
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(79 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
511
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iv)Monitoring/Testing
[G]§63.1209(n)(2)(iv)
519
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
512
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iv)§63.1209(n)(2)(vi)Monitoring/Testing
[G]§63.1209(n)(2)(iv), (n)(2)(vi)
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(80 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
513
§63.1221(a)(5)(i)
No
Comply with the following:Standard
§63.1221(a)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1221(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1221(a)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1221(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Reporting
§63.1207(f)(2)(i)§63.1210(b)(3)(i), (c)(1)(i)
Yes
519
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(81 of 191)
514
Comply with the following:Standard
§63.1221(a)(6)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i), [G](o)(2)-(3)
§63.1209(o)(4)§63.1221(d)
Monitoring/Testing[T]§63.1207(c)(3), (f)(1)(xi)
§63.1207(g)(2)(iii), [G](m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii)
[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii)
§63.1207(m)(5)§63.1210(b)(3)(i), (c)(1)(i)
Has an alternativestandards petition for
hydrogen chloride/chlorine gas been submitted to the
Administrator?
§63.1206(b)(9)(i)
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
Yes
502
No
519
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(82 of 191)
515
Comply with the following:Standard
§63.1221(a)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (n)(3)
§63.1221(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3), (g)(1)(i)(C), (g)(2)(iv)
§63.1208(b)(6)§63.1209(a)(1)(iii), (a)(5), [G](m)(1)(i)
[G]§63.1209(m)(1)(iv), [G](m)(2)Reporting
[G]§63.1206(b)(8)(iii)§63.1207(f)(1)(xvii), (f)(1)(xxiii)
[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)§63.1210(b)(3)(i), (c)(1)(i)
516
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(83 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?§63.1206(c)(8)(i)(B)
NoComply with the following:
Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
516
NoYes
519
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(84 of 191)
Does theincinerator burn
the dioxin-listed hazardous wastes F020, F021, F022,
F023, F026, or F027?
517
§63.1221(c)(2)
Comply with the following:Standard
§63.1221(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1221(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1221(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1221(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207((f)(1)(xix)§63.1210(b)(3)(i), (c)(1)(i)
518
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(85 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at
a location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
518
519
519
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(86 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
519
502
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(87 of 191)
Dioxins,Furans
601
Pb, Cd, Se
603
604
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
609
610
613Total
Chlorine
615
614
POHC
617
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
Have allpollutant paths been
completed? End
§63.1221
No
Continue through next path.
602
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(88 of 191)
603
Is thecombustion gas
temperature at the inlet to theinitial particulate matter control device 400
deg. F or lower based on theaverage of the test run
averages?
§63.1221(b)(1)(ii)
Comply with the following:Standard
§63.1221(b)(1)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(ii), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1221(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(3)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
619
Comply with the following:Standard
§63.1221(b)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(ii), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1221(d)
Monitoring/Testing[T][G]§63.1207(b)(2)-(3), [T](c)(3)
§63.1207(g)(1)(i)(A)§63.1207(g)(2)(ii), (g)(2)(v)
[G]§63.1208(b)(1)§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)
Recordkeeping§63.1209(k)(2)(i), [G](k)(3)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(89 of 191)
604
Has an alternativestandards petition for Hg
been submitted to theAdministrator?
§63.1206(b)(9)(i)
No
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
Yes
602
Is the kilnmeeting a maximum theoretical emission
concentration(MTEC)?
§63.1221(b)(2)(ii)
No
Yes
605
606
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(90 of 191)
Comply with the following:Standard
§63.1221(b)(2)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(4)§63.1221(d)
Monitoring/Testing[T]§63.1207(c)(3), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1221(b)(2)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(4)§63.1221(d)
Monitoring/Testing[T]§63.1207(c)(3), [G](m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
607 608
605 606
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(91 of 191)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
607
Yes§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), (l)(1)(iv)(A)Monitoring/Testing
§63.1209(l), (l)(1)(iv)(A)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
608
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), [G](l)(1)(iv)(B)-(C)Monitoring/Testing
§63.1209(l), [G](l)(1)(iv)(B)-(C)
619
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(92 of 191)
609
Comply with the following:Standard
[G]§63.1221(b)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1221(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(3)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
611
Has analternative standards
petition for semivolatile metals been submitted to the
Administrator?
§63.1206(b)(9)(i)
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
Yes
602
No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(93 of 191)
610
Comply with the following:Standard
[G]§63.1221(b)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1221(d)Monitoring/Testing
[T]§63.1207(c)(3), (f)(1)(xi), [G](m)(1)-(2)§63.1208(b)(4)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
612
Has analternative standards
petition for low volatile metals been submitted to the
Administrator?
§63.1206(b)(9)(i)
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
YesNo
602
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(94 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
611
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iv)Monitoring/Testing
[G]§63.1209(n)(2)(iv)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
612
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), [G](n)(2)(iv)§63.1209(n)(2)(vi)Monitoring/Testing
[G]§63.1209(n)(2)(iv), (n)(2)(vi)
619
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(95 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
613
§63.1221(b)(5)(i)
Comply with the following:Standard
§63.1221(b)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1221(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(3)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1221(b)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1221(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(3), [T](g)(2)(i), (g)(2)(v)§63.1209(a)(1)(i), (a)(2), [G](a)(4)
[G]§63.1209(a)(6), (a)(7)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Yes No
619
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(96 of 191)
614
Comply with the following:Standard
§63.1221(b)(6)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i), [G](o)(2)-(3)
§63.1209(o)(4)§63.1221(d)
Monitoring/Testing[T]§63.1207(c)(3), (f)(1)(xi), (g)(2)(iii)
[G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii)
[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii)
§63.1207(m)(5)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Has an alternativestandards petition for
hydrogen chloride/chlorine gas been submitted to the
Administrator?
§63.1206(b)(9)(i)
Comply with the following:Standard
§63.1206(b)(9)(i)§63.1206(b)(9)(iii), [G](b)(9)(vii)
Reporting[G]§63.1206(b)(9)(iv), (b)(9)(v)-(vi)
YesNo
619
602
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(97 of 191)
615
Comply with the following:Standard
§63.1221(b)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (n)(3)
§63.1221(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(3), (g)(1)(i)(C), (g)(2)(iv)
§63.1208(b)(6)§63.1209(a)(1)(iii), (a)(5), (m), [G](m)(1)(i)
[G]§63.1209(m)(1)(iv), [G](m)(2)Recordkeeping[G]§63.1212(c)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
616
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(98 of 191)
Is thecombustor equipped with
a baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
NoComply with the following:
Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
616
NoYes
619
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(99 of 191)
Does theincinerator burn the dioxin-
listed hazardous wastes F020, F021, F022, F023, F026,
or F027?
617
§63.1221(c)(2)
Comply with the following:Standard
§63.1221(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1221(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(i)-(ii), (c)(1)(i)-(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1221(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1221(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(3), [T](f)(1)(ii)(D)[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(i)-(ii), (c)(1)(i)-(ii)
[G]§63.1212(b)-(c)
618
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(100 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at a
location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
618
619
619
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(101 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
619
602
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(102 of 191)
Dioxins,Furans
701
Pb, Cd, Se
703
704
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
705
706
709Total
Chlorine
711
710
POHC
713
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
Have allpollutant paths been
completed? End
§63.1216
No
Continue through next path.
702
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(103 of 191)
703
§63.1216(a)(1)
Comply with the following:Standard
§63.1216(a)(1)§63.1216(a)(5)(i)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1216(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
715
Comply with the following:Standard
§63.1216(a)(1)§63.1216(a)(5)(ii)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1216(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(104 of 191)
704
Comply with the following:Standard
§63.1216(a)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1216(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2)
[G]§63.1207(m)(1)-(2)§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
Yes
No
Comply with the following:Standard
§63.1209(l), (l)(1)(i)Monitoring/Testing§63.1209(l), (l)(1)(i)
715
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(105 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
705
§63.1216(e)
Yes
In lieu of complying with particulate matter standard in §63.1216(a)(7), you
may elect to comply with alternative metal emission control requirements.
Comply with the following:Standard
§63.1216(a)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1216(e)(2)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
707
No
Is thesource an area
source?No
Yes
§63.1216(a)(3)
702
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(106 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
706
§63.1216(e)
Yes
Comply with the following:Standard
§63.1216(a)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1216(e)(2)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
708
§63.1216(a)(4)
No
In lieu of complying with particulate matter standard in §63.1216(a)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)
YesNo
702
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(107 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
707
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii)Monitoring/Testing§63.1209(n)(2)(ii)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
708
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii), (n)(2)(vi)Monitoring/Testing
§63.1209(n)(2)(ii), (n)(2)(vi)
715
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(108 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
709
§63.1216(a)(5)(i)
No
Comply with the following:Standard
§63.1216(a)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1216(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(3)[G]§63.1209(a)(6), (a)(7)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1216(a)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1216(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(4)[G]§63.1209(a)(6), (a)(7)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(i), (c)(1)(i)
Yes
715
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(109 of 191)
710
Comply with the following:Standard
§63.1216(a)(6)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i)[G]§63.1209(o)(2)-(3), (o)(4)
§63.1216(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)
[G]§63.1208(b)(5)(i), (b)(5)(ii)[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)§63.1210(b)(3)(i), (c)(1)(i)
No
YesIs the
source an areasource?
§63.1216(a)(6)
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)No
Yes
715
702
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(110 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
711
§63.1216(e)
Yes
Comply with the following:Standard
§63.1216(a)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (m)(3), (n)(3)
§63.1216(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(1), [T][G](c)(2)§63.1207(g)(1)(i)(C), (g)(2)(iv)
§63.1208(b)(6)§63.1209(a)(1)(iii), (a)(5), [G](m)(1)(i)
[G]§63.1209(m)(1)(iv), [G](m)(2), (m)(3)Reporting
[G]§63.1206(b)(8)(iii)§63.1207(f)(1)(xvii), (f)(1)(xxiii)
[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)§63.1210(b)(3)(i), (c)(1)(i)
712
No
Comply with §63.1216(e)(2)(i) and (ii) found in the appropriate metals paths.
§63.1216(a)(7)
In lieu of complying with particulate matter standard in §63.1216(a)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)
YesNo
702
702
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(111 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
NoComply with the following:
Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
712
NoYes
715
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(112 of 191)
Does theincinerator burn
the dioxin-listed hazardous wastes F020, F021, F022,
F023, F026, or F027?
713
§63.1216(c)(2)
Comply with the following:Standard
§63.1216(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1216(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Reporting
§63.1207(f)(1)(ii)(D), (f)(1)(xvii), (f)(1)(xix)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1216(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1216(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Reporting
§63.1207(f)(1)(ii)(D), (f)(1)(xvii), (f)(1)(xix)§63.1210(b)(3)(i), (c)(1)(i)
714
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(113 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at a
location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
714
715
715
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(114 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
715
702
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(115 of 191)
Dioxins,Furans
801
Pb, Cd, Se
803
804
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
805
806
809Total
Chlorine
811
810
POHC
813
PM
Hg
Applicant must go through the flowchart for
each pollutant group.
Have allpollutant paths been
completed? End
§63.1216
No
Continue through next path.
802
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(116 of 191)
803
§63.1216(b)(1)
Comply with the following:Standard
§63.1216(b)(1)§63.1216(b)(5)(i)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1216(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), (k)(3), (k)(8)Recordkeeping
§63.1209(k)(2)(i), (k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
815
Comply with the following:Standard
§63.1216(b)(1)§63.1216(b)(5)(ii)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1216(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), (k)(3), (k)(8)Recordkeeping
§63.1209(k)(2)(i), (k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(117 of 191)
804
Comply with the following:Standard
§63.1216(b)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1216(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2)
[G]§63.1207(m)(1)-(2)§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
Yes
No
Comply with the following:Standard
§63.1209(l), (l)(1)(i)Monitoring/Testing§63.1209(l), (l)(1)(i)
815
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(118 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
805
§63.1216(e)
Yes
Comply with the following:Standard
§63.1216(b)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1216(e)(3)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
807
No
§63.1216(b)(3)
802
In lieu of complying with particulate matter standard in §63.1216(b)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)
YesNo
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(119 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
806
§63.1216(e)
Yes
Comply with the following:Standard
§63.1216(b)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1216(e)(3)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1216(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
808
§63.1216(b)(4)
No
In lieu of complying with particulate matter standard in §63.1216(b)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)
YesNo
802
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(120 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
807
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii)Monitoring/Testing§63.1209(n)(2)(ii)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
808
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)-(ii), (n)(2)(vi)Monitoring/Testing
§63.1209(n)(2)(ii), (n)(2)(vi)
815
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(121 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
809
§63.1216(b)(5)(i)
Comply with the following:Standard
§63.1216(b)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1216(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(3)[G]§63.1209(a)(6), (a)(7)
Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1216(b)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1216(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(4)[G]§63.1209(a)(6), (a)(7)
Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Yes No
815
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(122 of 191)
810
Comply with the following:Standard
§63.1216(b)(6)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i)[G]§63.1209(o)(2)-(3), (o)(4)
§63.1216(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)
[G]§63.1208(b)(5)(i), (b)(5)(ii)[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
No
Is thesource an area
source?§63.1216(b)(6)
Yes
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)No
Yes
815
802
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(123 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
811
§63.1216(e)
Yes
In lieu of complying with particulate matter standard in §63.1216(b)(7), you
may elect to comply with alternative metal emission control requirements.
Comply with the following:Standard
§63.1216(b)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (m)(3), (n)(3)
§63.1216(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(1), [T][G](c)(2)§63.1207(g)(1)(i)(C), (g)(2)(iv)
§63.1208(b)(6)§63.1209(a)(1)(iii), (a)(5), [G](m)(1)(i)
[G]§63.1209(m)(1)(iv), [G](m)(2), (m)(3)Recordkeeping[G]§63.1212(c)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
812
No
Comply with §63.1216(e)(3)(i) and (ii) found in the appropriate metals paths.
§63.1216(b)(7)
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1216?
§63.1216(f)
YesNo
802
802
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(124 of 191)
Is thecombustor equipped with
a baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
NoComply with the following:
Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
812
NoYes
815
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(125 of 191)
Does theincinerator burn
the dioxin-listed hazardous wastes F020, F021, F022,
F023, F026,or F027?
813
§63.1216(c)(2)
Comply with the following:Standard
§63.1216(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1216(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207((f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1216(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1216(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207((f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
814
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(126 of 191)
814
Did the sourceComply with the following:
previous testing to documentNo Monitoring/Testing
conformance with the[T]§63.1206(b)(7)(iii)
DRE standard?
§63.1206(b)(7)(iii)
Yes815
Does the sourcefeed hazardous waste at a Comply with the following:
location in the combustion system Yes Standardother than the normal §63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)
flame zone?
§63.1206(b)(7)(ii)
No
Comply with the following:Recordkeeping 815
[G]§63.1206(b)(7)(i)
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(127 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
815
802
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(128 of 191)
Dioxins,Furans
901
Pb, Cd, Se
903
905
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
908
915
922Total
Chlorine
924
923
POHC
926
PM
Hg
Applicant must go through the flowchart for
each pollutant group.
Have allpollutant paths been
completed? End
§63.1217
No
Continue through next path.
902
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(129 of 191)
Is the boilerequipped with a dry air pollution
control system?903
§63.1217(a)(1)(i)Yes
Comply with the following:Standard
§63.1217(a)(1)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1217(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(1), [T][G](c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
928
904No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(130 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
904
§63.1217(a)(1)(ii)
Comply with the following:Standard
§63.1217(a)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1217(d)
Monitoring/Testing[T][G]§63.1207(b)(2)-(3), [T](c)(1)
[T][G]§63.1207(c)(2)§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)
[G]§63.1208(b)(1)§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)
Recordkeeping§63.1209(k)(2)(i), [G](k)(3)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(a)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1217(d)
Monitoring/Testing[T][G]§63.1207(b)(2)-(3), [T](c)(1)
[T][G]§63.1207(c)(2)§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)
[G]§63.1208(b)(1)§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)
Recordkeeping§63.1209(k)(2)(i), [G](k)(3)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
Yes No
928
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(131 of 191)
905
§63.1217(a)(2)(i)
No
Comply with the following:Standard
§63.1217(a)(2)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2)
[G]§63.1207(m)(1)-(2)§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(a)(2)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2)
[G]§63.1207(m)(1)-(2)§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
906 907
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb
Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(132 of 191)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
906
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)[G]§63.1209(l)(1)(ii)(C)-(D)
Monitoring/Testing§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)
[G]§63.1209(l)(1)(ii)(C)-(D)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
907
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)[G]§63.1209(l)(1)(ii)(B)[G]§63.1209(l)(1)(ii)(D)
Monitoring/Testing§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)
[G]§63.1209(l)(1)(ii)(B)[G]§63.1209(l)(1)(ii)(D)
928
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(133 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
908
§63.1217(e)
YesNo
§63.1217(a)(3)
902
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(a)(3)(i)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(e)(2)(i)(A)
No No
910 912
Yes Yes
909 911
In lieu of complying with particulate matter standard in §63.1217(a)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)
No
Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(134 of 191)
Comply with the following:Standard
§63.1217(a)(3)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(a)(3)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
913 914
909 910
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(135 of 191)
Comply with the following:Standard
§63.1217(e)(2)(i)(A)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(e)(2)(ii)(A)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
911 912
913 914
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(136 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
913
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), (n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(3)Monitoring/Testing
§63.1209(n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(3)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
914
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), (n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(2)Monitoring/Testing
§63.1209(n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(2)
928
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(137 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
915
§63.1217(e)
YesNo
§63.1217(a)(4)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(a)(4)(i)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(e)(2)(i)(B)
No No
917 919
Yes Yes
916 918
In lieu of complying with particulate matter standard in §63.1217(a)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)No
Yes
902
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(138 of 191)
Comply with the following:Standard
§63.1217(a)(4)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(a)(4)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
920 921
916 917
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(139 of 191)
Comply with the following:Standard
§63.1217(e)(2)(i)(B)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(e)(2)(ii)(B)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
918 919
920 921
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(140 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
920
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)§63.1209(n)(2)(v)(B)(2), (n)(2)(vi)
Monitoring/Testing§63.1209(n)(2)(v)(B)(2), (n)(2)(vi)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
921
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)[G]§63.1209(n)(2)(v)(B)(1)
§63.1209(n)(2)(vi)Monitoring/Testing
[G]§63.1209(n)(2)(v)(B)(1)§63.1209(n)(2)(vi)
928
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(141 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
922
§63.1217(a)(5)(i)
No
Comply with the following:Standard
§63.1217(a)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1217(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(3)[G]§63.1209(a)(6), (a)(7)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(a)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1217(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(4)[G]§63.1209(a)(6), (a)(7)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(i), (c)(1)(i)
Yes
928
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(142 of 191)
923Is the
source an areasource?
§63.1217(a)(6)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(a)(6)(i)
No
Comply with the following:Standard
§63.1217(a)(6)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(ii)(B)
[G]§63.1209(o)(2)-(3), (o)(4)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)
§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii)
[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(a)(6)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), [G](o)(1)(ii)(A)
[G]§63.1209(o)(2)-(3), (o)(4)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)
§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii)
[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)§63.1210(b)(3)(i), (c)(1)(i)
Yes
No
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)
YesNo
928
902
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(143 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
924
§63.1217(e)
Yes
Comply with the following:Standard
§63.1217(a)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (m)(3), (n)(3)
§63.1217(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(1), [T][G](c)(2), (g)(1)(i)(C)
§63.1207(g)(2)(iv)§63.1208(b)(6)
§63.1209(a)(1)(iii), (a)(5), (m), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2), (m)(3)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(i), (c)(1)(i)
925
No
Comply with §63.1217(e)(2)(i) and (ii) found in the appropriate metals paths.
§63.1217(a)(7)
In lieu of complying with particulate matter standard in §63.1217(a)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)
YesNo
902
902
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(144 of 191)
925
Is theYes combustor equipped with No
a baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system Yes
being used?
§63.1206(c)(8)(i)(B)Comply with the following:
No Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping 928
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(145 of 191)
Does theincinerator burn the
dioxin-listed hazardous wastes F020, F021, F022, F023,
F026, or F027?
926
§63.1217(c)(2)
Comply with the following:Standard
§63.1217(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1217(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Reporting
§63.1207(f)(1)(ii)(D), (f)(1)(xvii)§63.1207(f)(1)(xix)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1217(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1217(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Reporting
§63.1207(f)(1)(ii)(D), (f)(1)(xvii)§63.1207(f)(1)(xix)
§63.1210(b)(3)(i), (c)(1)(i)
927
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(146 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at a
location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
927
928
928
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(147 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
928
902
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(148 of 191)
Dioxins,Furans
1001
Pb, Cd, Se
1003
1005
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
1008
1015
1022Total
Chlorine
1024
1023
POHC
1026
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
Have allpollutant paths been
completed? End
§63.1217
No
Continue through next path.
1002
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(149 of 191)
Is the boilerequipped with a dry air pollution
control system?1003
§63.1217(b)(1)(i)Yes
Comply with the following:Standard
§63.1217(b)(1)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1217(d)
Monitoring/Testing[T][G]§63.1207(b)(2), [T](c)(1), [T][G](c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1028
1004No
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(150 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
1004
§63.1217(b)(1)(ii)
Comply with the following:Standard
§63.1217(b)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1217(d)
Monitoring/Testing[T][G]§63.1207(b)(2)-(3), [T](c)(1)
[T][G]§63.1207(c)(2)§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)
[G]§63.1208(b)(1)§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)
Recordkeeping§63.1209(k)(2)(i), [G](k)(3
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(b)(1)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(l)(2)§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)
[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)§63.1217(d)
Monitoring/Testing[T][G]§63.1207(b)(2)-(3), [T](c)(1)
[T][G]§63.1207(c)(2)§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)
[G]§63.1208(b)(1)§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)
Recordkeeping§63.1209(k)(2)(i), [G](k)(3
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Yes No
1028
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(151 of 191)
1005
§63.1217(b)(2)(i)
No
Comply with the following:Standard
§63.1217(b)(2)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2)
[G]§63.1207(m)(1)-(2)§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(b)(2)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2)
[G]§63.1207(m)(1)-(2)§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1006 1007
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb
Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(152 of 191)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(l)(1)(v)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)Reporting
[G]§63.1207(f)(1)(x)[G]§63.1209(l)(1)(v)
1006
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)[G]§63.1209(l)(1)(ii)(C)-(D)
Monitoring/Testing§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)
[G]§63.1209(l)(1)(ii)(C)-(D)
Are yourequesting to
extrapolate mercury feedrate limits from comprehensive
performance testlevels?
1007
Yes
§63.1207(f)(1)(x)§63.1209(l)(1)(v)
No
Comply with the following:Standard
§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)[G]§63.1209(l)(1)(ii)(B)[G]§63.1209(l)(1)(ii)(D)
Monitoring/Testing§63.1209(l), (l)(1)(ii), (l)(1)(ii)(A)
[G]§63.1209(l)(1)(ii)(B)[G]§63.1209(l)(1)(ii)(D)
1028
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(153 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
1008
§63.1217(e)
YesNo
§63.1217(b)(3)
1002
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(b)(3)(i)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(e)(3)(i)(A)
No No
1010 1012
Yes Yes
1009 1011
In lieu of complying with particulate matter standard in §63.1217(b)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)
YesNo
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(154 of 191)
Comply with the following:Standard
§63.1217(b)(3)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(b)(3)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1013 1014
1009 1010
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(155 of 191)
Comply with the following:Standard
§63.1217(e)(3)(i)(A)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(e)(3)(ii)(A)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1011 1012
1013 1014
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(156 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
1013
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), (n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(3)Monitoring/Testing
§63.1209(n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(3)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
1014
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i), (n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(2)Monitoring/Testing
§63.1209(n)(2)(v)(A)§63.1209(n)(2)(v)(A)(1)
[G]§63.1209(n)(2)(v)(A)(2)
1028
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(157 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
1015
§63.1217(e)
YesNo
§63.1217(b)(4)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(b)(4)(i)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(e)(3)(i)(B)
No No
1017 1019
Yes Yes
1016 1018
In lieu of complying with particulate matter standard in §63.1217(b)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)
YesNo
1002
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(158 of 191)
Comply with the following:Standard
§63.1217(b)(4)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(b)(4)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1020 1021
1016 1017
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(159 of 191)
Comply with the following:Standard
§63.1217(e)(3)(i)(B)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(e)(3)(ii)(B)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1217(e)(4)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1018 1019
1020 1021
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(160 of 191)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
Comply with the following:Standard
[G]§63.1209(n)(2)(vii)Monitoring/Testing
[T][G]§63.1207(f)(1)(x)[G]§63.1209(n)(2)(vii)
Reporting[G]§63.1207(f)(1)(x)
1020
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)§63.1209(n)(2)(v)(B)(2), (n)(2)(vi)
Monitoring/Testing§63.1209(n)(2)(v)(B)(2), (n)(2)(vi)
Are yourequesting to
extrapolate metal feedrate limits from comprehensive
performance testlevels?
1021
Yes
§63.1207(f)(1)(x)§63.1209(n)(2)(vii)
No
Comply with the following:Standard
§63.1209(n)(2)(i)[G]§63.1209(n)(2)(v)(B)(1)
§63.1209(n)(2)(vi)Monitoring/Testing
[G]§63.1209(n)(2)(v)(B)(1)§63.1209(n)(2)(vi)
1028
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(161 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
1022
§63.1217(b)(5)(i)
Comply with the following:Standard
§63.1217(b)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1217(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(3)[G]§63.1209(a)(6), (a)(7)
Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(b)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1217(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(4)[G]§63.1209(a)(6), (a)(7)
Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Yes No
1028
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(162 of 191)
1023
§63.1217(b)(6)
Doesthe boiler burn
hazardous waste withan as-fired heating value
less than 10,000Btu/lb?
§63.1217(b)(6)(i)
No
Comply with the following:Standard
§63.1217(b)(6)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(ii)(B)
[G]§63.1209(o)(2)-(3), (o)(4)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)
§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii)
[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(b)(6)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), [G](o)(1)(ii)(A)
[G]§63.1209(o)(2)-(3), (o)(4)§63.1217(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)
§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i), (b)(5)(ii)
[G]§63.1208(b)(5)(ii)(B)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Yes
Is thesource an area
source?No
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)
YesNo
1028
1002
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(163 of 191)
Is the owneror operator complying withalternative metal emission
requirements?
1024
§63.1217(e)
Yes
Comply with the following:Standard
§63.1217(b)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (m)(3), (n)(3)
§63.1217(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(1), [T][G](c)(2), (g)(1)(i)(C)
§63.1207(g)(2)(iv)§63.1208(b)(6)
§63.1209(a)(1)(iii), (a)(5), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2), (m)(3)
Recordkeeping[G]§63.1212(c)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
1025
No
Comply with §63.1217(e)(3)(i) and (ii) found in the appropriate metals paths.
§63.1217(b)(7)
In lieu of complying with particulate matter standard in §63.1217(b)(7), you
may elect to comply with alternative metal emission control requirements.
Is thesource an area
source?
Yes
Is the sourceelecting to comply
with §63.1217?
§63.1217(f)
No
1002
1002
No
Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(164 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Yes
No
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
NoComply with the following:
Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
1025
1028
1028
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(165 of 191)
Does theincinerator burn the dioxin-
listed hazardous wastes F020, F021, F022, F023, F026,
or F027?
1026
§63.1217(c)(2)
Comply with the following:Standard
§63.1217(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1217(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1217(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1217(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1027
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(166 of 191)
Did the sourceprevious testing to document
conformance with theDRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at a
location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
1027
1028
1028
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(167 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
1028
1002
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(168 of 191)
Dioxins,Furans
1101
Pb, Cd, Se
1103
1104
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
1105
1106
1107Total
Chlorine
1109
1108
POHC
1111
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
Have allpollutant paths been
completed? End
§63.1218
No
Continue through next path.
1102
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(169 of 191)
1103
§63.1218(a)(1)
Comply with the following:Standard
§63.1218(a)(1)§63.1218(a)(5)(ii)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1218(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
1113
Comply with the following:Standard
§63.1218(a)(1)§63.1218(a)(5)(i)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1218(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)Reporting
§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(i), (c)(1)(i)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(170 of 191)
1104
Comply with the following:Standard
§63.1218(a)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1218(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2)
[G]§63.1207(m)(1)-(2)§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(B)
§63.1210(b)(3)(i), (c)(1)(i)
1113
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(171 of 191)
1105
Comply with the following:Standard
§63.1218(a)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1218(d)Monitoring/Testing
[T]§63.1207(c)(1),[T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
No
Is thesource an area
source?
§63.1218(a)(3)
Yes
1102
Is the sourceelecting to comply
with §63.1218?
§63.1218(e)
No
Yes
1113
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(172 of 191)
1106
Comply with the following:Standard
§63.1218(a)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1218(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
Reporting§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)
§63.1207(f)(1)(xxvi), (m)(5)§63.1209(g)(1)(iv)(A)
§63.1210(b)(3)(i), (c)(1)(i)
No
Is thesource an area
source?
§63.1218(a)(4)
Yes
Is the sourceelecting to comply
with §63.1218?
§63.1218(e)
No
Yes
1113
1102
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(173 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
1107
§63.1218(a)(5)(i)
Comply with the following:Standard
§63.1218(a)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1218(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(3)[G]§63.1209(a)(6), (a)(7)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1218(a)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1218(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(4)[G]§63.1209(a)(6), (a)(7)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(i), (c)(1)(i)
Yes No
1113
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(174 of 191)
Is the facilitymeeting the ppmv emissionstandard (as opposed to the
calculated SRE)?
1108
§63.1218(a)(6)(i)
No
Comply with the following:Standard
§63.1218(a)(6)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i), [G](o)(2)-(3)
§63.1209(o)(4)§63.1218(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)
§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii)
§63.1207(m)(5)§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1218(a)(6)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i), [G](o)(2)-(3)
§63.1209(o)(4)§63.1218(d)
Monitoring/Testing[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)
§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)[G]§63.1208(b)(5)(i)
§63.1209(a)(5), (c)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii)
§63.1207(m)(5)§63.1210(b)(3)(i), (c)(1)(i)
Yes
Is thesource an area
source?
§63.1218(a)(6)
Is the source electing to comply with
§63.1218(e)?§63.1218(e)
Yes
NoNo
1113
1102
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(175 of 191)
1109
Comply with the following:Standard
§63.1218(a)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (n)(3)
§63.1218(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(1), [T][G](c)(2), (g)(1)(i)(C)
§63.1207(g)(2)(iv)§63.1208(b)(6)
§63.1209(a)(1)(iii), (a)(5), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(i), (c)(1)(i)
1110
No
Is thesource an area
source?§63.1218(a)(7)
Yes
Is the sourceelecting to comply
with §63.1218?
§63.1218(e)
No
Yes
1102
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(176 of 191)
Is thecombustor equipped with
a baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
No
Comply with the following:Standard
§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
1110
NoYes
1113
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(177 of 191)
Does theincinerator burn the dioxin-
listed hazardous wastes F020, F021, F022, F023, F026,
or F027?
1111
§63.1218(c)(2)
Comply with the following:Standard
§63.1218(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1218(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Reporting
§63.1207(f)(1)(ii)(D), (f)(1)(xvii)§63.1207(f)(1)(xix)
§63.1210(b)(3)(i), (c)(1)(i)
Comply with the following:Standard
§63.1218(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1218(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Reporting
§63.1207(f)(1)(ii)(D), (f)(1)(xvii)§63.1207(f)(1)(xix)
§63.1210(b)(3)(i), (c)(1)(i)
1112
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(178 of 191)
Did the source use previous testing to
document conformance with the DRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at
a location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
1112
1113
1113
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(179 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
1113
1102
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(180 of 191)
Dioxins,Furans
1301
Pb, Cd, Se
1303
1304
Sb, As, Be, Cr, Co, Mn, Ni
CO, THC
1305
1306
1307Total
Chlorine
1309
1308
POHC
1311
PM
Hg
Applicant must go through the flowchart for each
pollutant group.
Have allpollutant paths been
completed? End
§63.1218
No
Continue through next path.
1302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(181 of 191)
1303
§63.1218(b)(1)
Comply with the following:Standard
§63.1218(b)(1)§63.1218(b)(5)(i)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1218(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1313
Comply with the following:Standard
§63.1218(b)(1)§63.1218(b)(5)(ii)
[G]§63.1206(c)(6)(iv)[G]§63.1207(l)(2)
§63.1209(k), (k)(1)(i), (k)(2)(i)-(ii)[G]§63.1209(k)(3)-(4), (k)(5), [G](k)(6)-(9)
§63.1218(d)Monitoring/Testing
[T][G]§63.1207(b)(2)-(3), [T](c)(1)[T][G]§63.1207(c)(2)
§63.1207(g)(1)(i)(A), (g)(2)(ii), (g)(2)(v)[G]§63.1208(b)(1)
§63.1209(k)(2)(i), [G](k)(3), [G](k)(8)Recordkeeping
§63.1209(k)(2)(i), [G](k)(3)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xv), (f)(1)(xvii), (f)(1)(xix)[G]§63.1207(f)(1)(xx)-(xxi), (f)(1)(xxii)
§63.1207(f)(2)(ii), (j)(2)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
YesNo
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(182 of 191)
1304
Comply with the following:Standard
§63.1218(b)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1218(d)
Monitoring/Testing§63.1207(c)(1), [G](c)(2)[T][G]§63.1207(m)(1)-(2)
§63.1208(b)(2)§63.1209(a)(5)Recordkeeping
[G]§63.1207(m)(1)-(2)[G]§63.1212(c)
Reporting§63.1207(f)(1)(xvi), (f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(B)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1313
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(183 of 191)
1305
Comply with the following:Standard
§63.1218(b)(3)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1218(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(3)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
No
Is thesource an area
source?§63.1218(b)(3)
Yes
1302
Is the sourceelecting to comply
with §63.1218?
§63.1218(e)No
Yes
1313
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(184 of 191)
1306
Comply with the following:Standard
§63.1218(b)(4)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n), (n)(1), [G](n)(5)
§63.1218(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)[G]§63.1207(m)(1)-(2)
§63.1208(b)(4)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxvi), (m)(5)
§63.1209(g)(1)(iv)(A)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
No
Is thesource an area
source?§63.1218(b)(4)
Yes
Is the sourceelecting to comply
with §63.1218?
§63.1218(e)No
Yes
1313
1302
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(185 of 191)
Is the owner oroperator complying with theCO standard rather than the
THC standard?
1307
§63.1218(b)(5)(i)
No
Comply with the following:Standard
§63.1218(b)(5)(i)[G]§63.1206(c)(6)(iv)
§63.1218(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(3)[G]§63.1209(a)(6), (a)(7)
Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1218(b)(5)(ii)[G]§63.1206(c)(6)(iv)
§63.1218(d)Monitoring/Testing[G]§63.1206(b)(6)
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(g)(2)(i), (g)(2)(v)
§63.1209(a)(1)(i), (a)(2), [G](a)(4)[G]§63.1209(a)(6), (a)(7)
Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(2)(i)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Yes
1313
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(186 of 191)
Is the facilitymeeting the ppmv emissionstandard (as opposed to the
calculated SRE)?
1308
§63.1218(b)(6)(i)
No
Comply with the following:Standard
§63.1218(b)(6)(i)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i)[G]§63.1209(o)(2)-(3), (o)(4)
§63.1218(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)
[G]§63.1208(b)(5)(i)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1218(b)(6)(ii)[G]§63.1206(c)(6)(iv)
[G]§63.1207(m)(1)-(2), (m)(3)§63.1209(n)(4), (o), (o)(1)(i)[G]§63.1209(o)(2)-(3), (o)(4)
§63.1218(d)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2), (f)(1)(xi)§63.1207(g)(2)(iii), [G]§63.1207(m)(1)-(2)
[G]§63.1208(b)(5)(i)§63.1209(a)(5), (c)(5)
Recordkeeping[G]§63.1207(m)(1)-(2)
[G]§63.1212(c)Reporting
§63.1207(f)(1)(xi), (f)(1)(xvi)-(xvii)§63.1207(f)(1)(xxv)-(xxvi), (f)(2)(iii), (m)(5)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
Yes1302
Is thesource an area
source?
Is the sourceelecting to comply with
§63.1218(e)?
§63.1218(e)
No
§63.1218(b)(6)
Yes
Yes
No
1313
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(187 of 191)
1309
Comply with the following:Standard
§63.1218(b)(7)§63.1206(b)(8)(v)-(vii), [G](c)(6)(iv)
§63.1209(m), [G](m)(1)(i), [G](m)(1)(iv)[G]§63.1209(m)(2), (n)(3)
§63.1218(d)Monitoring/Testing
[G]§63.1206(b)(8)(iii)[T]§63.1207(c)(1), [T][G](c)(2), (g)(1)(i)(C)
§63.1207(g)(2)(iv)§63.1208(b)(6)
§63.1209(a)(1)(iii), (a)(5), [G](m)(1)(i)[G]§63.1209(m)(1)(iv), [G](m)(2)
Recordkeeping[G]§63.1212(c)
Reporting[G]§63.1206(b)(8)(iii)
§63.1207(f)(1)(xvii), (f)(1)(xxiii)[G]§63.1207(f)(1)(xxiv), (f)(2)(iv)
§63.1210(b)(3)(ii), (c)(1)(ii)[G]§63.1212(b)-(c)
1310
No
Is thesource an area
source?§63.1218(b)(7)
Yes
1302
Is the sourceelecting to comply
with §63.1218?
§63.1218(e)
No
Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(188 of 191)
Is thecombustor equipped with a
baghouse?
§63.1206(c)(8)(i)
Is a particulatematter detection system
being used?
§63.1206(c)(8)(i)(B)
NoComply with the following:
Standard§63.1206(c)(8)(i)(B), [G](c)(9)
Comply with the following:Standard
§63.1206(c)(8)(i)(A), [G](c)(8)(ii)-(iii)Recordkeeping
[G]§63.1206(c)(8)(iv)Reporting
§63.1206(c)(8)(i)(A), [G](c)(8)(iv)
Yes
1310
NoYes
1313
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(189 of 191)
Does theincinerator burn the dioxin-
listed hazardous wastes F020, F021, F022, F023, F026,
or F027?
1311
§63.1218(c)(2)
Comply with the following:Standard
§63.1218(c)(1)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1218(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
Comply with the following:Standard
§63.1218(c)(2)[G]§63.1206(c)(6)(iv)
[G]§63.1209(j)§63.1218(c)(3)(i)-(ii)Monitoring/Testing
[T]§63.1207(c)(1), [T][G](c)(2)[T]§63.1207(f)(1)(ii)(D)
[G]§63.1209(j)Recordkeeping[G]§63.1212(c)
Reporting§63.1207(f)(1)(ii)(D), (f)(1)(xvii)
§63.1207(f)(1)(xix)§63.1210(b)(3)(ii), (c)(1)(ii)
[G]§63.1212(b)-(c)
1312
No Yes
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(190 of 191)
Did the sourceuse previous testing to
document conformance with the DRE standard?
Yes
§63.1206(b)(7)(iii)
Comply with the following:Recordkeeping
[G]§63.1206(b)(7)(i)
NoComply with the following:
Monitoring/Testing[T]§63.1206(b)(7)(iii)
Does the sourcefeed hazardous waste at
a location in the combustion systemother than the normal
flame zone?
Comply with the following:Standard
§63.1206(b)(7)(ii)(A), (7)(ii)(B)(2)Yes
§63.1206(b)(7)(ii)
No
1312
1313
1313
06/09/2016 From 40 CFR Part 63, Subpart EEE, Amended 10/28/2008These flowcharts are for use by sources subject to the Federal Operating Permit Program and are subject to change. ***
Hazardous Waste Combustors40 CFR Part 63, Subpart EEE
(191 of 191)
Comply with the following:Standard
[G]§63.1206(b)(5), [G](c)(1)-(5), (c)(6)(i)-(ii)[G]§63.1206(c)(6)(v)-(vi), [G](c)(7)
§63.1207(g)(1)(iii)(A), [G](k), [G](l)(1)§63.1209(c)(1), [G](c)(2), [G](d), (i), (p), [G](q)
§63.1211(c)(1)-(2), (c)(4)Monitoring/Testing
[G]§63.1206(b)(5), [G](b)(12), [G](c)(3)[T]§63.1207(a), [T](b)(1), [T][G](d)-(e)
[T][G]§63.1207(f)(1)(i), [T](f)(1)(ii)[T]§63.1207(f)(1)(ii)(A)-(C), [T][G](f)(1)(iii)
[T]§63.1207(f)(1)(iv)-(ix), [T](f)(1)(xii)[T]§63.1207(f)(1)(xxvii), (g), (g)(1)(ii)
[T][G]§63.1207(h)-(i), [T][G](l)(1)§63.1208(b)(7)-(8)
§63.1209(b)(1), [G](b)(2), (b)(3)-(4), [G](b)(5)[G]§63.1209(c)(4), [G](d), [G](f), (g)(1)(i)-(ii)
§63.1209(i), (p), [G](q), (r)Recordkeeping
[G]§63.1206(b)(5), (b)(11), [G](b)(12)[G]§63.1206(c)(1)-(5), (c)(6)(vii), [G](c)(7)
§63.1207(f)(1)(xii), (g)(1)(iii)(A)§63.1209(b)(1), [G](c)(2), [G](c)(4), [G](q)
§63.1211(b), [G](c)(3), [G](d)Reporting
[G]§63.1206(b)(5), (b)(11), [G](c)(2)-(4)[G]§63.1207(e), [G](f)(1)(i), (f)(1)(ii)
§63.1207(f)(1)(ii)(A)-(C), [G](f)(1)(iii)§63.1207(f)(1)(iv)-(ix), (f)(1)(xii), (f)(1)(xviii)§63.1207(f)(1)(xxvii), (f)(2)(v)-(x), [G](h)-(i)
[G]§63.1207(j)(1), (j)(3)-(5), [G](k)[G]§63.1207(l)(1), (l)(3)
§63.1209(c)(3), (g)(1)(i)-(ii), [G](g)(1)(iii)[G]§63.1210(a), [G](b)(1), (b)(2), (c)(2)
[G]§63.1210(c)(3)-(4), [G](d)§63.1211(a), [G](c)(3), [G](d)
§63.1212(a)
1313
1302