tata steel and odisha: a partnership stronger than steel steel & odisha: the journey 1909...

16
Tata Steel and Odisha: A Partnership Stronger Than Steel Arun Misra, Vice President (Gopalpur Project) Date: 30/10/2017

Upload: lynhan

Post on 12-Jun-2018

231 views

Category:

Documents


1 download

TRANSCRIPT

Tata Steel and Odisha: A Partnership Stronger Than Steel Arun Misra, Vice President (Gopalpur Project) Date: 30/10/2017

2nd most geographically diversified

steel producer in the world

23.88 million tonnes of annual crude steel production

50 countries with

commercial presence

US $18.11 billion Turnover in FY 17

Tata Steel: A Global Conglomerate

ML**, Odisha

Sukinda, Odisha

West Bokaro (J)

Kalinganagar (O)

CAPACITY

7 MnTPA

Tata Steel India: An Overview

1

4 3

5 6

9 7 8

2

Steel Manufacturing and Finishing Mills

LOCATION NATURE OF OPERATIONS

Flat Product Manufacturing

Long Product Manufacturing 3 MnTPA

Flat Product Manufacturing 3 MnTPA

Jamshedpur (J) 1

2

Khondbond (O)

LOCATION NATURE OF OPERATIONS CAPACITY*

8 MnTPA

6 MnTPA

2 MnTPA

3

Iron & Coal Mines

4

5

6

7

8

9

Noamundi (J)

Katamati (O)

Joda East (O)

Jamadoba (J)

Sijua (J)

O/C Iron Ore Mine

O/C Iron Ore Mine

O/C Iron Ore Mine

O/C Iron Ore Mine

U/G Coal Mine

U/G Coal Mine

U/G Coal Mine

ML**, Odisha

LOCATION NATURE OF OPERATIONS CAPACITY*

0.21 MnTPA

0.19 MnTPA

0.23 MnTPA

Other Business Units

Manganese Mines

4 Ferro Alloy Plants

Chromite Mine

9 MnTPA

5 MnTPA

0.7 MnTPA

0.5 MnTPA

*ROM Production in FY 17 **Multiple Locations

1928

Tata Steel & Odisha: The Journey

1909

Discovered Iron Ore in Odisha

Discovered Mn. Ore in Odisha 1949

Discovered Chrome Ore in Odisha

1950

Ferro Alloy Plant (50,000 TPA), Joda starts production

1956

Mining Operation commenced in Joda East Iron Mine

1960

Mining Operation commenced in Sukinda Chromite Mine

1964

Mining Operation commenced in Manganese Group of Mine

1991

Acquisition of Charge Chrome Plant (50,000 TPA) from M/s OMC, Bamnipal 2006

Acquired Ferro Chrome Plant (52,000 TPA) from M/s Rawmet

2016

The First Unit of the Gopalpur Industrial Park Starts operating

2017

55,000 TPA Capacity Ferro Alloy Plant became operational

The first phase (3 MnTPA) of the state of the Art Steel Plant became operational

Tata Steel Kalinga Nagar

- Second largest integrated steel plant in India

- 3 MT crude steel production capacity in the first phase

- Tata Steel Kalinganagar has achieved the fastest ramp-up in a Greenfield project in India. Crude steel production in FY2017 was 1.68 MT

- Has the largest blast furnace in India - 4330 cubic metres

Tata Steel Gopalpur

380 Hectares

G O PA L P U R I N D U S T R I A L PA R K

Multi-Product SEZ (Suitable for Export Manufacturing)

Domestic Tariff Area (Suitable for Indian Markets)

Social Infrastructure (For people living within

the Industrial Park)

702 Hectares 120 Hectares

1202 Hectares

Gopalpur Industrial Park: An Introduction

Partners in Success

Climatic Impact Study Detail Engineering Traffic Assessment Master Planner

Railway Siding Study Anchor

Implementation Demand Study Marine Env. Study

*Logos represented are properties of respective companies and are protected by copyrights law.

0 KM

National Highway

Operational Air Strip

Sea Port

Railway Sliding

4 KM

8 KM

8 KM

Visakapatnam

Bhubaneswar

Golden Quadrilateral Road network (Connecting all Metro Cities of India)

Gopalpur Port

Paradip Port

Dhamra Port

Vishakapatnam

Bhubaneswar

Gopalpur Industrial park

Kolkata

National Highway 5 (Kolkata to Chennai)

East Coast Railway lane

From To Distance (in Nautical Miles)

Gopalpur Osaka, Japan 5,300

Multi-modal Connectivity

LIVING

- From Studio Apts. to Luxury Villas

- Serviced Apartments facilities available too

HEALTHCARE

- Primary Healthcare center

- 500 bed hospital

SHOPPING MALLS

- Departmental Stores - Restaurants - Brand Showrooms - Entertainment Zones

EDUCATION

- Primary Education - Vocational Training center - International Universities

GOPALPUR INDUSTRIAL PARK

The Complete City in the Offering

MANPOWER RESOURCING

SAFETY

& SECURITY

PLUG & PLAY INFRASTRUCTURE

CUSTOMER

RELATIONSHIP MANAGER

GUIDANCE IN

GOVT. APPROVALS

PAY PER USE FACILITIES

MAKE WITH

E A S E SERVICE

PROVIDERS

LIVING FACILITIES

Facilitation Support

Plug & Play Infrastructure Environment Clearance Obtained

Electricity - Incoming power supply at 220 KV - Stepped down power supply at 33/11 KV

Water - 10 MLD from Perennial water source - Additional 15 MLD Desalination Plant is proposed

Internal Road - Well planned internal roads

Drainage - Complete network of drainage and waste water collection system

“Units set up in Gopalpur Industrial Park are eligible for incentives offered by the Federal and State Governments”

Industrial Plots

Industrial plots with Power, Water, Road and Drainage connections up to the battery

limits of the plots.

Ready to Built Sheds

Ready built sheds of 10,000 Sq Ft area with Power, Water, Road and Drainage connections. Just Plug & Play!

Built to Suit

Factories are built as per the customer’s requirement. The customer provides the design req. and we build as per the requirements.

You Require, We Provide!

Tata Steel Ferro Chrome Plant

Leading Oil Marketing

Company in India

Pharmaceutical Company

Defence Manufacturing

Company

Mobile Manufacturing Unit

Russian Steel Maker

Golf Course by a USA based co.

USA based hospitality institute

Textile Manufacturer

Wellness Centre

International School

Medical Research Institute

Committed Plots

Bhubaneswar Half Marathon (2017)

Bhubaneswar Literary Meet (2017)

JN Tata Technical Training Centre, Gopalpur

Vaarta: Farmer - Scientist meet at Gopalpur (2017)

Community Outreach

End of the Presentation Download the

presentation here

Arun Misra

Vice Chairman (CII Odisha State Council) Vice President (Tata Steel) & Managing Director (Tata Steel Special Economic Zone Ltd) [email protected] +91 7205000180