Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Task 24 “ Wind Energy and Hydrogen Integration”Task 24 “ Wind Energy and Hydrogen Integration”
1
20-21 April Madrid
Mr. Ismael AsoIndustrial Engineer (Saragossa University)
European Master in Renewable Energies (CIRCE)PhD “Renewable Energies and Energetic Efficiency (Saragossa University)
R & D Aragon Hydrogen Foundation (SPAIN)
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
INDEX
Task 24 Description
�Objectives
�Prior Steps
�Members
2
�Members
�Case Studies
Interest in Spain related to Wind/Hydrogen
Aragon Hydrogen Foundation Activities
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
OBJECTIVES TASK 24:
To explore in detail all possible issues (Technical, Economical, Social,Environmental, Market and Legal ) related to hydrogen production usingelectrolysis with wind energy.
To explore in detail possible applications for hydrogen produced byelectrolysis using wind energy , with special emphasis on full wind & hydrogenintegration by means of hydrogen storage and electrical conversion that
3
integration by means of hydrogen storage and electrical conversion thatbalances the original wind energy production, allowing an approach to demandthat closes the gap with conventional energies.
Subtask A: State of the artSubtask B: Needed improvements and system integration
Subtask C: Business concept developmentSubtask D: Applications. Emphasis on wind energy management
Duration : 2006-2010
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
PRIOR STEPS
53rd IEA HIA ExCo meeting (Singapore, November 2005) : The interest on starting a new task on “windenergy & hydrogen integration” is endorsed by the ExCo. The Spanish representative takes the lead.
54th IEA HIA ExCo meeting (Lyon, June 2006): Dr. Luis Correas (Fundación Hidrógeno Aragón) andMr. Fernando Tamayo (Gamesa Energía), presented a first draft of the new task.
Project Definition Meeting (Brussels, 4th October 2006): attendance of 15 people from 7 countries. Arevised draft has been released, with a matured work plan proposal. Pending confirmation ofparticipation, especially from electrolyser manufacturers.
4
participation, especially from electrolyser manufacturers.
55th IEA HIA ExCo meeting (Petten, November 2006): the Task is finally approved by the ExCo, and akickoff meeting was made for spring 2007 – Huesca , in order to confirm participation.
56 th IEA HIA EXCo Meeting (Rapperswill, May 2007): First SAR showed and first Meeting , FirstMeeting Canary Island October 2007
57 th IEA ExCo Meeting (Montecatini, November 2007): First annual report. Second Meeting Athens
58 th IEA ExCo Meeting (Brisbane, July 2008): Oral presentation WHEC
59 th IEA ExCo Meeting (Athens, October 2008): Third meeting in Switzerland
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
First Meeting – Canary IslandKick-Off Meeting - Huesca
5
Third Meeting - Switzerland
Second Meeting – Athens
Fourth Meeting – USA
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
MEMBERS
EXPERT NAME INSTITUTION NAMELuis Correas Aragon Hydrogen FoundationIsmael Aso Aragon Hydrogen Foundation
Rupert Gammon Bryte Energy Ltd Ken-Ichiro OTA Yokohama National University
Mila Rey Gas NaturalPablo Fontela Endesa
Joerg Linnemann Planet GbR
20 Experts, 9 Countries
6
Joerg Linnemann Planet GbRClaus Jorgensen RISOErnest Burkhalter IHT
Eli Varkaraki CRESJavier Pino Seville UniversityRafael Ben Ariema
Aaron Hoskin Natural Resources of CanadaRaque Garde CENER
Salvador Suarez ITC
Kevin Harrison National Renewable Energy
LaboratoryAllan Schroeder RISOSam Miyashita NEDODennis Krieg Juelich
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Subtask A – State of the art
Subtask B – Needed improvements and system integration
7
Subtask C – Business concept development
Subtask D – Emphasis on wind energy management
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Demonstration Projects (Wind/Hydrogen)
Ramea Island (Canada)
Prince Edward Island (Canada)
8
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Demonstration Projects (Wind/Hydrogen)Wind2H2 (USA)
Japan
9
Germany
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Demonstration Projects (Wind/Hydrogen) - Spain
Sotavento (Lugo)Tahivilla (Cadiz)RES2H2 (Canarias)
10
ITHER
ITHER (Huesca)
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Why so Interest in Spain????
P.O. 3.7: Programming of non-dispatchable renewable energy. The Operator of the Electrical System can reduce (curtail) the wind energy produced on behalf of the stability of the grid
No correlation between wind power and consumptions
11
Wind Power gradient +/- 1.000 MW
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Relative Error (Forecast .vs. Real Production)
0
10
20
30
40
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43Forecast Horizon (hours)
Rel
ativ
e E
rror
(%)
Forecast Relative Error
12Spain an Isolated Electrical Island
Gradient Demand +/- 4.000 MW/h
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Possible scenario which can happen 2010…
30.000
32.000
34.000
7.716 MW Nuclear + 70 % Wind Power Install 20.155 MW = 21.824 MW
13
16.000
18.000
20.000
22.000
24.000
26.000
28.000
30.000
Lunes Martes Miércoles Jueves Viernes Sábado Domingo
Pot
enci
a (M
W)
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
2 November Sunday 2008…37 % was wind power disconnected
14
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Developments made by Aragón Hydrogen Foundation - IH T:
High Pressure Electrolysis 32 bar:
15
4 MW Electrolyze 50 kW Electrolyze
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Hydrogen Use : Automation
16
Hydrogen Refueling Station - Zaragoza
FormulaZero Racing www.formulazerlo.nl
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
IHER Project “Hydrogen Technological Infrastructure and Renewable Energies
National Engineering Award 2007 In the “Industrial Project” category, awarded by the General Council of Official Colleges of Industrial Engineers.Reception by His Highness Prince Felipe de Borbón
17
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
A simple and effective rationale:
Storing renewable energy …
… for fuelling hydrogen cars
The Opportunity of HydrogenThe Opportunity of HydrogenThe Opportunity of HydrogenThe Opportunity of Hydrogen
18
Drivers (what is behind):
Energy Self-supply
Industrial Competitiveness
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
61 Stakeholders form today the Foundation, belongin g to all relevant sectors.
19
Task 24: WIND ENERGY AND HYDROGEN INTEGRATION
TECHWINDGRID`09, 20-21 Madrid
Thanks for your Attention!!!Thanks for your Attention!!!
20
20-21 April
Mr. Ismael [email protected]