tasawar resume
TRANSCRIPT
-
8/19/2019 Tasawar Resume.
1/5
Postal address
Hadala, Post Office Dhudial, Tehsil and District
Chakwal.
B.Tech Civil
Tasawar Riaz
FF A ATTHHEERR NN A AMMEE:: RRII A AZZ HHUUSSSS A AIINN
DD A ATTEE OOFF BBIIRRTTHH:: 1155TTHH MM A AY Y ,, 11998877
NNIICC ##:: 337722001100--664433772222--11
PPAASSSSPPOORRTT ##:: BBJJ99991177222211
DDOOMMIICCIILLEE:: CCHHAAKKWWAALL ((PPUUNNJJAABB))
NNAATTIIOONNAALLIITTYY :: PPAAKKIISSTTAANNII
CCEELLLL## ::
SSKKYYPPEE NNAAMMEE :: tasawar.riaz2
++9922--330033--55668844556688
E-mail : [email protected]
To obtain a position which utilizes my skills in your organization, to work in a fast paced, professional and
competitive environment, which can harness my skills, and allow me to be a part of its vision and helps me in
growing along with it.
Bachelor of Technology in Civil Engineering, 2010
PIMSAT (Preston Institute of Management Science & Technology), Karachi
Higher Education Commission, Islamabad.
DAE in Civil Technology, (2004-2007)
GOVT. COLLEGE OF TECHNOLOGY, RASUL, M.B.DIN
(PBTE) LAHORE.
Matriculation (2003)
Govt. Sir Syed High School Mona, Chakwal, Rawalpindi Board.
Objective:
Academic Profile:
mailto:[email protected]:[email protected]:[email protected]
-
8/19/2019 Tasawar Resume.
2/5
Renoir Consulting: (June 2012 - March 2013
Certificate of implementation of management control system; including operational planning, reviewing and
control site production.
Software: AutoCAD2010/2012
Operating Systems: MS Windows 2007/Xp
Packages: MS Office Operational knowledge of Internet applications.
.
Multiline Engineers Ltd. :( June 2015 – Present).
As a Senior Project Engineer at various Projects all over in Pakistan.
Responsibilities:
• In charge of the construction and architectural works and Led group composed of more than
150 Site Engineer, Supervisors and Labors.
• Preparing reports to project manager for any problems related to the Scope of Service and
recommend solutions.
• Supervising and administrating the civil works.
• Estimate quantities and cost of materials, equipment, or labor to determine project feasibility.
• Discussing requirements with the client and other professionals (e.g. architects & Structural
Team).• Making sure sites meet legal guidelines, and health and safety requirements.
• Inspect project sites to monitor progress and ensure conformance to design specifications and
safety or sanitation standards.
• Direct construction, operations, and maintenance activities at project site.
• Develop and monitor the project design schedule to meet Client and firm time objectives.
• Attend public meetings and/or hearings, as necessary; assure that all public authority
approvals are obtained.
• Inform Project Architect and Department Managers of status of construction.
Computer Skills:
Work Experience:
Certificates:
-
8/19/2019 Tasawar Resume.
3/5
• Attend project meetings, as necessary
• Maintains safe and clean working environment by enforcing procedures, rules, and
regulations.
• Understanding the implications of health and safety regulations.
•
Read engineering drawings & execute it.
• Manage a high number of Site Construction team and workers, and make them work as a one
team.
• Reporting to Project Manager regarding Project progress and areas of concerns
• Attending the weekly progress meetings, technical meetings.
• General coordinator between the construction, architectural, electrical, and mechanical works
• Follow-up project schedules
Saudi Bin laden Group (RPD) :( Jan 2012 – April 2015)
As Site Engineer in Ministry of Interior Correctional Facilities Taif, Makkah, KSA Project.
As General Foreman in Mataf Expansion Project Haram Makkah, KSA.
Responsibilities:
• Construction supervision of structural work R.C.C frame structure, finishing works
(Block work, Plastering, Tiling, Painting, Glass work, Wooden and aluminum joinery and
Ceiling, Water Supply, Sanitation, Fire Fighting system etc.)
To develop and implement the project program on site in an organized and cost effective
manner in accordance with the approved design, quality standards and within the agreed timeframe.
• To supervise and monitor the site labor force through Foreman, Supervisors, monitoring the
work to complete the work as per requirement.
• Ensured that all the works done are in accordance with the approved construction drawings,
contract documents, project specifications.
• Conduct quality checks and complete quality check lists, with the QC Inspector, on works
carried out to ensure that the products meet specifications.
• Execute issued snag lists from consultants, oversee sub-contractors for various works, and
monitor all jobs for timely completion and compliance.• Dealing with Consultant.
• Monitoring the quality of the works in relation to the approved documents
• Preparing reports on quality and progress
• Responsible for progress of activities as per schedule.
• Ensure Quality of work.
• Responsible for Daily, weekly and monthly progress report of activities.
• Ensure the safety precautions are adhered by the work force.
• Participate in Project Review Meetings.
-
8/19/2019 Tasawar Resume.
4/5
• Set up and implement the safety standards of all the sites
Supply chain Business Solutions :( Oct 2009- Dec 2012)
As (Client) Civil Engineer in Engro Food’s Integrated Rice Processing Plant (IRPC) Project.
As (Client) Civil Engineer in Engro Food’s Omore Ice cream Project.
Responsibilities:
• Construction supervision of structural work R.C.C frame structure, PEB(Pre Engineered
Buildings), finishing works (Block work, Plastering, Tiling, Painting, Glass work, Wooden and
aluminum joinery and Ceiling, Water Supply, Sanitation, Fire Fighting system etc.)
• Final inspection of works and handing over of project in the presence of consultant.
• Quality Control
• Estimation of Materials
• Ensure the proper completion of the work on schedule with approved drawings, specifications
& quality limitations.
• Monitor project progress against the project plan and report discrepancies /delays for take
Corrective action.
• To supervise and monitor the site labor force through Foreman, Supervisors, monitoring the
work to complete the work as per requirement.
• Co-ordinations with Contractors, Project Manager.
• Delivery of Civil Works as per time lines
• Checking Contractor’s Running Bills
•
Review & Verify Contractors service bill / documents.
• Providing layout for structural and also for finishing works.
• Preparation of work schedule and monitoring & controlling the projects.
• Health and Safety Control in Civil Works.
Unilever Pakistan Limited: (May 2008 – Oct 2009)
As (Client) Civil Engineer in Unilever Brothers United Detergent Project (Surf Excel).
Responsibilities:
• Supervision of all types of Construction Works.
• To develop and implement the project program on site in an organized and cost effective manner i
Accordance with the approved design, quality standards and within the agreed time frame.
• Liaising with subcontractors and other professional staff.
• Implementation of Drawings & Specification on site.
• Contractors management systems
• Materials checking ( e.g. sand, bricks, blocks, cement & steel ) at site • Delivery of Civil Works as per time lines.
-
8/19/2019 Tasawar Resume.
5/5
• Leveling of Areas to be constructed.
• Checking Contractor’s Running Bills
• Layouts of Building using Co-ordinates by Total Station
• PTW Control at sites
• Health and Safety Control in Civil Works
Bauer International GMBH Germany: (July 2007 to April 2008)
As Site Surveyor / Supervisor Civil in Construction of “Mubarak Center” at Ferozepur Road, Lahore.
Responsibilities:
• Lead and control skilled labor and work crews engaged in all activities concerned with the civil
works aspects of the project
•
Supervision of Piling Works.
• Layout of Working & Test Piles Works using Total Station of Sokia 610K.
• Concreting of Piles
• Leveling of Areas to be constructed using Auto Level.
• Working using Safety Rules