Basic Concept of SEZ EstablishmentThe basic concept of Indonesia SEZs is the preparation of areas which have accessibility to the global market or the
main resources (access to the sea port and or airport)
BUSINESS INIndonesia SEZ
Export
Process Zone
Logistic
Industry
Technological
Advancement
Tourism
Energy
Other Economic Activities
A range of incentives are given to boost their competitiveness and to attract investors to the enter the SEZs.
3
Institutional Framework
Indonesia SEZ
4
12 SEZs and its Primary Activities
Investment Opportunity in SEZ
5
Fiscal Incentives In SEZNO SUBJECT INCENTIVES/FACILITIES
1. CORPORATE INCOME TAX (PPh)
• Tax Holiday for Primary Activities 5 - 20 years depending on value of investment• Tax Allowance for other than Primary Activities and for Primary Activities that is not eligible to get Tax Holiday facility,
with detail:1. Reduction in net income of 30% of the amount invested, prorated at 5% for six years,2. Losses carried forward for 5 years and could be extended to 10 years,3. Accelerated depreciation and amortization,4. Dividends tax 10% or lower for treaty countries.
2. VALUE ADDED TAX (PPN) VAT is not collected for the entry of certain Taxable Goods from Other Places within the Customs Area (TLDDP).
3.EXEMPTION FROM IMPORT DUTY AND NOT COLLECTED IMPORT TAX (PDRI/Pajak Dalam Rangka Impor)
• Not Collected Import Tax including VAT, Sales Tax on Luxurious Goods, and/or corporate income tax article 22• Facilities are granted for the Import of:
1. Capital Goods by Business Entity / Developer for SEZ Development2. Capital Goods and Raw Material for Tenant.
4.DEFERRED IMPORT DUTIES
• Deferred import duties for imported raw materials that are used for production, capital goods and packaging• A tariff of 0% import duty is applied for finished goods which have 40% of local content (TKDN)
5. EXCISEExempt from excise for raw materials or auxiliary materials that are used to produced finished goods which are notexcisable goods
6. LOCAL TAX • Reduction of local tax and / or local retribution at a minimum of 50% and a maximum of 100%
7. GOODS TRAFFIC• Prohibited items: prohibited for export / import• Restricted items: Imports of goods to SEZ have not been subject to restrictions
8.SPECIAL FACILITIES FORTOURISM SEZs
• Stores that are located within Tourism SEZs can participate in the VAT refund scheme for foreign passport holders• Exemption for VAT and Sales Tax on Luxury Goods can be granted
6
Non-Fiscal Incentives In SEZ
NO. SUBJECT
1. NO NEGATIVE LIST
2. IMPORT LIMITATION IS NOT APPLIED
3. EASE OF DOING BUSINESS FOR PERMIT & LICENSING
4 FOREIGN PROPERTY OWNERSHIP IN TOURISM SEZ
5 SPECIAL REGULATION FOR LABOUR AND EMPLOYMENT
6 SIMPLE IMMIGRATION FORMALITIES
7 EASINESS FOR LAND TITLING PROCEDURES
8 INTEGRATED INFRASTRUCTURE SUPPORT FROM GOVERNMENT
9 ONE STOP SERVICE BY ADMINISTRATOR
The government widely gives support with fiscal and non-fiscal incentives such as tax holiday, tax allowance, ease of custom services, immigration, labor, land and property access.
Through Online Single Submission investors can start their business almost immediately in SEZs. As required the government will support business in SEZs with necessary infrastructure.
Incentives and Facilities for
Investment in SEZs
7
Industrial SEZSei Mangkei | Galang Batang | Arun Lhokseumawe | Palu | Sorong
You can simply impress your audience and
add a unique and appeal to your Reports and
Presentations with our Templates. I hope and I
believe that this Template will your Time,
Money and Reputation.
MBTK | Bitung | Tanjung Api-Api
SEI MANGKEI SEZ
DEVELOPER
PT Perkebunan Nusantara III
AREA1,933.8 Ha
POPULATION
MINIMUM WAGES
Simalungun City: 864,786 People
Simalungun Regency:
USD 158.8
(2,224,036 IDR)
PROFILE
LAND AVAILABILITY
1,933.8 Ha
INFRASTRUCTURE
±115 km from Kualanamu Airport
±50 km from Kuala Tanjung Seaport
- Existing : 60 MW- Future Capacity : 61,6
MW (2019)
Road inside zone is fully constructed
Existing : 69 liter/second
Palm Oil Industry
Rubber Industry
Various Industry
LEGAL BASISGovernment Regulation(PP) Number 29 of 2012
Officially Operated:January 27, 2015
Simalungun Regency, North Sumatra Province
MASTERPLAN
BUSINESS OPPORTUNITY
9
GALANG BATANG SEZ
10
DEVELOPERPT Bintan Alumina Indonesia
AREA
2,333. 6 Ha
POPULATION
MINIMUM WAGES
Bintan: 154.584 People
Bintan:
USD 222.3
(3,112,618 IDR)
PROFILE
LAND AVAILABILITY
1049.94 Ha
INFRASTRUCTURE
20 km from Raja Haji Fisabilillah Airport
Seaport is integrated into the Zone
- Existing : 0.8 MW (By SOE)
- Future Capacity : a. 3.4 MW (By SOE)b. 6 x 25 MW (By
Developer)
2.6 km hot asphalt access road and is in the process to complete 8 km of roads in the area
- Existing : 60 liter/second- Future Capacity : 600
liter/second
LEGAL BASISGovernment Regulation(PP) Number 42 of 2017
Officially OperatedDecember 8th 2018
Bintan Regency, Riau islands Province
MASTERPLAN
BUSINESS OPPORTUNITY
AluminaIndustry
EnergyIndustry
Logistic & Export
BauxiteIndustry
ARUN LHOKSEUMAWE SEZ
11
DEVELOPERPT Patriot Nusantara Aceh (PATNA)
AREA2,622.48 Ha
POPULATION
MINIMUM WAGES
North Aceh: 593,492 People
Aceh Province:
USD 194.1
(2,717,750 IDR)
PROFILE
LAND AVAILABILITY
- 119 Ha for Plantsite- 46.38 Ha for
Community
INFRASTRUCTURE
13 km from Malikussaleh Airport
Krueng GeukuehSeaport is integrated into the Zone
- Existing : 219 MW- Future Capacity : 459
MW (2021)
Road is fully constructed with several sector need minor maintenance
Existing : 14.46 liter/second
LEGAL BASISGovernment Regulation(PP) Number 5 of 2017Officially OperatedDecember 14th 2018
North Aceh Regency, Lhokseumawe City, Aceh Province
MASTERPLAN
BUSINESS OPPORTUNITY
LhokseumaweCity
North Aceh
Oil & Gas Industry
Petrochemical Industry
PaperIndustry
AgroIndustry
Logistics
PALU SEZ
12
DEVELOPERPT Bangun PaluSulawesi Tengah (BPST)
AREA
1,500 Ha
POPULATION
MINIMUM WAGESPalu City:
USD 159.7
(2,235,900 IDR)
PROFILE
LAND AVAILABILITY
1,300 Ha
Palu City: 367.342 People
INFRASTRUCTURE
26 km from Mutiara SIS Al Jufri Airport
1 km from PantoloanSeaport
Road inside zone is fully constructed
- Existing : 15 liter/second- Future Capacity : 424
liters/second
LEGAL BASISGovernment Regulation (PP) Number 31 of 2014
Officially Operated :September 27, 2017
Palu City, Sulawesi Tengah Province
MASTERPLAN
BUSINESS OPPORTUNITY
Basic Infrastructure& Power Plant
ManufacturingIndustry
Logistic Supply Chain
Industrial Water Supply System & Water Treatment Plant
IndustrialEstate
Deep Port Business
- Existing : 20 MW - Future Capacity: Steam
electricity power plant 2 x 50 MW (2020)
SORONG SEZ
13
DEVELOPER
PT Malamoi Olom Wobok(MOW)
AREA
523,7 Ha
POPULATION
MINIMUM WAGES
Sorong: 82,784 People
Sorong:
USD 190.5
(2,667,000 IDR)
PROFILE
LAND AVAILABILITY
400 Ha
INFRASTRUCTURE
30 km from DomineEduard Osok Airport
- Arar Seaport is integrated into the Zone and under construction
- 35 km from Port of Sorong
- Existing : 9 MW - Future Capacity : 50
MW
Road inside zone is fully constructed
- Existing : 15 liter/second
- Future Capacity : 424 liter/second
LEGAL BASISGovernment Regulation (PP) Number 33 of 2016
Operational : End of 2019
Sorong Regency, West Papua Province
MASTERPLAN
BUSINESS OPPORTUNITY
Agricultural & Fisheries Industry
Logistic & Export
ShipyardIndustry
MALOY BATUTA TRANS KALIMANTAN SEZ
14
DEVELOPER
PT Maloy Batuta TransKalimantan
AREA
557.34 Ha
POPULATION
MINIMUM WAGES
East Kutai:
USD 191.3
(2,678,731IDR)
PROFILE
LAND AVAILABILITY
509.5 Ha
East Kutai: 833,625People
INFRASTRUCTURE
- 118 km from Tanjung Bara Airport
- 280 km from APT Pranoto Airport
- 406 km from Sultan Aji Muhammad Sulaiman Sepinggan Airport
Multipurpose MaloySeaport inside in SEZ is under construction (operating in 2019)
11.44 km access road
Future Capacity : 200liter/second (November 2018)
LEGAL BASISGovernment Regulation (PP) Number 85 of 2014
Operational : April 1 2019
Regency of East Kutai, East Kalimantan Province
MASTERPLAN
BUSINESS OPPORTUNITY
WoodIndustry
Palm Oil Industry
Logistic & Export
BITUNG SEZ
15
DEVELOPERPT Membangun SulutHebat (MSH)
AREA
534 Ha
POPULATION
MINIMUM WAGES
- Bitung City: 212,409 People
- Manado CIty: 430,133 People
North Sulawesi
Province:
USD 201.7
(2,824,286 IDR)
PROFILE
LAND AVAILABILITY
60.79 Ha
INFRASTRUCTURE
36 km from Sam Ratulangi Airport
7 km from Perikanan Samudera Seaport
Existing : 30 MW
415 m road inside zone is fully constructed
Existing : 15 liter/second
LEGAL BASISGovernment Regulation (PP) Number 32 of 2014
Operational : April 1 2019
Bitung City, North Sulawesi Province
MASTERPLAN
BUSINESS OPPORTUNITY
PharmaceuticalIndustry
Fisheries Industry
LogisticCoconut Industry
TANJUNG API-API SEZ
16
DEVELOPER
PT Sriwijaya MandiriSumsel (SMS)
AREA
2,030 Ha
POPULATION
MINIMUM WAGES
Banyuasin:
USD 195.4
(2,736,000 IDR)
PROFILE
LAND AVAILABILITY
153 Ha
Banyuasin: 833,625 People
INFRASTRUCTURE
70 km from Sultan Mahmud Badarrudin II Airport
2,5 km from TanjungApi-Api Seaport
- Existing : 2 x 60 MW- Future Capacity : 2 x
300 MW
65 km from Palembang –Tanjung Api-ApiNational Road
Future Capacity : 1,500,000 liter/second
LEGAL BASISGovernment Regulation (PP) Number 51 of 2014
Operational : 2019
Regency of Banyuasin II, Banyuasin Regency, South Sumatera Province
MASTERPLAN
BUSINESS OPPORTUNITY
Rubber Industry
Petrochemical Industry
Logistic
Palm Oil Industry
Tourism SEZTanjung Lesung | Tanjung Kelayang | Mandalika | Morotai
You can simply impress your audience and
add a unique and appeal to your Reports and
Presentations with our Templates. I hope and I
believe that this Template will your Time,
Money and Reputation.
TANJUNG LESUNG SEZ
18
DEVELOPERPT Banten West Java Tourism Development (BWJ)
AREA
1,500 Ha
POPULATION
MINIMUM WAGES
Pandeglang: 1,205,208 People
Pandeglang :
USD 168.1
(2,353,549 IDR)
PROFILE
LAND AVAILABILITY
1,430 Ha
INFRASTRUCTURE
180 km from Soekarno-Hatta International Airport
192 km from TanjungPriok Seaport
- Existing : 20 KV and 1 substation
- Future Capacity : 70 KV (2019)
- 5.11 km Row 50 is built- 1.7 km Row 35 A is built- 1,92 km Row 35 B is
built
Existing : 4.7 liter/second
LEGAL BASIS
Government Regulation (PP) Number 26 of 2012Officially Operated:February 23, 2015
Pandeglang Regency, Banten Province
MASTERPLAN
BUSINESS OPPORTUNITY
Accommodation Relaxation & Entertainment
F&B
Infrastructure Art & EducationAdventure Tourism
TANJUNG KELAYANG SEZ
19
DEVELOPER
Belitung Maritime Consortium
AREA324.4 Ha
POPULATION
MINIMUM WAGES
Belitung: 161,706 People
Bangka Belitung
Province: USD 196.8
(2,755,443 IDR)
PROFILE
LAND AVAILABILITY
INFRASTRUCTURE
37 km from HAS Hanandjoeddin Airport
27 km from TanjungPandan Seaport
- Existing : 67,000 kVA- Future capacity: 25
MVA
3.5 km road inside zone is available
Existing : 100 liter/second
LEGAL BASISGovernment Regulation (PP) Number 6 of 2016
Operational :March 14, 2019
Regency of Belitung, Bangka Belitung Islands Province
MASTERPLAN
BUSINESS OPPORTUNITY
Accommodation Relaxation & Entertainment
F&B
Infrastructure
25 Ha (Phase 1)
Art & EducationAdventure Tourism
MANDALIKA SEZ
20
DEVELOPER
PT ITDC
AREA
1,035.67 Ha
POPULATION
MINIMUM WAGES
Central Lombok: 922,088 People
West Nusa Tenggara:
USD 130.3
(1,825,000 IDR)
PROFILE
LAND AVAILABILITY
INFRASTRUCTURE
23 km from Lombok International Airport
46 km from Lembar Seaport
Existing: 30 MVAm
11 km road inside zone is fully constructed
Existing : 34 liter/second
LEGAL BASISGovernment Regulation (PP)Number 52 of 2014
Operational: October 20, 2017
Central Lombok Regency, West Nusa Tenggara Province
MASTERPLAN
BUSINESS OPPORTUNITY
Accommodation Relaxation & Entertainment
F&B
Infrastructure Smart Transportation
Health Service
n/a
MOROTAI SEZ
21
DEVELOPER
PT Jababeka Morotai
AREA
1.101, 76 Ha
POPULATION
MINIMUM WAGES
Morotai Island: 62,412 People
Morotai Island:
USD 207.1
(2,900,000 IDR)
PROFILE
LAND AVAILABILITY
INFRASTRUCTURE
10 km from PitoeMorotai Airport
- 20 km from WayabulaSeaport
- 10 km from DarubaSeaport
- Existing : 106 kVa- Future Capacity :
180 MW (2020)
1.6 km asphalt access road in the area
- Existing : 9.25 liter/second (pump well)
- Future Capacity : 30 liter/second
LEGAL BASISGovernment Regulation (PP) Number 32 of 2014
Operational :April 1 2019
Regency of Morotai Island, North Maluku Province
MASTERPLAN
BUSINESS OPPORTUNITY
Accommodation Leisure & Entertainment
F&B
Infrastructure
100 Ha
Fisheries
22
PH Floor MR 21 Building, Jalan Menteng Raya No. 21,
Central Jakarta, Indonesia
The National Council Secretariat for Special Economic Zone
The Coordinating Ministry for Economic Affairs
Republic of Indonesia
Phone/Fax : +6221-34832655/58
Email: [email protected]
Web : http://kek.go.id
THANK YOU