About the details of electricity production, distribution in Tamil Nadu and the problems in management of electricity

TRANSCRIPT

---

2007-2008

%

14375 481

133.3 19.93 3.46 17.30 2596 87

114 17 0.83 4.15 728 24

6.9 1.03 0.066 0.33 956 32

watt)

horsepower,HP)

work)

x ) x 2) 110 = 500

x 746

x

x

Distribution transformer)

MW)

Plant Load Factor, PLF)

x 1000

x x

PLF)

%)

2008 – 09

1050 x 1000 10,50,000

10,50,000 x 24 x 365 10,50,000 x 8760 ÷ 1,00,00,000 1.05 x 876 = 919.8

PLF)

= 919.8 – –

919.8 x 85.35) ÷ 100 = 785.05

PLF) 70

PLF) PLF)

10 PLF) 25

PLF)

-

--

I

PLF

PLF - %)

-

------

i)

ii)

i + ii)

II

--

i)

ii)

i + ii)

PLF)

PLF)

PLF)

PLF)

-

PLF)

x 100) ÷

-