×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [parasitic crossing]
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II
226 views
Brain Gestorme: Status of the LHeC Ring-Ring / Linac- Ring Basic Parameters I appologise to talk about things you already know
223 views
Deep Inelastic Scattering with the LHC * Overview e- Ring e-LINAC Physics Detector Status Max Klein for the LHeC Study Group Talk to H1 and ZEUS at DESY,
217 views
Dafne Upgrade with large Piwinsky angle and crab waist P. Raimondi Gruppo1 Nov.2006
227 views
Accelerator Summary
35 views
Dafne Upgrade with large Piwinsky angle and crab waist
53 views
Deep Inelastic Scattering with the LHC *
61 views