×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [overall parameters]
June 15-17, 2004 DOE Operations Review of PEP-II/BaBar 1 M. Sullivan for the PEP-II Team DOE Operations Review of the PEP-II B-Factory June 15-17, 2004
217 views
Interface for Finding Close Matches from Translation Memory
148 views
2 Concept
221 views
Fenton88 the Numerical Solution of Steady Water Wave Problems
31 views
Introduction to Choice-Based Conjoint (CBC) Copyright Sawtooth Software, Inc
229 views
BABAR Status & Plans David B. MacFarlane SLAC EPAC Meeting January 25, 2006
216 views
1# An overview of BaBar physics & prospects Hassan Jawahery University of Maryland SLUO meeting of Sept 11. 2006
218 views
Strategic Overview for Elementary Particle Physics David B. MacFarlane Assistant Director for EPP June 6, 2006
218 views
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January
221 views
S. Katsanevas IN2P3/CNRS. Two views on the state of our knowlege of the Universe In this beginning of the 21 st century, our knowledge of the Universe
220 views
PEP-II Now, Long Range, and Parameter Goals for 2003-2009
25 views
Image Formats
69 views
Next >