×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [intense proton beam]
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D
216 views
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield
215 views
Eric Prebys USPAS, Knoxville, TN, Jan. 20- 31, 2014
214 views
Recent Studies on ILC BDS and MERIT
33 views
MARS15 Simulations of the MERIT Mercury Target Experiment Fermilab March 18, 2008 2008 Neutrino Factory and Muon Collider Collaboration meeting Sergei
217 views
Special Topic: A Few Tricks of the Trade
23 views