×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [crossing scheme]
Spectrometer compensation in IR2 and IR8 during the 450 GeV collision run September 11, 2006 LOC meeting Y. Papaphilippou Thanks to S. Fartoukh, W. Herr,
215 views
Massimo GiovannozziChamonix XV, January 23-27 20061 Electrical circuits required for the minimum workable LHC during commissioning and first two years
213 views
Beam parameters and machine performance to be reached in 2010
46 views