×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [cosmics data]
LHCb Roadmap 2009-10. 2008: DIRAC3 put in production m Production activities o Started in July o Simulation, reconstruction, stripping P Includes file
217 views
Calorimeter Status: Preparing RUN II & LS2 Pascal Perret LPC Clermont 24 February 2015
220 views
ATLAS Tile Calorimeter WBS 3.4 Larry Price ANL M&O Status and Plans Toronto August 3, 2005
226 views
June 26 th, 2007 SPSC Yves Déclais 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of installation
215 views
October 18 th, 2007 LNGSC Yves Déclais 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1.Status of the installation of the electronic
214 views
Status of the production and STEP09
22 views
Terzo Convegno sulla Fisica di ALICE - LNF, 14.11.07 Andrea Dainese 1 Preparation for ITS alignment A. Dainese (INFN – LNL) for the ITS alignment group
214 views
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule
217 views