×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [beam line optics]
The Implementation of Top Up Operation at the Australian Synchrotron Light Source Don McGilvery
218 views
SPEAR 3 Beam Stability and Stabilization R. Hettel NSLS-II Stability Workshop April 18-20, 2007
226 views
The Backward Silicon Tracker 144 strip detectors (number of readout channels = 92.160) 48 pad detectors (number of trigger channels = 1536) Strip detector
219 views
The Implementation of Top Up Operation at the Australian Synchrotron Light Source
45 views
ALFA Results 2011 & Plans 2012 K.Hiller on behalf of the ALFA group
48 views