ARIZONA DEPARTMENT OF TRANSPORTATION Highway Termini Location Work Description TUCSON - BENSON HIGHWAY HOUGHTON ROAD TI RECONSTRUCT INTERCHANGE TRACS No. Project No. Item County District Gross Length Net Length Prepared By: CONTRACT # 2020006 TABULATION OF BIDS 010 PM 274 H888701C 010-E-(221)T 10119 PIMA SOUTHCENT 2.4 Brandon Campbell CONTRACTS AND SPECIFICATIONS SECTION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

ARIZONA DEPARTMENT OF TRANSPORTATION

Highway Termini Location Work Description

TUCSON - BENSON HIGHWAY HOUGHTON ROAD TI RECONSTRUCT INTERCHANGE

TRACS No. Project No. Item County District Gross Length Net Length Prepared By:

CONTRACT # 2020006

TABULATION OF BIDS

010 PM 274 H888701C 010-E-(221)T 10119 PIMA SOUTHCENT 2.4 Brandon Campbell

CONTRACTS AND SPECIFICATIONS SECTION

INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION

Page 2: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 1 of 67

BidRank ContractorBid Amount

Compared ToDepartment

EstimateExtended

Sum of Items

$23,427,902.19AMES CONSTRUCTION, INC.

8333 E. HARTFORD DRIVE SCOTTSDALE, AZ 85255

1 -17.1% $23,427,902.19

$26,495,857.13SUNDT CONSTRUCTION, INC.

2620 S. 55TH STREET TEMPE, AZ 85282

2 -6.2% $26,495,857.13

$27,273,937.90FNF CONSTRUCTION, INC.

115 S. 48TH STREET TEMPE, AZ 85281-8504

3 -3.4% $27,273,937.90

$28,242,913.83GRANITE CONSTRUCTION COMPANY

4115 E ILLINOIS ST TUCSON, AZ 85714

4 +.0% $28,242,913.83

$28,243,701.75DEPARTMENT ESTIMATE+% $28,243,701.75

$29,261,421.30PULICE CONSTRUCTION, INC.

8660 E. HARTFORD DRIVE, SUITE 305 SCOTTSDALE, AZ 85255

5 +3.6% $29,261,421.30

$29,944,992.00K E & G CONSTRUCTION, INC.

3949 E. IRVINGTON ROAD TUCSON, AZ 85714

6 +6.0% $29,944,992.00

Apparent Low Bidder is 17.1% Under Department Estimate (Difference = ($4,815,799.56))

Completion Date:

450 Calendar Days

The proposed project is located in Pima County on I-10, from milepost 274.45 to milepost 276.35, approximately 15 miles southeast of the City of Tucson. The proposed workconsists of constructing a diverging diamond interchange and replacing a bridge, placing asphaltic concrete, installing guardrail, constructing drainage basins, pavementmarking, signing, lighting and other related work.

Bid Opening Date : 5/22/2020, Prequalification Required, Engineer Specialist : Brandon Campbell

BID RESULTS FOR 2020006

Page 3: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 2 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2010011 ACRE CLEARING AND GRUBBING

Bid Rank Department Estimate 54.000 $4,000.000 $216,000.00

1 AMES CONSTRUCTION, INC. $419.790 $22,668.66 -89.5%

2 SUNDT CONSTRUCTION, INC. $2,500.000 $135,000.00 -37.5%

3 FNF CONSTRUCTION, INC. $1,294.000 $69,876.00 -67.7%

4 GRANITE CONSTRUCTION COMPANY $3,500.000 $189,000.00 -12.5%

5 PULICE CONSTRUCTION, INC. $3,500.000 $189,000.00 -12.5%

6 K E & G CONSTRUCTION, INC. $1,970.000 $106,380.00 -50.8%

2020021 L.FT. REMOVAL OF CONCRETE CURB AND GUTTER

Bid Rank Department Estimate 220.000 $35.000 $7,700.00

1 AMES CONSTRUCTION, INC. $2.870 $631.40 -91.8%

2 SUNDT CONSTRUCTION, INC. $8.000 $1,760.00 -77.1%

3 FNF CONSTRUCTION, INC. $6.000 $1,320.00 -82.9%

4 GRANITE CONSTRUCTION COMPANY $4.500 $990.00 -87.1%

5 PULICE CONSTRUCTION, INC. $10.000 $2,200.00 -71.4%

6 K E & G CONSTRUCTION, INC. $5.650 $1,243.00 -83.9%

2020025 SQ.FT. REMOVAL OF CONCRETE SIDEWALKS, DRIVEWAYS AND SLABS

Bid Rank Department Estimate 5,981.000 $6.000 $35,886.00

1 AMES CONSTRUCTION, INC. $2.230 $13,337.63 -62.8%

2 SUNDT CONSTRUCTION, INC. $3.000 $17,943.00 -50.0%

3 FNF CONSTRUCTION, INC. $2.500 $14,952.50 -58.3%

4 GRANITE CONSTRUCTION COMPANY $1.100 $6,579.10 -81.7%

5 PULICE CONSTRUCTION, INC. $1.000 $5,981.00 -83.3%

6 K E & G CONSTRUCTION, INC. $2.100 $12,560.10 -65.0%

2020027 L.FT. REMOVAL OF CONCRETE BARRIER

Bid Rank Department Estimate 100.000 $50.000 $5,000.00

1 AMES CONSTRUCTION, INC. $33.450 $3,345.00 -33.1%

2 SUNDT CONSTRUCTION, INC. $23.000 $2,300.00 -54.0%

3 FNF CONSTRUCTION, INC. $16.000 $1,600.00 -68.0%

4 GRANITE CONSTRUCTION COMPANY $34.000 $3,400.00 -32.0%

5 PULICE CONSTRUCTION, INC. $55.000 $5,500.00 +10.0%

6 K E & G CONSTRUCTION, INC. $19.500 $1,950.00 -61.0%

2020036 SQ.YD. REMOVAL OF ASPHALTIC CONCRETE PAVEMENT

Bid Rank Department Estimate 33,382.000 $6.000 $200,292.00

1 AMES CONSTRUCTION, INC. $4.730 $157,896.86 -21.2%

2 SUNDT CONSTRUCTION, INC. $3.000 $100,146.00 -50.0%

3 FNF CONSTRUCTION, INC. $3.250 $108,491.50 -45.8%

4 GRANITE CONSTRUCTION COMPANY $3.600 $120,175.20 -40.0%

5 PULICE CONSTRUCTION, INC. $3.000 $100,146.00 -50.0%

Page 4: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 3 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020036 SQ.YD. REMOVAL OF ASPHALTIC CONCRETE PAVEMENT

Bid Rank Department Estimate 33,382.000 $6.000 $200,292.00

6 K E & G CONSTRUCTION, INC. $2.200 $73,440.40 -63.3%

2020041 L.FT. REMOVAL OF PIPE

Bid Rank Department Estimate 869.000 $50.000 $43,450.00

1 AMES CONSTRUCTION, INC. $19.590 $17,023.71 -60.8%

2 SUNDT CONSTRUCTION, INC. $14.000 $12,166.00 -72.0%

3 FNF CONSTRUCTION, INC. $25.000 $21,725.00 -50.0%

4 GRANITE CONSTRUCTION COMPANY $25.000 $21,725.00 -50.0%

5 PULICE CONSTRUCTION, INC. $45.000 $39,105.00 -10.0%

6 K E & G CONSTRUCTION, INC. $17.000 $14,773.00 -66.0%

2020045 CU.YD. REMOVAL OF RIPRAP

Bid Rank Department Estimate 63.000 $40.000 $2,520.00

1 AMES CONSTRUCTION, INC. $10.010 $630.63 -75.0%

2 SUNDT CONSTRUCTION, INC. $30.000 $1,890.00 -25.0%

3 FNF CONSTRUCTION, INC. $18.000 $1,134.00 -55.0%

4 GRANITE CONSTRUCTION COMPANY $14.000 $882.00 -65.0%

5 PULICE CONSTRUCTION, INC. $25.000 $1,575.00 -37.5%

6 K E & G CONSTRUCTION, INC. $21.000 $1,323.00 -47.5%

2020048 EACH REMOVAL OF STRUCTURE (SPILLWAY)

Bid Rank Department Estimate 6.000 $1,000.000 $6,000.00

1 AMES CONSTRUCTION, INC. $669.050 $4,014.30 -33.1%

2 SUNDT CONSTRUCTION, INC. $325.000 $1,950.00 -67.5%

3 FNF CONSTRUCTION, INC. $600.000 $3,600.00 -40.0%

4 GRANITE CONSTRUCTION COMPANY $575.000 $3,450.00 -42.5%

5 PULICE CONSTRUCTION, INC. $350.000 $2,100.00 -65.0%

6 K E & G CONSTRUCTION, INC. $595.000 $3,570.00 -40.5%

2020052 L.FT. REMOVE (DIRECT BURY CABLE)(CENTURY LINK)

Bid Rank Department Estimate 7,576.000 $4.000 $30,304.00

1 AMES CONSTRUCTION, INC. $1.560 $11,818.56 -61.0%

2 SUNDT CONSTRUCTION, INC. $6.750 $51,138.00 +68.8%

3 FNF CONSTRUCTION, INC. $2.500 $18,940.00 -37.5%

4 GRANITE CONSTRUCTION COMPANY $3.150 $23,864.40 -21.3%

5 PULICE CONSTRUCTION, INC. $6.000 $45,456.00 +50.0%

6 K E & G CONSTRUCTION, INC. $1.000 $7,576.00 -75.0%

2020053 EACH REMOVE (END TERMINALS)

Bid Rank Department Estimate 7.000 $500.000 $3,500.00

1 AMES CONSTRUCTION, INC. $696.150 $4,873.05 +39.2%

2 SUNDT CONSTRUCTION, INC. $250.000 $1,750.00 -50.0%

Page 5: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 4 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020053 EACH REMOVE (END TERMINALS)

Bid Rank Department Estimate 7.000 $500.000 $3,500.00

3 FNF CONSTRUCTION, INC. $900.000 $6,300.00 +80.0%

4 GRANITE CONSTRUCTION COMPANY $1,000.000 $7,000.00 +100.0%

5 PULICE CONSTRUCTION, INC. $800.000 $5,600.00 +60.0%

6 K E & G CONSTRUCTION, INC. $840.000 $5,880.00 +68.0%

2020054 EACH REMOVE (SIGN ASSEMBLY)

Bid Rank Department Estimate 85.000 $130.000 $11,050.00

1 AMES CONSTRUCTION, INC. $76.480 $6,500.80 -41.2%

2 SUNDT CONSTRUCTION, INC. $290.000 $24,650.00 +123.1%

3 FNF CONSTRUCTION, INC. $100.000 $8,500.00 -23.1%

4 GRANITE CONSTRUCTION COMPANY $400.000 $34,000.00 +207.7%

5 PULICE CONSTRUCTION, INC. $300.000 $25,500.00 +130.8%

6 K E & G CONSTRUCTION, INC. $231.000 $19,635.00 +77.7%

2020055 L.SUM REMOVE AND SALVAGE (TRAFFIC SIGNAL EQUIPMENT)

Bid Rank Department Estimate 1.000 $3,000.000 $3,000.00

1 AMES CONSTRUCTION, INC. $4,771.700 $4,771.70 +59.1%

2 SUNDT CONSTRUCTION, INC. $4,000.000 $4,000.00 +33.3%

3 FNF CONSTRUCTION, INC. $5,000.000 $5,000.00 +66.7%

4 GRANITE CONSTRUCTION COMPANY $4,800.000 $4,800.00 +60.0%

5 PULICE CONSTRUCTION, INC. $11,000.000 $11,000.00 +266.7%

6 K E & G CONSTRUCTION, INC. $12,230.000 $12,230.00 +307.7%

2020071 L.FT. REMOVE GUARD RAIL

Bid Rank Department Estimate 1,888.000 $5.000 $9,440.00

1 AMES CONSTRUCTION, INC. $3.130 $5,909.44 -37.4%

2 SUNDT CONSTRUCTION, INC. $3.350 $6,324.80 -33.0%

3 FNF CONSTRUCTION, INC. $3.000 $5,664.00 -40.0%

4 GRANITE CONSTRUCTION COMPANY $3.000 $5,664.00 -40.0%

5 PULICE CONSTRUCTION, INC. $3.250 $6,136.00 -35.0%

6 K E & G CONSTRUCTION, INC. $3.800 $7,174.40 -24.0%

2020079 SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (3" - 3 1/2")

Bid Rank Department Estimate 6,961.000 $5.000 $34,805.00

1 AMES CONSTRUCTION, INC. $3.710 $25,825.31 -25.8%

2 SUNDT CONSTRUCTION, INC. $1.750 $12,181.75 -65.0%

3 FNF CONSTRUCTION, INC. $4.000 $27,844.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $4.200 $29,236.20 -16.0%

5 PULICE CONSTRUCTION, INC. $3.500 $24,363.50 -30.0%

6 K E & G CONSTRUCTION, INC. $2.000 $13,922.00 -60.0%

Page 6: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 5 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020080 SQ.YD. REMOVE BITUMINOUS PAVEMENT (MILLING) (1/2")

Bid Rank Department Estimate 56,707.000 $1.000 $56,707.00

1 AMES CONSTRUCTION, INC. $0.710 $40,261.97 -29.0%

2 SUNDT CONSTRUCTION, INC. $0.750 $42,530.25 -25.0%

3 FNF CONSTRUCTION, INC. $0.600 $34,024.20 -40.0%

4 GRANITE CONSTRUCTION COMPANY $1.140 $64,645.98 +14.0%

5 PULICE CONSTRUCTION, INC. $3.000 $170,121.00 +200.0%

6 K E & G CONSTRUCTION, INC. $0.820 $46,499.74 -18.0%

2020101 L.FT. REMOVE FENCE

Bid Rank Department Estimate 5,021.000 $4.000 $20,084.00

1 AMES CONSTRUCTION, INC. $1.730 $8,686.33 -56.8%

2 SUNDT CONSTRUCTION, INC. $1.000 $5,021.00 -75.0%

3 FNF CONSTRUCTION, INC. $2.500 $12,552.50 -37.5%

4 GRANITE CONSTRUCTION COMPANY $1.650 $8,284.65 -58.8%

5 PULICE CONSTRUCTION, INC. $2.000 $10,042.00 -50.0%

6 K E & G CONSTRUCTION, INC. $2.500 $12,552.50 -37.5%

2020115 EACH REMOVE (RCBC WITH WINGWALL)

Bid Rank Department Estimate 2.000 $15,000.000 $30,000.00

1 AMES CONSTRUCTION, INC. $7,475.270 $14,950.54 -50.2%

2 SUNDT CONSTRUCTION, INC. $1,800.000 $3,600.00 -88.0%

3 FNF CONSTRUCTION, INC. $50,000.000 $100,000.00 +233.3%

4 GRANITE CONSTRUCTION COMPANY $6,400.000 $12,800.00 -57.3%

5 PULICE CONSTRUCTION, INC. $10,000.000 $20,000.00 -33.3%

6 K E & G CONSTRUCTION, INC. $7,150.000 $14,300.00 -52.3%

2020116 EACH REMOVE (LIGHT POLE AND BASES)

Bid Rank Department Estimate 10.000 $500.000 $5,000.00

1 AMES CONSTRUCTION, INC. $1,076.190 $10,761.90 +115.2%

2 SUNDT CONSTRUCTION, INC. $910.000 $9,100.00 +82.0%

3 FNF CONSTRUCTION, INC. $800.000 $8,000.00 +60.0%

4 GRANITE CONSTRUCTION COMPANY $1,800.000 $18,000.00 +260.0%

5 PULICE CONSTRUCTION, INC. $1,000.000 $10,000.00 +100.0%

6 K E & G CONSTRUCTION, INC. $1,000.000 $10,000.00 +100.0%

2020152 SQ.YD. REMOVE DETOUR

Bid Rank Department Estimate 21,136.000 $5.000 $105,680.00

1 AMES CONSTRUCTION, INC. $5.620 $118,784.32 +12.4%

2 SUNDT CONSTRUCTION, INC. $6.500 $137,384.00 +30.0%

3 FNF CONSTRUCTION, INC. $11.000 $232,496.00 +120.0%

4 GRANITE CONSTRUCTION COMPANY $10.400 $219,814.40 +108.0%

5 PULICE CONSTRUCTION, INC. $3.000 $63,408.00 -40.0%

Page 7: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 6 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020152 SQ.YD. REMOVE DETOUR

Bid Rank Department Estimate 21,136.000 $5.000 $105,680.00

6 K E & G CONSTRUCTION, INC. $10.500 $221,928.00 +110.0%

2020154 L.SUM REMOVE (EXISTING LIGHTING CONDUCTORS)

Bid Rank Department Estimate 1.000 $10,000.000 $10,000.00

1 AMES CONSTRUCTION, INC. $4,111.000 $4,111.00 -58.9%

2 SUNDT CONSTRUCTION, INC. $3,400.000 $3,400.00 -66.0%

3 FNF CONSTRUCTION, INC. $4,000.000 $4,000.00 -60.0%

4 GRANITE CONSTRUCTION COMPANY $4,100.000 $4,100.00 -59.0%

5 PULICE CONSTRUCTION, INC. $4,500.000 $4,500.00 -55.0%

6 K E & G CONSTRUCTION, INC. $4,710.000 $4,710.00 -52.9%

2020155 EACH REMOVE (SAND BARREL CRASH CUSHION)

Bid Rank Department Estimate 1.000 $1,500.000 $1,500.00

1 AMES CONSTRUCTION, INC. $2,056.280 $2,056.28 +37.1%

2 SUNDT CONSTRUCTION, INC. $300.000 $300.00 -80.0%

3 FNF CONSTRUCTION, INC. $400.000 $400.00 -73.3%

4 GRANITE CONSTRUCTION COMPANY $2,600.000 $2,600.00 +73.3%

5 PULICE CONSTRUCTION, INC. $800.000 $800.00 -46.7%

6 K E & G CONSTRUCTION, INC. $257.000 $257.00 -82.9%

2020156 EACH REMOVE (EXISTING LIGHTING PULL BOX)

Bid Rank Department Estimate 13.000 $500.000 $6,500.00

1 AMES CONSTRUCTION, INC. $152.940 $1,988.22 -69.4%

2 SUNDT CONSTRUCTION, INC. $125.000 $1,625.00 -75.0%

3 FNF CONSTRUCTION, INC. $150.000 $1,950.00 -70.0%

4 GRANITE CONSTRUCTION COMPANY $155.000 $2,015.00 -69.0%

5 PULICE CONSTRUCTION, INC. $125.000 $1,625.00 -75.0%

6 K E & G CONSTRUCTION, INC. $154.000 $2,002.00 -69.2%

2020157 EACH REMOVE (CATTLE GUARD)

Bid Rank Department Estimate 2.000 $2,000.000 $4,000.00

1 AMES CONSTRUCTION, INC. $1,338.110 $2,676.22 -33.1%

2 SUNDT CONSTRUCTION, INC. $2,700.000 $5,400.00 +35.0%

3 FNF CONSTRUCTION, INC. $3,000.000 $6,000.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $4,100.000 $8,200.00 +105.0%

5 PULICE CONSTRUCTION, INC. $3,000.000 $6,000.00 +50.0%

6 K E & G CONSTRUCTION, INC. $3,310.000 $6,620.00 +65.5%

2020158 EACH REMOVE (CCTV POLE FOUNDATION)

Bid Rank Department Estimate 1.000 $1,000.000 $1,000.00

1 AMES CONSTRUCTION, INC. $552.120 $552.12 -44.8%

2 SUNDT CONSTRUCTION, INC. $1,600.000 $1,600.00 +60.0%

Page 8: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 7 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020158 EACH REMOVE (CCTV POLE FOUNDATION)

Bid Rank Department Estimate 1.000 $1,000.000 $1,000.00

3 FNF CONSTRUCTION, INC. $900.000 $900.00 -10.0%

4 GRANITE CONSTRUCTION COMPANY $1,450.000 $1,450.00 +45.0%

5 PULICE CONSTRUCTION, INC. $1,100.000 $1,100.00 +10.0%

6 K E & G CONSTRUCTION, INC. $6,170.000 $6,170.00 +517.0%

2020170 SQ.YD. REMOVE (SLOPE PAVING)

Bid Rank Department Estimate 974.000 $8.000 $7,792.00

1 AMES CONSTRUCTION, INC. $8.670 $8,444.58 +8.4%

2 SUNDT CONSTRUCTION, INC. $10.000 $9,740.00 +25.0%

3 FNF CONSTRUCTION, INC. $12.000 $11,688.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $12.250 $11,931.50 +53.1%

5 PULICE CONSTRUCTION, INC. $17.000 $16,558.00 +112.5%

6 K E & G CONSTRUCTION, INC. $2.600 $2,532.40 -67.5%

2020400 EACH REMOVE AND RELOCATE (STEEL DOUBLE GATE)

Bid Rank Department Estimate 2.000 $900.000 $1,800.00

1 AMES CONSTRUCTION, INC. $403.870 $807.74 -55.1%

2 SUNDT CONSTRUCTION, INC. $4,000.000 $8,000.00 +344.4%

3 FNF CONSTRUCTION, INC. $600.000 $1,200.00 -33.3%

4 GRANITE CONSTRUCTION COMPANY $385.000 $770.00 -57.2%

5 PULICE CONSTRUCTION, INC. $700.000 $1,400.00 -22.2%

6 K E & G CONSTRUCTION, INC. $716.000 $1,432.00 -20.4%

2030112 L.FT. SHOULDER BUILD-UP (MILLED AC)

Bid Rank Department Estimate 18,000.000 $1.000 $18,000.00

1 AMES CONSTRUCTION, INC. $0.310 $5,580.00 -69.0%

2 SUNDT CONSTRUCTION, INC. $0.650 $11,700.00 -35.0%

3 FNF CONSTRUCTION, INC. $0.740 $13,320.00 -26.0%

4 GRANITE CONSTRUCTION COMPANY $0.470 $8,460.00 -53.0%

5 PULICE CONSTRUCTION, INC. $3.500 $63,000.00 +250.0%

6 K E & G CONSTRUCTION, INC. $0.420 $7,560.00 -58.0%

2030113 HOUR SHOULDER BUILD-UP (COMPACTION)

Bid Rank Department Estimate 20.000 $120.000 $2,400.00

1 AMES CONSTRUCTION, INC. $115.070 $2,301.40 -4.1%

2 SUNDT CONSTRUCTION, INC. $95.000 $1,900.00 -20.8%

3 FNF CONSTRUCTION, INC. $125.000 $2,500.00 +4.2%

4 GRANITE CONSTRUCTION COMPANY $110.000 $2,200.00 -8.3%

5 PULICE CONSTRUCTION, INC. $120.000 $2,400.00 +0.0%

6 K E & G CONSTRUCTION, INC. $137.000 $2,740.00 +14.2%

Page 9: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 8 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2030301 CU.YD. ROADWAY EXCAVATION

Bid Rank Department Estimate 100,124.000 $15.000 $1,501,860.00

1 AMES CONSTRUCTION, INC. $7.500 $750,930.00 -50.0%

2 SUNDT CONSTRUCTION, INC. $12.000 $1,201,488.00 -20.0%

3 FNF CONSTRUCTION, INC. $10.750 $1,076,333.00 -28.3%

4 GRANITE CONSTRUCTION COMPANY $9.000 $901,116.00 -40.0%

5 PULICE CONSTRUCTION, INC. $8.000 $800,992.00 -46.7%

6 K E & G CONSTRUCTION, INC. $9.800 $981,215.20 -34.7%

2030302 CU.YD. ROADWAY EXCAVATION (OVEREXCAVATION)

Bid Rank Department Estimate 138,855.000 $8.000 $1,110,840.00

1 AMES CONSTRUCTION, INC. $1.860 $258,270.30 -76.8%

2 SUNDT CONSTRUCTION, INC. $3.750 $520,706.25 -53.1%

3 FNF CONSTRUCTION, INC. $4.000 $555,420.00 -50.0%

4 GRANITE CONSTRUCTION COMPANY $3.850 $534,591.75 -51.9%

5 PULICE CONSTRUCTION, INC. $2.000 $277,710.00 -75.0%

6 K E & G CONSTRUCTION, INC. $4.250 $590,133.75 -46.9%

2030401 CU.YD. DRAINAGE EXCAVATION

Bid Rank Department Estimate 41,014.000 $10.000 $410,140.00

1 AMES CONSTRUCTION, INC. $2.500 $102,535.00 -75.0%

2 SUNDT CONSTRUCTION, INC. $5.750 $235,830.50 -42.5%

3 FNF CONSTRUCTION, INC. $10.750 $440,900.50 +7.5%

4 GRANITE CONSTRUCTION COMPANY $3.900 $159,954.60 -61.0%

5 PULICE CONSTRUCTION, INC. $12.000 $492,168.00 +20.0%

6 K E & G CONSTRUCTION, INC. $4.500 $184,563.00 -55.0%

2030904 CU.YD. BORROW (IN PLACE)

Bid Rank Department Estimate 175,552.000 $12.000 $2,106,624.00

1 AMES CONSTRUCTION, INC. $5.050 $886,537.60 -57.9%

2 SUNDT CONSTRUCTION, INC. $16.000 $2,808,832.00 +33.3%

3 FNF CONSTRUCTION, INC. $12.000 $2,106,624.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $12.250 $2,150,512.00 +2.1%

5 PULICE CONSTRUCTION, INC. $16.000 $2,808,832.00 +33.3%

6 K E & G CONSTRUCTION, INC. $15.000 $2,633,280.00 +25.0%

2050003 SQ.YD. GRADING ROADWAY FOR PAVEMENT (DETOUR)

Bid Rank Department Estimate 21,136.000 $6.000 $126,816.00

1 AMES CONSTRUCTION, INC. $2.470 $52,205.92 -58.8%

2 SUNDT CONSTRUCTION, INC. $5.000 $105,680.00 -16.7%

3 FNF CONSTRUCTION, INC. $8.000 $169,088.00 +33.3%

4 GRANITE CONSTRUCTION COMPANY $3.000 $63,408.00 -50.0%

5 PULICE CONSTRUCTION, INC. $5.500 $116,248.00 -8.3%

Page 10: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 9 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2050003 SQ.YD. GRADING ROADWAY FOR PAVEMENT (DETOUR)

Bid Rank Department Estimate 21,136.000 $6.000 $126,816.00

6 K E & G CONSTRUCTION, INC. $1.900 $40,158.40 -68.3%

3030022 CU.YD. AGGREGATE BASE, CLASS 2

Bid Rank Department Estimate 23,845.000 $45.000 $1,073,025.00

1 AMES CONSTRUCTION, INC. $36.740 $876,065.30 -18.4%

2 SUNDT CONSTRUCTION, INC. $50.000 $1,192,250.00 +11.1%

3 FNF CONSTRUCTION, INC. $39.000 $929,955.00 -13.3%

4 GRANITE CONSTRUCTION COMPANY $44.000 $1,049,180.00 -2.2%

5 PULICE CONSTRUCTION, INC. $55.000 $1,311,475.00 +22.2%

6 K E & G CONSTRUCTION, INC. $45.000 $1,073,025.00 +0.0%

3030026 CU.YD. AGGREGATE SUBBASE, CLASS 6

Bid Rank Department Estimate 682.000 $50.000 $34,100.00

1 AMES CONSTRUCTION, INC. $82.210 $56,067.22 +64.4%

2 SUNDT CONSTRUCTION, INC. $8.000 $5,456.00 -84.0%

3 FNF CONSTRUCTION, INC. $40.000 $27,280.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $50.000 $34,100.00 +0.0%

5 PULICE CONSTRUCTION, INC. $65.000 $44,330.00 +30.0%

6 K E & G CONSTRUCTION, INC. $33.500 $22,847.00 -33.0%

4010010 SQ.YD. PORTLAND CEMENT CONCRETE PAVEMENT (10")

Bid Rank Department Estimate 31,760.000 $60.000 $1,905,600.00

1 AMES CONSTRUCTION, INC. $94.990 $3,016,882.40 +58.3%

2 SUNDT CONSTRUCTION, INC. $90.000 $2,858,400.00 +50.0%

3 FNF CONSTRUCTION, INC. $60.000 $1,905,600.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $94.000 $2,985,440.00 +56.7%

5 PULICE CONSTRUCTION, INC. $85.000 $2,699,600.00 +41.7%

6 K E & G CONSTRUCTION, INC. $106.000 $3,366,560.00 +76.7%

4040111 TON BITUMINOUS TACK COAT

Bid Rank Department Estimate 55.000 $500.000 $27,500.00

1 AMES CONSTRUCTION, INC. $558.600 $30,723.00 +11.7%

2 SUNDT CONSTRUCTION, INC. $475.000 $26,125.00 -5.0%

3 FNF CONSTRUCTION, INC. $450.000 $24,750.00 -10.0%

4 GRANITE CONSTRUCTION COMPANY $450.000 $24,750.00 -10.0%

5 PULICE CONSTRUCTION, INC. $500.000 $27,500.00 +0.0%

6 K E & G CONSTRUCTION, INC. $1,020.000 $56,100.00 +104.0%

4040116 HOUR APPLY BITUMINOUS TACK COAT

Bid Rank Department Estimate 92.000 $150.000 $13,800.00

1 AMES CONSTRUCTION, INC. $241.080 $22,179.36 +60.7%

2 SUNDT CONSTRUCTION, INC. $205.000 $18,860.00 +36.7%

Page 11: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 10 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

4040116 HOUR APPLY BITUMINOUS TACK COAT

Bid Rank Department Estimate 92.000 $150.000 $13,800.00

3 FNF CONSTRUCTION, INC. $172.000 $15,824.00 +14.7%

4 GRANITE CONSTRUCTION COMPANY $300.000 $27,600.00 +100.0%

5 PULICE CONSTRUCTION, INC. $275.000 $25,300.00 +83.3%

6 K E & G CONSTRUCTION, INC. $270.000 $24,840.00 +80.0%

4040270 TON ASPHALT BINDER (PG 70-10)

Bid Rank Department Estimate 1,049.000 $500.000 $524,500.00

1 AMES CONSTRUCTION, INC. $572.710 $600,772.79 +14.5%

2 SUNDT CONSTRUCTION, INC. $487.000 $510,863.00 -2.6%

3 FNF CONSTRUCTION, INC. $460.000 $482,540.00 -8.0%

4 GRANITE CONSTRUCTION COMPANY $425.000 $445,825.00 -15.0%

5 PULICE CONSTRUCTION, INC. $550.000 $576,950.00 +10.0%

6 K E & G CONSTRUCTION, INC. $627.000 $657,723.00 +25.4%

4040290 TON ASPHALT BINDER (PG 76-22 TR+)

Bid Rank Department Estimate 150.000 $900.000 $135,000.00

1 AMES CONSTRUCTION, INC. $823.200 $123,480.00 -8.5%

2 SUNDT CONSTRUCTION, INC. $700.000 $105,000.00 -22.2%

3 FNF CONSTRUCTION, INC. $670.000 $100,500.00 -25.6%

4 GRANITE CONSTRUCTION COMPANY $1,100.000 $165,000.00 +22.2%

5 PULICE CONSTRUCTION, INC. $850.000 $127,500.00 -5.6%

6 K E & G CONSTRUCTION, INC. $895.000 $134,250.00 -0.6%

4070002 TON ASPHALTIC CONCRETE FRICTION COURSE (PG 76-22 TR+)

Bid Rank Department Estimate 2,307.000 $80.000 $184,560.00

1 AMES CONSTRUCTION, INC. $69.970 $161,420.79 -12.5%

2 SUNDT CONSTRUCTION, INC. $59.500 $137,266.50 -25.6%

3 FNF CONSTRUCTION, INC. $53.000 $122,271.00 -33.8%

4 GRANITE CONSTRUCTION COMPANY $125.000 $288,375.00 +56.3%

5 PULICE CONSTRUCTION, INC. $60.000 $138,420.00 -25.0%

6 K E & G CONSTRUCTION, INC. $66.500 $153,415.50 -16.9%

4070021 TON MINERAL ADMIXTURE (FOR ACFC)

Bid Rank Department Estimate 22.000 $90.000 $1,980.00

1 AMES CONSTRUCTION, INC. $90.000 $1,980.00 +0.0%

2 SUNDT CONSTRUCTION, INC. $90.000 $1,980.00 +0.0%

3 FNF CONSTRUCTION, INC. $90.000 $1,980.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $90.000 $1,980.00 +0.0%

5 PULICE CONSTRUCTION, INC. $90.000 $1,980.00 +0.0%

6 K E & G CONSTRUCTION, INC. $90.000 $1,980.00 +0.0%

Page 12: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 11 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

4090003 TON ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL)

Bid Rank Department Estimate 5,722.000 $100.000 $572,200.00

1 AMES CONSTRUCTION, INC. $89.960 $514,751.12 -10.0%

2 SUNDT CONSTRUCTION, INC. $76.500 $437,733.00 -23.5%

3 FNF CONSTRUCTION, INC. $70.000 $400,540.00 -30.0%

4 GRANITE CONSTRUCTION COMPANY $112.000 $640,864.00 +12.0%

5 PULICE CONSTRUCTION, INC. $95.000 $543,590.00 -5.0%

6 K E & G CONSTRUCTION, INC. $86.250 $493,522.50 -13.8%

4160001 TON ASPHALTIC CONCRETE (1/2" MIX) (END PRODUCT)

Bid Rank Department Estimate 286.000 $200.000 $57,200.00

1 AMES CONSTRUCTION, INC. $69.380 $19,842.68 -65.3%

2 SUNDT CONSTRUCTION, INC. $59.000 $16,874.00 -70.5%

3 FNF CONSTRUCTION, INC. $64.000 $18,304.00 -68.0%

4 GRANITE CONSTRUCTION COMPANY $103.000 $29,458.00 -48.5%

5 PULICE CONSTRUCTION, INC. $100.000 $28,600.00 -50.0%

6 K E & G CONSTRUCTION, INC. $65.000 $18,590.00 -67.5%

4160004 TON ASPHALTIC CONCRETE (3/4" MIX) (END PRODUCT) (SPECIAL MIX)

Bid Rank Department Estimate 20,679.000 $50.000 $1,033,950.00

1 AMES CONSTRUCTION, INC. $60.980 $1,261,005.42 +22.0%

2 SUNDT CONSTRUCTION, INC. $51.850 $1,072,206.15 +3.7%

3 FNF CONSTRUCTION, INC. $46.000 $951,234.00 -8.0%

4 GRANITE CONSTRUCTION COMPANY $50.000 $1,033,950.00 +0.0%

5 PULICE CONSTRUCTION, INC. $55.000 $1,137,345.00 +10.0%

6 K E & G CONSTRUCTION, INC. $59.000 $1,220,061.00 +18.0%

4160031 TON MINERAL ADMIXTURE

Bid Rank Department Estimate 198.000 $90.000 $17,820.00

1 AMES CONSTRUCTION, INC. $90.000 $17,820.00 +0.0%

2 SUNDT CONSTRUCTION, INC. $90.000 $17,820.00 +0.0%

3 FNF CONSTRUCTION, INC. $90.000 $17,820.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $90.000 $17,820.00 +0.0%

5 PULICE CONSTRUCTION, INC. $90.000 $17,820.00 +0.0%

6 K E & G CONSTRUCTION, INC. $90.000 $17,820.00 +0.0%

5010011 L.FT. PIPE, CORRUGATED METAL, 24"

Bid Rank Department Estimate 267.000 $110.000 $29,370.00

1 AMES CONSTRUCTION, INC. $71.400 $19,063.80 -35.1%

2 SUNDT CONSTRUCTION, INC. $55.000 $14,685.00 -50.0%

3 FNF CONSTRUCTION, INC. $185.000 $49,395.00 +68.2%

4 GRANITE CONSTRUCTION COMPANY $118.000 $31,506.00 +7.3%

5 PULICE CONSTRUCTION, INC. $120.000 $32,040.00 +9.1%

Page 13: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 12 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

5010011 L.FT. PIPE, CORRUGATED METAL, 24"

Bid Rank Department Estimate 267.000 $110.000 $29,370.00

6 K E & G CONSTRUCTION, INC. $72.500 $19,357.50 -34.1%

5010025 L.FT. PIPE, CORRUGATED METAL, 36"

Bid Rank Department Estimate 472.000 $100.000 $47,200.00

1 AMES CONSTRUCTION, INC. $125.320 $59,151.04 +25.3%

2 SUNDT CONSTRUCTION, INC. $150.000 $70,800.00 +50.0%

3 FNF CONSTRUCTION, INC. $190.000 $89,680.00 +90.0%

4 GRANITE CONSTRUCTION COMPANY $160.000 $75,520.00 +60.0%

5 PULICE CONSTRUCTION, INC. $200.000 $94,400.00 +100.0%

6 K E & G CONSTRUCTION, INC. $103.000 $48,616.00 +3.0%

5010035 L.FT. PIPE, CORRUGATED METAL, 48"

Bid Rank Department Estimate 1,901.000 $125.000 $237,625.00

1 AMES CONSTRUCTION, INC. $165.190 $314,026.19 +32.2%

2 SUNDT CONSTRUCTION, INC. $130.000 $247,130.00 +4.0%

3 FNF CONSTRUCTION, INC. $260.000 $494,260.00 +108.0%

4 GRANITE CONSTRUCTION COMPANY $240.000 $456,240.00 +92.0%

5 PULICE CONSTRUCTION, INC. $225.000 $427,725.00 +80.0%

6 K E & G CONSTRUCTION, INC. $158.000 $300,358.00 +26.4%

5010107 L.FT. PIPE, CORRUGATED METAL, SLOTTED, 18"

Bid Rank Department Estimate 200.000 $160.000 $32,000.00

1 AMES CONSTRUCTION, INC. $193.920 $38,784.00 +21.2%

2 SUNDT CONSTRUCTION, INC. $160.000 $32,000.00 +0.0%

3 FNF CONSTRUCTION, INC. $240.000 $48,000.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $218.000 $43,600.00 +36.3%

5 PULICE CONSTRUCTION, INC. $210.000 $42,000.00 +31.3%

6 K E & G CONSTRUCTION, INC. $226.000 $45,200.00 +41.3%

5010204 L.FT. PIPE, CORRUGATED METAL, 28" X 20"

Bid Rank Department Estimate 95.000 $72.000 $6,840.00

1 AMES CONSTRUCTION, INC. $71.410 $6,783.95 -0.8%

2 SUNDT CONSTRUCTION, INC. $85.000 $8,075.00 +18.1%

3 FNF CONSTRUCTION, INC. $120.000 $11,400.00 +66.7%

4 GRANITE CONSTRUCTION COMPANY $112.000 $10,640.00 +55.6%

5 PULICE CONSTRUCTION, INC. $160.000 $15,200.00 +122.2%

6 K E & G CONSTRUCTION, INC. $72.500 $6,887.50 +0.7%

5010254 L.FT. PIPE, CORRUGATED METAL, 29" X 18"

Bid Rank Department Estimate 56.000 $75.000 $4,200.00

1 AMES CONSTRUCTION, INC. $135.190 $7,570.64 +80.3%

2 SUNDT CONSTRUCTION, INC. $90.000 $5,040.00 +20.0%

Page 14: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 13 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

5010254 L.FT. PIPE, CORRUGATED METAL, 29" X 18"

Bid Rank Department Estimate 56.000 $75.000 $4,200.00

3 FNF CONSTRUCTION, INC. $105.000 $5,880.00 +40.0%

4 GRANITE CONSTRUCTION COMPANY $108.000 $6,048.00 +44.0%

5 PULICE CONSTRUCTION, INC. $250.000 $14,000.00 +233.3%

6 K E & G CONSTRUCTION, INC. $118.000 $6,608.00 +57.3%

5012518 L.FT. STORM DRAIN PIPE, 18"

Bid Rank Department Estimate 530.000 $70.000 $37,100.00

1 AMES CONSTRUCTION, INC. $51.280 $27,178.40 -26.7%

2 SUNDT CONSTRUCTION, INC. $65.000 $34,450.00 -7.1%

3 FNF CONSTRUCTION, INC. $115.000 $60,950.00 +64.3%

4 GRANITE CONSTRUCTION COMPANY $95.000 $50,350.00 +35.7%

5 PULICE CONSTRUCTION, INC. $110.000 $58,300.00 +57.1%

6 K E & G CONSTRUCTION, INC. $46.500 $24,645.00 -33.6%

5012524 L.FT. STORM DRAIN PIPE, 24"

Bid Rank Department Estimate 2,403.000 $80.000 $192,240.00

1 AMES CONSTRUCTION, INC. $61.960 $148,889.88 -22.6%

2 SUNDT CONSTRUCTION, INC. $55.000 $132,165.00 -31.3%

3 FNF CONSTRUCTION, INC. $150.000 $360,450.00 +87.5%

4 GRANITE CONSTRUCTION COMPANY $100.000 $240,300.00 +25.0%

5 PULICE CONSTRUCTION, INC. $150.000 $360,450.00 +87.5%

6 K E & G CONSTRUCTION, INC. $72.500 $174,217.50 -9.4%

5014228 EACH FLARED END SECTION, 28" X 20" (C-13.25)

Bid Rank Department Estimate 2.000 $400.000 $800.00

1 AMES CONSTRUCTION, INC. $171.190 $342.38 -57.2%

2 SUNDT CONSTRUCTION, INC. $470.000 $940.00 +17.5%

3 FNF CONSTRUCTION, INC. $2,100.000 $4,200.00 +425.0%

4 GRANITE CONSTRUCTION COMPANY $700.000 $1,400.00 +75.0%

5 PULICE CONSTRUCTION, INC. $700.000 $1,400.00 +75.0%

6 K E & G CONSTRUCTION, INC. $613.000 $1,226.00 +53.3%

5014229 EACH FLARED END SECTION, 29" X 18" (C-13.25)

Bid Rank Department Estimate 2.000 $400.000 $800.00

1 AMES CONSTRUCTION, INC. $171.190 $342.38 -57.2%

2 SUNDT CONSTRUCTION, INC. $470.000 $940.00 +17.5%

3 FNF CONSTRUCTION, INC. $900.000 $1,800.00 +125.0%

4 GRANITE CONSTRUCTION COMPANY $775.000 $1,550.00 +93.8%

5 PULICE CONSTRUCTION, INC. $700.000 $1,400.00 +75.0%

6 K E & G CONSTRUCTION, INC. $623.000 $1,246.00 +55.8%

Page 15: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 14 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

5014518 EACH FLARED END SECTION, 18" (C-13.20 OR C-13.25)

Bid Rank Department Estimate 3.000 $800.000 $2,400.00

1 AMES CONSTRUCTION, INC. $154.500 $463.50 -80.7%

2 SUNDT CONSTRUCTION, INC. $470.000 $1,410.00 -41.3%

3 FNF CONSTRUCTION, INC. $1,050.000 $3,150.00 +31.3%

4 GRANITE CONSTRUCTION COMPANY $925.000 $2,775.00 +15.6%

5 PULICE CONSTRUCTION, INC. $750.000 $2,250.00 -6.3%

6 K E & G CONSTRUCTION, INC. $605.000 $1,815.00 -24.4%

5014524 EACH FLARED END SECTION, 24" (C-13.20 OR C-13.25)

Bid Rank Department Estimate 18.000 $1,000.000 $18,000.00

1 AMES CONSTRUCTION, INC. $349.840 $6,297.12 -65.0%

2 SUNDT CONSTRUCTION, INC. $670.000 $12,060.00 -33.0%

3 FNF CONSTRUCTION, INC. $800.000 $14,400.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $1,050.000 $18,900.00 +5.0%

5 PULICE CONSTRUCTION, INC. $900.000 $16,200.00 -10.0%

6 K E & G CONSTRUCTION, INC. $831.000 $14,958.00 -16.9%

5014699 EACH METAL SAFETY END SECTION (28" X 20")

Bid Rank Department Estimate 2.000 $500.000 $1,000.00

1 AMES CONSTRUCTION, INC. $901.920 $1,803.84 +80.4%

2 SUNDT CONSTRUCTION, INC. $2,000.000 $4,000.00 +300.0%

3 FNF CONSTRUCTION, INC. $1,800.000 $3,600.00 +260.0%

4 GRANITE CONSTRUCTION COMPANY $2,100.000 $4,200.00 +320.0%

5 PULICE CONSTRUCTION, INC. $2,000.000 $4,000.00 +300.0%

6 K E & G CONSTRUCTION, INC. $850.000 $1,700.00 +70.0%

5030025 EACH CONCRETE CATCH BASIN (C-15.20) ONE 11.5' WING, H=8' OR LESS

Bid Rank Department Estimate 4.000 $7,300.000 $29,200.00

1 AMES CONSTRUCTION, INC. $11,534.490 $46,137.96 +58.0%

2 SUNDT CONSTRUCTION, INC. $16,000.000 $64,000.00 +119.2%

3 FNF CONSTRUCTION, INC. $18,500.000 $74,000.00 +153.4%

4 GRANITE CONSTRUCTION COMPANY $12,400.000 $49,600.00 +69.9%

5 PULICE CONSTRUCTION, INC. $9,000.000 $36,000.00 +23.3%

6 K E & G CONSTRUCTION, INC. $11,980.000 $47,920.00 +64.1%

5030027 EACH CONCRETE CATCH BASIN (C-15.20) ONE 19.5' WING, H=8' OR LESS

Bid Rank Department Estimate 2.000 $8,000.000 $16,000.00

1 AMES CONSTRUCTION, INC. $15,238.810 $30,477.62 +90.5%

2 SUNDT CONSTRUCTION, INC. $19,000.000 $38,000.00 +137.5%

3 FNF CONSTRUCTION, INC. $24,500.000 $49,000.00 +206.3%

4 GRANITE CONSTRUCTION COMPANY $15,100.000 $30,200.00 +88.8%

5 PULICE CONSTRUCTION, INC. $11,000.000 $22,000.00 +37.5%

Page 16: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 15 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

5030027 EACH CONCRETE CATCH BASIN (C-15.20) ONE 19.5' WING, H=8' OR LESS

Bid Rank Department Estimate 2.000 $8,000.000 $16,000.00

6 K E & G CONSTRUCTION, INC. $15,730.000 $31,460.00 +96.6%

5030031 EACH CONCRETE CATCH BASIN (C-15.20) SUMP ONLY, H=8' OR LESS

Bid Rank Department Estimate 2.000 $6,500.000 $13,000.00

1 AMES CONSTRUCTION, INC. $5,521.790 $11,043.58 -15.0%

2 SUNDT CONSTRUCTION, INC. $6,400.000 $12,800.00 -1.5%

3 FNF CONSTRUCTION, INC. $6,400.000 $12,800.00 -1.5%

4 GRANITE CONSTRUCTION COMPANY $5,100.000 $10,200.00 -21.5%

5 PULICE CONSTRUCTION, INC. $7,000.000 $14,000.00 +7.7%

6 K E & G CONSTRUCTION, INC. $8,400.000 $16,800.00 +29.2%

5030142 EACH CONCRETE CATCH BASIN (MEDIAN) (C-15.80)(H=8' OR LESS)

Bid Rank Department Estimate 4.000 $5,000.000 $20,000.00

1 AMES CONSTRUCTION, INC. $5,849.610 $23,398.44 +17.0%

2 SUNDT CONSTRUCTION, INC. $6,500.000 $26,000.00 +30.0%

3 FNF CONSTRUCTION, INC. $7,300.000 $29,200.00 +46.0%

4 GRANITE CONSTRUCTION COMPANY $7,800.000 $31,200.00 +56.0%

5 PULICE CONSTRUCTION, INC. $7,000.000 $28,000.00 +40.0%

6 K E & G CONSTRUCTION, INC. $7,410.000 $29,640.00 +48.2%

5030605 EACH CONCRETE CATCH BASIN (C-15.91)(H=8' OR LESS)

Bid Rank Department Estimate 10.000 $6,000.000 $60,000.00

1 AMES CONSTRUCTION, INC. $6,031.280 $60,312.80 +0.5%

2 SUNDT CONSTRUCTION, INC. $5,700.000 $57,000.00 -5.0%

3 FNF CONSTRUCTION, INC. $7,600.000 $76,000.00 +26.7%

4 GRANITE CONSTRUCTION COMPANY $4,300.000 $43,000.00 -28.3%

5 PULICE CONSTRUCTION, INC. $6,500.000 $65,000.00 +8.3%

6 K E & G CONSTRUCTION, INC. $7,210.000 $72,100.00 +20.2%

5050013 EACH MANHOLE (C 18.10) (FOR PIPES 6" TO 36")

Bid Rank Department Estimate 5.000 $6,000.000 $30,000.00

1 AMES CONSTRUCTION, INC. $5,907.340 $29,536.70 -1.5%

2 SUNDT CONSTRUCTION, INC. $8,400.000 $42,000.00 +40.0%

3 FNF CONSTRUCTION, INC. $10,500.000 $52,500.00 +75.0%

4 GRANITE CONSTRUCTION COMPANY $6,500.000 $32,500.00 +8.3%

5 PULICE CONSTRUCTION, INC. $6,500.000 $32,500.00 +8.3%

6 K E & G CONSTRUCTION, INC. $5,750.000 $28,750.00 -4.2%

6016088 EACH HEADWALL (SD 6.30)(3 - 48" PIPE)

Bid Rank Department Estimate 2.000 $6,500.000 $13,000.00

1 AMES CONSTRUCTION, INC. $12,029.740 $24,059.48 +85.1%

2 SUNDT CONSTRUCTION, INC. $37,000.000 $74,000.00 +469.2%

Page 17: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 16 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6016088 EACH HEADWALL (SD 6.30)(3 - 48" PIPE)

Bid Rank Department Estimate 2.000 $6,500.000 $13,000.00

3 FNF CONSTRUCTION, INC. $16,000.000 $32,000.00 +146.2%

4 GRANITE CONSTRUCTION COMPANY $20,500.000 $41,000.00 +215.4%

5 PULICE CONSTRUCTION, INC. $25,000.000 $50,000.00 +284.6%

6 K E & G CONSTRUCTION, INC. $19,840.000 $39,680.00 +205.2%

6016089 EACH HEADWALL (SD 6.30)(4 - 48" PIPE)

Bid Rank Department Estimate 4.000 $8,500.000 $34,000.00

1 AMES CONSTRUCTION, INC. $13,136.430 $52,545.72 +54.5%

2 SUNDT CONSTRUCTION, INC. $38,000.000 $152,000.00 +347.1%

3 FNF CONSTRUCTION, INC. $18,000.000 $72,000.00 +111.8%

4 GRANITE CONSTRUCTION COMPANY $24,400.000 $97,600.00 +187.1%

5 PULICE CONSTRUCTION, INC. $27,000.000 $108,000.00 +217.6%

6 K E & G CONSTRUCTION, INC. $21,240.000 $84,960.00 +149.9%

6016090 EACH HEADWALL (SD 6.30)(2 - 36" PIPE)

Bid Rank Department Estimate 2.000 $6,000.000 $12,000.00

1 AMES CONSTRUCTION, INC. $10,317.500 $20,635.00 +72.0%

2 SUNDT CONSTRUCTION, INC. $7,400.000 $14,800.00 +23.3%

3 FNF CONSTRUCTION, INC. $13,000.000 $26,000.00 +116.7%

4 GRANITE CONSTRUCTION COMPANY $10,700.000 $21,400.00 +78.3%

5 PULICE CONSTRUCTION, INC. $12,000.000 $24,000.00 +100.0%

6 K E & G CONSTRUCTION, INC. $6,110.000 $12,220.00 +1.8%

6060047 EACH BRIDGE SIGN STRUCTURE (SD9.20, TYPE 3F)

Bid Rank Department Estimate 2.000 $90,000.000 $180,000.00

1 AMES CONSTRUCTION, INC. $100,747.340 $201,494.68 +11.9%

2 SUNDT CONSTRUCTION, INC. $80,000.000 $160,000.00 -11.1%

3 FNF CONSTRUCTION, INC. $100,000.000 $200,000.00 +11.1%

4 GRANITE CONSTRUCTION COMPANY $110,000.000 $220,000.00 +22.2%

5 PULICE CONSTRUCTION, INC. $100,000.000 $200,000.00 +11.1%

6 K E & G CONSTRUCTION, INC. $97,000.000 $194,000.00 +7.8%

6060059 EACH BRIDGE SIGN STRUCTURE (TAPERED TUBE, SINGLE BEAM, 85'1" TO 100')

Bid Rank Department Estimate 1.000 $18,000.000 $18,000.00

1 AMES CONSTRUCTION, INC. $29,287.020 $29,287.02 +62.7%

2 SUNDT CONSTRUCTION, INC. $22,000.000 $22,000.00 +22.2%

3 FNF CONSTRUCTION, INC. $30,000.000 $30,000.00 +66.7%

4 GRANITE CONSTRUCTION COMPANY $40,500.000 $40,500.00 +125.0%

5 PULICE CONSTRUCTION, INC. $27,000.000 $27,000.00 +50.0%

6 K E & G CONSTRUCTION, INC. $27,500.000 $27,500.00 +52.8%

Page 18: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 17 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6060074 EACH FOUNDATION FOR BRIDGE SIGN STRUCTURE (TAPERED TUBE)

Bid Rank Department Estimate 2.000 $4,000.000 $8,000.00

1 AMES CONSTRUCTION, INC. $3,514.440 $7,028.88 -12.1%

2 SUNDT CONSTRUCTION, INC. $3,900.000 $7,800.00 -2.5%

3 FNF CONSTRUCTION, INC. $4,500.000 $9,000.00 +12.5%

4 GRANITE CONSTRUCTION COMPANY $3,500.000 $7,000.00 -12.5%

5 PULICE CONSTRUCTION, INC. $5,000.000 $10,000.00 +25.0%

6 K E & G CONSTRUCTION, INC. $4,770.000 $9,540.00 +19.3%

6060078 EACH FOUNDATION FOR BRIDGE SIGN STRUCTURE (SD9.20, TYPE 3F)

Bid Rank Department Estimate 4.000 $11,000.000 $44,000.00

1 AMES CONSTRUCTION, INC. $9,957.590 $39,830.36 -9.5%

2 SUNDT CONSTRUCTION, INC. $9,100.000 $36,400.00 -17.3%

3 FNF CONSTRUCTION, INC. $12,000.000 $48,000.00 +9.1%

4 GRANITE CONSTRUCTION COMPANY $17,250.000 $69,000.00 +56.8%

5 PULICE CONSTRUCTION, INC. $11,000.000 $44,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $11,230.000 $44,920.00 +2.1%

6060133 EACH CANTILEVER SIGN STRUCTURE (SD9.10, TYPE 3C)

Bid Rank Department Estimate 1.000 $48,000.000 $48,000.00

1 AMES CONSTRUCTION, INC. $53,888.110 $53,888.11 +12.3%

2 SUNDT CONSTRUCTION, INC. $42,000.000 $42,000.00 -12.5%

3 FNF CONSTRUCTION, INC. $55,000.000 $55,000.00 +14.6%

4 GRANITE CONSTRUCTION COMPANY $60,000.000 $60,000.00 +25.0%

5 PULICE CONSTRUCTION, INC. $50,000.000 $50,000.00 +4.2%

6 K E & G CONSTRUCTION, INC. $51,500.000 $51,500.00 +7.3%

6060134 EACH CANTILEVER SIGN STRUCTURE (SD9.10, TYPE 4C)

Bid Rank Department Estimate 3.000 $60,000.000 $180,000.00

1 AMES CONSTRUCTION, INC. $65,602.920 $196,808.76 +9.3%

2 SUNDT CONSTRUCTION, INC. $53,000.000 $159,000.00 -11.7%

3 FNF CONSTRUCTION, INC. $71,000.000 $213,000.00 +18.3%

4 GRANITE CONSTRUCTION COMPANY $74,300.000 $222,900.00 +23.8%

5 PULICE CONSTRUCTION, INC. $65,000.000 $195,000.00 +8.3%

6 K E & G CONSTRUCTION, INC. $62,000.000 $186,000.00 +3.3%

6060256 EACH FOUNDATION FOR CANTILEVER SIGN STRUCTURE (SD9.10, TYPE 3C)

Bid Rank Department Estimate 1.000 $11,000.000 $11,000.00

1 AMES CONSTRUCTION, INC. $9,957.590 $9,957.59 -9.5%

2 SUNDT CONSTRUCTION, INC. $9,000.000 $9,000.00 -18.2%

3 FNF CONSTRUCTION, INC. $13,000.000 $13,000.00 +18.2%

4 GRANITE CONSTRUCTION COMPANY $16,100.000 $16,100.00 +46.4%

5 PULICE CONSTRUCTION, INC. $11,000.000 $11,000.00 +0.0%

Page 19: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 18 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6060256 EACH FOUNDATION FOR CANTILEVER SIGN STRUCTURE (SD9.10, TYPE 3C)

Bid Rank Department Estimate 1.000 $11,000.000 $11,000.00

6 K E & G CONSTRUCTION, INC. $11,040.000 $11,040.00 +0.4%

6060257 EACH FOUNDATION FOR CANTILEVER SIGN STRUCTURE (SD9.10, TYPE 4C)

Bid Rank Department Estimate 3.000 $11,000.000 $33,000.00

1 AMES CONSTRUCTION, INC. $9,957.590 $29,872.77 -9.5%

2 SUNDT CONSTRUCTION, INC. $9,000.000 $27,000.00 -18.2%

3 FNF CONSTRUCTION, INC. $13,100.000 $39,300.00 +19.1%

4 GRANITE CONSTRUCTION COMPANY $17,000.000 $51,000.00 +54.5%

5 PULICE CONSTRUCTION, INC. $11,000.000 $33,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $11,040.000 $33,120.00 +0.4%

6070002 L.FT. BREAKAWAY SIGN POST S4X7.7

Bid Rank Department Estimate 94.000 $35.000 $3,290.00

1 AMES CONSTRUCTION, INC. $29.290 $2,753.26 -16.3%

2 SUNDT CONSTRUCTION, INC. $32.000 $3,008.00 -8.6%

3 FNF CONSTRUCTION, INC. $30.000 $2,820.00 -14.3%

4 GRANITE CONSTRUCTION COMPANY $46.500 $4,371.00 +32.9%

5 PULICE CONSTRUCTION, INC. $40.000 $3,760.00 +14.3%

6 K E & G CONSTRUCTION, INC. $44.000 $4,136.00 +25.7%

6070004 L.FT. BREAKAWAY SIGN POST W6X12

Bid Rank Department Estimate 135.000 $45.000 $6,075.00

1 AMES CONSTRUCTION, INC. $35.140 $4,743.90 -21.9%

2 SUNDT CONSTRUCTION, INC. $37.000 $4,995.00 -17.8%

3 FNF CONSTRUCTION, INC. $45.000 $6,075.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $63.000 $8,505.00 +40.0%

5 PULICE CONSTRUCTION, INC. $45.000 $6,075.00 +0.0%

6 K E & G CONSTRUCTION, INC. $50.000 $6,750.00 +11.1%

6070006 L.FT. BREAKAWAY SIGN POST W8X18

Bid Rank Department Estimate 273.000 $48.000 $13,104.00

1 AMES CONSTRUCTION, INC. $46.860 $12,792.78 -2.4%

2 SUNDT CONSTRUCTION, INC. $45.000 $12,285.00 -6.3%

3 FNF CONSTRUCTION, INC. $50.000 $13,650.00 +4.2%

4 GRANITE CONSTRUCTION COMPANY $75.000 $20,475.00 +56.3%

5 PULICE CONSTRUCTION, INC. $55.000 $15,015.00 +14.6%

6 K E & G CONSTRUCTION, INC. $62.000 $16,926.00 +29.2%

6070008 L.FT. BREAKAWAY SIGN POST W10X22

Bid Rank Department Estimate 162.000 $55.000 $8,910.00

1 AMES CONSTRUCTION, INC. $52.720 $8,540.64 -4.1%

2 SUNDT CONSTRUCTION, INC. $50.000 $8,100.00 -9.1%

Page 20: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 19 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6070008 L.FT. BREAKAWAY SIGN POST W10X22

Bid Rank Department Estimate 162.000 $55.000 $8,910.00

3 FNF CONSTRUCTION, INC. $52.000 $8,424.00 -5.5%

4 GRANITE CONSTRUCTION COMPANY $102.000 $16,524.00 +85.5%

5 PULICE CONSTRUCTION, INC. $60.000 $9,720.00 +9.1%

6 K E & G CONSTRUCTION, INC. $68.500 $11,097.00 +24.5%

6070022 EACH FOUNDATION FOR BREAKAWAY SIGN POST S4X7.7

Bid Rank Department Estimate 8.000 $350.000 $2,800.00

1 AMES CONSTRUCTION, INC. $585.740 $4,685.92 +67.4%

2 SUNDT CONSTRUCTION, INC. $290.000 $2,320.00 -17.1%

3 FNF CONSTRUCTION, INC. $650.000 $5,200.00 +85.7%

4 GRANITE CONSTRUCTION COMPANY $475.000 $3,800.00 +35.7%

5 PULICE CONSTRUCTION, INC. $350.000 $2,800.00 +0.0%

6 K E & G CONSTRUCTION, INC. $403.000 $3,224.00 +15.1%

6070024 EACH FOUNDATION FOR BREAKAWAY SIGN POST W6X12

Bid Rank Department Estimate 10.000 $400.000 $4,000.00

1 AMES CONSTRUCTION, INC. $878.610 $8,786.10 +119.7%

2 SUNDT CONSTRUCTION, INC. $460.000 $4,600.00 +15.0%

3 FNF CONSTRUCTION, INC. $900.000 $9,000.00 +125.0%

4 GRANITE CONSTRUCTION COMPANY $775.000 $7,750.00 +93.8%

5 PULICE CONSTRUCTION, INC. $550.000 $5,500.00 +37.5%

6 K E & G CONSTRUCTION, INC. $628.000 $6,280.00 +57.0%

6070026 EACH FOUNDATION FOR BREAKAWAY SIGN POST W8X18

Bid Rank Department Estimate 14.000 $800.000 $11,200.00

1 AMES CONSTRUCTION, INC. $1,054.330 $14,760.62 +31.8%

2 SUNDT CONSTRUCTION, INC. $700.000 $9,800.00 -12.5%

3 FNF CONSTRUCTION, INC. $1,150.000 $16,100.00 +43.8%

4 GRANITE CONSTRUCTION COMPANY $1,000.000 $14,000.00 +25.0%

5 PULICE CONSTRUCTION, INC. $900.000 $12,600.00 +12.5%

6 K E & G CONSTRUCTION, INC. $958.000 $13,412.00 +19.8%

6070028 EACH FOUNDATION FOR BREAKAWAY SIGN POST W10X22

Bid Rank Department Estimate 7.000 $850.000 $5,950.00

1 AMES CONSTRUCTION, INC. $1,288.630 $9,020.41 +51.6%

2 SUNDT CONSTRUCTION, INC. $750.000 $5,250.00 -11.8%

3 FNF CONSTRUCTION, INC. $1,400.000 $9,800.00 +64.7%

4 GRANITE CONSTRUCTION COMPANY $1,170.000 $8,190.00 +37.6%

5 PULICE CONSTRUCTION, INC. $950.000 $6,650.00 +11.8%

6 K E & G CONSTRUCTION, INC. $1,020.000 $7,140.00 +20.0%

Page 21: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 20 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6070038 EACH SLIP BASEFOR PERFORATED SIGN POST)

Bid Rank Department Estimate 90.000 $160.000 $14,400.00

1 AMES CONSTRUCTION, INC. $205.010 $18,450.90 +28.1%

2 SUNDT CONSTRUCTION, INC. $130.000 $11,700.00 -18.8%

3 FNF CONSTRUCTION, INC. $200.000 $18,000.00 +25.0%

4 GRANITE CONSTRUCTION COMPANY $290.000 $26,100.00 +81.3%

5 PULICE CONSTRUCTION, INC. $150.000 $13,500.00 -6.3%

6 K E & G CONSTRUCTION, INC. $176.000 $15,840.00 +10.0%

6070054 L.FT. SIGN POST (PERFORATED) (2 S)

Bid Rank Department Estimate 165.000 $10.000 $1,650.00

1 AMES CONSTRUCTION, INC. $9.370 $1,546.05 -6.3%

2 SUNDT CONSTRUCTION, INC. $8.250 $1,361.25 -17.5%

3 FNF CONSTRUCTION, INC. $15.000 $2,475.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $19.000 $3,135.00 +90.0%

5 PULICE CONSTRUCTION, INC. $11.000 $1,815.00 +10.0%

6 K E & G CONSTRUCTION, INC. $11.500 $1,897.50 +15.0%

6070055 L.FT. SIGN POST (PERFORATED) (2 1/2 S)

Bid Rank Department Estimate 200.000 $12.000 $2,400.00

1 AMES CONSTRUCTION, INC. $14.060 $2,812.00 +17.2%

2 SUNDT CONSTRUCTION, INC. $9.000 $1,800.00 -25.0%

3 FNF CONSTRUCTION, INC. $13.000 $2,600.00 +8.3%

4 GRANITE CONSTRUCTION COMPANY $22.000 $4,400.00 +83.3%

5 PULICE CONSTRUCTION, INC. $12.000 $2,400.00 +0.0%

6 K E & G CONSTRUCTION, INC. $12.500 $2,500.00 +4.2%

6070057 L.FT. SIGN POST (PERFORATED) (2 1/2 T)

Bid Rank Department Estimate 1,088.000 $16.000 $17,408.00

1 AMES CONSTRUCTION, INC. $21.090 $22,945.92 +31.8%

2 SUNDT CONSTRUCTION, INC. $15.000 $16,320.00 -6.3%

3 FNF CONSTRUCTION, INC. $20.000 $21,760.00 +25.0%

4 GRANITE CONSTRUCTION COMPANY $28.500 $31,008.00 +78.1%

5 PULICE CONSTRUCTION, INC. $18.000 $19,584.00 +12.5%

6 K E & G CONSTRUCTION, INC. $21.000 $22,848.00 +31.3%

6070060 EACH FOUNDATION FOR SIGN POST (CONCRETE)

Bid Rank Department Estimate 111.000 $160.000 $17,760.00

1 AMES CONSTRUCTION, INC. $234.300 $26,007.30 +46.4%

2 SUNDT CONSTRUCTION, INC. $150.000 $16,650.00 -6.3%

3 FNF CONSTRUCTION, INC. $275.000 $30,525.00 +71.9%

4 GRANITE CONSTRUCTION COMPANY $245.000 $27,195.00 +53.1%

5 PULICE CONSTRUCTION, INC. $175.000 $19,425.00 +9.4%

Page 22: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 21 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6070060 EACH FOUNDATION FOR SIGN POST (CONCRETE)

Bid Rank Department Estimate 111.000 $160.000 $17,760.00

6 K E & G CONSTRUCTION, INC. $204.000 $22,644.00 +27.5%

6080005 SQ.FT. REGULATORY, WARNING, OR MARKER SIGN PANEL

Bid Rank Department Estimate 1,284.000 $18.000 $23,112.00

1 AMES CONSTRUCTION, INC. $25.770 $33,088.68 +43.2%

2 SUNDT CONSTRUCTION, INC. $18.000 $23,112.00 +0.0%

3 FNF CONSTRUCTION, INC. $25.000 $32,100.00 +38.9%

4 GRANITE CONSTRUCTION COMPANY $26.800 $34,411.20 +48.9%

5 PULICE CONSTRUCTION, INC. $22.000 $28,248.00 +22.2%

6 K E & G CONSTRUCTION, INC. $25.000 $32,100.00 +38.9%

6080018 SQ.FT. EXTRUDED ALUMINUM SIGN PANEL

Bid Rank Department Estimate 2,656.000 $26.000 $69,056.00

1 AMES CONSTRUCTION, INC. $35.140 $93,331.84 +35.2%

2 SUNDT CONSTRUCTION, INC. $26.000 $69,056.00 +0.0%

3 FNF CONSTRUCTION, INC. $24.000 $63,744.00 -7.7%

4 GRANITE CONSTRUCTION COMPANY $32.000 $84,992.00 +23.1%

5 PULICE CONSTRUCTION, INC. $30.000 $79,680.00 +15.4%

6 K E & G CONSTRUCTION, INC. $36.000 $95,616.00 +38.5%

6080025 SQ.FT. FLAT SHEET ALUMINUM SIGN PANEL

Bid Rank Department Estimate 353.000 $23.000 $8,119.00

1 AMES CONSTRUCTION, INC. $29.290 $10,339.37 +27.3%

2 SUNDT CONSTRUCTION, INC. $23.000 $8,119.00 +0.0%

3 FNF CONSTRUCTION, INC. $30.000 $10,590.00 +30.4%

4 GRANITE CONSTRUCTION COMPANY $42.000 $14,826.00 +82.6%

5 PULICE CONSTRUCTION, INC. $28.000 $9,884.00 +21.7%

6 K E & G CONSTRUCTION, INC. $31.500 $11,119.50 +37.0%

6080055 EACH SIGN PANEL (RELOCATE)

Bid Rank Department Estimate 6.000 $40.000 $240.00

1 AMES CONSTRUCTION, INC. $468.590 $2,811.54 +1071.5%

2 SUNDT CONSTRUCTION, INC. $570.000 $3,420.00 +1325.0%

3 FNF CONSTRUCTION, INC. $275.000 $1,650.00 +587.5%

4 GRANITE CONSTRUCTION COMPANY $690.000 $4,140.00 +1625.0%

5 PULICE CONSTRUCTION, INC. $700.000 $4,200.00 +1650.0%

6 K E & G CONSTRUCTION, INC. $780.000 $4,680.00 +1850.0%

6110201 L.FT. METAL HANDRAIL

Bid Rank Department Estimate 394.000 $50.000 $19,700.00

1 AMES CONSTRUCTION, INC. $28.650 $11,288.10 -42.7%

2 SUNDT CONSTRUCTION, INC. $30.000 $11,820.00 -40.0%

Page 23: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 22 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6110201 L.FT. METAL HANDRAIL

Bid Rank Department Estimate 394.000 $50.000 $19,700.00

3 FNF CONSTRUCTION, INC. $30.000 $11,820.00 -40.0%

4 GRANITE CONSTRUCTION COMPANY $28.800 $11,347.20 -42.4%

5 PULICE CONSTRUCTION, INC. $30.000 $11,820.00 -40.0%

6 K E & G CONSTRUCTION, INC. $32.500 $12,805.00 -35.0%

7015010 L.FT. TEMPORARY CONCRETE BARRIER (INSTALLATION AND REMOVAL)

Bid Rank Department Estimate 16,100.000 $20.000 $322,000.00

1 AMES CONSTRUCTION, INC. $15.370 $247,457.00 -23.2%

2 SUNDT CONSTRUCTION, INC. $12.000 $193,200.00 -40.0%

3 FNF CONSTRUCTION, INC. $13.000 $209,300.00 -35.0%

4 GRANITE CONSTRUCTION COMPANY $23.000 $370,300.00 +15.0%

5 PULICE CONSTRUCTION, INC. $20.000 $322,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $17.500 $281,750.00 -12.5%

7015020 EACH TEMPORARY IMPACT ATTENUATORS (INSTALLATION AND REMOVAL)

Bid Rank Department Estimate 10.000 $3,000.000 $30,000.00

1 AMES CONSTRUCTION, INC. $1,246.220 $12,462.20 -58.5%

2 SUNDT CONSTRUCTION, INC. $2,000.000 $20,000.00 -33.3%

3 FNF CONSTRUCTION, INC. $1,300.000 $13,000.00 -56.7%

4 GRANITE CONSTRUCTION COMPANY $4,000.000 $40,000.00 +33.3%

5 PULICE CONSTRUCTION, INC. $2,400.000 $24,000.00 -20.0%

6 K E & G CONSTRUCTION, INC. $2,470.000 $24,700.00 -17.7%

7015032 L.FT. TEMPORARY PREFORMED MARKING (TYPE II, TAPE LINE)

Bid Rank Department Estimate 45,065.000 $3.000 $135,195.00

1 AMES CONSTRUCTION, INC. $1.520 $68,498.80 -49.3%

2 SUNDT CONSTRUCTION, INC. $1.250 $56,331.25 -58.3%

3 FNF CONSTRUCTION, INC. $1.250 $56,331.25 -58.3%

4 GRANITE CONSTRUCTION COMPANY $1.000 $45,065.00 -66.7%

5 PULICE CONSTRUCTION, INC. $1.500 $67,597.50 -50.0%

6 K E & G CONSTRUCTION, INC. $1.600 $72,104.00 -46.7%

7015036 EACH TEMPORARY PREFORMED MARKING (ARROW, SYMBOL OR LEGEND)

Bid Rank Department Estimate 48.000 $200.000 $9,600.00

1 AMES CONSTRUCTION, INC. $267.330 $12,831.84 +33.7%

2 SUNDT CONSTRUCTION, INC. $220.000 $10,560.00 +10.0%

3 FNF CONSTRUCTION, INC. $222.000 $10,656.00 +11.0%

4 GRANITE CONSTRUCTION COMPANY $262.000 $12,576.00 +31.0%

5 PULICE CONSTRUCTION, INC. $250.000 $12,000.00 +25.0%

6 K E & G CONSTRUCTION, INC. $281.000 $13,488.00 +40.5%

Page 24: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 23 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7015051 EACH OBLITERATE PAVEMENT MARKING (ARROW, SYMBOL OR LEGEND)

Bid Rank Department Estimate 28.000 $90.000 $2,520.00

1 AMES CONSTRUCTION, INC. $121.510 $3,402.28 +35.0%

2 SUNDT CONSTRUCTION, INC. $100.000 $2,800.00 +11.1%

3 FNF CONSTRUCTION, INC. $101.000 $2,828.00 +12.2%

4 GRANITE CONSTRUCTION COMPANY $119.000 $3,332.00 +32.2%

5 PULICE CONSTRUCTION, INC. $125.000 $3,500.00 +38.9%

6 K E & G CONSTRUCTION, INC. $128.000 $3,584.00 +42.2%

7015052 L.FT. OBLITERATE PAVEMENT MARKING (STRIPE)

Bid Rank Department Estimate 39,977.000 $0.500 $19,988.50

1 AMES CONSTRUCTION, INC. $0.300 $11,993.10 -40.0%

2 SUNDT CONSTRUCTION, INC. $0.250 $9,994.25 -50.0%

3 FNF CONSTRUCTION, INC. $0.250 $9,994.25 -50.0%

4 GRANITE CONSTRUCTION COMPANY $0.200 $7,995.40 -60.0%

5 PULICE CONSTRUCTION, INC. $0.300 $11,993.10 -40.0%

6 K E & G CONSTRUCTION, INC. $0.320 $12,792.64 -36.0%

7015070 EACH OBLITERATE PAVEMENT MARKERS

Bid Rank Department Estimate 13.000 $20.000 $260.00

1 AMES CONSTRUCTION, INC. $2.430 $31.59 -87.9%

2 SUNDT CONSTRUCTION, INC. $2.000 $26.00 -90.0%

3 FNF CONSTRUCTION, INC. $2.000 $26.00 -90.0%

4 GRANITE CONSTRUCTION COMPANY $2.380 $30.94 -88.1%

5 PULICE CONSTRUCTION, INC. $2.500 $32.50 -87.5%

6 K E & G CONSTRUCTION, INC. $2.550 $33.15 -87.3%

7015091 SQ.FT. SPECIALTY SIGNS

Bid Rank Department Estimate 204.000 $20.000 $4,080.00

1 AMES CONSTRUCTION, INC. $18.350 $3,743.40 -8.3%

2 SUNDT CONSTRUCTION, INC. $16.000 $3,264.00 -20.0%

3 FNF CONSTRUCTION, INC. $17.000 $3,468.00 -15.0%

4 GRANITE CONSTRUCTION COMPANY $38.000 $7,752.00 +90.0%

5 PULICE CONSTRUCTION, INC. $20.000 $4,080.00 +0.0%

6 K E & G CONSTRUCTION, INC. $18.500 $3,774.00 -7.5%

7016020 L.FT.-DAY TEMPORARY CONCRETE BARRIER (IN USE)

Bid Rank Department Estimate 1,071,700.000 $0.050 $53,585.00

1 AMES CONSTRUCTION, INC. $0.050 $53,585.00 +0.0%

2 SUNDT CONSTRUCTION, INC. $0.050 $53,585.00 +0.0%

3 FNF CONSTRUCTION, INC. $0.040 $42,868.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $0.100 $107,170.00 +100.0%

5 PULICE CONSTRUCTION, INC. $0.100 $107,170.00 +100.0%

Page 25: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 24 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7016020 L.FT.-DAY TEMPORARY CONCRETE BARRIER (IN USE)

Bid Rank Department Estimate 1,071,700.000 $0.050 $53,585.00

6 K E & G CONSTRUCTION, INC. $0.090 $96,453.00 +80.0%

7016021 EACH-DAY TEMPORARY IMPACT ATTENUATORS (IN USE)

Bid Rank Department Estimate 790.000 $30.000 $23,700.00

1 AMES CONSTRUCTION, INC. $28.850 $22,791.50 -3.8%

2 SUNDT CONSTRUCTION, INC. $25.000 $19,750.00 -16.7%

3 FNF CONSTRUCTION, INC. $25.000 $19,750.00 -16.7%

4 GRANITE CONSTRUCTION COMPANY $50.000 $39,500.00 +66.7%

5 PULICE CONSTRUCTION, INC. $30.000 $23,700.00 +0.0%

6 K E & G CONSTRUCTION, INC. $38.000 $30,020.00 +26.7%

7016030 EACH-DAY BARRICADE (TYPE 1, TYPE 2, VERT.PANEL, TUBULAR MARKER)

Bid Rank Department Estimate 56,972.000 $0.300 $17,091.60

1 AMES CONSTRUCTION, INC. $0.150 $8,545.80 -50.0%

2 SUNDT CONSTRUCTION, INC. $0.050 $2,848.60 -83.3%

3 FNF CONSTRUCTION, INC. $0.150 $8,545.80 -50.0%

4 GRANITE CONSTRUCTION COMPANY $0.180 $10,254.96 -40.0%

5 PULICE CONSTRUCTION, INC. $0.130 $7,406.36 -56.7%

6 K E & G CONSTRUCTION, INC. $0.150 $8,545.80 -50.0%

7016031 EACH-DAY BARRICADE (TYPE 3, HIGH LEVEL FLAG TREE)

Bid Rank Department Estimate 2,406.000 $0.700 $1,684.20

1 AMES CONSTRUCTION, INC. $0.430 $1,034.58 -38.6%

2 SUNDT CONSTRUCTION, INC. $0.400 $962.40 -42.9%

3 FNF CONSTRUCTION, INC. $0.400 $962.40 -42.9%

4 GRANITE CONSTRUCTION COMPANY $0.380 $914.28 -45.7%

5 PULICE CONSTRUCTION, INC. $0.450 $1,082.70 -35.7%

6 K E & G CONSTRUCTION, INC. $0.430 $1,034.58 -38.6%

7016032 EACH-DAY PORTABLE SIGN STAND (RIGID)

Bid Rank Department Estimate 4,542.000 $0.600 $2,725.20

1 AMES CONSTRUCTION, INC. $0.180 $817.56 -70.0%

2 SUNDT CONSTRUCTION, INC. $0.150 $681.30 -75.0%

3 FNF CONSTRUCTION, INC. $0.200 $908.40 -66.7%

4 GRANITE CONSTRUCTION COMPANY $0.220 $999.24 -63.3%

5 PULICE CONSTRUCTION, INC. $0.250 $1,135.50 -58.3%

6 K E & G CONSTRUCTION, INC. $0.180 $817.56 -70.0%

7016033 EACH-DAY PORTABLE SIGN STAND (SPRING TYPE)

Bid Rank Department Estimate 3,928.000 $0.800 $3,142.40

1 AMES CONSTRUCTION, INC. $0.610 $2,396.08 -23.8%

2 SUNDT CONSTRUCTION, INC. $0.550 $2,160.40 -31.3%

Page 26: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 25 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7016033 EACH-DAY PORTABLE SIGN STAND (SPRING TYPE)

Bid Rank Department Estimate 3,928.000 $0.800 $3,142.40

3 FNF CONSTRUCTION, INC. $0.600 $2,356.80 -25.0%

4 GRANITE CONSTRUCTION COMPANY $0.670 $2,631.76 -16.3%

5 PULICE CONSTRUCTION, INC. $0.450 $1,767.60 -43.8%

6 K E & G CONSTRUCTION, INC. $0.620 $2,435.36 -22.5%

7016034 EACH-DAY DRUM

Bid Rank Department Estimate 685.000 $0.500 $342.50

1 AMES CONSTRUCTION, INC. $0.490 $335.65 -2.0%

2 SUNDT CONSTRUCTION, INC. $0.450 $308.25 -10.0%

3 FNF CONSTRUCTION, INC. $0.400 $274.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $0.500 $342.50 +0.0%

5 PULICE CONSTRUCTION, INC. $0.350 $239.75 -30.0%

6 K E & G CONSTRUCTION, INC. $0.490 $335.65 -2.0%

7016035 EACH-DAY WARNING LIGHT (TYPE A)

Bid Rank Department Estimate 23,017.000 $0.250 $5,754.25

1 AMES CONSTRUCTION, INC. $0.150 $3,452.55 -40.0%

2 SUNDT CONSTRUCTION, INC. $0.150 $3,452.55 -40.0%

3 FNF CONSTRUCTION, INC. $0.150 $3,452.55 -40.0%

4 GRANITE CONSTRUCTION COMPANY $0.180 $4,143.06 -28.0%

5 PULICE CONSTRUCTION, INC. $0.110 $2,531.87 -56.0%

6 K E & G CONSTRUCTION, INC. $0.150 $3,452.55 -40.0%

7016037 EACH-DAY WARNING LIGHT (TYPE C)

Bid Rank Department Estimate 51,304.000 $0.300 $15,391.20

1 AMES CONSTRUCTION, INC. $0.180 $9,234.72 -40.0%

2 SUNDT CONSTRUCTION, INC. $0.050 $2,565.20 -83.3%

3 FNF CONSTRUCTION, INC. $0.150 $7,695.60 -50.0%

4 GRANITE CONSTRUCTION COMPANY $0.230 $11,799.92 -23.3%

5 PULICE CONSTRUCTION, INC. $0.110 $5,643.44 -63.3%

6 K E & G CONSTRUCTION, INC. $0.180 $9,234.72 -40.0%

7016039 EACH-DAY EMBEDDED SIGN POST

Bid Rank Department Estimate 22,500.000 $0.100 $2,250.00

1 AMES CONSTRUCTION, INC. $0.180 $4,050.00 +80.0%

2 SUNDT CONSTRUCTION, INC. $0.150 $3,375.00 +50.0%

3 FNF CONSTRUCTION, INC. $15.000 $337,500.00 +14900.0%

4 GRANITE CONSTRUCTION COMPANY $0.230 $5,175.00 +130.0%

5 PULICE CONSTRUCTION, INC. $0.200 $4,500.00 +100.0%

6 K E & G CONSTRUCTION, INC. $0.180 $4,050.00 +80.0%

Page 27: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 26 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7016050 EACH-DAY TRUCK-MOUNTED ATTENUATOR

Bid Rank Department Estimate 390.000 $400.000 $156,000.00

1 AMES CONSTRUCTION, INC. $116.210 $45,321.90 -70.9%

2 SUNDT CONSTRUCTION, INC. $100.000 $39,000.00 -75.0%

3 FNF CONSTRUCTION, INC. $110.000 $42,900.00 -72.5%

4 GRANITE CONSTRUCTION COMPANY $540.000 $210,600.00 +35.0%

5 PULICE CONSTRUCTION, INC. $800.000 $312,000.00 +100.0%

6 K E & G CONSTRUCTION, INC. $561.000 $218,790.00 +40.3%

7016051 EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.)

Bid Rank Department Estimate 14,074.000 $0.600 $8,444.40

1 AMES CONSTRUCTION, INC. $0.310 $4,362.94 -48.3%

2 SUNDT CONSTRUCTION, INC. $0.250 $3,518.50 -58.3%

3 FNF CONSTRUCTION, INC. $0.300 $4,222.20 -50.0%

4 GRANITE CONSTRUCTION COMPANY $0.220 $3,096.28 -63.3%

5 PULICE CONSTRUCTION, INC. $0.350 $4,925.90 -41.7%

6 K E & G CONSTRUCTION, INC. $0.310 $4,362.94 -48.3%

7016052 EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE)

Bid Rank Department Estimate 14,730.000 $0.700 $10,311.00

1 AMES CONSTRUCTION, INC. $0.430 $6,333.90 -38.6%

2 SUNDT CONSTRUCTION, INC. $0.400 $5,892.00 -42.9%

3 FNF CONSTRUCTION, INC. $0.400 $5,892.00 -42.9%

4 GRANITE CONSTRUCTION COMPANY $0.450 $6,628.50 -35.7%

5 PULICE CONSTRUCTION, INC. $0.450 $6,628.50 -35.7%

6 K E & G CONSTRUCTION, INC. $0.430 $6,333.90 -38.6%

7016061 EACH-DAY FLASHING ARROW PANEL

Bid Rank Department Estimate 384.000 $25.000 $9,600.00

1 AMES CONSTRUCTION, INC. $18.350 $7,046.40 -26.6%

2 SUNDT CONSTRUCTION, INC. $16.000 $6,144.00 -36.0%

3 FNF CONSTRUCTION, INC. $20.000 $7,680.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $11.500 $4,416.00 -54.0%

5 PULICE CONSTRUCTION, INC. $20.000 $7,680.00 -20.0%

6 K E & G CONSTRUCTION, INC. $18.500 $7,104.00 -26.0%

7016067 EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED)

Bid Rank Department Estimate 802.000 $30.000 $24,060.00

1 AMES CONSTRUCTION, INC. $24.470 $19,624.94 -18.4%

2 SUNDT CONSTRUCTION, INC. $22.000 $17,644.00 -26.7%

3 FNF CONSTRUCTION, INC. $35.000 $28,070.00 +16.7%

4 GRANITE CONSTRUCTION COMPANY $30.000 $24,060.00 +0.0%

5 PULICE CONSTRUCTION, INC. $25.000 $20,050.00 -16.7%

Page 28: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 27 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7016067 EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED)

Bid Rank Department Estimate 802.000 $30.000 $24,060.00

6 K E & G CONSTRUCTION, INC. $24.500 $19,649.00 -18.3%

7016075 HOUR FLAGGING SERVICES (CIVILIAN)

Bid Rank Department Estimate 272.000 $45.000 $12,240.00

1 AMES CONSTRUCTION, INC. $38.090 $10,360.48 -15.4%

2 SUNDT CONSTRUCTION, INC. $55.000 $14,960.00 +22.2%

3 FNF CONSTRUCTION, INC. $50.000 $13,600.00 +11.1%

4 GRANITE CONSTRUCTION COMPANY $50.000 $13,600.00 +11.1%

5 PULICE CONSTRUCTION, INC. $55.000 $14,960.00 +22.2%

6 K E & G CONSTRUCTION, INC. $27.000 $7,344.00 -40.0%

7016078 HOUR FLAGGING SERVICES (LOCAL ENFORCEMENT OFFICER)

Bid Rank Department Estimate 432.000 $70.000 $30,240.00

1 AMES CONSTRUCTION, INC. $69.230 $29,907.36 -1.1%

2 SUNDT CONSTRUCTION, INC. $65.000 $28,080.00 -7.1%

3 FNF CONSTRUCTION, INC. $78.000 $33,696.00 +11.4%

4 GRANITE CONSTRUCTION COMPANY $65.260 $28,192.32 -6.8%

5 PULICE CONSTRUCTION, INC. $85.000 $36,720.00 +21.4%

6 K E & G CONSTRUCTION, INC. $92.500 $39,960.00 +32.1%

7016080 HOUR FLAGGING SERVICES (DPS)

Bid Rank Department Estimate 1,280.000 $65.260 $83,532.80

1 AMES CONSTRUCTION, INC. $65.260 $83,532.80 +0.0%

2 SUNDT CONSTRUCTION, INC. $65.260 $83,532.80 +0.0%

3 FNF CONSTRUCTION, INC. $65.260 $83,532.80 +0.0%

4 GRANITE CONSTRUCTION COMPANY $65.260 $83,532.80 +0.0%

5 PULICE CONSTRUCTION, INC. $65.260 $83,532.80 +0.0%

6 K E & G CONSTRUCTION, INC. $65.260 $83,532.80 +0.0%

7020011 EACH IMPACT ATTENUATION DEVICE(SAND BARREL CRASH CUSHION,TYPE A)

Bid Rank Department Estimate 2.000 $4,000.000 $8,000.00

1 AMES CONSTRUCTION, INC. $11,655.640 $23,311.28 +191.4%

2 SUNDT CONSTRUCTION, INC. $8,700.000 $17,400.00 +117.5%

3 FNF CONSTRUCTION, INC. $15,000.000 $30,000.00 +275.0%

4 GRANITE CONSTRUCTION COMPANY $8,400.000 $16,800.00 +110.0%

5 PULICE CONSTRUCTION, INC. $10,000.000 $20,000.00 +150.0%

6 K E & G CONSTRUCTION, INC. $12,330.000 $24,660.00 +208.3%

7030090 EACH REFERENCE MARKER (M-30)

Bid Rank Department Estimate 4.000 $100.000 $400.00

1 AMES CONSTRUCTION, INC. $351.440 $1,405.76 +251.4%

2 SUNDT CONSTRUCTION, INC. $330.000 $1,320.00 +230.0%

Page 29: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 28 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7030090 EACH REFERENCE MARKER (M-30)

Bid Rank Department Estimate 4.000 $100.000 $400.00

3 FNF CONSTRUCTION, INC. $400.000 $1,600.00 +300.0%

4 GRANITE CONSTRUCTION COMPANY $440.000 $1,760.00 +340.0%

5 PULICE CONSTRUCTION, INC. $160.000 $640.00 +60.0%

6 K E & G CONSTRUCTION, INC. $43.000 $172.00 -57.0%

7030095 EACH MILEPOST MARKER (S-10)

Bid Rank Department Estimate 4.000 $350.000 $1,400.00

1 AMES CONSTRUCTION, INC. $351.440 $1,405.76 +0.4%

2 SUNDT CONSTRUCTION, INC. $350.000 $1,400.00 +0.0%

3 FNF CONSTRUCTION, INC. $425.000 $1,700.00 +21.4%

4 GRANITE CONSTRUCTION COMPANY $450.000 $1,800.00 +28.6%

5 PULICE CONSTRUCTION, INC. $700.000 $2,800.00 +100.0%

6 K E & G CONSTRUCTION, INC. $247.000 $988.00 -29.4%

7040005 L.FT. PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090")

Bid Rank Department Estimate 42,068.000 $0.450 $18,930.60

1 AMES CONSTRUCTION, INC. $0.490 $20,613.32 +8.9%

2 SUNDT CONSTRUCTION, INC. $0.400 $16,827.20 -11.1%

3 FNF CONSTRUCTION, INC. $0.400 $16,827.20 -11.1%

4 GRANITE CONSTRUCTION COMPANY $0.470 $19,771.96 +4.4%

5 PULICE CONSTRUCTION, INC. $0.500 $21,034.00 +11.1%

6 K E & G CONSTRUCTION, INC. $0.510 $21,454.68 +13.3%

7040006 L.FT. PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090")

Bid Rank Department Estimate 37,550.000 $0.450 $16,897.50

1 AMES CONSTRUCTION, INC. $0.490 $18,399.50 +8.9%

2 SUNDT CONSTRUCTION, INC. $0.400 $15,020.00 -11.1%

3 FNF CONSTRUCTION, INC. $0.400 $15,020.00 -11.1%

4 GRANITE CONSTRUCTION COMPANY $0.470 $17,648.50 +4.4%

5 PULICE CONSTRUCTION, INC. $0.500 $18,775.00 +11.1%

6 K E & G CONSTRUCTION, INC. $0.510 $19,150.50 +13.3%

7040072 L.FT. PAVEMENT MARKING (TRANSVERSE) (THERMOPLASTIC) (ALKYD) (0.090")

Bid Rank Department Estimate 3,084.000 $1.000 $3,084.00

1 AMES CONSTRUCTION, INC. $0.680 $2,097.12 -32.0%

2 SUNDT CONSTRUCTION, INC. $0.560 $1,727.04 -44.0%

3 FNF CONSTRUCTION, INC. $0.600 $1,850.40 -40.0%

4 GRANITE CONSTRUCTION COMPANY $0.640 $1,973.76 -36.0%

5 PULICE CONSTRUCTION, INC. $0.650 $2,004.60 -35.0%

6 K E & G CONSTRUCTION, INC. $0.720 $2,220.48 -28.0%

Page 30: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 29 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7042031 L.FT. PRIMER-SEALER FOR PCCP THERMOPLASTIC STRIPING

Bid Rank Department Estimate 3,894.000 $1.000 $3,894.00

1 AMES CONSTRUCTION, INC. $0.240 $934.56 -76.0%

2 SUNDT CONSTRUCTION, INC. $0.200 $778.80 -80.0%

3 FNF CONSTRUCTION, INC. $0.200 $778.80 -80.0%

4 GRANITE CONSTRUCTION COMPANY $0.230 $895.62 -77.0%

5 PULICE CONSTRUCTION, INC. $0.250 $973.50 -75.0%

6 K E & G CONSTRUCTION, INC. $0.260 $1,012.44 -74.0%

7042051 L.FT. REMOVAL OF CURING COMPOUND FOR STRIPING

Bid Rank Department Estimate 3,894.000 $0.600 $2,336.40

1 AMES CONSTRUCTION, INC. $0.240 $934.56 -60.0%

2 SUNDT CONSTRUCTION, INC. $0.200 $778.80 -66.7%

3 FNF CONSTRUCTION, INC. $0.200 $778.80 -66.7%

4 GRANITE CONSTRUCTION COMPANY $0.230 $895.62 -61.7%

5 PULICE CONSTRUCTION, INC. $0.250 $973.50 -58.3%

6 K E & G CONSTRUCTION, INC. $0.260 $1,012.44 -56.7%

7050022 L.FT. PAVEMENT MARKING, PREFORMED, WHITE STRIPE, TYPE I

Bid Rank Department Estimate 31,615.000 $3.000 $94,845.00

1 AMES CONSTRUCTION, INC. $2.920 $92,315.80 -2.7%

2 SUNDT CONSTRUCTION, INC. $2.400 $75,876.00 -20.0%

3 FNF CONSTRUCTION, INC. $2.500 $79,037.50 -16.7%

4 GRANITE CONSTRUCTION COMPANY $3.000 $94,845.00 +0.0%

5 PULICE CONSTRUCTION, INC. $3.000 $94,845.00 +0.0%

6 K E & G CONSTRUCTION, INC. $3.050 $96,425.75 +1.7%

7050023 EACH PAVEMENT MARKING, PREFORMED, SINGLE ARROW, TYPE I

Bid Rank Department Estimate 60.000 $200.000 $12,000.00

1 AMES CONSTRUCTION, INC. $265.140 $15,908.40 +32.6%

2 SUNDT CONSTRUCTION, INC. $218.200 $13,092.00 +9.1%

3 FNF CONSTRUCTION, INC. $222.000 $13,320.00 +11.0%

4 GRANITE CONSTRUCTION COMPANY $250.000 $15,000.00 +25.0%

5 PULICE CONSTRUCTION, INC. $250.000 $15,000.00 +25.0%

6 K E & G CONSTRUCTION, INC. $279.000 $16,740.00 +39.5%

7050024 EACH PAVEMENT MARKING, PREFORMED, DOUBLE ARROW, TYPE I

Bid Rank Department Estimate 4.000 $220.000 $880.00

1 AMES CONSTRUCTION, INC. $322.010 $1,288.04 +46.4%

2 SUNDT CONSTRUCTION, INC. $265.000 $1,060.00 +20.5%

3 FNF CONSTRUCTION, INC. $270.000 $1,080.00 +22.7%

4 GRANITE CONSTRUCTION COMPANY $300.000 $1,200.00 +36.4%

5 PULICE CONSTRUCTION, INC. $325.000 $1,300.00 +47.7%

Page 31: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 30 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7050024 EACH PAVEMENT MARKING, PREFORMED, DOUBLE ARROW, TYPE I

Bid Rank Department Estimate 4.000 $220.000 $880.00

6 K E & G CONSTRUCTION, INC. $339.000 $1,356.00 +54.1%

7050026 EACH PAVEMENT MARKING, PREFORMED, LEGEND (ONLY), TYPE I

Bid Rank Department Estimate 12.000 $260.000 $3,120.00

1 AMES CONSTRUCTION, INC. $243.030 $2,916.36 -6.5%

2 SUNDT CONSTRUCTION, INC. $200.000 $2,400.00 -23.1%

3 FNF CONSTRUCTION, INC. $205.000 $2,460.00 -21.2%

4 GRANITE CONSTRUCTION COMPANY $235.000 $2,820.00 -9.6%

5 PULICE CONSTRUCTION, INC. $250.000 $3,000.00 -3.8%

6 K E & G CONSTRUCTION, INC. $256.000 $3,072.00 -1.5%

7050028 EACH PAVEMENT MARKING, PREFORMED,SYMBOL, TYPE I

Bid Rank Department Estimate 6.000 $160.000 $960.00

1 AMES CONSTRUCTION, INC. $322.010 $1,932.06 +101.3%

2 SUNDT CONSTRUCTION, INC. $265.000 $1,590.00 +65.6%

3 FNF CONSTRUCTION, INC. $270.000 $1,620.00 +68.8%

4 GRANITE CONSTRUCTION COMPANY $300.000 $1,800.00 +87.5%

5 PULICE CONSTRUCTION, INC. $325.000 $1,950.00 +103.1%

6 K E & G CONSTRUCTION, INC. $339.000 $2,034.00 +111.9%

7050059 EACH PAVEMENT MARKING, PREFORMED, ROUTE-TO-ROUTE LEGEND, TYPE I/IV

Bid Rank Department Estimate 8.000 $600.000 $4,800.00

1 AMES CONSTRUCTION, INC. $2,430.260 $19,442.08 +305.0%

2 SUNDT CONSTRUCTION, INC. $2,000.000 $16,000.00 +233.3%

3 FNF CONSTRUCTION, INC. $2,025.000 $16,200.00 +237.5%

4 GRANITE CONSTRUCTION COMPANY $2,350.000 $18,800.00 +291.7%

5 PULICE CONSTRUCTION, INC. $2,300.000 $18,400.00 +283.3%

6 K E & G CONSTRUCTION, INC. $2,560.000 $20,480.00 +326.7%

7050070 L.FT. PRIMER-SEALER FOR PCCP (STRIPING)

Bid Rank Department Estimate 23,136.000 $1.000 $23,136.00

1 AMES CONSTRUCTION, INC. $0.150 $3,470.40 -85.0%

2 SUNDT CONSTRUCTION, INC. $0.120 $2,776.32 -88.0%

3 FNF CONSTRUCTION, INC. $0.150 $3,470.40 -85.0%

4 GRANITE CONSTRUCTION COMPANY $0.140 $3,239.04 -86.0%

5 PULICE CONSTRUCTION, INC. $0.150 $3,470.40 -85.0%

6 K E & G CONSTRUCTION, INC. $0.150 $3,470.40 -85.0%

7050071 EACH PRIMER-SEALER FOR PCCP (SYMBOL/LEGEND)

Bid Rank Department Estimate 84.000 $30.000 $2,520.00

1 AMES CONSTRUCTION, INC. $42.530 $3,572.52 +41.8%

2 SUNDT CONSTRUCTION, INC. $35.000 $2,940.00 +16.7%

Page 32: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 31 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7050071 EACH PRIMER-SEALER FOR PCCP (SYMBOL/LEGEND)

Bid Rank Department Estimate 84.000 $30.000 $2,520.00

3 FNF CONSTRUCTION, INC. $36.000 $3,024.00 +20.0%

4 GRANITE CONSTRUCTION COMPANY $40.000 $3,360.00 +33.3%

5 PULICE CONSTRUCTION, INC. $45.000 $3,780.00 +50.0%

6 K E & G CONSTRUCTION, INC. $45.000 $3,780.00 +50.0%

7050074 L.FT. REMOVAL OF CURING COMPOUND (PCCP) (STRIPING)

Bid Rank Department Estimate 23,136.000 $0.500 $11,568.00

1 AMES CONSTRUCTION, INC. $0.150 $3,470.40 -70.0%

2 SUNDT CONSTRUCTION, INC. $0.120 $2,776.32 -76.0%

3 FNF CONSTRUCTION, INC. $0.150 $3,470.40 -70.0%

4 GRANITE CONSTRUCTION COMPANY $0.140 $3,239.04 -72.0%

5 PULICE CONSTRUCTION, INC. $0.150 $3,470.40 -70.0%

6 K E & G CONSTRUCTION, INC. $0.150 $3,470.40 -70.0%

7050075 EACH REMOVAL OF CURING COMPOUND (PCCP) (SYMBOL/LEGEND)

Bid Rank Department Estimate 84.000 $30.000 $2,520.00

1 AMES CONSTRUCTION, INC. $30.380 $2,551.92 +1.3%

2 SUNDT CONSTRUCTION, INC. $25.000 $2,100.00 -16.7%

3 FNF CONSTRUCTION, INC. $26.000 $2,184.00 -13.3%

4 GRANITE CONSTRUCTION COMPANY $29.000 $2,436.00 -3.3%

5 PULICE CONSTRUCTION, INC. $30.000 $2,520.00 +0.0%

6 K E & G CONSTRUCTION, INC. $32.000 $2,688.00 +6.7%

7060013 EACH PAVEMENT MARKER, RAISED, TYPE C

Bid Rank Department Estimate 2,058.000 $3.000 $6,174.00

1 AMES CONSTRUCTION, INC. $3.650 $7,511.70 +21.7%

2 SUNDT CONSTRUCTION, INC. $3.000 $6,174.00 +0.0%

3 FNF CONSTRUCTION, INC. $3.000 $6,174.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $3.550 $7,305.90 +18.3%

5 PULICE CONSTRUCTION, INC. $3.500 $7,203.00 +16.7%

6 K E & G CONSTRUCTION, INC. $3.850 $7,923.30 +28.3%

7060015 EACH PAVEMENT MARKER, RAISED, TYPE D

Bid Rank Department Estimate 84.000 $3.000 $252.00

1 AMES CONSTRUCTION, INC. $3.650 $306.60 +21.7%

2 SUNDT CONSTRUCTION, INC. $3.000 $252.00 +0.0%

3 FNF CONSTRUCTION, INC. $3.000 $252.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $3.550 $298.20 +18.3%

5 PULICE CONSTRUCTION, INC. $3.500 $294.00 +16.7%

6 K E & G CONSTRUCTION, INC. $3.850 $323.40 +28.3%

Page 33: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 32 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7060017 EACH PAVEMENT MARKER, RAISED, TYPE E

Bid Rank Department Estimate 920.000 $3.000 $2,760.00

1 AMES CONSTRUCTION, INC. $3.650 $3,358.00 +21.7%

2 SUNDT CONSTRUCTION, INC. $3.000 $2,760.00 +0.0%

3 FNF CONSTRUCTION, INC. $3.000 $2,760.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $3.550 $3,266.00 +18.3%

5 PULICE CONSTRUCTION, INC. $3.500 $3,220.00 +16.7%

6 K E & G CONSTRUCTION, INC. $3.850 $3,542.00 +28.3%

7060018 EACH PAVEMENT MARKER, RAISED, TYPE G

Bid Rank Department Estimate 125.000 $3.000 $375.00

1 AMES CONSTRUCTION, INC. $3.650 $456.25 +21.7%

2 SUNDT CONSTRUCTION, INC. $3.000 $375.00 +0.0%

3 FNF CONSTRUCTION, INC. $3.000 $375.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $3.550 $443.75 +18.3%

5 PULICE CONSTRUCTION, INC. $3.500 $437.50 +16.7%

6 K E & G CONSTRUCTION, INC. $3.850 $481.25 +28.3%

7080201 L.FT. WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED) (WHITE)

Bid Rank Department Estimate 28,463.000 $0.150 $4,269.45

1 AMES CONSTRUCTION, INC. $0.120 $3,415.56 -20.0%

2 SUNDT CONSTRUCTION, INC. $0.100 $2,846.30 -33.3%

3 FNF CONSTRUCTION, INC. $0.100 $2,846.30 -33.3%

4 GRANITE CONSTRUCTION COMPANY $0.120 $3,415.56 -20.0%

5 PULICE CONSTRUCTION, INC. $0.120 $3,415.56 -20.0%

6 K E & G CONSTRUCTION, INC. $0.130 $3,700.19 -13.3%

7080202 L.FT. WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED) (YELLOW)

Bid Rank Department Estimate 26,585.000 $0.150 $3,987.75

1 AMES CONSTRUCTION, INC. $0.120 $3,190.20 -20.0%

2 SUNDT CONSTRUCTION, INC. $0.100 $2,658.50 -33.3%

3 FNF CONSTRUCTION, INC. $0.100 $2,658.50 -33.3%

4 GRANITE CONSTRUCTION COMPANY $0.120 $3,190.20 -20.0%

5 PULICE CONSTRUCTION, INC. $0.120 $3,190.20 -20.0%

6 K E & G CONSTRUCTION, INC. $0.130 $3,456.05 -13.3%

7080203 L.FT. WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED) (WHITE OR YELLOW)

Bid Rank Department Estimate 56,156.000 $0.150 $8,423.40

1 AMES CONSTRUCTION, INC. $0.120 $6,738.72 -20.0%

2 SUNDT CONSTRUCTION, INC. $0.100 $5,615.60 -33.3%

3 FNF CONSTRUCTION, INC. $0.100 $5,615.60 -33.3%

4 GRANITE CONSTRUCTION COMPANY $0.120 $6,738.72 -20.0%

5 PULICE CONSTRUCTION, INC. $0.120 $6,738.72 -20.0%

Page 34: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 33 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7080203 L.FT. WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED) (WHITE OR YELLOW)

Bid Rank Department Estimate 56,156.000 $0.150 $8,423.40

6 K E & G CONSTRUCTION, INC. $0.130 $7,300.28 -13.3%

7080204 EACH WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED SYMBOL)

Bid Rank Department Estimate 70.000 $75.000 $5,250.00

1 AMES CONSTRUCTION, INC. $48.610 $3,402.70 -35.2%

2 SUNDT CONSTRUCTION, INC. $40.000 $2,800.00 -46.7%

3 FNF CONSTRUCTION, INC. $41.000 $2,870.00 -45.3%

4 GRANITE CONSTRUCTION COMPANY $47.000 $3,290.00 -37.3%

5 PULICE CONSTRUCTION, INC. $50.000 $3,500.00 -33.3%

6 K E & G CONSTRUCTION, INC. $51.000 $3,570.00 -32.0%

7080208 EACH WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED LEGEND) (ONLY)

Bid Rank Department Estimate 12.000 $100.000 $1,200.00

1 AMES CONSTRUCTION, INC. $48.610 $583.32 -51.4%

2 SUNDT CONSTRUCTION, INC. $40.000 $480.00 -60.0%

3 FNF CONSTRUCTION, INC. $41.000 $492.00 -59.0%

4 GRANITE CONSTRUCTION COMPANY $47.000 $564.00 -53.0%

5 PULICE CONSTRUCTION, INC. $50.000 $600.00 -50.0%

6 K E & G CONSTRUCTION, INC. $51.000 $612.00 -49.0%

7080301 EACH PAINT BULL NOSE

Bid Rank Department Estimate 11.000 $100.000 $1,100.00

1 AMES CONSTRUCTION, INC. $91.130 $1,002.43 -8.9%

2 SUNDT CONSTRUCTION, INC. $75.000 $825.00 -25.0%

3 FNF CONSTRUCTION, INC. $80.000 $880.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $87.000 $957.00 -13.0%

5 PULICE CONSTRUCTION, INC. $90.000 $990.00 -10.0%

6 K E & G CONSTRUCTION, INC. $96.000 $1,056.00 -4.0%

7080407 EACH WATERBORNE-TYPE II PAVEMENT MARKING (PAINTED LEGEND) (LOOK LEFT/RIGHT)

Bid Rank Department Estimate 8.000 $100.000 $800.00

1 AMES CONSTRUCTION, INC. $91.140 $729.12 -8.9%

2 SUNDT CONSTRUCTION, INC. $75.000 $600.00 -25.0%

3 FNF CONSTRUCTION, INC. $80.000 $640.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $87.000 $696.00 -13.0%

5 PULICE CONSTRUCTION, INC. $90.000 $720.00 -10.0%

6 K E & G CONSTRUCTION, INC. $96.000 $768.00 -4.0%

7310011 EACH POLE (TYPE A) (8 FT.)

Bid Rank Department Estimate 1.000 $600.000 $600.00

1 AMES CONSTRUCTION, INC. $1,064.460 $1,064.46 +77.4%

2 SUNDT CONSTRUCTION, INC. $870.000 $870.00 +45.0%

Page 35: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 34 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7310011 EACH POLE (TYPE A) (8 FT.)

Bid Rank Department Estimate 1.000 $600.000 $600.00

3 FNF CONSTRUCTION, INC. $800.000 $800.00 +33.3%

4 GRANITE CONSTRUCTION COMPANY $1,020.000 $1,020.00 +70.0%

5 PULICE CONSTRUCTION, INC. $800.000 $800.00 +33.3%

6 K E & G CONSTRUCTION, INC. $794.000 $794.00 +32.3%

7310012 EACH POLE (TYPE A) (10 FT.)

Bid Rank Department Estimate 5.000 $750.000 $3,750.00

1 AMES CONSTRUCTION, INC. $1,101.160 $5,505.80 +46.8%

2 SUNDT CONSTRUCTION, INC. $900.000 $4,500.00 +20.0%

3 FNF CONSTRUCTION, INC. $830.000 $4,150.00 +10.7%

4 GRANITE CONSTRUCTION COMPANY $1,100.000 $5,500.00 +46.7%

5 PULICE CONSTRUCTION, INC. $825.000 $4,125.00 +10.0%

6 K E & G CONSTRUCTION, INC. $818.000 $4,090.00 +9.1%

7310070 EACH POLE (TYPE G) (STANDARD BASE)

Bid Rank Department Estimate 2.000 $4,000.000 $8,000.00

1 AMES CONSTRUCTION, INC. $2,691.730 $5,383.46 -32.7%

2 SUNDT CONSTRUCTION, INC. $2,200.000 $4,400.00 -45.0%

3 FNF CONSTRUCTION, INC. $2,200.000 $4,400.00 -45.0%

4 GRANITE CONSTRUCTION COMPANY $2,660.000 $5,320.00 -33.5%

5 PULICE CONSTRUCTION, INC. $2,200.000 $4,400.00 -45.0%

6 K E & G CONSTRUCTION, INC. $2,250.000 $4,500.00 -43.8%

7310110 EACH POLE (TYPE J)

Bid Rank Department Estimate 3.000 $3,000.000 $9,000.00

1 AMES CONSTRUCTION, INC. $8,564.590 $25,693.77 +185.5%

2 SUNDT CONSTRUCTION, INC. $7,000.000 $21,000.00 +133.3%

3 FNF CONSTRUCTION, INC. $7,000.000 $21,000.00 +133.3%

4 GRANITE CONSTRUCTION COMPANY $8,500.000 $25,500.00 +183.3%

5 PULICE CONSTRUCTION, INC. $6,500.000 $19,500.00 +116.7%

6 K E & G CONSTRUCTION, INC. $7,000.000 $21,000.00 +133.3%

7310120 EACH POLE (TYPE K)

Bid Rank Department Estimate 1.000 $5,000.000 $5,000.00

1 AMES CONSTRUCTION, INC. $9,176.350 $9,176.35 +83.5%

2 SUNDT CONSTRUCTION, INC. $7,500.000 $7,500.00 +50.0%

3 FNF CONSTRUCTION, INC. $8,000.000 $8,000.00 +60.0%

4 GRANITE CONSTRUCTION COMPANY $9,100.000 $9,100.00 +82.0%

5 PULICE CONSTRUCTION, INC. $8,000.000 $8,000.00 +60.0%

6 K E & G CONSTRUCTION, INC. $7,680.000 $7,680.00 +53.6%

Page 36: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 35 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7310140 EACH POLE (TYPE R)

Bid Rank Department Estimate 2.000 $5,500.000 $11,000.00

1 AMES CONSTRUCTION, INC. $11,236.750 $22,473.50 +104.3%

2 SUNDT CONSTRUCTION, INC. $9,184.000 $18,368.00 +67.0%

3 FNF CONSTRUCTION, INC. $8,500.000 $17,000.00 +54.5%

4 GRANITE CONSTRUCTION COMPANY $11,100.000 $22,200.00 +101.8%

5 PULICE CONSTRUCTION, INC. $8,500.000 $17,000.00 +54.5%

6 K E & G CONSTRUCTION, INC. $8,430.000 $16,860.00 +53.3%

7310190 EACH POLE (TYPE G)(ALUMINUM)

Bid Rank Department Estimate 30.000 $1,300.000 $39,000.00

1 AMES CONSTRUCTION, INC. $2,165.620 $64,968.60 +66.6%

2 SUNDT CONSTRUCTION, INC. $1,770.000 $53,100.00 +36.2%

3 FNF CONSTRUCTION, INC. $2,000.000 $60,000.00 +53.8%

4 GRANITE CONSTRUCTION COMPANY $2,100.000 $63,000.00 +61.5%

5 PULICE CONSTRUCTION, INC. $1,800.000 $54,000.00 +38.5%

6 K E & G CONSTRUCTION, INC. $1,830.000 $54,900.00 +40.8%

7310191 EACH POLE (TYPE H)(ALUMINUM)

Bid Rank Department Estimate 50.000 $1,500.000 $75,000.00

1 AMES CONSTRUCTION, INC. $2,398.090 $119,904.50 +59.9%

2 SUNDT CONSTRUCTION, INC. $1,960.000 $98,000.00 +30.7%

3 FNF CONSTRUCTION, INC. $2,100.000 $105,000.00 +40.0%

4 GRANITE CONSTRUCTION COMPANY $2,350.000 $117,500.00 +56.7%

5 PULICE CONSTRUCTION, INC. $2,100.000 $105,000.00 +40.0%

6 K E & G CONSTRUCTION, INC. $2,200.000 $110,000.00 +46.7%

7310195 EACH POST (PEDESTRIAN PUSH BUTTON)

Bid Rank Department Estimate 2.000 $600.000 $1,200.00

1 AMES CONSTRUCTION, INC. $1,712.920 $3,425.84 +185.5%

2 SUNDT CONSTRUCTION, INC. $1,400.000 $2,800.00 +133.3%

3 FNF CONSTRUCTION, INC. $700.000 $1,400.00 +16.7%

4 GRANITE CONSTRUCTION COMPANY $1,650.000 $3,300.00 +175.0%

5 PULICE CONSTRUCTION, INC. $750.000 $1,500.00 +25.0%

6 K E & G CONSTRUCTION, INC. $767.000 $1,534.00 +27.8%

7310197 EACH BREAKAWAY BASE FOR LIGHTING POLE OR SIGNAL FLASHER

Bid Rank Department Estimate 18.000 $600.000 $10,800.00

1 AMES CONSTRUCTION, INC. $856.460 $15,416.28 +42.7%

2 SUNDT CONSTRUCTION, INC. $700.000 $12,600.00 +16.7%

3 FNF CONSTRUCTION, INC. $600.000 $10,800.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $850.000 $15,300.00 +41.7%

5 PULICE CONSTRUCTION, INC. $700.000 $12,600.00 +16.7%

Page 37: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 36 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7310197 EACH BREAKAWAY BASE FOR LIGHTING POLE OR SIGNAL FLASHER

Bid Rank Department Estimate 18.000 $600.000 $10,800.00

6 K E & G CONSTRUCTION, INC. $672.000 $12,096.00 +12.0%

7310200 EACH POLE FOUNDATION (TYPE A)

Bid Rank Department Estimate 6.000 $700.000 $4,200.00

1 AMES CONSTRUCTION, INC. $611.760 $3,670.56 -12.6%

2 SUNDT CONSTRUCTION, INC. $500.000 $3,000.00 -28.6%

3 FNF CONSTRUCTION, INC. $350.000 $2,100.00 -50.0%

4 GRANITE CONSTRUCTION COMPANY $600.000 $3,600.00 -14.3%

5 PULICE CONSTRUCTION, INC. $650.000 $3,900.00 -7.1%

6 K E & G CONSTRUCTION, INC. $665.000 $3,990.00 -5.0%

7310201 EACH BREAKAWAY BASE FOR LIGHTING POLES (OVER 30')

Bid Rank Department Estimate 50.000 $650.000 $32,500.00

1 AMES CONSTRUCTION, INC. $917.640 $45,882.00 +41.2%

2 SUNDT CONSTRUCTION, INC. $750.000 $37,500.00 +15.4%

3 FNF CONSTRUCTION, INC. $800.000 $40,000.00 +23.1%

4 GRANITE CONSTRUCTION COMPANY $900.000 $45,000.00 +38.5%

5 PULICE CONSTRUCTION, INC. $750.000 $37,500.00 +15.4%

6 K E & G CONSTRUCTION, INC. $840.000 $42,000.00 +29.2%

7310260 EACH POLE FOUNDATION (TYPE G) (STANDARD BASE)

Bid Rank Department Estimate 20.000 $1,000.000 $20,000.00

1 AMES CONSTRUCTION, INC. $1,027.750 $20,555.00 +2.8%

2 SUNDT CONSTRUCTION, INC. $840.000 $16,800.00 -16.0%

3 FNF CONSTRUCTION, INC. $700.000 $14,000.00 -30.0%

4 GRANITE CONSTRUCTION COMPANY $1,000.000 $20,000.00 +0.0%

5 PULICE CONSTRUCTION, INC. $1,000.000 $20,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $1,060.000 $21,200.00 +6.0%

7310276 EACH POLE FOUNDATION (TYPE H) (BREAKAWAY)

Bid Rank Department Estimate 50.000 $1,200.000 $60,000.00

1 AMES CONSTRUCTION, INC. $1,211.280 $60,564.00 +0.9%

2 SUNDT CONSTRUCTION, INC. $990.000 $49,500.00 -17.5%

3 FNF CONSTRUCTION, INC. $1,500.000 $75,000.00 +25.0%

4 GRANITE CONSTRUCTION COMPANY $1,200.000 $60,000.00 +0.0%

5 PULICE CONSTRUCTION, INC. $1,800.000 $90,000.00 +50.0%

6 K E & G CONSTRUCTION, INC. $1,820.000 $91,000.00 +51.7%

7310290 EACH POLE FOUNDATION (TYPE J)

Bid Rank Department Estimate 3.000 $1,400.000 $4,200.00

1 AMES CONSTRUCTION, INC. $2,569.380 $7,708.14 +83.5%

2 SUNDT CONSTRUCTION, INC. $2,100.000 $6,300.00 +50.0%

Page 38: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 37 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7310290 EACH POLE FOUNDATION (TYPE J)

Bid Rank Department Estimate 3.000 $1,400.000 $4,200.00

3 FNF CONSTRUCTION, INC. $2,000.000 $6,000.00 +42.9%

4 GRANITE CONSTRUCTION COMPANY $2,600.000 $7,800.00 +85.7%

5 PULICE CONSTRUCTION, INC. $3,000.000 $9,000.00 +114.3%

6 K E & G CONSTRUCTION, INC. $3,160.000 $9,480.00 +125.7%

7310300 EACH POLE FOUNDATION (TYPE K)

Bid Rank Department Estimate 1.000 $1,500.000 $1,500.00

1 AMES CONSTRUCTION, INC. $2,814.080 $2,814.08 +87.6%

2 SUNDT CONSTRUCTION, INC. $2,300.000 $2,300.00 +53.3%

3 FNF CONSTRUCTION, INC. $2,000.000 $2,000.00 +33.3%

4 GRANITE CONSTRUCTION COMPANY $2,800.000 $2,800.00 +86.7%

5 PULICE CONSTRUCTION, INC. $3,000.000 $3,000.00 +100.0%

6 K E & G CONSTRUCTION, INC. $3,160.000 $3,160.00 +110.7%

7310320 EACH POLE FOUNDATION (TYPE R)

Bid Rank Department Estimate 2.000 $2,300.000 $4,600.00

1 AMES CONSTRUCTION, INC. $2,875.260 $5,750.52 +25.0%

2 SUNDT CONSTRUCTION, INC. $2,350.000 $4,700.00 +2.2%

3 FNF CONSTRUCTION, INC. $2,000.000 $4,000.00 -13.0%

4 GRANITE CONSTRUCTION COMPANY $2,900.000 $5,800.00 +26.1%

5 PULICE CONSTRUCTION, INC. $3,100.000 $6,200.00 +34.8%

6 K E & G CONSTRUCTION, INC. $3,210.000 $6,420.00 +39.6%

7310371 EACH POLE FOUNDATION (TYPE G)(BREAKAWAY)

Bid Rank Department Estimate 10.000 $2,500.000 $25,000.00

1 AMES CONSTRUCTION, INC. $1,101.160 $11,011.60 -56.0%

2 SUNDT CONSTRUCTION, INC. $900.000 $9,000.00 -64.0%

3 FNF CONSTRUCTION, INC. $1,000.000 $10,000.00 -60.0%

4 GRANITE CONSTRUCTION COMPANY $1,100.000 $11,000.00 -56.0%

5 PULICE CONSTRUCTION, INC. $1,200.000 $12,000.00 -52.0%

6 K E & G CONSTRUCTION, INC. $1,230.000 $12,300.00 -50.8%

7310372 EACH POLE FOUNDATION (54 FT. CCTV POLE)

Bid Rank Department Estimate 1.000 $6,000.000 $6,000.00

1 AMES CONSTRUCTION, INC. $4,967.460 $4,967.46 -17.2%

2 SUNDT CONSTRUCTION, INC. $4,060.000 $4,060.00 -32.3%

3 FNF CONSTRUCTION, INC. $4,500.000 $4,500.00 -25.0%

4 GRANITE CONSTRUCTION COMPANY $5,000.000 $5,000.00 -16.7%

5 PULICE CONSTRUCTION, INC. $4,000.000 $4,000.00 -33.3%

6 K E & G CONSTRUCTION, INC. $4,210.000 $4,210.00 -29.8%

Page 39: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 38 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7310390 EACH PEDESTRIAN PUSH BUTTON POST FOUNDATION

Bid Rank Department Estimate 2.000 $500.000 $1,000.00

1 AMES CONSTRUCTION, INC. $672.930 $1,345.86 +34.6%

2 SUNDT CONSTRUCTION, INC. $550.000 $1,100.00 +10.0%

3 FNF CONSTRUCTION, INC. $600.000 $1,200.00 +20.0%

4 GRANITE CONSTRUCTION COMPANY $650.000 $1,300.00 +30.0%

5 PULICE CONSTRUCTION, INC. $550.000 $1,100.00 +10.0%

6 K E & G CONSTRUCTION, INC. $582.000 $1,164.00 +16.4%

7310511 EACH MAST ARM (10 FT.) (TAPERED)

Bid Rank Department Estimate 4.000 $700.000 $2,800.00

1 AMES CONSTRUCTION, INC. $734.110 $2,936.44 +4.9%

2 SUNDT CONSTRUCTION, INC. $600.000 $2,400.00 -14.3%

3 FNF CONSTRUCTION, INC. $550.000 $2,200.00 -21.4%

4 GRANITE CONSTRUCTION COMPANY $720.000 $2,880.00 +2.9%

5 PULICE CONSTRUCTION, INC. $650.000 $2,600.00 -7.1%

6 K E & G CONSTRUCTION, INC. $673.000 $2,692.00 -3.9%

7310570 EACH MAST ARM (30 FT.) (TAPERED)

Bid Rank Department Estimate 2.000 $1,800.000 $3,600.00

1 AMES CONSTRUCTION, INC. $2,997.610 $5,995.22 +66.5%

2 SUNDT CONSTRUCTION, INC. $2,450.000 $4,900.00 +36.1%

3 FNF CONSTRUCTION, INC. $3,000.000 $6,000.00 +66.7%

4 GRANITE CONSTRUCTION COMPANY $2,900.000 $5,800.00 +61.1%

5 PULICE CONSTRUCTION, INC. $5,000.000 $10,000.00 +177.8%

6 K E & G CONSTRUCTION, INC. $5,020.000 $10,040.00 +178.9%

7310590 EACH MAST ARM (40 FT.) (TAPERED)

Bid Rank Department Estimate 1.000 $3,000.000 $3,000.00

1 AMES CONSTRUCTION, INC. $3,181.130 $3,181.13 +6.0%

2 SUNDT CONSTRUCTION, INC. $2,600.000 $2,600.00 -13.3%

3 FNF CONSTRUCTION, INC. $3,200.000 $3,200.00 +6.7%

4 GRANITE CONSTRUCTION COMPANY $3,100.000 $3,100.00 +3.3%

5 PULICE CONSTRUCTION, INC. $6,000.000 $6,000.00 +100.0%

6 K E & G CONSTRUCTION, INC. $6,560.000 $6,560.00 +118.7%

7310600 EACH MAST ARM (45 FT.) (TAPERED)

Bid Rank Department Estimate 1.000 $3,000.000 $3,000.00

1 AMES CONSTRUCTION, INC. $5,444.630 $5,444.63 +81.5%

2 SUNDT CONSTRUCTION, INC. $4,450.000 $4,450.00 +48.3%

3 FNF CONSTRUCTION, INC. $4,500.000 $4,500.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $5,300.000 $5,300.00 +76.7%

5 PULICE CONSTRUCTION, INC. $6,500.000 $6,500.00 +116.7%

Page 40: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 39 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7310600 EACH MAST ARM (45 FT.) (TAPERED)

Bid Rank Department Estimate 1.000 $3,000.000 $3,000.00

6 K E & G CONSTRUCTION, INC. $6,760.000 $6,760.00 +125.3%

7310610 EACH MAST ARM (50 FT.) (TAPERED)

Bid Rank Department Estimate 2.000 $3,000.000 $6,000.00

1 AMES CONSTRUCTION, INC. $5,505.810 $11,011.62 +83.5%

2 SUNDT CONSTRUCTION, INC. $4,500.000 $9,000.00 +50.0%

3 FNF CONSTRUCTION, INC. $4,700.000 $9,400.00 +56.7%

4 GRANITE CONSTRUCTION COMPANY $5,400.000 $10,800.00 +80.0%

5 PULICE CONSTRUCTION, INC. $7,000.000 $14,000.00 +133.3%

6 K E & G CONSTRUCTION, INC. $7,530.000 $15,060.00 +151.0%

7310652 EACH MAST ARM (10 FT.)(ALUMINUM)

Bid Rank Department Estimate 66.000 $750.000 $49,500.00

1 AMES CONSTRUCTION, INC. $672.930 $44,413.38 -10.3%

2 SUNDT CONSTRUCTION, INC. $550.000 $36,300.00 -26.7%

3 FNF CONSTRUCTION, INC. $600.000 $39,600.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $650.000 $42,900.00 -13.3%

5 PULICE CONSTRUCTION, INC. $550.000 $36,300.00 -26.7%

6 K E & G CONSTRUCTION, INC. $569.000 $37,554.00 -24.1%

7310653 EACH MAST ARM (15 FT.)(ALUMINUM)

Bid Rank Department Estimate 14.000 $800.000 $11,200.00

1 AMES CONSTRUCTION, INC. $734.110 $10,277.54 -8.2%

2 SUNDT CONSTRUCTION, INC. $600.000 $8,400.00 -25.0%

3 FNF CONSTRUCTION, INC. $650.000 $9,100.00 -18.8%

4 GRANITE CONSTRUCTION COMPANY $730.000 $10,220.00 -8.8%

5 PULICE CONSTRUCTION, INC. $750.000 $10,500.00 -6.3%

6 K E & G CONSTRUCTION, INC. $739.000 $10,346.00 -7.6%

7320030 L.FT. ELECTRICAL CONDUIT (1") (PVC)

Bid Rank Department Estimate 445.000 $8.000 $3,560.00

1 AMES CONSTRUCTION, INC. $4.890 $2,176.05 -38.9%

2 SUNDT CONSTRUCTION, INC. $4.000 $1,780.00 -50.0%

3 FNF CONSTRUCTION, INC. $12.000 $5,340.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $4.800 $2,136.00 -40.0%

5 PULICE CONSTRUCTION, INC. $5.000 $2,225.00 -37.5%

6 K E & G CONSTRUCTION, INC. $5.050 $2,247.25 -36.9%

7320050 L.FT. ELECTRICAL CONDUIT (2") (PVC)

Bid Rank Department Estimate 23,502.000 $6.000 $141,012.00

1 AMES CONSTRUCTION, INC. $6.610 $155,348.22 +10.2%

2 SUNDT CONSTRUCTION, INC. $5.400 $126,910.80 -10.0%

Page 41: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 40 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7320050 L.FT. ELECTRICAL CONDUIT (2") (PVC)

Bid Rank Department Estimate 23,502.000 $6.000 $141,012.00

3 FNF CONSTRUCTION, INC. $12.500 $293,775.00 +108.3%

4 GRANITE CONSTRUCTION COMPANY $6.500 $152,763.00 +8.3%

5 PULICE CONSTRUCTION, INC. $7.000 $164,514.00 +16.7%

6 K E & G CONSTRUCTION, INC. $7.500 $176,265.00 +25.0%

7320060 L.FT. ELECTRICAL CONDUIT (2 1/2") (PVC)

Bid Rank Department Estimate 300.000 $12.000 $3,600.00

1 AMES CONSTRUCTION, INC. $8.560 $2,568.00 -28.7%

2 SUNDT CONSTRUCTION, INC. $7.000 $2,100.00 -41.7%

3 FNF CONSTRUCTION, INC. $16.500 $4,950.00 +37.5%

4 GRANITE CONSTRUCTION COMPANY $8.500 $2,550.00 -29.2%

5 PULICE CONSTRUCTION, INC. $10.000 $3,000.00 -16.7%

6 K E & G CONSTRUCTION, INC. $11.000 $3,300.00 -8.3%

7320070 L.FT. ELECTRICAL CONDUIT (3") (PVC)

Bid Rank Department Estimate 525.000 $10.000 $5,250.00

1 AMES CONSTRUCTION, INC. $9.420 $4,945.50 -5.8%

2 SUNDT CONSTRUCTION, INC. $7.700 $4,042.50 -23.0%

3 FNF CONSTRUCTION, INC. $17.000 $8,925.00 +70.0%

4 GRANITE CONSTRUCTION COMPANY $9.200 $4,830.00 -8.0%

5 PULICE CONSTRUCTION, INC. $9.000 $4,725.00 -10.0%

6 K E & G CONSTRUCTION, INC. $10.000 $5,250.00 +0.0%

7320072 L.FT. ELECTRICAL CONDUIT (3 - 3") (PVC)

Bid Rank Department Estimate 7,790.000 $20.000 $155,800.00

1 AMES CONSTRUCTION, INC. $14.680 $114,357.20 -26.6%

2 SUNDT CONSTRUCTION, INC. $12.000 $93,480.00 -40.0%

3 FNF CONSTRUCTION, INC. $18.000 $140,220.00 -10.0%

4 GRANITE CONSTRUCTION COMPANY $14.300 $111,397.00 -28.5%

5 PULICE CONSTRUCTION, INC. $12.000 $93,480.00 -40.0%

6 K E & G CONSTRUCTION, INC. $13.000 $101,270.00 -35.0%

7320073 L.FT. ELECTRICAL CONDUIT (2 - 3") (PVC)

Bid Rank Department Estimate 1,355.000 $18.000 $24,390.00

1 AMES CONSTRUCTION, INC. $12.970 $17,574.35 -27.9%

2 SUNDT CONSTRUCTION, INC. $10.600 $14,363.00 -41.1%

3 FNF CONSTRUCTION, INC. $16.000 $21,680.00 -11.1%

4 GRANITE CONSTRUCTION COMPANY $13.000 $17,615.00 -27.8%

5 PULICE CONSTRUCTION, INC. $10.000 $13,550.00 -44.4%

6 K E & G CONSTRUCTION, INC. $10.500 $14,227.50 -41.7%

Page 42: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 41 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7320090 L.FT. ELECTRICAL CONDUIT (4") (PVC)

Bid Rank Department Estimate 1,718.000 $16.000 $27,488.00

1 AMES CONSTRUCTION, INC. $11.930 $20,495.74 -25.4%

2 SUNDT CONSTRUCTION, INC. $9.750 $16,750.50 -39.1%

3 FNF CONSTRUCTION, INC. $14.000 $24,052.00 -12.5%

4 GRANITE CONSTRUCTION COMPANY $11.750 $20,186.50 -26.6%

5 PULICE CONSTRUCTION, INC. $12.000 $20,616.00 -25.0%

6 K E & G CONSTRUCTION, INC. $12.500 $21,475.00 -21.9%

7320275 L.FT. ELECTRICAL CONDUIT (3 - 3") (HDPE)(DIRECTIONAL DRILL)

Bid Rank Department Estimate 140.000 $40.000 $5,600.00

1 AMES CONSTRUCTION, INC. $66.070 $9,249.80 +65.2%

2 SUNDT CONSTRUCTION, INC. $54.000 $7,560.00 +35.0%

3 FNF CONSTRUCTION, INC. $70.000 $9,800.00 +75.0%

4 GRANITE CONSTRUCTION COMPANY $65.000 $9,100.00 +62.5%

5 PULICE CONSTRUCTION, INC. $55.000 $7,700.00 +37.5%

6 K E & G CONSTRUCTION, INC. $54.500 $7,630.00 +36.3%

7320291 L.FT. ELECTRICAL CONDUIT (2")(PVC)(IN BARRIER)

Bid Rank Department Estimate 785.000 $15.000 $11,775.00

1 AMES CONSTRUCTION, INC. $7.340 $5,761.90 -51.1%

2 SUNDT CONSTRUCTION, INC. $6.000 $4,710.00 -60.0%

3 FNF CONSTRUCTION, INC. $21.000 $16,485.00 +40.0%

4 GRANITE CONSTRUCTION COMPANY $7.200 $5,652.00 -52.0%

5 PULICE CONSTRUCTION, INC. $2.500 $1,962.50 -83.3%

6 K E & G CONSTRUCTION, INC. $2.600 $2,041.00 -82.7%

7320292 L.FT. ELECTRICAL CONDUIT (2 - 3")(PVC)(IN BARRIER)

Bid Rank Department Estimate 509.000 $20.000 $10,180.00

1 AMES CONSTRUCTION, INC. $15.290 $7,782.61 -23.6%

2 SUNDT CONSTRUCTION, INC. $12.500 $6,362.50 -37.5%

3 FNF CONSTRUCTION, INC. $27.000 $13,743.00 +35.0%

4 GRANITE CONSTRUCTION COMPANY $15.000 $7,635.00 -25.0%

5 PULICE CONSTRUCTION, INC. $6.500 $3,308.50 -67.5%

6 K E & G CONSTRUCTION, INC. $7.050 $3,588.45 -64.8%

7320293 L.FT. ELECTRICAL CONDUIT (4")(PVC)(IN BARRIER)

Bid Rank Department Estimate 489.000 $22.000 $10,758.00

1 AMES CONSTRUCTION, INC. $14.070 $6,880.23 -36.0%

2 SUNDT CONSTRUCTION, INC. $11.500 $5,623.50 -47.7%

3 FNF CONSTRUCTION, INC. $22.000 $10,758.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $13.500 $6,601.50 -38.6%

5 PULICE CONSTRUCTION, INC. $4.500 $2,200.50 -79.5%

Page 43: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 42 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7320293 L.FT. ELECTRICAL CONDUIT (4")(PVC)(IN BARRIER)

Bid Rank Department Estimate 489.000 $22.000 $10,758.00

6 K E & G CONSTRUCTION, INC. $4.800 $2,347.20 -78.2%

7320410 EACH PULL BOX (NO. 5)

Bid Rank Department Estimate 17.000 $550.000 $9,350.00

1 AMES CONSTRUCTION, INC. $507.760 $8,631.92 -7.7%

2 SUNDT CONSTRUCTION, INC. $415.000 $7,055.00 -24.5%

3 FNF CONSTRUCTION, INC. $450.000 $7,650.00 -18.2%

4 GRANITE CONSTRUCTION COMPANY $500.000 $8,500.00 -9.1%

5 PULICE CONSTRUCTION, INC. $550.000 $9,350.00 +0.0%

6 K E & G CONSTRUCTION, INC. $652.000 $11,084.00 +18.5%

7320420 EACH PULL BOX (NO. 7)

Bid Rank Department Estimate 19.000 $600.000 $11,400.00

1 AMES CONSTRUCTION, INC. $856.460 $16,272.74 +42.7%

2 SUNDT CONSTRUCTION, INC. $700.000 $13,300.00 +16.7%

3 FNF CONSTRUCTION, INC. $800.000 $15,200.00 +33.3%

4 GRANITE CONSTRUCTION COMPANY $840.000 $15,960.00 +40.0%

5 PULICE CONSTRUCTION, INC. $850.000 $16,150.00 +41.7%

6 K E & G CONSTRUCTION, INC. $910.000 $17,290.00 +51.7%

7320421 EACH PULL BOX (NO. 7) (WITH EXTENSION)

Bid Rank Department Estimate 3.000 $700.000 $2,100.00

1 AMES CONSTRUCTION, INC. $1,039.990 $3,119.97 +48.6%

2 SUNDT CONSTRUCTION, INC. $850.000 $2,550.00 +21.4%

3 FNF CONSTRUCTION, INC. $950.000 $2,850.00 +35.7%

4 GRANITE CONSTRUCTION COMPANY $1,020.000 $3,060.00 +45.7%

5 PULICE CONSTRUCTION, INC. $900.000 $2,700.00 +28.6%

6 K E & G CONSTRUCTION, INC. $913.000 $2,739.00 +30.4%

7320450 EACH PULL BOX (NO. 7) (FMS STD. FM-2.06)

Bid Rank Department Estimate 10.000 $1,100.000 $11,000.00

1 AMES CONSTRUCTION, INC. $1,920.920 $19,209.20 +74.6%

2 SUNDT CONSTRUCTION, INC. $1,570.000 $15,700.00 +42.7%

3 FNF CONSTRUCTION, INC. $1,800.000 $18,000.00 +63.6%

4 GRANITE CONSTRUCTION COMPANY $1,870.000 $18,700.00 +70.0%

5 PULICE CONSTRUCTION, INC. $1,200.000 $12,000.00 +9.1%

6 K E & G CONSTRUCTION, INC. $1,260.000 $12,600.00 +14.5%

7320455 EACH PULL BOX (NO. 9)

Bid Rank Department Estimate 11.000 $3,600.000 $39,600.00

1 AMES CONSTRUCTION, INC. $5,566.990 $61,236.89 +54.6%

2 SUNDT CONSTRUCTION, INC. $4,550.000 $50,050.00 +26.4%

Page 44: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 43 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7320455 EACH PULL BOX (NO. 9)

Bid Rank Department Estimate 11.000 $3,600.000 $39,600.00

3 FNF CONSTRUCTION, INC. $5,000.000 $55,000.00 +38.9%

4 GRANITE CONSTRUCTION COMPANY $5,500.000 $60,500.00 +52.8%

5 PULICE CONSTRUCTION, INC. $4,000.000 $44,000.00 +11.1%

6 K E & G CONSTRUCTION, INC. $4,060.000 $44,660.00 +12.8%

7320460 EACH PULL BOX (NO. 4)(MODIFIED)

Bid Rank Department Estimate 96.000 $900.000 $86,400.00

1 AMES CONSTRUCTION, INC. $1,468.220 $140,949.12 +63.1%

2 SUNDT CONSTRUCTION, INC. $1,200.000 $115,200.00 +33.3%

3 FNF CONSTRUCTION, INC. $1,300.000 $124,800.00 +44.4%

4 GRANITE CONSTRUCTION COMPANY $1,420.000 $136,320.00 +57.8%

5 PULICE CONSTRUCTION, INC. $1,500.000 $144,000.00 +66.7%

6 K E & G CONSTRUCTION, INC. $1,440.000 $138,240.00 +60.0%

7320461 EACH PULL BOX (NO. 6)(MODIFIED)

Bid Rank Department Estimate 2.000 $1,100.000 $2,200.00

1 AMES CONSTRUCTION, INC. $2,312.440 $4,624.88 +110.2%

2 SUNDT CONSTRUCTION, INC. $1,890.000 $3,780.00 +71.8%

3 FNF CONSTRUCTION, INC. $2,100.000 $4,200.00 +90.9%

4 GRANITE CONSTRUCTION COMPANY $2,280.000 $4,560.00 +107.3%

5 PULICE CONSTRUCTION, INC. $1,600.000 $3,200.00 +45.5%

6 K E & G CONSTRUCTION, INC. $1,680.000 $3,360.00 +52.7%

7320475 EACH JUNCTION BOX (TYPE I)

Bid Rank Department Estimate 4.000 $700.000 $2,800.00

1 AMES CONSTRUCTION, INC. $1,088.930 $4,355.72 +55.6%

2 SUNDT CONSTRUCTION, INC. $890.000 $3,560.00 +27.1%

3 FNF CONSTRUCTION, INC. $1,000.000 $4,000.00 +42.9%

4 GRANITE CONSTRUCTION COMPANY $1,050.000 $4,200.00 +50.0%

5 PULICE CONSTRUCTION, INC. $950.000 $3,800.00 +35.7%

6 K E & G CONSTRUCTION, INC. $961.000 $3,844.00 +37.3%

7320503 L.FT. CONDUCTOR (NO. 12)

Bid Rank Department Estimate 44,000.000 $0.700 $30,800.00

1 AMES CONSTRUCTION, INC. $0.730 $32,120.00 +4.3%

2 SUNDT CONSTRUCTION, INC. $0.600 $26,400.00 -14.3%

3 FNF CONSTRUCTION, INC. $0.700 $30,800.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $0.720 $31,680.00 +2.9%

5 PULICE CONSTRUCTION, INC. $0.500 $22,000.00 -28.6%

6 K E & G CONSTRUCTION, INC. $0.490 $21,560.00 -30.0%

Page 45: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 44 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7320510 L.FT. CONDUCTOR (NO. 10)

Bid Rank Department Estimate 4,168.000 $0.800 $3,334.40

1 AMES CONSTRUCTION, INC. $0.980 $4,084.64 +22.5%

2 SUNDT CONSTRUCTION, INC. $0.800 $3,334.40 +0.0%

3 FNF CONSTRUCTION, INC. $0.900 $3,751.20 +12.5%

4 GRANITE CONSTRUCTION COMPANY $0.950 $3,959.60 +18.8%

5 PULICE CONSTRUCTION, INC. $1.000 $4,168.00 +25.0%

6 K E & G CONSTRUCTION, INC. $1.100 $4,584.80 +37.5%

7320520 L.FT. CONDUCTOR (NO. 8)

Bid Rank Department Estimate 20,890.000 $0.700 $14,623.00

1 AMES CONSTRUCTION, INC. $1.100 $22,979.00 +57.1%

2 SUNDT CONSTRUCTION, INC. $0.900 $18,801.00 +28.6%

3 FNF CONSTRUCTION, INC. $1.000 $20,890.00 +42.9%

4 GRANITE CONSTRUCTION COMPANY $1.070 $22,352.30 +52.9%

5 PULICE CONSTRUCTION, INC. $0.900 $18,801.00 +28.6%

6 K E & G CONSTRUCTION, INC. $0.990 $20,681.10 +41.4%

7320530 L.FT. CONDUCTOR (NO. 6)

Bid Rank Department Estimate 58,723.000 $0.900 $52,850.70

1 AMES CONSTRUCTION, INC. $1.280 $75,165.44 +42.2%

2 SUNDT CONSTRUCTION, INC. $1.050 $61,659.15 +16.7%

3 FNF CONSTRUCTION, INC. $1.100 $64,595.30 +22.2%

4 GRANITE CONSTRUCTION COMPANY $1.250 $73,403.75 +38.9%

5 PULICE CONSTRUCTION, INC. $1.200 $70,467.60 +33.3%

6 K E & G CONSTRUCTION, INC. $1.250 $73,403.75 +38.9%

7320540 L.FT. CONDUCTOR (NO. 4)

Bid Rank Department Estimate 9,540.000 $1.000 $9,540.00

1 AMES CONSTRUCTION, INC. $1.590 $15,168.60 +59.0%

2 SUNDT CONSTRUCTION, INC. $1.300 $12,402.00 +30.0%

3 FNF CONSTRUCTION, INC. $1.500 $14,310.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $1.550 $14,787.00 +55.0%

5 PULICE CONSTRUCTION, INC. $1.300 $12,402.00 +30.0%

6 K E & G CONSTRUCTION, INC. $1.500 $14,310.00 +50.0%

7320590 L.FT. CONDUCTOR (INSULATED BOND) (NO. 8)

Bid Rank Department Estimate 26,735.000 $0.800 $21,388.00

1 AMES CONSTRUCTION, INC. $1.100 $29,408.50 +37.5%

2 SUNDT CONSTRUCTION, INC. $0.900 $24,061.50 +12.5%

3 FNF CONSTRUCTION, INC. $1.000 $26,735.00 +25.0%

4 GRANITE CONSTRUCTION COMPANY $1.080 $28,873.80 +35.0%

5 PULICE CONSTRUCTION, INC. $0.500 $13,367.50 -37.5%

Page 46: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 45 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7320590 L.FT. CONDUCTOR (INSULATED BOND) (NO. 8)

Bid Rank Department Estimate 26,735.000 $0.800 $21,388.00

6 K E & G CONSTRUCTION, INC. $0.490 $13,100.15 -38.8%

7320651 L.SUM CONDUCTORS (TRAFFIC SIGNALS)

Bid Rank Department Estimate 1.000 $21,500.000 $21,500.00

1 AMES CONSTRUCTION, INC. $71,135.060 $71,135.06 +230.9%

2 SUNDT CONSTRUCTION, INC. $58,140.000 $58,140.00 +170.4%

3 FNF CONSTRUCTION, INC. $85,000.000 $85,000.00 +295.3%

4 GRANITE CONSTRUCTION COMPANY $70,000.000 $70,000.00 +225.6%

5 PULICE CONSTRUCTION, INC. $40,000.000 $40,000.00 +86.0%

6 K E & G CONSTRUCTION, INC. $43,500.000 $43,500.00 +102.3%

7330061 EACH TRAFFIC SIGNAL FACE (TYPE F) (MODIFIED LED)

Bid Rank Department Estimate 17.000 $400.000 $6,800.00

1 AMES CONSTRUCTION, INC. $709.640 $12,063.88 +77.4%

2 SUNDT CONSTRUCTION, INC. $580.000 $9,860.00 +45.0%

3 FNF CONSTRUCTION, INC. $550.000 $9,350.00 +37.5%

4 GRANITE CONSTRUCTION COMPANY $700.000 $11,900.00 +75.0%

5 PULICE CONSTRUCTION, INC. $500.000 $8,500.00 +25.0%

6 K E & G CONSTRUCTION, INC. $519.000 $8,823.00 +29.8%

7330137 EACH TRAFFIC SIGNAL FACE (TYPE R) (MODIFIED LED)

Bid Rank Department Estimate 8.000 $500.000 $4,000.00

1 AMES CONSTRUCTION, INC. $709.640 $5,677.12 +41.9%

2 SUNDT CONSTRUCTION, INC. $580.000 $4,640.00 +16.0%

3 FNF CONSTRUCTION, INC. $570.000 $4,560.00 +14.0%

4 GRANITE CONSTRUCTION COMPANY $700.000 $5,600.00 +40.0%

5 PULICE CONSTRUCTION, INC. $500.000 $4,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $528.000 $4,224.00 +5.6%

7330211 EACH PEDESTRIAN SIGNAL (MAN/HAND)(LED)

Bid Rank Department Estimate 8.000 $400.000 $3,200.00

1 AMES CONSTRUCTION, INC. $483.290 $3,866.32 +20.8%

2 SUNDT CONSTRUCTION, INC. $395.000 $3,160.00 -1.3%

3 FNF CONSTRUCTION, INC. $450.000 $3,600.00 +12.5%

4 GRANITE CONSTRUCTION COMPANY $475.000 $3,800.00 +18.8%

5 PULICE CONSTRUCTION, INC. $400.000 $3,200.00 +0.0%

6 K E & G CONSTRUCTION, INC. $395.000 $3,160.00 -1.3%

7330310 EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE II)

Bid Rank Department Estimate 16.000 $125.000 $2,000.00

1 AMES CONSTRUCTION, INC. $159.060 $2,544.96 +27.2%

2 SUNDT CONSTRUCTION, INC. $130.000 $2,080.00 +4.0%

Page 47: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 46 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7330310 EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE II)

Bid Rank Department Estimate 16.000 $125.000 $2,000.00

3 FNF CONSTRUCTION, INC. $120.000 $1,920.00 -4.0%

4 GRANITE CONSTRUCTION COMPANY $155.000 $2,480.00 +24.0%

5 PULICE CONSTRUCTION, INC. $140.000 $2,240.00 +12.0%

6 K E & G CONSTRUCTION, INC. $144.000 $2,304.00 +15.2%

7330330 EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE IV)

Bid Rank Department Estimate 6.000 $500.000 $3,000.00

1 AMES CONSTRUCTION, INC. $587.290 $3,523.74 +17.5%

2 SUNDT CONSTRUCTION, INC. $480.000 $2,880.00 -4.0%

3 FNF CONSTRUCTION, INC. $450.000 $2,700.00 -10.0%

4 GRANITE CONSTRUCTION COMPANY $580.000 $3,480.00 +16.0%

5 PULICE CONSTRUCTION, INC. $500.000 $3,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $525.000 $3,150.00 +5.0%

7330340 EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE V)

Bid Rank Department Estimate 7.000 $540.000 $3,780.00

1 AMES CONSTRUCTION, INC. $599.520 $4,196.64 +11.0%

2 SUNDT CONSTRUCTION, INC. $490.000 $3,430.00 -9.3%

3 FNF CONSTRUCTION, INC. $450.000 $3,150.00 -16.7%

4 GRANITE CONSTRUCTION COMPANY $600.000 $4,200.00 +11.1%

5 PULICE CONSTRUCTION, INC. $450.000 $3,150.00 -16.7%

6 K E & G CONSTRUCTION, INC. $492.000 $3,444.00 -8.9%

7330360 EACH TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VII)

Bid Rank Department Estimate 2.000 $570.000 $1,140.00

1 AMES CONSTRUCTION, INC. $636.230 $1,272.46 +11.6%

2 SUNDT CONSTRUCTION, INC. $520.000 $1,040.00 -8.8%

3 FNF CONSTRUCTION, INC. $475.000 $950.00 -16.7%

4 GRANITE CONSTRUCTION COMPANY $630.000 $1,260.00 +10.5%

5 PULICE CONSTRUCTION, INC. $550.000 $1,100.00 -3.5%

6 K E & G CONSTRUCTION, INC. $562.000 $1,124.00 -1.4%

7330630 L.SUM REMOVE TRAFFIC SIGNALS

Bid Rank Department Estimate 1.000 $5,000.000 $5,000.00

1 AMES CONSTRUCTION, INC. $15,660.970 $15,660.97 +213.2%

2 SUNDT CONSTRUCTION, INC. $12,800.000 $12,800.00 +156.0%

3 FNF CONSTRUCTION, INC. $7,000.000 $7,000.00 +40.0%

4 GRANITE CONSTRUCTION COMPANY $15,500.000 $15,500.00 +210.0%

5 PULICE CONSTRUCTION, INC. $11,000.000 $11,000.00 +120.0%

6 K E & G CONSTRUCTION, INC. $11,580.000 $11,580.00 +131.6%

Page 48: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 47 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7340050 EACH CONTROL CABINET (TYPE V)

Bid Rank Department Estimate 1.000 $25,000.000 $25,000.00

1 AMES CONSTRUCTION, INC. $41,599.450 $41,599.45 +66.4%

2 SUNDT CONSTRUCTION, INC. $34,000.000 $34,000.00 +36.0%

3 FNF CONSTRUCTION, INC. $23,000.000 $23,000.00 -8.0%

4 GRANITE CONSTRUCTION COMPANY $41,000.000 $41,000.00 +64.0%

5 PULICE CONSTRUCTION, INC. $45,000.000 $45,000.00 +80.0%

6 K E & G CONSTRUCTION, INC. $46,000.000 $46,000.00 +84.0%

7340103 EACH CONTROL CABINET (BATTERY BACKUP)

Bid Rank Department Estimate 1.000 $12,100.000 $12,100.00

1 AMES CONSTRUCTION, INC. $10,032.810 $10,032.81 -17.1%

2 SUNDT CONSTRUCTION, INC. $8,200.000 $8,200.00 -32.2%

3 FNF CONSTRUCTION, INC. $6,000.000 $6,000.00 -50.4%

4 GRANITE CONSTRUCTION COMPANY $9,800.000 $9,800.00 -19.0%

5 PULICE CONSTRUCTION, INC. $8,000.000 $8,000.00 -33.9%

6 K E & G CONSTRUCTION, INC. $8,060.000 $8,060.00 -33.4%

7340115 EACH PEDESTAL (ELECTRICAL) (COT)

Bid Rank Department Estimate 1.000 $5,000.000 $5,000.00

1 AMES CONSTRUCTION, INC. $2,814.080 $2,814.08 -43.7%

2 SUNDT CONSTRUCTION, INC. $2,300.000 $2,300.00 -54.0%

3 FNF CONSTRUCTION, INC. $2,400.000 $2,400.00 -52.0%

4 GRANITE CONSTRUCTION COMPANY $2,800.000 $2,800.00 -44.0%

5 PULICE CONSTRUCTION, INC. $3,000.000 $3,000.00 -40.0%

6 K E & G CONSTRUCTION, INC. $3,290.000 $3,290.00 -34.2%

7340120 EACH METER PEDESTAL CABINET

Bid Rank Department Estimate 1.000 $3,500.000 $3,500.00

1 AMES CONSTRUCTION, INC. $2,814.080 $2,814.08 -19.6%

2 SUNDT CONSTRUCTION, INC. $2,300.000 $2,300.00 -34.3%

3 FNF CONSTRUCTION, INC. $3,000.000 $3,000.00 -14.3%

4 GRANITE CONSTRUCTION COMPANY $2,800.000 $2,800.00 -20.0%

5 PULICE CONSTRUCTION, INC. $2,500.000 $2,500.00 -28.6%

6 K E & G CONSTRUCTION, INC. $2,710.000 $2,710.00 -22.6%

7350060 EACH PEDESTRIAN PUSH BUTTON

Bid Rank Department Estimate 8.000 $400.000 $3,200.00

1 AMES CONSTRUCTION, INC. $636.230 $5,089.84 +59.1%

2 SUNDT CONSTRUCTION, INC. $520.000 $4,160.00 +30.0%

3 FNF CONSTRUCTION, INC. $450.000 $3,600.00 +12.5%

4 GRANITE CONSTRUCTION COMPANY $620.000 $4,960.00 +55.0%

5 PULICE CONSTRUCTION, INC. $400.000 $3,200.00 +0.0%

Page 49: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 48 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7350060 EACH PEDESTRIAN PUSH BUTTON

Bid Rank Department Estimate 8.000 $400.000 $3,200.00

6 K E & G CONSTRUCTION, INC. $428.000 $3,424.00 +7.0%

7350210 EACH VIDEO DETECTION SYSTEM (6 THERMO CAMERAS)

Bid Rank Department Estimate 1.000 $20,000.000 $20,000.00

1 AMES CONSTRUCTION, INC. $64,772.790 $64,772.79 +223.9%

2 SUNDT CONSTRUCTION, INC. $52,940.000 $52,940.00 +164.7%

3 FNF CONSTRUCTION, INC. $30,000.000 $30,000.00 +50.0%

4 GRANITE CONSTRUCTION COMPANY $64,000.000 $64,000.00 +220.0%

5 PULICE CONSTRUCTION, INC. $55,000.000 $55,000.00 +175.0%

6 K E & G CONSTRUCTION, INC. $55,800.000 $55,800.00 +179.0%

7350810 EACH PRE-EMPT SENSORS

Bid Rank Department Estimate 2.000 $2,000.000 $4,000.00

1 AMES CONSTRUCTION, INC. $1,101.170 $2,202.34 -44.9%

2 SUNDT CONSTRUCTION, INC. $900.000 $1,800.00 -55.0%

3 FNF CONSTRUCTION, INC. $450.000 $900.00 -77.5%

4 GRANITE CONSTRUCTION COMPANY $1,100.000 $2,200.00 -45.0%

5 PULICE CONSTRUCTION, INC. $750.000 $1,500.00 -62.5%

6 K E & G CONSTRUCTION, INC. $810.000 $1,620.00 -59.5%

7360104 EACH LUMINAIRE (HORIZONTAL MOUNT)(25L)(LED)

Bid Rank Department Estimate 66.000 $550.000 $36,300.00

1 AMES CONSTRUCTION, INC. $1,039.990 $68,639.34 +89.1%

2 SUNDT CONSTRUCTION, INC. $850.000 $56,100.00 +54.5%

3 FNF CONSTRUCTION, INC. $850.000 $56,100.00 +54.5%

4 GRANITE CONSTRUCTION COMPANY $1,000.000 $66,000.00 +81.8%

5 PULICE CONSTRUCTION, INC. $850.000 $56,100.00 +54.5%

6 K E & G CONSTRUCTION, INC. $936.000 $61,776.00 +70.2%

7360105 EACH LUMINAIRE (AMERICAN ELECTRIC AUTOBAHN)(LED)

Bid Rank Department Estimate 18.000 $600.000 $10,800.00

1 AMES CONSTRUCTION, INC. $978.810 $17,618.58 +63.1%

2 SUNDT CONSTRUCTION, INC. $800.000 $14,400.00 +33.3%

3 FNF CONSTRUCTION, INC. $475.000 $8,550.00 -20.8%

4 GRANITE CONSTRUCTION COMPANY $940.000 $16,920.00 +56.7%

5 PULICE CONSTRUCTION, INC. $450.000 $8,100.00 -25.0%

6 K E & G CONSTRUCTION, INC. $475.000 $8,550.00 -20.8%

7360235 EACH LOAD CENTER CABINET (TYPE I)(COT STD. DTL. T-325)

Bid Rank Department Estimate 1.000 $12,000.000 $12,000.00

1 AMES CONSTRUCTION, INC. $11,623.370 $11,623.37 -3.1%

2 SUNDT CONSTRUCTION, INC. $9,500.000 $9,500.00 -20.8%

Page 50: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 49 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7360235 EACH LOAD CENTER CABINET (TYPE I)(COT STD. DTL. T-325)

Bid Rank Department Estimate 1.000 $12,000.000 $12,000.00

3 FNF CONSTRUCTION, INC. $17,000.000 $17,000.00 +41.7%

4 GRANITE CONSTRUCTION COMPANY $11,400.000 $11,400.00 -5.0%

5 PULICE CONSTRUCTION, INC. $10,000.000 $10,000.00 -16.7%

6 K E & G CONSTRUCTION, INC. $10,110.000 $10,110.00 -15.8%

7360241 EACH LOAD CENTER CABINET (TYPE IV) (240/480 VOLT)

Bid Rank Department Estimate 1.000 $12,000.000 $12,000.00

1 AMES CONSTRUCTION, INC. $5,750.510 $5,750.51 -52.1%

2 SUNDT CONSTRUCTION, INC. $4,700.000 $4,700.00 -60.8%

3 FNF CONSTRUCTION, INC. $8,000.000 $8,000.00 -33.3%

4 GRANITE CONSTRUCTION COMPANY $5,600.000 $5,600.00 -53.3%

5 PULICE CONSTRUCTION, INC. $10,000.000 $10,000.00 -16.7%

6 K E & G CONSTRUCTION, INC. $10,260.000 $10,260.00 -14.5%

7360260 L.SUM REMOVE AND SALVAGE LOAD CENTER CABINETS

Bid Rank Department Estimate 1.000 $500.000 $500.00

1 AMES CONSTRUCTION, INC. $978.810 $978.81 +95.8%

2 SUNDT CONSTRUCTION, INC. $800.000 $800.00 +60.0%

3 FNF CONSTRUCTION, INC. $800.000 $800.00 +60.0%

4 GRANITE CONSTRUCTION COMPANY $975.000 $975.00 +95.0%

5 PULICE CONSTRUCTION, INC. $2,000.000 $2,000.00 +300.0%

6 K E & G CONSTRUCTION, INC. $2,220.000 $2,220.00 +344.0%

7370200 L.SUM TEMPORARY TRAFFIC SIGNALS

Bid Rank Department Estimate 1.000 $215,000.000 $215,000.00

1 AMES CONSTRUCTION, INC. $244,702.690 $244,702.69 +13.8%

2 SUNDT CONSTRUCTION, INC. $667,680.000 $667,680.00 +210.5%

3 FNF CONSTRUCTION, INC. $400,000.000 $400,000.00 +86.0%

4 GRANITE CONSTRUCTION COMPANY $750,000.000 $750,000.00 +248.8%

5 PULICE CONSTRUCTION, INC. $490,000.000 $490,000.00 +127.9%

6 K E & G CONSTRUCTION, INC. $598,000.000 $598,000.00 +178.1%

7370309 EACH REMOVE AND RELOCATE (CCTV POLE, CABINET AND CCTV CAMERA)

Bid Rank Department Estimate 1.000 $2,500.000 $2,500.00

1 AMES CONSTRUCTION, INC. $5,016.410 $5,016.41 +100.7%

2 SUNDT CONSTRUCTION, INC. $4,100.000 $4,100.00 +64.0%

3 FNF CONSTRUCTION, INC. $4,000.000 $4,000.00 +60.0%

4 GRANITE CONSTRUCTION COMPANY $5,000.000 $5,000.00 +100.0%

5 PULICE CONSTRUCTION, INC. $4,000.000 $4,000.00 +60.0%

6 K E & G CONSTRUCTION, INC. $4,170.000 $4,170.00 +66.8%

Page 51: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 50 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7370400 L.SUM ELECTRICAL SERVICE

Bid Rank Department Estimate 1.000 $25,000.000 $25,000.00

1 AMES CONSTRUCTION, INC. $19,111.280 $19,111.28 -23.6%

2 SUNDT CONSTRUCTION, INC. $15,620.000 $15,620.00 -37.5%

3 FNF CONSTRUCTION, INC. $31,000.000 $31,000.00 +24.0%

4 GRANITE CONSTRUCTION COMPANY $19,000.000 $19,000.00 -24.0%

5 PULICE CONSTRUCTION, INC. $14,000.000 $14,000.00 -44.0%

6 K E & G CONSTRUCTION, INC. $15,480.000 $15,480.00 -38.1%

8030092 SQ.YD. GRANITE MULCH (1 1/4" MINUS)

Bid Rank Department Estimate 3,322.000 $4.000 $13,288.00

1 AMES CONSTRUCTION, INC. $6.120 $20,330.64 +53.0%

2 SUNDT CONSTRUCTION, INC. $4.750 $15,779.50 +18.8%

3 FNF CONSTRUCTION, INC. $5.000 $16,610.00 +25.0%

4 GRANITE CONSTRUCTION COMPANY $32.000 $106,304.00 +700.0%

5 PULICE CONSTRUCTION, INC. $22.000 $73,084.00 +450.0%

6 K E & G CONSTRUCTION, INC. $6.950 $23,087.90 +73.8%

8050003 ACRE SEEDING (CLASS II)

Bid Rank Department Estimate 70.000 $4,000.000 $280,000.00

1 AMES CONSTRUCTION, INC. $3,920.930 $274,465.10 -2.0%

2 SUNDT CONSTRUCTION, INC. $3,300.000 $231,000.00 -17.5%

3 FNF CONSTRUCTION, INC. $3,350.000 $234,500.00 -16.3%

4 GRANITE CONSTRUCTION COMPANY $3,500.000 $245,000.00 -12.5%

5 PULICE CONSTRUCTION, INC. $3,500.000 $245,000.00 -12.5%

6 K E & G CONSTRUCTION, INC. $4,110.000 $287,700.00 +2.8%

8061298 EACH SHRUB (FIVE GALLON)

Bid Rank Department Estimate 92.000 $20.000 $1,840.00

1 AMES CONSTRUCTION, INC. $23.180 $2,132.56 +15.9%

2 SUNDT CONSTRUCTION, INC. $18.000 $1,656.00 -10.0%

3 FNF CONSTRUCTION, INC. $19.000 $1,748.00 -5.0%

4 GRANITE CONSTRUCTION COMPANY $83.000 $7,636.00 +315.0%

5 PULICE CONSTRUCTION, INC. $75.000 $6,900.00 +275.0%

6 K E & G CONSTRUCTION, INC. $23.500 $2,162.00 +17.5%

8061427 EACH YUCCA (15-GALLON)

Bid Rank Department Estimate 155.000 $100.000 $15,500.00

1 AMES CONSTRUCTION, INC. $115.880 $17,961.40 +15.9%

2 SUNDT CONSTRUCTION, INC. $90.000 $13,950.00 -10.0%

3 FNF CONSTRUCTION, INC. $91.000 $14,105.00 -9.0%

4 GRANITE CONSTRUCTION COMPANY $120.000 $18,600.00 +20.0%

5 PULICE CONSTRUCTION, INC. $110.000 $17,050.00 +10.0%

Page 52: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 51 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

8061427 EACH YUCCA (15-GALLON)

Bid Rank Department Estimate 155.000 $100.000 $15,500.00

6 K E & G CONSTRUCTION, INC. $94.500 $14,647.50 -5.5%

8061631 EACH CACTUS (PRICKLY PEAR)

Bid Rank Department Estimate 91.000 $25.000 $2,275.00

1 AMES CONSTRUCTION, INC. $38.630 $3,515.33 +54.5%

2 SUNDT CONSTRUCTION, INC. $30.000 $2,730.00 +20.0%

3 FNF CONSTRUCTION, INC. $31.000 $2,821.00 +24.0%

4 GRANITE CONSTRUCTION COMPANY $148.000 $13,468.00 +492.0%

5 PULICE CONSTRUCTION, INC. $140.000 $12,740.00 +460.0%

6 K E & G CONSTRUCTION, INC. $23.000 $2,093.00 -8.0%

8061632 EACH CACTUS (CHOLLA)

Bid Rank Department Estimate 28.000 $30.000 $840.00

1 AMES CONSTRUCTION, INC. $38.630 $1,081.64 +28.8%

2 SUNDT CONSTRUCTION, INC. $30.000 $840.00 +0.0%

3 FNF CONSTRUCTION, INC. $31.000 $868.00 +3.3%

4 GRANITE CONSTRUCTION COMPANY $135.000 $3,780.00 +350.0%

5 PULICE CONSTRUCTION, INC. $130.000 $3,640.00 +333.3%

6 K E & G CONSTRUCTION, INC. $27.500 $770.00 -8.3%

8061645 EACH CACTUS (BARREL)(5 GALLON)

Bid Rank Department Estimate 24.000 $25.000 $600.00

1 AMES CONSTRUCTION, INC. $38.630 $927.12 +54.5%

2 SUNDT CONSTRUCTION, INC. $30.000 $720.00 +20.0%

3 FNF CONSTRUCTION, INC. $31.000 $744.00 +24.0%

4 GRANITE CONSTRUCTION COMPANY $210.000 $5,040.00 +740.0%

5 PULICE CONSTRUCTION, INC. $200.000 $4,800.00 +700.0%

6 K E & G CONSTRUCTION, INC. $51.000 $1,224.00 +104.0%

8061655 EACH OCOTILLO (6' TO 8' IN HEIGHT)

Bid Rank Department Estimate 32.000 $110.000 $3,520.00

1 AMES CONSTRUCTION, INC. $334.780 $10,712.96 +204.3%

2 SUNDT CONSTRUCTION, INC. $260.000 $8,320.00 +136.4%

3 FNF CONSTRUCTION, INC. $270.000 $8,640.00 +145.5%

4 GRANITE CONSTRUCTION COMPANY $185.000 $5,920.00 +68.2%

5 PULICE CONSTRUCTION, INC. $175.000 $5,600.00 +59.1%

6 K E & G CONSTRUCTION, INC. $298.000 $9,536.00 +170.9%

8070011 MONTH LANDSCAPING ESTABLISHMENT (12 MONTHS)

Bid Rank Department Estimate 12.000 $1,000.000 $12,000.00

1 AMES CONSTRUCTION, INC. $1,686.770 $20,241.24 +68.7%

2 SUNDT CONSTRUCTION, INC. $1,300.000 $15,600.00 +30.0%

Page 53: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 52 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

8070011 MONTH LANDSCAPING ESTABLISHMENT (12 MONTHS)

Bid Rank Department Estimate 12.000 $1,000.000 $12,000.00

3 FNF CONSTRUCTION, INC. $2,175.000 $26,100.00 +117.5%

4 GRANITE CONSTRUCTION COMPANY $2,450.000 $29,400.00 +145.0%

5 PULICE CONSTRUCTION, INC. $2,000.000 $24,000.00 +100.0%

6 K E & G CONSTRUCTION, INC. $7,760.000 $93,120.00 +676.0%

8080008 L.SUM WATER DISTRIBUTION SYSTEM (TEMPORARY IRRIGATION)

Bid Rank Department Estimate 1.000 $25,000.000 $25,000.00

1 AMES CONSTRUCTION, INC. $14,034.920 $14,034.92 -43.9%

2 SUNDT CONSTRUCTION, INC. $11,000.000 $11,000.00 -56.0%

3 FNF CONSTRUCTION, INC. $14,000.000 $14,000.00 -44.0%

4 GRANITE CONSTRUCTION COMPANY $47,500.000 $47,500.00 +90.0%

5 PULICE CONSTRUCTION, INC. $30,000.000 $30,000.00 +20.0%

6 K E & G CONSTRUCTION, INC. $33,700.000 $33,700.00 +34.8%

8080551 L.FT. PIPE (PVC)(12")(SLEEVE)

Bid Rank Department Estimate 450.000 $60.000 $27,000.00

1 AMES CONSTRUCTION, INC. $33.510 $15,079.50 -44.2%

2 SUNDT CONSTRUCTION, INC. $45.000 $20,250.00 -25.0%

3 FNF CONSTRUCTION, INC. $25.000 $11,250.00 -58.3%

4 GRANITE CONSTRUCTION COMPANY $77.000 $34,650.00 +28.3%

5 PULICE CONSTRUCTION, INC. $70.000 $31,500.00 +16.7%

6 K E & G CONSTRUCTION, INC. $24.500 $11,025.00 -59.2%

8080692 L.FT. PIPELINE ENCASEMENT

Bid Rank Department Estimate 46.000 $500.000 $23,000.00

1 AMES CONSTRUCTION, INC. $286.550 $13,181.30 -42.7%

2 SUNDT CONSTRUCTION, INC. $240.000 $11,040.00 -52.0%

3 FNF CONSTRUCTION, INC. $650.000 $29,900.00 +30.0%

4 GRANITE CONSTRUCTION COMPANY $235.000 $10,810.00 -53.0%

5 PULICE CONSTRUCTION, INC. $525.000 $24,150.00 +5.0%

6 K E & G CONSTRUCTION, INC. $446.000 $20,516.00 -10.8%

8101014 L.FT. EROSION CONTROL (WATTLES)(20")

Bid Rank Department Estimate 7,271.000 $5.000 $36,355.00

1 AMES CONSTRUCTION, INC. $3.220 $23,412.62 -35.6%

2 SUNDT CONSTRUCTION, INC. $7.750 $56,350.25 +55.0%

3 FNF CONSTRUCTION, INC. $2.900 $21,085.90 -42.0%

4 GRANITE CONSTRUCTION COMPANY $5.010 $36,427.71 +0.2%

5 PULICE CONSTRUCTION, INC. $4.500 $32,719.50 -10.0%

6 K E & G CONSTRUCTION, INC. $8.750 $63,621.25 +75.0%

Page 54: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 53 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

8101018 SQ.YD. EROSION CONTROL (CATCH BASIN TEMPORARY FABRIC FILTER)

Bid Rank Department Estimate 113.000 $30.000 $3,390.00

1 AMES CONSTRUCTION, INC. $2.330 $263.29 -92.2%

2 SUNDT CONSTRUCTION, INC. $34.000 $3,842.00 +13.3%

3 FNF CONSTRUCTION, INC. $10.000 $1,130.00 -66.7%

4 GRANITE CONSTRUCTION COMPANY $25.000 $2,825.00 -16.7%

5 PULICE CONSTRUCTION, INC. $22.000 $2,486.00 -26.7%

6 K E & G CONSTRUCTION, INC. $67.000 $7,571.00 +123.3%

8101021 L.FT. EROSION CONTROL (WATTLES) (9")

Bid Rank Department Estimate 18,887.000 $2.000 $37,774.00

1 AMES CONSTRUCTION, INC. $1.920 $36,263.04 -4.0%

2 SUNDT CONSTRUCTION, INC. $3.000 $56,661.00 +50.0%

3 FNF CONSTRUCTION, INC. $1.750 $33,052.25 -12.5%

4 GRANITE CONSTRUCTION COMPANY $3.600 $67,993.20 +80.0%

5 PULICE CONSTRUCTION, INC. $2.000 $37,774.00 +0.0%

6 K E & G CONSTRUCTION, INC. $5.500 $103,878.50 +175.0%

8101029 CU.YD. EROSION CONTROL (ROCK MULCH) (GRADATION C)

Bid Rank Department Estimate 107.000 $100.000 $10,700.00

1 AMES CONSTRUCTION, INC. $129.720 $13,880.04 +29.7%

2 SUNDT CONSTRUCTION, INC. $110.000 $11,770.00 +10.0%

3 FNF CONSTRUCTION, INC. $120.000 $12,840.00 +20.0%

4 GRANITE CONSTRUCTION COMPANY $130.000 $13,910.00 +30.0%

5 PULICE CONSTRUCTION, INC. $95.000 $10,165.00 -5.0%

6 K E & G CONSTRUCTION, INC. $238.000 $25,466.00 +138.0%

8101030 SQ.YD. EROSION CONTROL (CONSTRUCTION ENTRANCE / EXIT GRAVEL PAD)

Bid Rank Department Estimate 1,250.000 $25.000 $31,250.00

1 AMES CONSTRUCTION, INC. $7.500 $9,375.00 -70.0%

2 SUNDT CONSTRUCTION, INC. $20.000 $25,000.00 -20.0%

3 FNF CONSTRUCTION, INC. $55.000 $68,750.00 +120.0%

4 GRANITE CONSTRUCTION COMPANY $30.500 $38,125.00 +22.0%

5 PULICE CONSTRUCTION, INC. $25.000 $31,250.00 +0.0%

6 K E & G CONSTRUCTION, INC. $29.500 $36,875.00 +18.0%

8101035 L.FT. EROSION CONTROL (SEDIMENT LOGS) (20")

Bid Rank Department Estimate 3,300.000 $7.000 $23,100.00

1 AMES CONSTRUCTION, INC. $5.170 $17,061.00 -26.1%

2 SUNDT CONSTRUCTION, INC. $9.250 $30,525.00 +32.1%

3 FNF CONSTRUCTION, INC. $5.000 $16,500.00 -28.6%

4 GRANITE CONSTRUCTION COMPANY $8.000 $26,400.00 +14.3%

5 PULICE CONSTRUCTION, INC. $6.000 $19,800.00 -14.3%

Page 55: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 54 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

8101035 L.FT. EROSION CONTROL (SEDIMENT LOGS) (20")

Bid Rank Department Estimate 3,300.000 $7.000 $23,100.00

6 K E & G CONSTRUCTION, INC. $13.000 $42,900.00 +85.7%

9010001 L.SUM MOBILIZATION

Bid Rank Department Estimate 1.000 $2,800,000.000 $2,800,000.00

1 AMES CONSTRUCTION, INC. $2,225,765.000 $2,225,765.00 -20.5%

2 SUNDT CONSTRUCTION, INC. $2,070,000.000 $2,070,000.00 -26.1%

3 FNF CONSTRUCTION, INC. $2,700,000.000 $2,700,000.00 -3.6%

4 GRANITE CONSTRUCTION COMPANY $2,086,948.390 $2,086,948.39 -25.5%

5 PULICE CONSTRUCTION, INC. $2,925,000.000 $2,925,000.00 +4.5%

6 K E & G CONSTRUCTION, INC. $2,791,555.020 $2,791,555.02 -0.3%

9030013 L.FT. BARBED WIRE GAME FENCE

Bid Rank Department Estimate 6,129.000 $18.000 $110,322.00

1 AMES CONSTRUCTION, INC. $3.350 $20,532.15 -81.4%

2 SUNDT CONSTRUCTION, INC. $4.050 $24,822.45 -77.5%

3 FNF CONSTRUCTION, INC. $5.000 $30,645.00 -72.2%

4 GRANITE CONSTRUCTION COMPANY $3.300 $20,225.70 -81.7%

5 PULICE CONSTRUCTION, INC. $3.500 $21,451.50 -80.6%

6 K E & G CONSTRUCTION, INC. $5.300 $32,483.70 -70.6%

9030045 EACH FENCE GATE (TYPE 1, SINGLE)(14')

Bid Rank Department Estimate 1.000 $1,000.000 $1,000.00

1 AMES CONSTRUCTION, INC. $1,096.210 $1,096.21 +9.6%

2 SUNDT CONSTRUCTION, INC. $710.000 $710.00 -29.0%

3 FNF CONSTRUCTION, INC. $900.000 $900.00 -10.0%

4 GRANITE CONSTRUCTION COMPANY $1,100.000 $1,100.00 +10.0%

5 PULICE CONSTRUCTION, INC. $1,200.000 $1,200.00 +20.0%

6 K E & G CONSTRUCTION, INC. $933.000 $933.00 -6.7%

9030106 EACH FENCE GATE (TYPE 1, DOUBLE)(16')

Bid Rank Department Estimate 3.000 $2,000.000 $6,000.00

1 AMES CONSTRUCTION, INC. $1,211.600 $3,634.80 -39.4%

2 SUNDT CONSTRUCTION, INC. $850.000 $2,550.00 -57.5%

3 FNF CONSTRUCTION, INC. $950.000 $2,850.00 -52.5%

4 GRANITE CONSTRUCTION COMPANY $1,180.000 $3,540.00 -41.0%

5 PULICE CONSTRUCTION, INC. $1,300.000 $3,900.00 -35.0%

6 K E & G CONSTRUCTION, INC. $1,120.000 $3,360.00 -44.0%

9050005 L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (MASH)

Bid Rank Department Estimate 800.000 $40.000 $32,000.00

1 AMES CONSTRUCTION, INC. $39.780 $31,824.00 -0.6%

2 SUNDT CONSTRUCTION, INC. $40.000 $32,000.00 +0.0%

Page 56: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 55 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9050005 L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (MASH)

Bid Rank Department Estimate 800.000 $40.000 $32,000.00

3 FNF CONSTRUCTION, INC. $40.000 $32,000.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $22.800 $18,240.00 -43.0%

5 PULICE CONSTRUCTION, INC. $40.000 $32,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $48.000 $38,400.00 +20.0%

9050025 EACH GUARD RAIL TERMINAL (C-10.20, C-10.21 OR C-10.22)

Bid Rank Department Estimate 2.000 $4,500.000 $9,000.00

1 AMES CONSTRUCTION, INC. $5,237.580 $10,475.16 +16.4%

2 SUNDT CONSTRUCTION, INC. $8,600.000 $17,200.00 +91.1%

3 FNF CONSTRUCTION, INC. $4,300.000 $8,600.00 -4.4%

4 GRANITE CONSTRUCTION COMPANY $3,550.000 $7,100.00 -21.1%

5 PULICE CONSTRUCTION, INC. $5,000.000 $10,000.00 +11.1%

6 K E & G CONSTRUCTION, INC. $6,320.000 $12,640.00 +40.4%

9050036 EACH GUARD RAIL, ANCHOR ASSEMBLY

Bid Rank Department Estimate 2.000 $2,000.000 $4,000.00

1 AMES CONSTRUCTION, INC. $3,908.440 $7,816.88 +95.4%

2 SUNDT CONSTRUCTION, INC. $2,000.000 $4,000.00 +0.0%

3 FNF CONSTRUCTION, INC. $2,000.000 $4,000.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $1,950.000 $3,900.00 -2.5%

5 PULICE CONSTRUCTION, INC. $4,000.000 $8,000.00 +100.0%

6 K E & G CONSTRUCTION, INC. $4,720.000 $9,440.00 +136.0%

9080031 L.FT. CONCRETE CURB (C-05.10) (TYPE G)

Bid Rank Department Estimate 1,151.000 $15.000 $17,265.00

1 AMES CONSTRUCTION, INC. $45.020 $51,818.02 +200.1%

2 SUNDT CONSTRUCTION, INC. $39.000 $44,889.00 +160.0%

3 FNF CONSTRUCTION, INC. $38.000 $43,738.00 +153.3%

4 GRANITE CONSTRUCTION COMPANY $28.000 $32,228.00 +86.7%

5 PULICE CONSTRUCTION, INC. $30.000 $34,530.00 +100.0%

6 K E & G CONSTRUCTION, INC. $34.500 $39,709.50 +130.0%

9080041 L.FT. CONCRETE CURB (COT STD.DTL.209)(TYPE 1)

Bid Rank Department Estimate 810.000 $25.000 $20,250.00

1 AMES CONSTRUCTION, INC. $45.340 $36,725.40 +81.4%

2 SUNDT CONSTRUCTION, INC. $39.000 $31,590.00 +56.0%

3 FNF CONSTRUCTION, INC. $39.000 $31,590.00 +56.0%

4 GRANITE CONSTRUCTION COMPANY $26.000 $21,060.00 +4.0%

5 PULICE CONSTRUCTION, INC. $35.000 $28,350.00 +40.0%

6 K E & G CONSTRUCTION, INC. $33.000 $26,730.00 +32.0%

Page 57: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 56 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9080086 L.FT. CONCRETE CURB AND GUTTER (C-05.10)(TYPE D AND D-3)

Bid Rank Department Estimate 2,928.000 $30.000 $87,840.00

1 AMES CONSTRUCTION, INC. $44.780 $131,115.84 +49.3%

2 SUNDT CONSTRUCTION, INC. $43.000 $125,904.00 +43.3%

3 FNF CONSTRUCTION, INC. $38.000 $111,264.00 +26.7%

4 GRANITE CONSTRUCTION COMPANY $38.750 $113,460.00 +29.2%

5 PULICE CONSTRUCTION, INC. $35.000 $102,480.00 +16.7%

6 K E & G CONSTRUCTION, INC. $48.500 $142,008.00 +61.7%

9080087 L.FT. CONCRETE CURB AND GUTTER (C-05.10)(TYPE E AND E-1)

Bid Rank Department Estimate 6,104.000 $30.000 $183,120.00

1 AMES CONSTRUCTION, INC. $39.700 $242,328.80 +32.3%

2 SUNDT CONSTRUCTION, INC. $34.000 $207,536.00 +13.3%

3 FNF CONSTRUCTION, INC. $34.000 $207,536.00 +13.3%

4 GRANITE CONSTRUCTION COMPANY $34.000 $207,536.00 +13.3%

5 PULICE CONSTRUCTION, INC. $30.000 $183,120.00 +0.0%

6 K E & G CONSTRUCTION, INC. $50.000 $305,200.00 +66.7%

9080088 L.FT. CONCRETE CURB AND GUTTER (C-05.10)(TYPE G)

Bid Rank Department Estimate 518.000 $30.000 $15,540.00

1 AMES CONSTRUCTION, INC. $47.380 $24,542.84 +57.9%

2 SUNDT CONSTRUCTION, INC. $45.000 $23,310.00 +50.0%

3 FNF CONSTRUCTION, INC. $43.000 $22,274.00 +43.3%

4 GRANITE CONSTRUCTION COMPANY $47.600 $24,656.80 +58.7%

5 PULICE CONSTRUCTION, INC. $45.000 $23,310.00 +50.0%

6 K E & G CONSTRUCTION, INC. $49.000 $25,382.00 +63.3%

9080089 L.FT. CONCRETE CURB AND GUTTER (C-05.10)(TYPE A-1)

Bid Rank Department Estimate 1,724.000 $30.000 $51,720.00

1 AMES CONSTRUCTION, INC. $31.900 $54,995.60 +6.3%

2 SUNDT CONSTRUCTION, INC. $44.000 $75,856.00 +46.7%

3 FNF CONSTRUCTION, INC. $28.000 $48,272.00 -6.7%

4 GRANITE CONSTRUCTION COMPANY $27.000 $46,548.00 -10.0%

5 PULICE CONSTRUCTION, INC. $27.000 $46,548.00 -10.0%

6 K E & G CONSTRUCTION, INC. $66.000 $113,784.00 +120.0%

9080109 L.FT. CONCRETE SINGLE CURB (MODIFIED RAMP CURB)(C-05.30)

Bid Rank Department Estimate 1,148.000 $22.000 $25,256.00

1 AMES CONSTRUCTION, INC. $35.630 $40,903.24 +62.0%

2 SUNDT CONSTRUCTION, INC. $43.000 $49,364.00 +95.5%

3 FNF CONSTRUCTION, INC. $31.000 $35,588.00 +40.9%

4 GRANITE CONSTRUCTION COMPANY $35.700 $40,983.60 +62.3%

5 PULICE CONSTRUCTION, INC. $33.000 $37,884.00 +50.0%

Page 58: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 57 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9080109 L.FT. CONCRETE SINGLE CURB (MODIFIED RAMP CURB)(C-05.30)

Bid Rank Department Estimate 1,148.000 $22.000 $25,256.00

6 K E & G CONSTRUCTION, INC. $31.000 $35,588.00 +40.9%

9080201 SQ.FT. CONCRETE SIDEWALK (C-05.20)

Bid Rank Department Estimate 6,357.000 $10.000 $63,570.00

1 AMES CONSTRUCTION, INC. $6.820 $43,354.74 -31.8%

2 SUNDT CONSTRUCTION, INC. $7.500 $47,677.50 -25.0%

3 FNF CONSTRUCTION, INC. $6.500 $41,320.50 -35.0%

4 GRANITE CONSTRUCTION COMPANY $6.300 $40,049.10 -37.0%

5 PULICE CONSTRUCTION, INC. $6.500 $41,320.50 -35.0%

6 K E & G CONSTRUCTION, INC. $9.050 $57,530.85 -9.5%

9080296 EACH CONCRETE SIDEWALK RAMP (C-05.30)(TYPE C)

Bid Rank Department Estimate 2.000 $2,500.000 $5,000.00

1 AMES CONSTRUCTION, INC. $4,468.120 $8,936.24 +78.7%

2 SUNDT CONSTRUCTION, INC. $3,500.000 $7,000.00 +40.0%

3 FNF CONSTRUCTION, INC. $3,500.000 $7,000.00 +40.0%

4 GRANITE CONSTRUCTION COMPANY $2,600.000 $5,200.00 +4.0%

5 PULICE CONSTRUCTION, INC. $4,000.000 $8,000.00 +60.0%

6 K E & G CONSTRUCTION, INC. $2,930.000 $5,860.00 +17.2%

9080298 EACH CONCRETE SIDEWALK RAMP (C-05.30)(TYPE F)

Bid Rank Department Estimate 6.000 $2,500.000 $15,000.00

1 AMES CONSTRUCTION, INC. $1,546.320 $9,277.92 -38.1%

2 SUNDT CONSTRUCTION, INC. $2,700.000 $16,200.00 +8.0%

3 FNF CONSTRUCTION, INC. $900.000 $5,400.00 -64.0%

4 GRANITE CONSTRUCTION COMPANY $850.000 $5,100.00 -66.0%

5 PULICE CONSTRUCTION, INC. $900.000 $5,400.00 -64.0%

6 K E & G CONSTRUCTION, INC. $2,280.000 $13,680.00 -8.8%

9080300 EACH CONCRETE SIDEWALK RAMP (C-05.30)(DETAIL E)

Bid Rank Department Estimate 2.000 $2,500.000 $5,000.00

1 AMES CONSTRUCTION, INC. $3,095.540 $6,191.08 +23.8%

2 SUNDT CONSTRUCTION, INC. $3,100.000 $6,200.00 +24.0%

3 FNF CONSTRUCTION, INC. $2,500.000 $5,000.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $3,300.000 $6,600.00 +32.0%

5 PULICE CONSTRUCTION, INC. $2,500.000 $5,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $3,770.000 $7,540.00 +50.8%

9100008 L.FT. CONCRETE BARRIER (HALF)(SD 1.01)

Bid Rank Department Estimate 66.000 $140.000 $9,240.00

1 AMES CONSTRUCTION, INC. $51.930 $3,427.38 -62.9%

2 SUNDT CONSTRUCTION, INC. $430.000 $28,380.00 +207.1%

Page 59: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 58 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9100008 L.FT. CONCRETE BARRIER (HALF)(SD 1.01)

Bid Rank Department Estimate 66.000 $140.000 $9,240.00

3 FNF CONSTRUCTION, INC. $300.000 $19,800.00 +114.3%

4 GRANITE CONSTRUCTION COMPANY $315.000 $20,790.00 +125.0%

5 PULICE CONSTRUCTION, INC. $400.000 $26,400.00 +185.7%

6 K E & G CONSTRUCTION, INC. $416.000 $27,456.00 +197.1%

9100014 L.FT. CONCRETE BARRIER (HALF)(C-10.52)(32")(TYPE F WITH GUTTER)

Bid Rank Department Estimate 200.000 $150.000 $30,000.00

1 AMES CONSTRUCTION, INC. $47.400 $9,480.00 -68.4%

2 SUNDT CONSTRUCTION, INC. $150.000 $30,000.00 +0.0%

3 FNF CONSTRUCTION, INC. $90.000 $18,000.00 -40.0%

4 GRANITE CONSTRUCTION COMPANY $162.000 $32,400.00 +8.0%

5 PULICE CONSTRUCTION, INC. $125.000 $25,000.00 -16.7%

6 K E & G CONSTRUCTION, INC. $181.000 $36,200.00 +20.7%

9100015 L.FT. CONCRETE BARRIER (HALF)(C-10.52)(42")(TYPE F WITH GUTTER)

Bid Rank Department Estimate 298.000 $150.000 $44,700.00

1 AMES CONSTRUCTION, INC. $86.540 $25,788.92 -42.3%

2 SUNDT CONSTRUCTION, INC. $160.000 $47,680.00 +6.7%

3 FNF CONSTRUCTION, INC. $95.000 $28,310.00 -36.7%

4 GRANITE CONSTRUCTION COMPANY $170.000 $50,660.00 +13.3%

5 PULICE CONSTRUCTION, INC. $165.000 $49,170.00 +10.0%

6 K E & G CONSTRUCTION, INC. $202.000 $60,196.00 +34.7%

9100112 EACH CONCRETE HALF BARRIER TRANSITION (C-10.78)(LOW SPEED APPROACH)

Bid Rank Department Estimate 2.000 $1,500.000 $3,000.00

1 AMES CONSTRUCTION, INC. $1,384.690 $2,769.38 -7.7%

2 SUNDT CONSTRUCTION, INC. $4,300.000 $8,600.00 +186.7%

3 FNF CONSTRUCTION, INC. $1,800.000 $3,600.00 +20.0%

4 GRANITE CONSTRUCTION COMPANY $7,000.000 $14,000.00 +366.7%

5 PULICE CONSTRUCTION, INC. $8,000.000 $16,000.00 +433.3%

6 K E & G CONSTRUCTION, INC. $3,920.000 $7,840.00 +161.3%

9100114 EACH CONCRETE BARRIER TRANSITION (HALF)(DETAIL B)

Bid Rank Department Estimate 8.000 $9,000.000 $72,000.00

1 AMES CONSTRUCTION, INC. $4,038.680 $32,309.44 -55.1%

2 SUNDT CONSTRUCTION, INC. $3,300.000 $26,400.00 -63.3%

3 FNF CONSTRUCTION, INC. $2,900.000 $23,200.00 -67.8%

4 GRANITE CONSTRUCTION COMPANY $3,400.000 $27,200.00 -62.2%

5 PULICE CONSTRUCTION, INC. $8,000.000 $64,000.00 -11.1%

6 K E & G CONSTRUCTION, INC. $3,920.000 $31,360.00 -56.4%

Page 60: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 59 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9130001 CU.YD. RIPRAP (DUMPED)

Bid Rank Department Estimate 384.000 $110.000 $42,240.00

1 AMES CONSTRUCTION, INC. $138.270 $53,095.68 +25.7%

2 SUNDT CONSTRUCTION, INC. $110.000 $42,240.00 +0.0%

3 FNF CONSTRUCTION, INC. $110.000 $42,240.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $98.000 $37,632.00 -10.9%

5 PULICE CONSTRUCTION, INC. $135.000 $51,840.00 +22.7%

6 K E & G CONSTRUCTION, INC. $173.000 $66,432.00 +57.3%

9130030 CU.YD. RIPRAP (GABIONS) (BASKET)

Bid Rank Department Estimate 108.000 $500.000 $54,000.00

1 AMES CONSTRUCTION, INC. $208.210 $22,486.68 -58.4%

2 SUNDT CONSTRUCTION, INC. $320.000 $34,560.00 -36.0%

3 FNF CONSTRUCTION, INC. $330.000 $35,640.00 -34.0%

4 GRANITE CONSTRUCTION COMPANY $500.000 $54,000.00 +0.0%

5 PULICE CONSTRUCTION, INC. $450.000 $48,600.00 -10.0%

6 K E & G CONSTRUCTION, INC. $456.000 $49,248.00 -8.8%

9140104 SQ.FT. DECORATIVE PAVEMENT

Bid Rank Department Estimate 30,751.000 $5.000 $153,755.00

1 AMES CONSTRUCTION, INC. $13.320 $409,603.32 +166.4%

2 SUNDT CONSTRUCTION, INC. $12.000 $369,012.00 +140.0%

3 FNF CONSTRUCTION, INC. $15.000 $461,265.00 +200.0%

4 GRANITE CONSTRUCTION COMPANY $10.000 $307,510.00 +100.0%

5 PULICE CONSTRUCTION, INC. $13.100 $402,838.10 +162.0%

6 K E & G CONSTRUCTION, INC. $8.750 $269,071.25 +75.0%

9210011 SQ.YD. MEDIAN PAVING

Bid Rank Department Estimate 27.000 $200.000 $5,400.00

1 AMES CONSTRUCTION, INC. $132.040 $3,565.08 -34.0%

2 SUNDT CONSTRUCTION, INC. $150.000 $4,050.00 -25.0%

3 FNF CONSTRUCTION, INC. $340.000 $9,180.00 +70.0%

4 GRANITE CONSTRUCTION COMPANY $300.000 $8,100.00 +50.0%

5 PULICE CONSTRUCTION, INC. $65.000 $1,755.00 -67.5%

6 K E & G CONSTRUCTION, INC. $237.000 $6,399.00 +18.5%

9230003 HOUR ON-THE-JOB TRAINING WITH GOALS

Bid Rank Department Estimate 3,000.000 $3.000 $9,000.00

1 AMES CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

2 SUNDT CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

3 FNF CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $3.000 $9,000.00 +0.0%

5 PULICE CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

Page 61: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 60 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9230003 HOUR ON-THE-JOB TRAINING WITH GOALS

Bid Rank Department Estimate 3,000.000 $3.000 $9,000.00

6 K E & G CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

9240010 L.SUM FORCE ACCOUNT WORK (PROVIDE ELCTRICAL SERVICE)

Bid Rank Department Estimate 1.000 $10,000.000 $10,000.00

1 AMES CONSTRUCTION, INC. $10,000.000 $10,000.00 +0.0%

2 SUNDT CONSTRUCTION, INC. $10,000.000 $10,000.00 +0.0%

3 FNF CONSTRUCTION, INC. $10,000.000 $10,000.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $10,000.000 $10,000.00 +0.0%

5 PULICE CONSTRUCTION, INC. $10,000.000 $10,000.00 +0.0%

6 K E & G CONSTRUCTION, INC. $10,000.000 $10,000.00 +0.0%

9240103 L.SUM MISCELLANEOUS WORK (ELECTRICAL RECORD DRAWINGS)

Bid Rank Department Estimate 1.000 $10,000.000 $10,000.00

1 AMES CONSTRUCTION, INC. $5,138.760 $5,138.76 -48.6%

2 SUNDT CONSTRUCTION, INC. $4,200.000 $4,200.00 -58.0%

3 FNF CONSTRUCTION, INC. $4,300.000 $4,300.00 -57.0%

4 GRANITE CONSTRUCTION COMPANY $5,100.000 $5,100.00 -49.0%

5 PULICE CONSTRUCTION, INC. $6,500.000 $6,500.00 -35.0%

6 K E & G CONSTRUCTION, INC. $6,330.000 $6,330.00 -36.7%

9240118 SQ.FT. MISCELLANEOUS WORK (PAVEMENT MARKING, PREFORMED, TYPE 1, GREEN BIKE LANE)

Bid Rank Department Estimate 1,998.000 $20.000 $39,960.00

1 AMES CONSTRUCTION, INC. $11.180 $22,337.64 -44.1%

2 SUNDT CONSTRUCTION, INC. $9.250 $18,481.50 -53.8%

3 FNF CONSTRUCTION, INC. $10.000 $19,980.00 -50.0%

4 GRANITE CONSTRUCTION COMPANY $11.000 $21,978.00 -45.0%

5 PULICE CONSTRUCTION, INC. $11.000 $21,978.00 -45.0%

6 K E & G CONSTRUCTION, INC. $12.000 $23,976.00 -40.0%

9240151 L.FT. MISCELLANEOUS WORK (WHITE CONTRASTING PAVEMENT MARKING TAPE)

Bid Rank Department Estimate 23,404.000 $2.000 $46,808.00

1 AMES CONSTRUCTION, INC. $6.620 $154,934.48 +231.0%

2 SUNDT CONSTRUCTION, INC. $5.500 $128,722.00 +175.0%

3 FNF CONSTRUCTION, INC. $5.500 $128,722.00 +175.0%

4 GRANITE CONSTRUCTION COMPANY $6.500 $152,126.00 +225.0%

5 PULICE CONSTRUCTION, INC. $7.000 $163,828.00 +250.0%

6 K E & G CONSTRUCTION, INC. $6.950 $162,657.80 +247.5%

9240152 L.FT. MISCELLANEOUS WORK (YELLOW CONTRASTING PAVEMENT MARKING TAPE)

Bid Rank Department Estimate 6,620.000 $2.000 $13,240.00

1 AMES CONSTRUCTION, INC. $6.620 $43,824.40 +231.0%

2 SUNDT CONSTRUCTION, INC. $5.500 $36,410.00 +175.0%

Page 62: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 61 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9240152 L.FT. MISCELLANEOUS WORK (YELLOW CONTRASTING PAVEMENT MARKING TAPE)

Bid Rank Department Estimate 6,620.000 $2.000 $13,240.00

3 FNF CONSTRUCTION, INC. $5.500 $36,410.00 +175.0%

4 GRANITE CONSTRUCTION COMPANY $6.800 $45,016.00 +240.0%

5 PULICE CONSTRUCTION, INC. $7.000 $46,340.00 +250.0%

6 K E & G CONSTRUCTION, INC. $6.950 $46,009.00 +247.5%

9240170 L.SUM CONTRACTOR QUALITY CONTROL

Bid Rank Department Estimate 1.000 $250,000.000 $250,000.00

1 AMES CONSTRUCTION, INC. $126,929.930 $126,929.93 -49.2%

2 SUNDT CONSTRUCTION, INC. $250,000.000 $250,000.00 +0.0%

3 FNF CONSTRUCTION, INC. $353,500.000 $353,500.00 +41.4%

4 GRANITE CONSTRUCTION COMPANY $100,000.000 $100,000.00 -60.0%

5 PULICE CONSTRUCTION, INC. $225,000.000 $225,000.00 -10.0%

6 K E & G CONSTRUCTION, INC. $235,000.000 $235,000.00 -6.0%

9240181 SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(MANUAL/MECHANICAL METHODS)

Bid Rank Department Estimate 146,000.000 $0.600 $87,600.00

1 AMES CONSTRUCTION, INC. $0.360 $52,560.00 -40.0%

2 SUNDT CONSTRUCTION, INC. $0.300 $43,800.00 -50.0%

3 FNF CONSTRUCTION, INC. $0.550 $80,300.00 -8.3%

4 GRANITE CONSTRUCTION COMPANY $0.350 $51,100.00 -41.7%

5 PULICE CONSTRUCTION, INC. $0.350 $51,100.00 -41.7%

6 K E & G CONSTRUCTION, INC. $0.170 $24,820.00 -71.7%

9240182 SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(HERBICIDE)

Bid Rank Department Estimate 180,000.000 $0.400 $72,000.00

1 AMES CONSTRUCTION, INC. $0.300 $54,000.00 -25.0%

2 SUNDT CONSTRUCTION, INC. $0.250 $45,000.00 -37.5%

3 FNF CONSTRUCTION, INC. $0.200 $36,000.00 -50.0%

4 GRANITE CONSTRUCTION COMPANY $0.290 $52,200.00 -27.5%

5 PULICE CONSTRUCTION, INC. $0.300 $54,000.00 -25.0%

6 K E & G CONSTRUCTION, INC. $0.110 $19,800.00 -72.5%

9250001 L.SUM CONSTRUCTION SURVEYING AND LAYOUT

Bid Rank Department Estimate 1.000 $250,000.000 $250,000.00

1 AMES CONSTRUCTION, INC. $212,244.360 $212,244.36 -15.1%

2 SUNDT CONSTRUCTION, INC. $400,000.000 $400,000.00 +60.0%

3 FNF CONSTRUCTION, INC. $400,000.000 $400,000.00 +60.0%

4 GRANITE CONSTRUCTION COMPANY $100,000.000 $100,000.00 -60.0%

5 PULICE CONSTRUCTION, INC. $280,000.000 $280,000.00 +12.0%

6 K E & G CONSTRUCTION, INC. $203,000.000 $203,000.00 -18.8%

Page 63: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 62 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9280037 L.FT. GROUND-IN RUMBLE STRIP (12 INCH)

Bid Rank Department Estimate 12,449.000 $0.500 $6,224.50

1 AMES CONSTRUCTION, INC. $0.430 $5,353.07 -14.0%

2 SUNDT CONSTRUCTION, INC. $0.250 $3,112.25 -50.0%

3 FNF CONSTRUCTION, INC. $0.400 $4,979.60 -20.0%

4 GRANITE CONSTRUCTION COMPANY $0.680 $8,465.32 +36.0%

5 PULICE CONSTRUCTION, INC. $0.300 $3,734.70 -40.0%

6 K E & G CONSTRUCTION, INC. $0.320 $3,983.68 -36.0%

2020009 A CU.YD. REMOVAL OF STRUCTURAL CONCRETE

Bid Rank Department Estimate 1.000 $2,000.000 $2,000.00

1 AMES CONSTRUCTION, INC. $4,776.560 $4,776.56 +138.8%

2 SUNDT CONSTRUCTION, INC. $200.000 $200.00 -90.0%

3 FNF CONSTRUCTION, INC. $600.000 $600.00 -70.0%

4 GRANITE CONSTRUCTION COMPANY $1,590.000 $1,590.00 -20.5%

5 PULICE CONSTRUCTION, INC. $1,500.000 $1,500.00 -25.0%

6 K E & G CONSTRUCTION, INC. $2,250.000 $2,250.00 +12.5%

2030501 A CU.YD. STRUCTURAL EXCAVATION

Bid Rank Department Estimate 62.000 $60.000 $3,720.00

1 AMES CONSTRUCTION, INC. $177.070 $10,978.34 +195.1%

2 SUNDT CONSTRUCTION, INC. $16.000 $992.00 -73.3%

3 FNF CONSTRUCTION, INC. $30.000 $1,860.00 -50.0%

4 GRANITE CONSTRUCTION COMPANY $64.000 $3,968.00 +6.7%

5 PULICE CONSTRUCTION, INC. $80.000 $4,960.00 +33.3%

6 K E & G CONSTRUCTION, INC. $37.000 $2,294.00 -38.3%

2030506 A CU.YD. STRUCTURE BACKFILL

Bid Rank Department Estimate 65.000 $100.000 $6,500.00

1 AMES CONSTRUCTION, INC. $100.070 $6,504.55 +0.1%

2 SUNDT CONSTRUCTION, INC. $48.000 $3,120.00 -52.0%

3 FNF CONSTRUCTION, INC. $45.000 $2,925.00 -55.0%

4 GRANITE CONSTRUCTION COMPANY $86.500 $5,622.50 -13.5%

5 PULICE CONSTRUCTION, INC. $175.000 $11,375.00 +75.0%

6 K E & G CONSTRUCTION, INC. $76.000 $4,940.00 -24.0%

6010002 A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000)

Bid Rank Department Estimate 90.000 $1,000.000 $90,000.00

1 AMES CONSTRUCTION, INC. $883.580 $79,522.20 -11.6%

2 SUNDT CONSTRUCTION, INC. $820.000 $73,800.00 -18.0%

3 FNF CONSTRUCTION, INC. $650.000 $58,500.00 -35.0%

4 GRANITE CONSTRUCTION COMPANY $600.000 $54,000.00 -40.0%

5 PULICE CONSTRUCTION, INC. $900.000 $81,000.00 -10.0%

Page 64: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 63 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6010002 A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000)

Bid Rank Department Estimate 90.000 $1,000.000 $90,000.00

6 K E & G CONSTRUCTION, INC. $650.000 $58,500.00 -35.0%

6050002 A LB. REINFORCING STEEL

Bid Rank Department Estimate 13,285.000 $2.000 $26,570.00

1 AMES CONSTRUCTION, INC. $1.050 $13,949.25 -47.5%

2 SUNDT CONSTRUCTION, INC. $0.900 $11,956.50 -55.0%

3 FNF CONSTRUCTION, INC. $1.200 $15,942.00 -40.0%

4 GRANITE CONSTRUCTION COMPANY $1.000 $13,285.00 -50.0%

5 PULICE CONSTRUCTION, INC. $1.200 $15,942.00 -40.0%

6 K E & G CONSTRUCTION, INC. $1.050 $13,949.25 -47.5%

6050101 A EACH PLACE DOWELS

Bid Rank Department Estimate 24.000 $30.000 $720.00

1 AMES CONSTRUCTION, INC. $60.580 $1,453.92 +101.9%

2 SUNDT CONSTRUCTION, INC. $18.000 $432.00 -40.0%

3 FNF CONSTRUCTION, INC. $30.000 $720.00 +0.0%

4 GRANITE CONSTRUCTION COMPANY $28.000 $672.00 -6.7%

5 PULICE CONSTRUCTION, INC. $45.000 $1,080.00 +50.0%

6 K E & G CONSTRUCTION, INC. $70.500 $1,692.00 +135.0%

6110201 A L.FT. METAL HANDRAIL

Bid Rank Department Estimate 89.000 $80.000 $7,120.00

1 AMES CONSTRUCTION, INC. $28.650 $2,549.85 -64.2%

2 SUNDT CONSTRUCTION, INC. $45.000 $4,005.00 -43.8%

3 FNF CONSTRUCTION, INC. $30.000 $2,670.00 -62.5%

4 GRANITE CONSTRUCTION COMPANY $28.750 $2,558.75 -64.1%

5 PULICE CONSTRUCTION, INC. $30.000 $2,670.00 -62.5%

6 K E & G CONSTRUCTION, INC. $32.500 $2,892.50 -59.4%

2020002 B L.SUM REMOVE BRIDGE

Bid Rank Department Estimate 1.000 $250,000.000 $250,000.00

1 AMES CONSTRUCTION, INC. $86,238.200 $86,238.20 -65.5%

2 SUNDT CONSTRUCTION, INC. $100,000.000 $100,000.00 -60.0%

3 FNF CONSTRUCTION, INC. $100,000.000 $100,000.00 -60.0%

4 GRANITE CONSTRUCTION COMPANY $150,000.000 $150,000.00 -40.0%

5 PULICE CONSTRUCTION, INC. $110,000.000 $110,000.00 -56.0%

6 K E & G CONSTRUCTION, INC. $142,000.000 $142,000.00 -43.2%

2030501 B CU.YD. STRUCTURAL EXCAVATION

Bid Rank Department Estimate 120.000 $60.000 $7,200.00

1 AMES CONSTRUCTION, INC. $140.230 $16,827.60 +133.7%

2 SUNDT CONSTRUCTION, INC. $30.000 $3,600.00 -50.0%

Page 65: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 64 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2030501 B CU.YD. STRUCTURAL EXCAVATION

Bid Rank Department Estimate 120.000 $60.000 $7,200.00

3 FNF CONSTRUCTION, INC. $12.000 $1,440.00 -80.0%

4 GRANITE CONSTRUCTION COMPANY $30.000 $3,600.00 -50.0%

5 PULICE CONSTRUCTION, INC. $40.000 $4,800.00 -33.3%

6 K E & G CONSTRUCTION, INC. $30.000 $3,600.00 -50.0%

2030506 B CU.YD. STRUCTURE BACKFILL

Bid Rank Department Estimate 105.000 $100.000 $10,500.00

1 AMES CONSTRUCTION, INC. $94.920 $9,966.60 -5.1%

2 SUNDT CONSTRUCTION, INC. $35.000 $3,675.00 -65.0%

3 FNF CONSTRUCTION, INC. $32.000 $3,360.00 -68.0%

4 GRANITE CONSTRUCTION COMPANY $46.500 $4,882.50 -53.5%

5 PULICE CONSTRUCTION, INC. $110.000 $11,550.00 +10.0%

6 K E & G CONSTRUCTION, INC. $68.500 $7,192.50 -31.5%

6010005 B CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 4,500)

Bid Rank Department Estimate 1,808.000 $900.000 $1,627,200.00

1 AMES CONSTRUCTION, INC. $571.000 $1,032,368.00 -36.6%

2 SUNDT CONSTRUCTION, INC. $880.000 $1,591,040.00 -2.2%

3 FNF CONSTRUCTION, INC. $762.000 $1,377,696.00 -15.3%

4 GRANITE CONSTRUCTION COMPANY $1,000.000 $1,808,000.00 +11.1%

5 PULICE CONSTRUCTION, INC. $815.000 $1,473,520.00 -9.4%

6 K E & G CONSTRUCTION, INC. $1,090.000 $1,970,720.00 +21.1%

6011150 B L.FT. SINGLE SLOPE BRIDGE CONCRETE BARRIER AND TRANSITION (38")

Bid Rank Department Estimate 777.000 $160.000 $124,320.00

1 AMES CONSTRUCTION, INC. $111.560 $86,682.12 -30.3%

2 SUNDT CONSTRUCTION, INC. $125.000 $97,125.00 -21.9%

3 FNF CONSTRUCTION, INC. $180.000 $139,860.00 +12.5%

4 GRANITE CONSTRUCTION COMPANY $300.000 $233,100.00 +87.5%

5 PULICE CONSTRUCTION, INC. $135.000 $104,895.00 -15.6%

6 K E & G CONSTRUCTION, INC. $158.000 $122,766.00 -1.3%

6011347 B L.FT. DECK JOINT ASSEMBLY (3X3 COMPRESSION SEAL)

Bid Rank Department Estimate 127.000 $450.000 $57,150.00

1 AMES CONSTRUCTION, INC. $218.990 $27,811.73 -51.3%

2 SUNDT CONSTRUCTION, INC. $225.000 $28,575.00 -50.0%

3 FNF CONSTRUCTION, INC. $270.000 $34,290.00 -40.0%

4 GRANITE CONSTRUCTION COMPANY $340.000 $43,180.00 -24.4%

5 PULICE CONSTRUCTION, INC. $300.000 $38,100.00 -33.3%

6 K E & G CONSTRUCTION, INC. $193.000 $24,511.00 -57.1%

Page 66: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 65 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6011371 B SQ.FT. APPROACH SLAB (SD 2.01)

Bid Rank Department Estimate 6,505.000 $30.000 $195,150.00

1 AMES CONSTRUCTION, INC. $16.000 $104,080.00 -46.7%

2 SUNDT CONSTRUCTION, INC. $20.000 $130,100.00 -33.3%

3 FNF CONSTRUCTION, INC. $29.000 $188,645.00 -3.3%

4 GRANITE CONSTRUCTION COMPANY $23.000 $149,615.00 -23.3%

5 PULICE CONSTRUCTION, INC. $28.000 $182,140.00 -6.7%

6 K E & G CONSTRUCTION, INC. $25.000 $162,625.00 -16.7%

6011372 B SQ.FT. ANCHOR SLAB (TYPE 1) (SD 2.02)

Bid Rank Department Estimate 11,623.000 $35.000 $406,805.00

1 AMES CONSTRUCTION, INC. $16.500 $191,779.50 -52.9%

2 SUNDT CONSTRUCTION, INC. $20.000 $232,460.00 -42.9%

3 FNF CONSTRUCTION, INC. $26.000 $302,198.00 -25.7%

4 GRANITE CONSTRUCTION COMPANY $27.000 $313,821.00 -22.9%

5 PULICE CONSTRUCTION, INC. $27.000 $313,821.00 -22.9%

6 K E & G CONSTRUCTION, INC. $21.000 $244,083.00 -40.0%

6014955 B L.FT. PRECAST, P/S MEMBER (AASHTO TYPE 5 MOD. GR.)

Bid Rank Department Estimate 3,114.000 $350.000 $1,089,900.00

1 AMES CONSTRUCTION, INC. $278.000 $865,692.00 -20.6%

2 SUNDT CONSTRUCTION, INC. $300.000 $934,200.00 -14.3%

3 FNF CONSTRUCTION, INC. $307.000 $955,998.00 -12.3%

4 GRANITE CONSTRUCTION COMPANY $300.000 $934,200.00 -14.3%

5 PULICE CONSTRUCTION, INC. $375.000 $1,167,750.00 +7.1%

6 K E & G CONSTRUCTION, INC. $363.000 $1,130,382.00 +3.7%

6015101 B EACH RESTRAINERS, VERTICAL EARTHQUAKE (FIXED)

Bid Rank Department Estimate 24.000 $150.000 $3,600.00

1 AMES CONSTRUCTION, INC. $113.670 $2,728.08 -24.2%

2 SUNDT CONSTRUCTION, INC. $125.000 $3,000.00 -16.7%

3 FNF CONSTRUCTION, INC. $120.000 $2,880.00 -20.0%

4 GRANITE CONSTRUCTION COMPANY $162.000 $3,888.00 +8.0%

5 PULICE CONSTRUCTION, INC. $200.000 $4,800.00 +33.3%

6 K E & G CONSTRUCTION, INC. $357.000 $8,568.00 +138.0%

6015102 B EACH RESTRAINERS, VERTICAL EARTHQUAKE (EXPANSION)

Bid Rank Department Estimate 24.000 $230.000 $5,520.00

1 AMES CONSTRUCTION, INC. $241.080 $5,785.92 +4.8%

2 SUNDT CONSTRUCTION, INC. $225.000 $5,400.00 -2.2%

3 FNF CONSTRUCTION, INC. $270.000 $6,480.00 +17.4%

4 GRANITE CONSTRUCTION COMPANY $305.000 $7,320.00 +32.6%

5 PULICE CONSTRUCTION, INC. $350.000 $8,400.00 +52.2%

Page 67: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 66 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6015102 B EACH RESTRAINERS, VERTICAL EARTHQUAKE (EXPANSION)

Bid Rank Department Estimate 24.000 $230.000 $5,520.00

6 K E & G CONSTRUCTION, INC. $468.000 $11,232.00 +103.5%

6050002 B LB. REINFORCING STEEL

Bid Rank Department Estimate 417,490.000 $2.000 $834,980.00

1 AMES CONSTRUCTION, INC. $0.900 $375,741.00 -55.0%

2 SUNDT CONSTRUCTION, INC. $0.850 $354,866.50 -57.5%

3 FNF CONSTRUCTION, INC. $1.200 $500,988.00 -40.0%

4 GRANITE CONSTRUCTION COMPANY $1.120 $467,588.80 -44.0%

5 PULICE CONSTRUCTION, INC. $1.100 $459,239.00 -45.0%

6 K E & G CONSTRUCTION, INC. $1.100 $459,239.00 -45.0%

9100012 B L.FT. CONCRETE BARRIER (SINGLE SLOPE COMB. TRAFFIC/PED BARRIER)

Bid Rank Department Estimate 771.000 $120.000 $92,520.00

1 AMES CONSTRUCTION, INC. $79.050 $60,947.55 -34.1%

2 SUNDT CONSTRUCTION, INC. $100.000 $77,100.00 -16.7%

3 FNF CONSTRUCTION, INC. $94.000 $72,474.00 -21.7%

4 GRANITE CONSTRUCTION COMPANY $275.000 $212,025.00 +129.2%

5 PULICE CONSTRUCTION, INC. $130.000 $100,230.00 +8.3%

6 K E & G CONSTRUCTION, INC. $115.000 $88,665.00 -4.2%

6090060 C L.FT. DRILLED SHAFT FOUNDATION (60")

Bid Rank Department Estimate 460.000 $1,200.000 $552,000.00

1 AMES CONSTRUCTION, INC. $642.240 $295,430.40 -46.5%

2 SUNDT CONSTRUCTION, INC. $510.000 $234,600.00 -57.5%

3 FNF CONSTRUCTION, INC. $590.000 $271,400.00 -50.8%

4 GRANITE CONSTRUCTION COMPANY $650.000 $299,000.00 -45.8%

5 PULICE CONSTRUCTION, INC. $635.000 $292,100.00 -47.1%

6 K E & G CONSTRUCTION, INC. $748.000 $344,080.00 -37.7%

6090072 C L.FT. DRILLED SHAFT FOUNDATION (72")

Bid Rank Department Estimate 280.000 $1,500.000 $420,000.00

1 AMES CONSTRUCTION, INC. $799.630 $223,896.40 -46.7%

2 SUNDT CONSTRUCTION, INC. $600.000 $168,000.00 -60.0%

3 FNF CONSTRUCTION, INC. $715.000 $200,200.00 -52.3%

4 GRANITE CONSTRUCTION COMPANY $810.000 $226,800.00 -46.0%

5 PULICE CONSTRUCTION, INC. $775.000 $217,000.00 -48.3%

6 K E & G CONSTRUCTION, INC. $809.000 $226,520.00 -46.1%

7320476 C EACH JUNCTION BOX (TYPE II)

Bid Rank Department Estimate 2.000 $600.000 $1,200.00

1 AMES CONSTRUCTION, INC. $1,101.170 $2,202.34 +83.5%

2 SUNDT CONSTRUCTION, INC. $780.000 $1,560.00 +30.0%

Page 68: TABULATION OF BIDSs3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/bc... · 2020-06-23 · Printed: 6/23/2020 Page 1 of 67 Bid Rank Bid Amount Contractor Compared To Department

Printed: 6/23/2020 Page 67 of 67

*** Bid Tabs for Proposal Pamphlet 2020006 ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7320476 C EACH JUNCTION BOX (TYPE II)

Bid Rank Department Estimate 2.000 $600.000 $1,200.00

3 FNF CONSTRUCTION, INC. $1,200.000 $2,400.00 +100.0%

4 GRANITE CONSTRUCTION COMPANY $1,100.000 $2,200.00 +83.3%

5 PULICE CONSTRUCTION, INC. $900.000 $1,800.00 +50.0%

6 K E & G CONSTRUCTION, INC. $481.000 $962.00 -19.8%

7370452 C L.SUM MISCELLANEOUS ELECTRICAL (ELECTRICAL EQUIPMENT IN BRIDGE)

Bid Rank Department Estimate 1.000 $6,000.000 $6,000.00

1 AMES CONSTRUCTION, INC. $2,936.430 $2,936.43 -51.1%

2 SUNDT CONSTRUCTION, INC. $9,500.000 $9,500.00 +58.3%

3 FNF CONSTRUCTION, INC. $3,000.000 $3,000.00 -50.0%

4 GRANITE CONSTRUCTION COMPANY $2,900.000 $2,900.00 -51.7%

5 PULICE CONSTRUCTION, INC. $10,000.000 $10,000.00 +66.7%

6 K E & G CONSTRUCTION, INC. $11,730.000 $11,730.00 +95.5%

9140155 C SQ.FT. RETAINING WALL (MSE)

Bid Rank Department Estimate 14,306.000 $80.000 $1,144,480.00

1 AMES CONSTRUCTION, INC. $92.620 $1,325,021.72 +15.8%

2 SUNDT CONSTRUCTION, INC. $80.000 $1,144,480.00 +0.0%

3 FNF CONSTRUCTION, INC. $115.000 $1,645,190.00 +43.8%

4 GRANITE CONSTRUCTION COMPANY $100.000 $1,430,600.00 +25.0%

5 PULICE CONSTRUCTION, INC. $95.000 $1,359,070.00 +18.8%

6 K E & G CONSTRUCTION, INC. $115.000 $1,645,190.00 +43.8%