table of contents of contents introduction ... new project - opens a blank sign specs template. open...

59

Upload: dothien

Post on 22-Mar-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the
Page 2: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the
Page 3: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

Table of Contents

Introduction ........................................................................ 5Installing the Application from the Internet..................... 5

Getting Started ................................................................... 6Setting up your Sign Specification Pages........................................................................ 6Creating a new Project ..................................................................................................... 6Sign Spesc 2000 Command Bar Icons:............................................................................ 7

Project Info Tab ................................................................ 10

Project Info tab fields ....................................................................................................... 10Custom Page Numbering ............................................................................................... 11Title Block .......................................................................................................................... 11

Sign Spec Pages .............................................................. 14Setting Pages .................................................................................................................... 14Combo Page .................................................................................................................... 15Deleting Pages ................................................................................................................ 15

Entering Sign Specification information......................... 16Installation, Relocation and Removal Pages ................................................................ 16Data Entry Fields on the Sign INS, REL & REM Pages ..................................................... 16

Other Tab .......................................................................... 20Fields on the Other Tab.................................................................................................... 20Entering and Deleting Rows ............................................................................................ 21

Costs Tab........................................................................... 22

Page 4: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

Adding Special Material, Size and Cost Selections ..................................................... 22

Guidelines on Estimating Cost ........................................ 24Single Post Sign (or no post)............................................................................................ 24Multi-post Sign .................................................................................................................. 24Sign Bridges, Cantilever Sign Structures, Bridge Mounted Sign Structures ................ 25Post (wood or steelt) ........................................................................................................ 26Other Items to Include in the Estimate for Permanent Signing ................................... 26

Cost Estimate .................................................................... 28Displaying the Cost Estimate .......................................................................................... 28

Printing............................................................................... 30Printer Setup ...................................................................................................................... 31

Addendum Shading ........................................................ 32Adding Addendum Shading........................................................................................... 32Removing Addendum Shading ...................................................................................... 32

Saving Files ....................................................................... 33

Appendix A ...................................................................... 34Project Engineer Stamps in Clip Art ............................................................................... 34

Appendix B ....................................................................... 36Sheeting Sign Type Area Type ........................................................................................ 36

Appendix C ...................................................................... 38Signs Alphabetic List ........................................................................................................ 38

Index ................................................................................. 40

Page 5: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the
Page 6: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

6

Sign Specifications Users Guide

IntroductionWelcome to the Sign Specifications and Cost Estimate (Sign Specs) Program.

This program is an Excel 2000 based application, customized using VBA (VisualBasic for Applications) and ADO (ActiveX Data Objects).

Sign Specs was developed relying on experienced user input from partici-pants statewide. The main development concerns were to provide users with aprogram that easy to use and flexible enough to cover the diverse needs of allRegions statewide.

Installing the Application From theInternet

1. Click on the “Setup.exe” This will iniate the installation process to your PC.2. A folder will be created on your PC named, C:/Wsdot Install.3. To run the application, go to:

Wsdot Install/Sign Spec/WSDOT/Sign Spec/SIGNSPEC2000.xla.Double click on the file SIGNSPEC2000.xla. Follow the instructions asoutlined in the Sign Specs Users Guide to begin a New Sign Specsworkbook. (To preserve the integrity of the Macros, Do Not modify SignSpecworkbooks outside of the Sign Specs application)

IMPORTANT INFORMATION

This Application performs best in the Windows 2000/Excel 2000 environment.Attempting to run the application with versions of Excel less than 9.x , or withoperating systems other than Windows NT or preferably Windows 2000 will incurerrors within the operating macros. Should you experience errors within theWindows 2000/Excel 2000 environment, check that the Microsoft Service Release1.0 (*SR 1) has been installed on your PC. *This may be obtained free of charge atwww.microsoft.com.

The “CUT” command, although available should not be used at any time.

If the Sign Specs toolbar is not visible, From the drop down menus select“VIEW”, “TOOLBARS”, “SIGNSPECIFICATIONS 2000”.

Page 7: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

7

July 2001

Getting StartedSetting up your Sign Specification pages

Sign Specs 2000 allows for flexibility in developing the Sign Specifications Pages.The Sign Pages may be set up the accommodate the different sign typesindividually (this is the default setting), or in combination.

By default There may be up to 10 pages of each the Installation, Relocationand Removal sheets.

When the Combo setting is selected, all Sign Page types are combined on 1Combo Page. When using this setting you are limited to eight or less per each signtype. (see “Setting Pages” for further information)

The number or type of pages may be set before you begin entering data, oryou may let the Sign Specs program create new pages automatically as you addSigns.

Creating a new project

Launch the Sign Specs application (SIGNSPEC2000.xla). This will bring up theapplication template, macros and data links used in creating Sign Specs.

To begin, create a new workbook file by clicking on the New Project buttonlocated on the SIGNSPEC 2000 command bar, or select New Project from the

SIGNS pull-down menu. Thiswill create a blank templatecontaining:

1 Project Info tab.1 INS Page tab

(Sign Installation sheet).1 REL Page tab

(Sign Relocation sheet).1 REM Page tab

(Sign Removal sheet).1 Other tab1 Costs tab1 Cost Estimate tab

Figure 1 !NOTE:

All Existing SignSpecs2000 job filesmust be opened from within theSignSpecs2000 application usingthe “Open Project” icon, or the“file” “open” menu selections.If job files are opened and revisedoutside the SignSpecs2000 application, these files will not have access to theapplication macros resulting in incompatibilityfor further revisions within the SignSpecs2000application.

Page 8: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

8

Sign Specifications Users Guide

Once a project has been created, or an existing project is opened, all icons onthe SignSpecs 2000 command bar are activated. Due to the number of Icons not allwill be displayed. To view these Icons, click the extension list pull down menu on thefar right of the Command Bar.

SignSpecs 2000 Command Bar Icons:

About Program - This displays a dialog box showing basicInformation about the program.

New Project - Opens a blank Sign Specs template.

Open Project - Opens an existing project.

Save File - Save current project to the default file location.(The default file location for SignSpecs 2000project files is the last folder that anySignSpecs2000 Project file was saved to).

Print - Prints Project elements.

Set Pages - Provides a dialog box where you may setthe number of pages (10 max) for each pagetype.

Clear Addendum - Clears Addendum shading from All pagesin the project workbook.

Project Info - Opens the Project Info tab.

Go to - Displays a dialog box that allows you toselect a Sign within each set of INS, REM andREL pages, then transports you to the cellthat contains that sign.

Preferences - Displays a dialog box that allows for theselection of zoom to view the Project infoand Page tabs at. Also allows for theactivation of the autosave feature.

Cost Estimate - Opens the Cost Estimate Tab

Costs - Opens the Costs Tab

Other - Opens the Other Tab

Page 9: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

9

July 2001

Help - Link to the Internet on-line users guide.

Exit - Closes the SignSpecs 2000 Application.

Page 10: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

10

Sign Specifications Users Guide

Project Info TabThe Project Info tab is where the basic information for the project isentered. This will include such items as the Project Title, Federal &WSDOT Identification numbers and Design Office contacts.

This tab is also used to setup the page numbering for the INS, REMand REL Pages, and insert the Project Engineer’s seal when needed.

Project Info tab fields

Region: Click in this field to activate the Region pull-down menu andselect the appropriate region. Once a region has been selectedthis region will become the default for all subsequent Sign Specs2000 projects created.

Work Order: Enter the work order number for the project in this field.(e.g. 0L1234, XL5678).

Project Title: The text entered in this field becomes the first part of thefile name. (This is not the project title that appears on the plans sheets.)

Remarks: Enter any informational notes, such as County or Mile Postdata.

Figure 2

Page 11: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

11

July 2001

Custom Page Numbering

Sheet Ref. No. (Alpha prefix): Separate fields are provided for each of thedifferent types of Sign Pages. In these fields enter the Alpha designation for each(e.g. SS, SREL etc.)

Sheet Ref. No. (Beginning Numeric Suffix): Separate fields are provided for eachof the different types of Sign Pages. In these fields enter the beginning numericsuffix for each series of INS, REL and REM Pages.

Beginning Plan Sheet Number: Separate fields are provided for each of thedifferent types of Sign Pages. In these fields enter the numeric character for the firstnumber in the contract plans where each series of the Sign Pages will begin.

Total Sheet Number on Contract Plans: In this field enter the number that repre-sents the sheet count for the entire set of contract plans.

Title BlockThere are several sections to the title block, the first set of fields are:

Designed By:Entered By:Checked By:Proj. Engr:Region Admin:

These fields provide an area to enter all necessary Region Design contacts. Thesenames will be displayed in the title block, on all Sign Pages in the fields located inthe far left side of the page.

Job Number: This field is for the project PS&E Number (Supplied by your RegionalHeadquarters Design Office) Information entered here will be displayed directly tothe right of the Revision area in the title block on all pages.

Contract Number: This field is for the project Contract Number (assigned when aproject is placed on Advertisement). Information entered here will be displayeddirectly below the PS&E number in the title block on all pages.

Page 12: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

12

Sign Specifications Users Guide

SR:First Line of PS&E Title:Second Line of PS&E Title:

Enter each line of the project title in the corrasponding fields. (see examplefigure 2). Text entered in these fields will be displayed in the Title area of the titleblock on all pages.

Federal Aid Project Number: This field provides a area to enter the Federal Aidnumber. A Federal Aid number applies only to those projects that have federalfunding included in the project. Text entered in this field will be displayed on allpages directly to the right of the Job Number in the title block.

State Seal: This field enables the placement of the Project Engineer’s stampon the Sign Spec Pages. To place the Project Engineer’s seal in this field, copy thegraphic (.bmp, .gif, .jpg, .tif etc.) to the clipboard, right click anywhere on theProject Info tab, from the mouse menu select “ Paste State Seal”. The ProjectEngineer’s seal will pasted into the field and displayed on all Sign Spec pages.(See appendix A to see how to set up a folder with P.E. stamps in your Clipart file)

Show WSDOT Logo: Click off the check mark to hide the WSDOT logo on allSign Spec Pages.

Page 13: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

13

July 2001

Page 14: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

14

Sign Specifications Users Guide

Sign Spec PagesSign SpecsS2000 creates all new projects to contain a Project Info tab, INS

Page 1, REL Page , REM Page 1, an Other tab, a Costs tab and a Cost Estimatetab. The INS, REL and REM pages are complete plan sheets, each containing 30rows per page for entering sign data. New pages will automatically be added ifsigns are inserted into a page that would cause it to exceed the limit of 30 signsper page.

By Default the INS, REL and REM pages are separate, however for smallprojects containing eight or less signs per page type, the Set Pages option may beused to create a Combo page.

Setting Pages

Each of the Sign Spec pages;INS, REL and REM are complete Plansheets, each containing 30 rows forthe entry of sign data. New pageswill automatically be created whenrows for sign data are inserted thatexceed the 30 signs per page limit.

You may manually increase ordecrease the number in the INS, RELand REM Pages at any time by click-ing on the Set Pages icon. This willbring up the Set Pages dialog box, inwhich the spinners may be used toset the number of pages wide andtall for each. Once a page hasbeen created, whether automati-cally by the insertion of new signentries, or manually using the Set Pages command, the page will remain as part ofthe project until it is manually deleted, even if it contains no sign data.

As you increase or decrease the number of pages using the spinners, thenumber of signs the new settings will accommodate is displayed in the text di-rectly below the spinners.

Each workbook may contain up to 34 separate pages, [1] Project Info page,[10] INS Pages, [10] REL Pages, [10] REM Pages, [1] Other tab,[1] Cost tab and [1]Cost Estimate tab.

Figure 3

Page 15: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

15

July 2001

Deleting Pages

When deleting extraneous pages from the project file, use the Set Pages fea-ture to reduce the number of Pages Tall.

The Set Pages feature only provides for the removal of pages from the end ofa set. To remove pages from the middle of a set, you must right mouse click oneach sign to be deleted, and select “Delete Sign”.

Combo Sheet

For Small projects containing 8 or less signs per page type, the Set Pages com-mand may be used to select “ Combo Sheet” . (shown in figure 3)By selecting the Combo Sheet you are telling the Sign Specs application to copythe data from the first 8 rows of INS Page 1, REL Page1 and REM page 1, and pastethis data under like headings on a single Combo Sheet page. Any signs beyondthe first eight for each sign type and construction notes that exist on any of thepages, will not be copied over.

The Set Pages command may also be used to switch from a Combo Sheet toSeparate Sheets (shown in figure 3). All sign data from the Combo sheet will bebroken out by type and placed on in the appropriate INS Page, REL Page or REMPage. Construction notes will not be copied over.

Page 16: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

16

Sign Specifications Users Guide

Entering Sign Specification DataEach of the Sign Spec Specification pages; INS, REL and REM contain 30

rows per page for entering sign data.If it is necessary to insert a sign between existing signs, Select the sign directly

below where the new sign is to be placed, perform a right mouse click, and select“Insert Sign” from the right mouse menu. A blank row is inserted in which to enterthe sign data.NOTE: If the sign spec page is full when a new row is in-serted, all signs below the insertion point will be moveddown. Signs will be moved from the bottom of the fullpage to the top of the next page. If no pages exist for signsto be moved to, a new page will automatically be createdto accomodated the signs.

Sign Installation , Relocation & Removal Pages

Sign Specification information for INS (installation), REL(relocation) and REM (removal) data is entered on the INS,REL and REM Pages.

ON each page type, enter the appropriate data in eachof the required fields as necessary. Do not enter extraneouspunctuation (e.g. - - -), or place text in numeric fields, doingso will cause errors in calculating the Cost Estimate.

Data fields on the INS, REL and REM Pages:

GRP- Enter the number that corrasponds to the group of work in which thesign installation is taking place.

SIGN NO. - Enter the number that refers to this sign asshown on the signing plan (e.g. 1, R-3, 2...).

SIGN CODE & SIGN DESCRIPTION - Enter the appropriate code anddescription for each sign type. These may typed manually, or imported intothe sign spec sheet. To import signs into a page right mouse click onthe row where the new sign(s) is to be placed, select “Pick Standard Signs”(figure 4).

Figure 4

Rig

ht M

ouse

Men

u

Page 17: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

17

July 2001

From the Pick Standard Signs selection window, select the sign or signsthat are to be imported; Click OK. All selected signs will be imported intothe sheet and placed in order by Sign Code.

STA. LOC. (or MP) - Enter the Station Location on alignment and the offsetdirection that describes where each sign is to be placed.

EXISTING STA. LOC. (or MP) - This field is unique to the REL page.Enter the sign location on alignment and the offset direction that describeswhere each sign currently exists.

NEW STA. LOC. (or MP) - This field is unique to the REL page.Enter the sign location on alignment and the offset direction that describesthe new location of each sign.

SIGN SIZE - Enter the X (width) and Y (height) dimensions of the sign.Default dimension indicators are set to display inches. To change this tofeet, enter the foot (’) symbol after the dimension.

SHEETING TYPE - Select a sheeting type from the in cell pull down menu.

LETTER SIZE OR CODE - Select a Code from the in cell pull down menu.To reference a specific plan sheet, enter select SEE REMARKS from the menuand enter the plan reference in the REMARKS column.

POST MATERIAL - Select a post material from the in cell pull down menu. Ifthe post material needed is not available for selection, it may be added foruse in this project by modifying the Costs Tab. Please refer to the Costs Tabsection for more information.

POST SIZE - Select a post size from the in cell pull down menu. The selectionmenu displayed will be determined by the post material entered in thepreceding cell.If the Post Size needed is not available for selection, it may be added for usein this project by modifying the Costs Tab. Please refer to the Cost Tabsection for more information.Post size should be selected after a Post Material is entered; if a postmaterial has not been entered, no menu will be available for Post Sizes.Although data may be manually entered in this field, if no post materialexists to associate with the post size, it will not be calculated in the CostEstimate.

# OF POSTS - This field is unique to the Removal PageEnter the number of posts that are included in the removal of each sign.

Page 18: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

18

Sign Specifications Users Guide

POST LENGTH (H1, H2, H3, H4) - Enter the length of eachpost used in the installation of the sign, up to 4 posts persign.

CLEARANCE, V & W - (figure 6)V(vertical clearance)*

Enter in feet, the distance from the Traveled edge ofRoadway to the bottom of the sign.

W - (horizontal distance)*Enter in feet, the distance from the Traveled Edge ofRoadway to the nearest sign post.

* See Section 820 of the DesignManual for information ondeterminingVertical andHorizontal clearance.

REMARKS - Enter any signspecific instructions regard-ing; materials, installation,Standard Plans reference,or note references.

CONSTRUCTION NOTES - The first three lines of the Construction Notes aregeneral constructions notes that apply to all projects. Enter project specificconstruction notes on the line that reads “ ROOM FOR ADDITIONAL NOTES”

Figure 5

Figure 6

Page 19: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

19

July 2001

Page 20: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

20

Sign Specifications Users Guide

Other TabThe Other tab provides a place to enter those items of permanent

signing that are part of the sign estimate, but are not entered in the INS, RELor REM pages, nor included in the EBASE project estimate.

The items entered on the Other tab will be used by the Cost Estimatetab when calculating the Sign Cost Estimate, unless otherwise specified bythe user.

Fields on the Other tab

Grp: Enter the Group of work that the item is to be associatedwith.

Description: Enter item description (e.g. Sign Cleaning, Band-It)

Unit Cost: Enter the cost per Each

Qty: Enter the quantity of this item to be used in the project.

Total Cost: This will be calculated automatically using thefigures provided in the Unit Cost and Qty fields.

Total cost for all items entered on the Other tab is displayed above the TotalCost column in a field labled “Other Total”

Inserting and Deleting Rows

Should more rows be needed in which to list items, or a new item mustbe inserted between existing items use the Insert Row command.To use the Insert Row command, select the row directly below where thenew item is to be inserted; Click the right mouse button the display themouse menu and select, Insert Row.

Item rows may be deleted by right clicking on the item to be deletedand selecting, Delete Row. (see figure 7)

Page 21: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

21

July 2001

Figure 7

Page 22: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

22

Sign Specifications Users Guide

Costs TabThe Costs tab contains all of the selections that are used in the pull-down

menus on the on the sign specification pages, and the costs associated with thoseselections. This tab also includes the cost in dollars per square foot for Installation,Relocation and Removal of signs.

All dollar figures contained within this tab, are used in conjunction with thedata entered in the sign specifications pages by the Cost Estimate tab to createthe Sign Estimate.

Each Region has a Sign Specs Administrator who will modify and keep currentthe cost data in the Costs tab to reflect actual costs in their Region.When a new sign specs project is created and saved the Costs template is copiedinto the project. The user may then use the Material/Size selections and the costsassociated with those selections as they appear on the Costs tab, or they maymodify the existing selections, and even add Material/Size and Cost selections tothe Costs tab that will then be made available in the pull-down selection menuson the sign spec pages.

Adding Special Material, Size and Cost Selections

Special post material, sizes and cost data may be added to the Cost tab. Toadd special selections, go to the POST Costs section on the Costs tab; click in the celldirectly below where the new selection is to be inserted; click the right-mouse but-ton to display the right mouse menu and select “Insert Row”. A blank row is inserted,fill in the new material, size and cost selection data as shown in figure 8.

Once the new data has been entered, it is available for selection in the INS, RELand REM pages. (see figure 9)

To apply the new or revised post material/size data to signs entered on the signspecifications pages prior to entry of special cost data, delete the POST MATERIALentered for the sign and reselect it from the in cell menu. This activates the revisedPOST SIZE menu to include all changes made on the Costs tab.

To modify the cost of an existing Sign or Post, simply select the figure to bechanged, and type the new cost in the field.

Page 23: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

23

July 2001

Figure 8

Figure 9

Changes made to the Costs tab become available as menuselections in the Sign Installation, Relocation and Removal Pages

Page 24: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

24

Sign Specifications Users Guide

Guidelines on Estimating CostWhen estimating the Cost for signing many factors must be taken into consid-

eration. First what catagory; Installation; Relocation or Removal, next how will thesign be mounted mounted, the type of posts it will be mounted to, and finally willthere be any Other costs associated with the sign?

Included here are some basic things to take into consideration when estimat-ing costs for signs.

Single Post Sign (or no post)

New Installations:The estimated cost ($/S.F.) that the Contractor is likely to bid (including alladditives) to fabricate, provide, and install a sign on a single post, a lightstandard, a luminaire ploe, a signal pole, a span wire, a mast arm, a utilitypole or on a concrete barrier mounted post.

Removal:The estimated cost ($/S.F.) that the Contractor is likely to bid for removal ofthe sign from a single post, a light standard, a luminaire ploe, a signal pole,a span wire, a mast arm, a utility pole or on a concrete barrier mountedpost.

Relocation:The estimated cost ($/S.F.) that the Contractor is likely to bid for removal ofthe sign from a single post, a light standard, a luminaire ploe, a signal pole,a span wire, a mast arm, a utility pole or on a concrete barrier mountedpost.Include in the ($/S.F.) all costs for the contractor to re-install the sign at itsnew location.

Multi-Post Sign

New Installations:The estimated cost ($/S.F.) that the Contractor is likely to bid (including alladditives) to fabricate, provide, and install a sign on multiple posts.

Removal:The estimated cost ($/S.F.) that the Contractor is likely to bid for removal ofthe sign from a multi-post installation.

Page 25: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

25

July 2001

Relocation:The estimated cost ($/S.F.) that the Contractor is likely to bid for removal ofthe sign from a multi-post installation.Include in the ($/S.F.) all costs for the contractor to re-install the sign at itsnew location.

Overhead Sign

New Installation:The estimated cost ($/S.F.) that the Contractor is likely to bid (including alladditives) to fabricate, provide, and install a sign on a sign overhead;including a sign bridge, a cantilever sign structure or a bridge mounted sign.

Removal:The estimated cost ($/S.F.) that the Contractor is likely to bid for removal ofan overhead sign from a sign bridge, a cantilever sign structure or a bridgemounted sign.

Relocation:The estimated cost ($/S.F.) that the Contractor is likely to bid for removal ofan overhead sign from a sign bridge, a cantilever sign structure or a bridgemounted sign.Include in the ($/S.F.) all costs fot the Contractor to re-install the sign at itsnew location.

Sign Bridges, Cantilever Sign Structures, Bridge Mounted SignStructures

New Installations:New installations of these structures ate separate bid items and should notbe included in the Lump Sum estimate for Permanent Signing.

Removal:Removal of these items should be included in the Lump Sum estimate forPermanent Signing.In the Posts Cost area on the Costs Tab, for removal of each of theseitems, include the estimated cost ($) that the Contractor is likely to bid forremoval of these items.

Relocation:Relocation of these items should be included in the Lump Sum estimate forPermanent Signing.In the Posts Cost area on the Costs Tab, for removal of each of theseitems, include the estimated cost ($) that the Contractor is likely to bid forrelocation of these items.

Page 26: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

26

Sign Specifications Users Guide

Posts (Wood or Steel)

New Installations:Total estimates cost ($) that the Contractor is likely to bid (includingadditives) to fabricate, provide ans install the post of the type specified.

Removal:Total estimates cost ($) that the Contractor is likely to bid for removalof a post of the type specified.Include all costs for backfilling holes, removing concrete and removalof barrier mounter posts and brackets.

Relocation:Total estimates cost ($) that the Contractor is likely to bid for removalof a post of the type specified.Include all costs for backfilling holes, removing concrete, and the removalof barrier mounter posts and brackets.Also include all costs for the Contractor to fabricate, provide and install newposts of the type specified (if applicable).Include all all costs for backfilling, concrete foundations, and fabrication ofbrackets for barrier mounted posts.

Other Items to include in the estimate for Permanent Signing

•Re-facing of Signs•Band-its•Sign Message Revisions•Sign Cleaning•Sign Lighting

Page 27: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

27

July 2001

Page 28: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

28

Sign Specifications Users Guide

Cost Estimate TabThe Cost Estimate tab uses the information entered in the sign specification

Installation (INS), Relocation (REL), Removal (REM)Pages and the Othertab combined with the dollar ($) figures entered in the Costs tab tocalculate the Cost Estimate for Sign Specifications.

Displaying the Cost Estimate

To display the Cost Estimate, right-mouse click anywhere on the screen andselect “Refresh Cost Estimate”. This will bring up the Refresh Cost Estimatewindow. (see figure 10)From this window select the sign specification types are to be includedin this estimate (i.e. Installation, Other etc.); Also select whether or not toinclude the group sub totals.

Once the Cost Estimate is displayed, it must be refreshed each time furtherrevisions are made to the INS, REL and Rem Pages. Refreshing the CostEstimate will import the new revisions and recalculate the Cost Estimate.

Figure 10

Page 29: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

29

July 2001

When ”Include Group Subtotals” isnot selected, the Cost Estimate will besorted first by Sign Spec Type, then group.The Cost Estimate will display neithergroup totals nor a grand total. This is thedefault setting for the Cost Estimate.(figure 11)

When the Group sub total option isselected, the Cost Estimate will first besorted by Group, then by sign specifica-tion type. The Cost Estimate will alsoinclude a sub total for each Group andGrand Total line at the bottom, displayingthe Grand Total for all selected sign types

in the estimate. (see figure 12)Another feature that becomes available

when the group sub totals are included, is the“1” & “ 2” button at the top left corner of theCost Estimate. (see figure 12a) Button “1” willroll up all the sign specifictation cost data, anddisplay only the sub total for each group andthe grand total for all groups. Button “2” willrestore the Cost Estimate.

Figure 11

Figure 12

Figure 12a

Page 30: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

30

Sign Specifications Users Guide

PrintingSign Specification Pages may be printed on any size paper, but must be

printed on 11” x 17” for inclusion in the plans.To print the INS, REL,REM, Other, Cost and Cost Estimate Pages click on the

printer icon. The Print Project dialog box will be displayed, place a check marknext to the items to be printed. (Figure 13)

For Instalation, Relocation and Removal pages a “Select” button is available.The default print setting will print all Installation, Relocation and Removal Pages inthe project when checked. The “Select” button allows you to specify which ofthose pages to print. (Figure 14)

Printer Setup

SignSpecs2000 will use the printer you have set as default for you computer un-less otherwise specified. To change the printer that SignSpecs2000 uses, click theSetup button in the Print Project dialog box, (Figure 15) this will activate the PrinterSetup dialog box. (Figure 16) Click on the printer to be used and click OK. Shouldspecial settings be necessary, (i.e. special paper tray, etc.) click the Setup button inthe Printer Setup dialog box. This button activates the Advanced Page Setup wherespecial settings are allowed. (Figure 17)

Figure 14Figure 13

Figure 14

Page 31: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

31

July 2001

Figure 17

Figure 18

Print Project Dialog boxAllows you to specify what

objects to print.Preview Pages before they are

printed.Indicate how many copies to print.Specify paper size for print output.

Printer Setup Dialog boxAllows you to specify printers for

SignSpecs2000 to use.

Advanced Page Setup Dialog boxAllows you to use advanced print

settings such as paper tray selectionand print resolution.(Available features will varydepending on printer make & model)

Figure 16

Printer Setup

Page 32: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

32

Sign Specifications Users Guide

Addendum ShadingChanges to the Sign Specification pages during the advertisement period will

necessitate an addendum to be issued for those pages. All revisions made foraddendums will be shaded.

Adding Addendum Shading

To shade INS, REL and REM Pages for addendum revisions,select the sign to be shaded, right-click on the selection, andfrom the mouse menu select “Shade for Addendum”. Fornon-contiguous selections hold the CNTL key down whileselecting. (figure 18)

Removing Addendum Shading

There are 3 levels of addendum shading removal:SelectionPageProject

To remove addendum shading from a selection, rightclick in the selection; then from the mouse menu select“Clear Addendum Shading”

To remove addendum shading from a page, right clickanywhere on the page, then from the mouse menu select“Clear All Addendum.

To remove addendum shading and revision informationfrom the entire project, click the “Clear Addendum” button onthe SignSpec2000 menu bar.(figure 18)

Any addendum related revisions made to Sign Specification pages must benoted in the Revision area of the Title Block. Text entered here is automaticallyshaded by the SignSpec2000 program (figure 19)

Figure 18

Figure 19

Page 33: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

33

July 2001

Saving filesTo save a Sign Specs 2000 file, click the Save File Icon. For New files the file name

will automatically default to the Project Title as entered on the Project Info tab

The Sign Specs 2000 program will create the file name based on three fields.

Project TitleWork OrderJob Number

The file name will always be composed first of the text entered in the Project Titlefield + the text in the Work Order field, provided there is no text in the Job Numberfield.

Should the Job Number field contain text, then the file name will be theProject Title + Job number.

This Automatic naming function only occurs the first time a new project file issaved. Once the file has been named, the name will remain static even if the datain the Project Title field is changed.

When you are saving a file you may interrupt the automatic naming function byentering a different file name in the “Save As” dialog box when it is displayed.

By default Sign Specs 2000 saves new, or revised project files to the last foldera Sign Specs 2000 project file was saved. To save to a different folder, Select FILE,SAVE AS and select the path to the new folder.

Page 34: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

34

Sign Specifications Users Guide

APPENDIX AProject Engineer Stamps in Clip Art

Before you begin place all the Project Engineer Stamp Image files together ina folder that you can easily browse to and find.

Open Excel (or any Microsoft Office app.).If the Drawing toolbar is not currently open, click on VIEW, select TOOLBARS

and click on DRAWING to activate the toolbar. Once the toolbar is active clickthe Insert Clip Art icon, this will display the Insert Clip Art dialog box. Click on “New Category”, when the new category dialog box pops up type “P.E. Stamps”for the new category name an click Ok. A new catagory icon called P.E. Stampswill be added to the insert clip art box. Scroll down until you see this new icon,double click on the icon to open the category. It should say “There were no clipsfound matching your request”. We will now add the Project Engineer Stamps tothis category.

Click on “ Import Clips” browse to the folder in which you place all the imagefiles of the Project Engineer Stamps, Select all the image files in the folder (Holdthe Shift key down while clicking on the file names to make multiple selections).Click Import.

Click Ok for each image as they are imported into the Clipart category.Close Clipart.

To Use the Clipart for the P.E. Stamps you imported, Have your drawingtoolbar available while you are working in the Sign Specs 2000 program, Click inthe “ Insert Clip Art” icon, Scroll down to the PE Stamp category that you previ-ously created and click on it to display all the P. E. stamps in the category. Rightclick on the P.E. Stamp that you need and select COPY, Close the Clip art cat-egories box and return to the Project Info tab, right click anywhere on the ProjectInfo tab and select “Paste State Seal” from the mouse menu.

Page 35: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

35

July 2001

Page 36: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

36

Sign Specifications Users Guide

APPENDIX B

Sheeting Sign Type Area Type*All red background signs All III & IV(Stop, Wrong Way, etc.)Regulatory Signs Rural II

Urban III & IVWarning Signs Rural II

Urban III & IVRoute Markers All II(M Series Signs)General Information All II(I series)Milepost Markers All IIGuide Signs(Backgrounds)Ground Mounted All IIOverhead(Lighted) All IOverhead(Not lighted) All III & IVLetters, Border, Symbols All III & IVBlue, Brown Background Signs All IIOrange (Construction Signs) All I & II

*Sheeting types as designated in ASTMSpecification D 4956.

Page 37: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

37

July 2001

Page 38: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

38

Sign Specifications Users Guide

APPENDIX CSigns - Alphabetic List

Abrupt Lane Edge ............................................................................................... W21-801Added lane Symbol left ......................................................................................... W4-3LAdded lane Symbol Right .....................................................................................W4-3RAdopt-A-Highway ................................................................................................... I6-901Advance Destination* ...........................................................................................D1-401Advance Destination W/Route Marker* .............................................................D1-501Advance Guide Sign* ............................................................................................... E1-1Advance Pedestrian Crossing............................................................................... W11-2Advance Turn Arrow 90 Degrees ............................................................................ M5-1Advance Turn Arrow 90 Degrees .......................................................................... M5-1BAdvance Turn Arrow 45 Degrees ............................................................................ M5-2Advance Turn Arrow 45 Degrees .......................................................................... M5-2BAirport (Symbol) ........................................................................................................... I5-5All Trucks Commercial Vehicles Next Right ......................................................... R13-1All Trucks Stop Before Moving Onto Bridge ................................................... R12-1001All Way ......................................................................................................................... R1-4Alternate Plaque ....................................................................................................... M4-1Approach Directional Sign - 1 Destination* .......................................................D1-901Approach Directional Sign - 2 Destinations* .....................................................D1-801Approved Snow Traction Advised (Plaque) .................................................. R16-2016Approved Snow Traction Required (Plaque) ................................................ R16-2014Arrow (315 Degrees) ............................................................................................. W2-401Arrow (360 Degrees) Only ..................................................................................... R3-501Automobile Litter only ............................................................................................ I6-801Axle Weight Limit ______ Tons ................................................................................. R12-2Back Eq. Plaque ...................................................................................................D10-401 Beach ....................................................................................................................D7-1402Be A Good Citizen Don’t Litter .............................................................................. I6-501Begin (Bicycle Route) ......................................................................................... M4-1101Begin Check Mile ______.................................................................................... I30-301ABeginning Of Project .................................................................................................... P-1Begin Right Turn Lane - Yield To Bikes ..................................................................... R4-4Be Prepared To Stop ............................................................................................. W20-7BBicycle Crossing....................................................................................................... W11-1Bicycle Lanes Ahead ............................................................................................... R3-16Bicycles Must Exit .................................................................................................... R5-601

Page 39: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

39

July 2001

Bicycles Use Caution Plaque W10-101PBicycle Directional Arrow 90 Degrees ................................................................... M7-1Bicycle Directional Arrow 360 Degrees ................................................................. M7-2Bicycle Dir. Arrow 2 heads 45 Degrees/225 Degrees .......................................... M7-3Bicycle Directional Arrow 45 Degrees ................................................................... M7-4Bicycle Dir. Arrow 2 Heads 90 Degrees/270 Degrees.......................................... M7-5Bicycle Dir. Arrow 2 Heads 360/90 Degrees ____ ................................................. M7-6Bicycle Dir. Arrow 2 heads 360/45 Degrees ____ ................................................. M7-7Bike Route ..................................................................................................................D11-1Bike Symbol ____ (Bicycle Route Marker) .............................................................. M1-8Bike Symbol (Interstate Bike Route Marker ........................................................... M1-9Bike (Symbol) Use Pedestrian Signal ....................................................................... R9-5Bikeway Narrows ....................................................................................................... W5-4Bike (Symbol) Yield To Peds ...................................................................................... R9-6Blasting Zone Ahead .............................................................................................. W22-1Bridge Number ........................................................................................................ I7-301Bridge Out ______ Miles Ahead Local Traffic Only ...........................................R11-3ABridge Painting Ahead ..................................................................................... W21-1001Bridge Work Ahead ............................................................................................. W21-901Buckle Up ............................................................................................................... R16-901Bump ........................................................................................................................... W8-1______Busses And Carpools Only ________ ........................................................... R3-11Buses & ____ Person Carpools ____ Arrow 180 ____ ............................................ R3-14Buses Only Right Lane ......................................................................................... R3-2001Business ....................................................................................................................... M4-3Bus Station .................................................................................................................... I5-6By-Pass ......................................................................................................................... M4-2Carpool Info ________ ..........................................................................................D12-201Carpool Info ________ ..........................................................................................D12-202Cattle Crossing ........................................................................................................ W11-4Caution-No Warning Signs ......................................................................................... I7-7Cemetery Entrance ..........................................................................................W11-1301Center lane (Two WY. Left Turn) Only (Post Mounted) ...................................... R3-9BChain Enforcement Ends Here........................................................................... R16-301Chain-Off Parking Only ....................................................................................... R16-701Chain-Up Parking Only ........................................................................................ R16-601Chevron Alignment Sign .......................................................................................... W1-8City Entrance Sign* ................................................................................................. I2-301City Interchange Sequence* ................................................................................... E8-2City Next ____ Exits* .................................................................................................... E9-1Clean Water Arrow Directional............................................................................. I8-704Clean Water - Use For Filling Domestic Tanks ..................................................... I8-706Commercial Vehicles Excluded .............................................................................. R5-4

Page 40: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

40

Sign Specifications Users Guide

Commercial Vehicle Use Prohibited ................................................................... I8-704Compact Cars Only............................................................................................. R5-1301Congestion Ahead ........................................................................................... W14-2203Congested Area ................................................................................................W14-2202County Entrance Sign* ........................................................................................... I2-201Cross On Green Light Only ..................................................................................... R10-1Cross Only At Crosswalks ........................................................................................... R9-2Cross Road Symbol ................................................................................................... W2-1Cross On Walk Signal Only ...................................................................................... R10-2Cross On Walk Signal Only With Man Symbol ...................................................R10-2ACrossroad Name Sign* ..........................................................................................D3-201Crossroad Name Sign* ..........................................................................................D3-301Crossroad Name Sign W/Chevron*.....................................................................D3-302Crossroad Railroad Sign ......................................................................................... W10-2Crosswalk (Overhead) .................................................................................... W11A-301Crosswalk (Arrow ______ Degrees) ................................................................ W11A-401Curve Left ................................................................................................................. W1-2LCurve Right ...............................................................................................................W1-2R2 Curve Right Arrows.............................................................................................W1-4BR3 Curve Right Arrows............................................................................................ W1-4CRDaylight Hours Only ................................................................................................ I8-701Dead End ................................................................................................................. W14-1Dead End With Arrow ........................................................................................... W14-1PDeer Crossing ........................................................................................................... W11-3180 Degree Curve Left ....................................................................................... W1-901L180 Degree Curve Right .....................................................................................W1-901RDelay Of 5 Vehicles Illegal Must Use Turnouts .................................................... I8-201Deposit Litter ______ Mile(s) ................................................................................... I6-1011 Destination W/Arrow* .........................................................................................D1-1012 Destinations W/Arrows* ......................................................................................D1-2013 Destinations W/Arrows* ......................................................................................D1-301Detour ......................................................................................................................... M4-8Detour Ahead .......................................................................................................... W20-2Detour (Arrow ______) Left/Right ........................................................................... M4-10Detour (Arrow ____ Degrees) Left/Right ................................................................ M4-9Diagrammatic* ........................................................................................................... E1-4Dip ............................................................................................................................... W8-2Directional Arrow 90 Degrees ................................................................................. M6-1Directional Arrow 90 Degrees ............................................................................... M6-1BDirectional Arrow 45 Degrees ................................................................................. M6-2Directional Arrow 45 Degrees ............................................................................... M6-2BDirectional Arrow 360 Degrees ............................................................................... M6-3

Page 41: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

41

July 2001

Directional Arrow 360 Degrees ............................................................................. M6-3BDirectional Arrow 2 Heads 90 Degrees/270 Degrees .......................................... M6-4Directional Arrow 2 Heads 90 Degrees/270 Degrees ........................................ M6-4BDirectional Arrow 2 Heads 45 Degrees/225 Degrees .......................................... M6-5Directional Arrow 2 Heads 45 Degrees/225 Degrees ........................................ M6-5BDirectional Arrow 2 Heads 360 Degrees/90 Degrees .......................................... M6-6Directional Arrow 2 Heads 360 Degrees/90 Degrees ........................................ M6-6BDirectional Arrow 2 Heads 360 Degrees/45 Degrees .......................................... M6-7Directional Arrow 2 Heads 360 Degrees/45 Degrees ........................................ M6-7BDirectional W/Route Marker* ...............................................................................D1-701Divided Highway........................................................................................................ R6-3Divided Highway......................................................................................................R6-3ADivided Highway....................................................................................................... W6-1Divided Highway Ends ............................................................................................. W6-2Do Not Block Intersection ...................................................................................... R10-7Do Not Drive On Shoulder .................................................................................. R11-501Do Not Enter ................................................................................................................ R5-1Do Not Pass ................................................................................................................. R4-1Do Not Roll Rocks Endangers People Below ................................................... R18-201Do Not Stop On Tracks .............................................................................................. R8-8Double Arrow ........................................................................................................... W12-1Double Exit Or Next Right Second Left* .............................................................. E3-101Draw Bridge .......................................................................................................W14-1001Draw Bridge Ahead ..........................................................................................W14-1002Dump Station Instructions ...................................................................................... I8-708East .............................................................................................................................. M3-2East ............................................................................................................................ M3-2BEmergency Call Box ..............................................................................................D8-101Emergency Parking Only .......................................................................................... R8-4Emergency Restrictions ....................................................................................... R12-502Emerg. Restrictions ____ Miles Ahead On Hwy ____ ....................................... R12-503Emergency Stopping Only ....................................................................................... R8-7End ............................................................................................................................... M4-6End ............................................................................................................................. M4-12End (Bicycle Route) ............................................................................................ M4-1201End Lane Closure ................................................................................................ G20-601End Road Work ......................................................................................................G20-2AEmergency Signal ............................................................................................... W10-701Emergency Signal Ahead .................................................................................... W3-401End Blasting Zone .................................................................................................... W22-3End Check Mile ______ ......................................................................................... I30-301End Project .................................................................................................................... P-2End Of Road marker (Refl) ................................................................................ W16-101End Of Road Marker (Non-Refl) ........................................................................ W16-102

Page 42: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

42

Sign Specifications Users Guide

End School Zone ..........................................................................................................S5-2End Shoulder Driving............................................................................................... I8-601Entering Fire District No. ______ ............................................................................. I8-804Entering Limited Access Area ............................................................................... I2-601Equestrian Crossing ................................................................................................. W11-7Except All-Wheel Drive With Approved Traction Tires .................................... R16-202Exception Plaque* ................................................................................................ R8-3APExempt ....................................................................................................................... R15-3Exempt Plaque .................................................................................................... W10-101Exit (Arrow ______ Degrees) ...................................................................................... E5-1Exit Direction* .......................................................................................................... E6-101Exit Gore Sign with Exit Number And Arrow* ....................................................... E5-1AExit ________ MPH .................................................................................................... W13-2Exit Only Guide Sign W/Arrow* ............................................................................ E4-501Exit Only Panels ......................................................................................................... E11-1Exit Panel* .................................................................................................................... E1-5Farm Machinery ...................................................................................................... W11-5Ferry (Car /Boarding Symbol) ................................................................................ I5-801Ferry Symbol ........................................................................................................... I5-801AFire Hydrant Marker................................................................................................. I7-401Fire Station ................................................................................................................ W11-8Fire Station Ahead............................................................................................... W15-201Flagger’s Paddle ............................................................................................... W21-1201Flagger (Symbol) .................................................................................................. W20-7AFlying Rock .........................................................................................................W21-1601Food (Freeway Double Exit)* ............................................................................... LG-M4Food - Gas - Lodging Next Right* ........................................................................D9-103Food Next Exit (Freeway)*..................................................................................... LG-M3Food - Phone - Gas - Lodging, Etc.* ....................................................................D9-101Food - Phone - Gas - Lodging Next Right* .........................................................D9-102Forest Fire Prevention Symbol................................................................................ I1-201For ____ Mi. ........................................................................................................... W13-401For Project Information ....................................................................................... G24-501Free Coffee ...............................................................................................................D13-1Freeway Entrance ................................................................................................ E12-201Freeway Ends ____ Mile ........................................................................................ W6-401Fresh Oil/Tar .............................................................................................................. W21-2Gas, Food, Lodging Next Right/Left (Conventional Roads)* ...........................LG-C1Gas, Food, Lodging (Ramps)* ............................................................................... LG-R1Gas (Freeway Double Exits)* ................................................................................ LG-M2Gas Next Right (Freeway)* ................................................................................... LG-M1____ % Grade ............................................................................................................. W7-3 ____ % Grade ______ Miles .................................................................................... W7-3B

Page 43: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

43

July 2001

Grated Bridge Deck ........................................................................................... W8-2101Grooved Pavement ............................................................................................ W8-2001Handicapped Crossing .......................................................................................... W11-9Handle And Staff For Flag Paddle ..................................................................W21-1202HC Prohibited Symbol ............................................................................................. R14-3HC Symbol ................................................................................................................. R14-2Heritage Marker ______ Mile ................................................................................. I5-103Heritage Marker W/Arrow ...................................................................................... I5-104Highway Entrance ............................................................................................... E12-101Hill ............................................................................................................................. W7-101Hill (Bicycle Symbol) .................................................................................................. W7-5Hill Symbol .................................................................................................................. W7-1Hitchhiking Permitted ............................................................................................. I7-901Hospital ................................................................................................................. W15-301Impact Attenuator Marking .............................................................................. W12-501Impact Attenuator Marking .............................................................................. W12-502In Memory Of ______ ............................................................................................. I20-203Interchange Sequence Sign*................................................................................... E8-1Interstate ______......................................................................................................... M1-1Interstate Business Loop ........................................................................................... M1-2Interstate Business Spur ______ ................................................................................ M1-3JCT ............................................................................................................................... M2-1Junction ______ ________ .......................................................................................... M2-2Keep Left/Right (Ped & Bike Symbols)* .................................................................. R9-7Keep Left Symbol ....................................................................................................... R4-8Keep Off Median ..................................................................................................... R11-1Keep Off Wet Paint .............................................................................................. R17-101Keep Right 30 Degree Arrow.................................................................................. R4-7BKeep Right Except To Pass .................................................................................... R4-301Keep Right Horizontal Arrow...................................................................................R4-7AKeep Right Symbol ..................................................................................................... R4-7Lane Ends Merge Left ............................................................................................. W9-2LLane Ends Merge Right ..........................................................................................W9-2RLarge Arrow ................................................................................................................ W1-6Large Arrow (2-Heads) ............................................................................................. W1-7Lateral Clearance Marker (Left) ..................................................................... W12-401LLateral Clearance Marker (Right) ..................................................................W12-401RLeaving Limited Access Area................................................................................ I2-701Leaving Range Area .............................................................................................. I2-501(Left Arrow) Only (Left Right Arrows) ................................................................... R3-802(Left Arrow) Only (Left Straight Arrows) ................................................................... R3-8(Left Arrow) Only (Straight Arrow) Only .............................................................. R3-801Left Lane Ends .......................................................................................................... W9-1L

Page 44: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

44

Sign Specifications Users Guide

Left Lane Must Turn Left ........................................................................................... R3-7LLeft On Green Arrow Only ...................................................................................... R10-5Left Only Arrow ........................................................................................................... R3-5Left Turn ..................................................................................................................... W1-1LLeft Turns Ahead .................................................................................................... W2-601Left Turn Must Yield ............................................................................................ R10-1201Left Turn Signal ...................................................................................................... R10-10LLewis-Clark Trail Marker ............................................................................................. R3-6Lights? ....................................................................................................................... I4-301Litter Symbol Sign .................................................................................................... I6-201Livestock Inspec. Required Stop At Weigh Station ......................................... R13-401Lodging (Freeway Double Exit)* .......................................................................... LG-M6Lodging Next Exit (Freeway)* ............................................................................... LG-M5Loose Gravel .............................................................................................................. W8-7Low Clearance Symbol ______ Ft ______ Inch .................................................... W12-2Low Clearance ______ Ft ______ Inch .............................................................. W12-301Low Clearance Marker LT./RT. .......................................................................... W12-302Low Flying Aircraft ............................................................................................... W14-701Low Shoulder ............................................................................................................. W8-9Merging From Left ................................................................................................... W4-1LMerging From Right.................................................................................................W4-1RMile ______ .............................................................................................................. I30-401______ Mile ...............................................................................................................D5-602Mile ______ (Single Faced) ......................................................................................D10-1Mile ______ (Back To Back) .................................................................................D10-101Mile ______ (Single Faced) ......................................................................................D10-2Mile ______ (Back To Back) .................................................................................D10-201Mile ______ (Single Faced) ......................................................................................D10-3Mile ______ (Back To Back) .................................................................................D10-301______Miles ........................................................................................................... W13-501Mileage Sign*.............................................................................................................. E7-1Military Rd Closed XX Miles Ahead Local Traff. Only ...............................R11-3 MODMinimum Speed ______ ............................................................................................. R2-4Mountain pass Ahead Drive Carefully .......................................................... W14-1601Motorcycles Only ................................................................................................. R5-1201Mowing Test Area ................................................................................................... I8-801______ MPH ............................................................................................................... W13-1______ MPH .............................................................................................................. R2-501Multi-Lane Destination W/Arrow* ........................................................................D1-601Multi-Lane Destination W/Arrows* .......................................................................D1-602Multi-Lane Destination W/Arrows* .......................................................................D1-603Narrow Bridge ............................................................................................................ W5-2Narrow Bridge Symbol ........................................................................................... W5-2A

Page 45: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

45

July 2001

____ National Forest (Forest Service Route Marker) ............................................. M1-7New Signal Ahead .............................................................................................. W20-902Next Exit ______ Miles ................................................................................................. E2-1Next Exit ______ Miles ............................................................................................... E2-1ANext ______ Miles .................................................................................................... W7-3ANext ______ Miles ..................................................................................................... I7-702Next Rest Area ____ Miles ......................................................................................D5-102Next Right Guide Sign* .......................................................................................... E4-301Next Services ______ Miles...................................................................................D9-1601Night ______ ................................................................................................................. R2-3No Bicycles Symbol .................................................................................................... R5-6No Camping .........................................................................................................D7-2202No Center Stripe ...................................................................................................... W8-12No Dumping Allowed .......................................................................................... R18-301No Fishing From Bridge ........................................................................................ R18-101No Hitchhiking............................................................................................................. R9-4No Hitchhiking Symbol ............................................................................................R9-4ANo Left Turn Symbol ................................................................................................... R3-2No Motor Vehicles ..................................................................................................... R5-3No Outlet .................................................................................................................. W14-2No Outlet With Arrow ............................................................................................W14-2PNo Parking ................................................................................................................... R8-3No Parking Anytime ............................................................................................... R7-101No Parking Anytime ................................................................................................... R7-1No Parking Anytime (Double Headed Arrow)................................................... R7-102No Parking Beyond This Point ............................................................................... R8-301No Parking Bike Lane ................................................................................................. R7-9No Parking Bike Lane (Symbol) ..............................................................................R7-9ANo Parking Bus Stop ............................................................................................... R7-701No parking Bus Stop (Arrow)................................................................................. R7-107No Parking Bus Stop ________ Arrow........................................................................ R7-7No Parking Bus Stop Symbol With Transit Logo ............................................... R7-107ANo parking Except On Shoulder .............................................................................. R8-2No Parking Except Sundays And Holidays (Arrow)* ............................................. R7-3No Parking Except Sundays .................................................................................. R7-301No Parking Loading Zone ..................................................................................... R7-601No Parking Loading Zone (Double Arrow) ............................................................. R7-6No Parking On Pavement ......................................................................................... R8-1No Parking (Symbol) ................................................................................................R8-3ANo Parking Symbol (Time) To (Time) ......................................................................R7-2ANo Parking (Time) To (Time) .................................................................................. R7-202No Parking XXXX To XXXX* ........................................................................................ R7-2No Passing On Bridge ............................................................................................ R4-901

Page 46: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

46

Sign Specifications Users Guide

No Passing Zone ...................................................................................................... W14-3No Pedestrian Crossing ............................................................................................. R9-3No Pedestrian Crossing Symbol .............................................................................R9-3ANo Right Turn Symbol ................................................................................................. R3-1North ............................................................................................................................ M3-1North .......................................................................................................................... M3-1BNo Shoulder .......................................................................................................... W8-1801No Standing Anytime ________ Arrow ..................................................................... R7-4No Stopping Except On Shoulder ........................................................................... R8-6No Stopping On Pavement ...................................................................................... R8-5No Stopping Or Standing Arrow ......................................................... R7-401 W/ArrowNo Stopping Or Standing ______ ....................................................... R7-402 No ArrowNotice - Parking/Commuters Only ....................................................................... I8-703No Trespassing .......................................................................................................... R17-2No Trucks Over ________ LBS. Empty Weight ........................................................ R12-3No Trucks Symbol........................................................................................................ R5-2No Turn On Red ................................................................................................... R10-11ANo Turn On Red .................................................................................................... R10-11BNo Turns ........................................................................................................................ R3-3No U-Turn ..................................................................................................................... R3-4One Hour Parking (Time) To (Time)* ........................................................................ R7-5One Lane Road Ahead ......................................................................................... W20-4One Lane Bridge ....................................................................................................... W5-3One Truck At A Time On Bridge ....................................................................... R12-1101One Vehicle In Median At A Time..................................................................... R10-701One Way (Left) ......................................................................................................... R6-1LOne Way (Left) ......................................................................................................... R6-2LOne Way (Right) ....................................................................................................... R6-1ROne Way (Right) ....................................................................................................... R6-2ROpen Closed Panel ...............................................................................................D8-202Parallel Parking Only.......................................................................................... R7-10802Park & Ride* ................................................................................................................D4-2Park & Ride ____* ....................................................................................................D4-301Park And Ride Next Right* ...................................................................................... E13-1Park And Ride W/Exit Number ................................................................................ E13-2(Parking) 15 Minute Parking* ............................................................................ R7-10801(Parking) 48 Hours Maximum Parking ............................................................... R8-1201Passing lane ______ Miles ...................................................................................... R4-601Pass With Care ............................................................................................................ R4-2Pavement Ends .......................................................................................................... W8-3Pavement Ends (Symbol) ...................................................................................... W8-3APavement Ruts ..................................................................................................... W8-2201Pavement Width Transition Left ............................................................................ W4-2L

Page 47: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

47

July 2001

Pavement Width Transition Right ..........................................................................W4-2RPedestrians/Bicycles ........................................................................................ W11A-501Pedestrian Crossing.............................................................................................. W11A-2Pedestrians And Bicycles Prohibited ................................................................... R5-10BPedestrians, Hitchhikers, Prohibited .................................................................. R5-1001Pedestrians, hitchhikers, Bicycles Prohibited ................................................... R5-1002Pedestrians Prohibited.......................................................................................... R5-10CPeds, Bicycles, Motor-Driven Cycles Prohibited................................................R5-10APet Area Directional ..............................................................................................D5-801Pet Area Keep Pets On Leash ..............................................................................D5-901Pilot Car Follow Me ................................................................................................. G20-4Pit Site ............................................................................................................................. P-4Pit Site/Miles* ................................................................................................................. P-6Playground ............................................................................................................... I9-101Playground (Symbol) .............................................................................................. W15-1Please Don’t Drink And Drive .............................................................................. I20-201Please Do Your Part To Control Littering.............................................................. I6-401Please keep Our State Clean And green ........................................................... I6-601Please Limit Your Stay To 8 Hours No Tents Or Camps ...................................... I8-702Primitive Road No Warning Signs.......................................................................... I7-701Private Road Name Sign.......................................................................................D3-104Pull-Thru Sign (Overhead)* ........................................................................................ E6-2Push Button For Green Light ................................................................................... R10-3Push Button For Walk Signal .................................................................................... R10-4Push Button For Walk Signal-Dir. Arrow Left .................................................... R10-4001Push Button For Walk signal-Dir. Arrow Right .................................................. R10-4002Railroad Advance Sign .......................................................................................... W10-1Railroad Crossing (Cross Buck) ............................................................................... R15-1Ramp ________ MPH ............................................................................................... W13-3Ramp Will Be Closed ____ Exit Will Be Closed ____*...................................... R11-1501Range Area Watch Out For Livestock ................................................................. I2-401Rec Area next Right .............................................................................................D7-7701Recreation (Conventional Roads)*......................................................................LG-C3Recreation (Freeway Double Exit)* ..................................................................... LG-M8Recreation Next Right (Freeway)*....................................................................... LG-M7Recreation (Ramps) ................................................................................................ LG-R2Reduced Speed ____ .............................................................................................. R2-5BReduced Speed Ahead .........................................................................................R2-5AReport Drunk Driving ............................................................................................. I20-101Report Violators ______ ........................................................................................... I6-711Reserved Parking (Disabled Logo) ...................................................................... R7-801Rest Area Advance (Minor) ..................................................................................D5-601Rest Area (Arrow ______ Degrees) (Major) ........................................................ D5-201

Page 48: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

48

Sign Specifications Users Guide

Rest Area (Arrow ______ Degrees) (Minor) ........................................................ D5-701Rest Area ____ Miles ...............................................................................................D5-101Rest Area Next Right ..............................................................................................D5-103Rest Area Parking*..................................................................................................D4-401Rest Area Visitor Info Center (Arrow ____ Degrees) ..........................................D5-204Rest Area visitor Information Center ____ Miles .................................................D5-202Rest Area Visitor Information Center Next Right ...............................................D5-203Restricted Lane Ahead ........................................................................................... R3-10Restricted Lane Ahead ........................................................................................... R3-13Restricted Lane Ends ............................................................................................... R3-12Restricted Lane Ends ............................................................................................... R3-15Restricted Parking XXXX To XXXX ......................................................................... R7-108Reverse Curve Left .................................................................................................. W1-4LReverse Curve Right ...............................................................................................W1-4RReverse Turn Left ...................................................................................................... W1-3LReverse Turn Right ...................................................................................................W1-3RRight Lane (Bicycle Symbol) Only ......................................................................... R3-17Right Lane Ends .......................................................................................................W9-1RRight Lane Must Exit ............................................................................................... R3-701Right Lane Must Turn Right ...................................................................................... R3-7RRight/Left Lane Closed Ahead* ............................................................................ W20-5Right Shoulder Closed Ahead........................................................................... W20-303Right Turn ..................................................................................................................W1-1RRight Turn Signal ...................................................................................................R10-10RRight Two Lanes Closed Ahead........................................................................ W20-501Road Closed ............................................................................................................. R11-2Road Closed ______ Miles Ahead Local Traffic Only ......................................... R11-3Road Closed To Thru-Traffic .................................................................................... R11-4Road Machinery Ahead ........................................................................................ W21-3Road Narrows ............................................................................................................ W5-1Road/Street Closed Ahead* ................................................................................. W20-3Road Work Ahead .................................................................................................. W20-1Road Work Next ____ Miles .................................................................................... G20-1Rocks ..................................................................................................................... W8-1701Rough Road ............................................................................................................... W8-8Route Marker Assembly W/Arrow* ..................................................................... M8-101Route Marker Assembly W/Arrows* .................................................................... M8-201Route Marker Assembly W/Arrows* .................................................................... M8-301Route Marker Assembly W/Two Shields* ........................................................... M8-401Runaway Truck Ramp Arrow ______ Degrees ................................................... W7-4ARunaway Truck Ramp ____ Mile ............................................................................. W7-4Scenic And Recreational Highway Marker ........................................................ I4-401School ...........................................................................................................................S4-3

Page 49: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

49

July 2001

School Advance Sign .................................................................................................S1-1School Bus Stop Ahead ..............................................................................................S3-1School Bus Turn-Around ..........................................................................................S3-201School Crosswalk.........................................................................................................S2-1School Speed Limit 20 When Children Are Present ...........................................S5-101School Speed Limit 20 When Flashing .....................................................................S5-1Severe Side Wind Ahead ................................................................................... W14-801Shoulder Closed .................................................................................................. W20-301Shoulder Drop-Off ............................................................................................... W21-701Shoulder Drop-Off Symbol .................................................................................... W8-9AShoulder Work .......................................................................................................... W21-5Side Road Railroad Sign ____ ................................................................................ W10-3Side Road Symbol ____ ............................................................................................ W2-2Side Road Symbol ____ 45 Degrees ....................................................................... W2-3Signal Ahead (Symbol)............................................................................................. W3-3Signal Revision Ahead ........................................................................................ W20-903Signals Set For ____ MPH ............................................................................................. I1-1Slide Area ............................................................................................................. W8-1901Slippery When Wet (Bicycle Symbol) ................................................................... W8-10Slippery When Wet Symbol ...................................................................................... W8-5Slower Traffic Keep Right .......................................................................................... R4-3Slow Moving Vehicle (Symbol) ......................................................................... W14-601Slow Moving Vehicle .......................................................................................... W14-901Slow Vehicle May Use Shoulder ........................................................................... I8-501Slow Vehicle Turnout ________ .............................................................................. I8-401Slow Vehicle Turnout (Arrow ____ Degrees) ....................................................... I8-301Slow vehicles Use Turnouts Next ______ Miles .................................................... I8-101Snowmobile Crossing ............................................................................................. W11-6Soft Shoulder .............................................................................................................. W8-4South........................................................................................................................... M3-3South......................................................................................................................... M3-3BSpeed Limit .................................................................................................................. R2-1Speed Limit ____ Minimum ____ .............................................................................R2-4ASpeedometer Check Section Ahe ............................................................... ad I30-101Speed Zone Ahead ................................................................................................ R2-5CSpur Route Plaque ...............................................................................................D10-501State Disabled Parking Permit Required ............................................................ R7-801State Law - Motorcyclist Must Wear Helmets ................................................... I8-1001State Law Vehicles Must Keep Right Except To Pass ........................................ I8-901State Route ______ ................................................................................................ M1-601State Route ______ (Directional) ......................................................................... M1-701State Route ______ (Guide Sign Use).................................................................. M1-602Stock Pile........................................................................................................................ P-3

Page 50: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

50

Sign Specifications Users Guide

Stock Pile ____ Miles .................................................................................................... P-5Stop............................................................................................................................... R1-1Stop Ahead ............................................................................................................... W3-1Stop Ahead (Symbol) ............................................................................................ W3-1AStop Here On Red (Curved Arrow)......................................................................R10-6AStop Here On Red (Directional Arrow) .............................................................. R10-6LStop Here On Red (Directional Arrow) .............................................................. R10-6RStream Name Sign ................................................................................................. I3-101Street Name Sign* ..................................................................................................D3-101Summit Elevation Sign* ........................................................................................... I3-201Survey Crew ............................................................................................................. W21-6Symbol - Boating ..................................................................................................D7-1001Symbol - Boat Launch .........................................................................................D7-1101Symbol - Boat Moorage ......................................................................................D7-1201Symbol - Bridle Trail ............................................................................................... D7-601Symbol - Campfire ...............................................................................................D7-2204Symbol - Canoeing ..............................................................................................D7-1601Symbol - Climbing ..................................................................................................D7-801Symbol - Cross Country Skiing .......................................................................... D7-2002Symbol - Diesel Gas .............................................................................................D9-1101Symbol - Emergency Medical Services ............................................................... D9-13Symbol - Fishing ....................................................................................................D7-1301Symbol - Food .............................................................................................................D9-8Symbol - Gas .............................................................................................................D9-11Symbol - Golfing .....................................................................................................D7-701Symbol - Handicapped ............................................................................................D9-6Symbol - Hospital ........................................................................................................D9-2Symbol - Information .............................................................................................D5-904Symbol - Lighthouse ...............................................................................................D5-903Symbol - Lodging .......................................................................................................D9-9Symbol - LP Gas ........................................................................................................D9-15Symbol - Pet Area - Keep Pets On Leash ...........................................................D5-906Symbol - Phone (Recreational)................................................................................ D9-1Symbol - Phone (Advance) ______ Mile ...............................................................D9-1BSymbol - Phone (Arrow ______ Degrees) ............................................................. D9-1ASymbol - Picnicking ..............................................................................................D7-2201Symbol - Playground ...........................................................................................D7-2203Symbol - Question Mark ......................................................................................D9-1301Symbol - Ranger Station ........................................................................................D5-902Symbol - Recreational Vehicle Sanitary Station ................................................ D9-12Symbol - Restroom Men ............................................................................................D9-4Symbol - Restroom Women ......................................................................................D9-5

Page 51: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

51

July 2001

Symbol - Restroom Women And Men ....................................................................D9-7Symbol - Showers .....................................................................................................D9-10Symbol - Snowmobile Area ................................................................................D7-2101Symbol - Snow Skiing ...........................................................................................D7-2001Symbol - Swimming ..............................................................................................D7-1401Symbol - Tent Camping ............................................................................................D9-3Symbol - Trail ...........................................................................................................D7-501Symbol - Trailer And Tent Camping ......................................................................D9-3BSymbol - Trailer Camping....................................................................................... D9-3ASymbol - Viewpoint ................................................................................................D5-905Symbol - Water Skiing ..........................................................................................D7-1501Symbol - Winter Sports .........................................................................................D7-2103T (Symbol) ................................................................................................................... W2-4T Symbol Railroad Sign ........................................................................................... W10-4Temporary .................................................................................................................. M4-7Temporary ................................................................................................................ M4-7BThrowing Away Burning Material Prohibited ...................................................... I6-301Tired? Rest Area ______ Miles ...............................................................................D5-301Tires Chains Required On All Vehicles .............................................................. R16-201To.................................................................................................................................. M4-5To................................................................................................................................ M4-5BTo................................................................................................................................ M4-13______ To ______ ...........................................................................................................S4-1To (Bicycle Route) ............................................................................................... M4-1301To Cross Street Push Button - Wait For Green Light ...........................................R10-3ATo Cross Street Push Button Wait For Walk Signal ..............................................R10-4ATourist Activities (Freeway Double Exit)* ........................................................... LG-M10Tourist Activities (Conventional Roads)* ..............................................................LG-C2Tourist Activities Next Right (Freeway)* ............................................................... LG-M9Tourist Activities (Ramps)* ...................................................................................... LG-R3Tow-Away Zone ...................................................................................................... R7-201Tow-Away Zone Symbol ..................................................................................... R7-201A______ Tracks ______ ................................................................................................. R15-2Tracks Out Of Service ................................................................................................ R8-9Traffic Fines Double In Work Zones ..................................................................... I20-301Traffic Revision Ahead ........................................................................................ W20-901Traffic Survey Ahead........................................................................................... W24-101Train Station (Symbol) ................................................................................................ I5-7Truck ............................................................................................................................ M4-4Truck Crossing ............................................................................................................ W8-6Truck Crossing (Symbol) ....................................................................................... W11-10Truck Lane ____ Feet .................................................................................................. R4-6Truck Route ................................................................................................................ R14-1

Page 52: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

52

Sign Specifications Users Guide

Trucks ____ ................................................................................................................... R2-2Trucks Entering Highway ...................................................................................... W21-30Trucks Leaving Highway.................................................................................... W21-30ATrucks Over 10,000 GVWR Stop At Scales When Open .................................. R13-201Trucks Prohibited Symbol ........................................................................................ R14-5Weigh Station Closed Trucks Stop At Scales .................................................... R13-301Truck Symbol ............................................................................................................. R14-4Trucks Use Low Gear .............................................................................................. W7-2BTrucks Use Right Lane ......................................................................................... W14-501Tunnel ........................................................................................................................ W22-2Turn On Lights ........................................................................................................... I7-501(Two Way Left Turn) Only (Overhead Mounted) ................................................R3-9ATwo Way Traffic (Symbol) ......................................................................................... W6-3Uneven Lanes ......................................................................................................... W8-11Unlawful To Litter $50 Min. Fine ............................................................................ I6-701Urban Public Parking Sign ......................................................................................... D4-1U.S. ______ ................................................................................................................... M1-4U.S. ______ (Directional) ........................................................................................ M1-401U.S. ______ (Guide Sign Use) ................................................................................. M1-4AUse All Lanes........................................................................................................ G24-101Use Crosswalk (Arrow Left) .................................................................................... R9-3BLUse Crosswalk (Arrow Right) ................................................................................. R9-3BRUse Lane With Green Arrow ................................................................................... R10-8Use Left Lane ........................................................................................................ G24-201Use Of Compression Brakes Prohibited .............................................................. R4-604Use Right Lane ..................................................................................................... G24-301Use Right Shoulder To Install Chains .................................................................. R16-101Use Right Shoulder To Remove Chains ............................................................. R16-102Use Your Ashtray .......................................................................................................... I1-2Van Accessible .................................................................................................... R7-801AVegetation Management Application ............................................................... I1-301Vehicles Over 10,000 LBS Gross Must Use Chains ............................................ R16-501Vehicles With Lugs Prohibited .................................................................................. R5-5Walk On Left Facing Traffic....................................................................................... R9-1Watch For Ice....................................................................................................... W8-1601Water Over Roadway ........................................................................................ W8-1501Water Unsafe To Drink............................................................................................. I8-7094-Way* .......................................................................................................................... R1-3Weight Limit ____ Tons ............................................................................................. R12-1Weight Limit ____ Tons Per Axle ____ Tons Gross .................................................. R12-4Weight Limit Truck Symbols W/Weight* ................................................................ R12-5Weight Restrictions In Force................................................................................ R12-501Weigh Station Exit (Arrow ____ Degrees) ............................................................D8-301Weigh Station ____ Mile.............................................................................................D8-1Weigh Station Right Lane......................................................................................D8-201Welcome To Washington ....................................................................................... I2-101

Page 53: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

53

July 2001

West ............................................................................................................................. M3-4West ........................................................................................................................... M3-4BWhen Children Are Present .......................................................................................S4-2When Flagged .........................................................................................................S4-501When Flashing..............................................................................................................S4-4Winding Road Left .................................................................................................. W1-5LWinding Road Right ................................................................................................W1-5RWork Crew (Symbol) ............................................................................................ W21-1AWork Zone Ahead; Give ‘Em A Brake .............................................................. G28-101Wrong Way ................................................................................................................R5-1AY (Symbol)................................................................................................................... W2-5Yield .............................................................................................................................. R1-2Yield Ahead (Symbol) ........................................................................................... W3-2A

Page 54: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

54

Sign Specifications Users Guide

IndexSymbols# OF POSTS 17

AAbout Program Icon 7Addendum Shading 32

Adding shading 32Clear Addemdum 7, 32Clear Addendum Shading 32Deleting shading 32

Adding Special Material, Size and Cost Selections 22Advanced Page Setup Dialog box 31Automatic naming function 33

BBeginning Plan Sheet Number 11

CChange the printer 30Checked By 11Clear Addendum 7, 32Clear Addendum Shading 32Clear All Addendum 32Clearance, V & W 18Combo Sheet 15

Deleting Pages 15Command Bar Icons 7Construction Notes 18Contract Number 11Cost Estimate 7, 14

1 & 2 buttons 29Cost Estimate Tab 28

Displaying the Cost Estimate 28Refreshing the Cost Estimate 28Group Sub Totals 281 & 2 Buttons on the Cost Estimate 29Total Cost fiels 29

Costs Icon 7Costs Tab 14, 22

Inserting New Post Materials 22Inserting New Post Sizes 22Inserting New Sign and Post Costs 22Revising Existing Materials, Size & Cost 22

Page 55: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

55

July 2001

Custom Page Numbering 11Beginning Plan Sheet Number 11

DDefault print setting 30Delete Row 20Deleting Pages 15Description 20Designed By 11Displaying the Cost Estimate 28Drawing toolbar 34

EEntered By 11EXISTING STA. LOC. (or MP) 17Exit icon 8

FFederal Aid Project Number 12file name 33First Line of PS&E Title 12

GGeneral constructions notes 18Go to Icon 7Grand Total 29group 28group sub totals 28GRP 16Grp 20Guidelines on Estimating Cost 24

HHelp Icon 8horizontal distance 18

IIcons

About Icon 7Clear Addendum Icon 7Costs Icon 7Cost Estimate Icon 7Exit Icon 8Go To Icon 7Help Icon 8New Project 7Open Project Icon 7Other Icon 7Preferences 7Project Info Icon 7Print Icon 7

Page 56: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

56

Sign Specifications Users Guide

Import Clips 34Include Group Subtotals 29increase or decrease the number of pages 14INS Page 14insert a sign 16Insert Clip Art 34Insert Row command 20Inserting and Deleting Rows 20

J

Job Number 11, 33

L

LETTER SIZE OR CODE 17

N

New Installations 24New Project Icon 7NEW STA. LOC. (or MP) 17

O

Open Project Icon 7Other Icon 7Other Items to include in the estimate for Permane 26Other Tab 20

Grp field 20Description Field 20Unit Cost 20Qty Field 20Total Cost Field 20Other Total 20Insertind and Deleting Rows 20

Overhead Sign 25

P

P.E. Stamps 34page numbering 10paper size 31Paste State Seal 34Pick Standard Signs 16Post Length (H1, H2, H3, H4) 18Post Material 17, 22Post Size 17Posts (Wood or Steel) 26Preferences Icon 7Preview Pages 31Print Icon 7

Page 57: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

57

July 2001

Printing 30Change Printer 30Default Print Setting 30Print Preview 31Print Project 30Print Project Dialog box 31Printer Setup Dialog box 31Select Button 30Setup Button 31

Proj. Engr 11Project Engineer Stamps in Clip Art 34Project Engineer’s seal 10Project Engineer’s stamp 12, 34

State Seal 34Project Info Icon 7Project Info Tab 10

Project Info Tab Fields 10, 11, 12Project Title 10, 33PS&E Number 11

QQty 20

R

Revising Post & Sign Costs 22Refresh Cost Estimate 28Region 10Region Admin 11REL Page 14Relocation 24REM Page 14REMARKS 18Remarks 10Removal 24Removing Addendum Shading 32Revision area 32ROOM FOR ADDITIONAL NOTES” 18

SSave As 33Save File 7, 33Saving files 33

Automatic Naming Function 33State seal 10, 34

Project Engineer’s Stamp 34Second Line of PS&E Title 12Select button 30Set Pages 7, 15Setting Pages 14Setup button 30Setup dialog box 30Sheet Ref. No. (Alpha prefix) 11Sheet Ref. No. (Beginning Numeric Suffix) 11Sheeting Sign Type Area Type* 36

Page 58: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

58

Sign Specifications Users Guide

Sheeting Type 17Show WSDOT Logo 12Sign Bridges, Cantilever Sign Structures, Bridge M 25Sign Code & Sign Description 16Sign Installation , Relocation & Removal Pages 16

Fields 16, 17, 18Sign No 16Sign Size 17Sign Specs Administrator 22Sign Specification Pages 14

Setting Pages 14Increasing Number of Pages 14Decreasing Number of Pages 14

Single Post Sign (or no post) 24SR 12STA. LOC. (or MP) 17State Seal 12

TTitle Block 11Total Cost 20Total Sheet Number on Contract Plans 11

UUnit Cost 20

Vvertical clearance 18

WWork Order 10, 33

Page 59: Table of Contents of Contents Introduction ... New Project - Opens a blank Sign Specs template. Open Project - Opens an existing project. Save File - Save current project to the

59

July 2001