table of contents - atlas project support · the identification step addresses project scope and...
TRANSCRIPT
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Table of Contents
Firm Description ................................................................................................................3
Cost Consulting ..................................................................................................................4
Independent Cost Estimating ............................................................................ 5
Energy Conservation Estimating ...................................................................... 6
Conceptual Estimating ....................................................................................... 7
QC/QA Program ................................................................................................................8
Key Personnel Resumes .....................................................................................................9
Experience ........................................................................................................................12
Small Business Certificates .............................................................................................16
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Firm Description
Michael Vargas founded Atlas Project Support in 2009 on the principles of old-
fashioned hard work and hiring the best personnel in the industry. The company has
become one of the leading energy and construction managers in California.
Atlas is dedicated to delivering notable projects of outstanding quality, on time, while
maximizing value for the consulting dollar. Its reputation has been built as a result of
outstanding client relationships, supported by an experienced team of managers.
Atlas continues to provide leadership, strength, stability, longevity and superior client
service by:
• Creating a management structure that best serves our client’s needs • Hiring and retaining some of the most talented people in the industry • Providing accurate and detailed cost estimating • Focusing on preconstruction that ultimately saves our clients money • Maintaining financial strength and stability • Staying abreast of the latest industry technologies • Pledging a high-level of service that maintains our reputation for quality • Building lasting relationships through an enjoyable project experience.
All of Atlas’ employees are based out of the San Diego corporate headquarters.
Over the past three years the company has secured an average of $1 million in
consulting revenue and currently has $1 million in construction management backlog
with the various public entities such as the County of San Diego Department of
General Services and Los Angeles District USACE to perform preconstruction
services and independent cost estimating.
Corporate Headquarters: ...................................... Primary Point of Contact:
31303 Golf Club Drive ................................................................. Michael Vargas
Bonsall, CA 92003 .................................................................... P: 619.865.9687
F: 206.203.3968 ....................................... email: [email protected]
Website: http://myatlasproject.com
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Cost Consulting
The genesis of our focus on highly specialized cost analysis is a direct result of client
feedback. Every project requires reliable and often highly specialized costing solutions.
Atlas offers cost standardization for facility owners, architects and construction
managers. Managers of construction programs with a portfolio of multiple buildings,
either in a campus environment or across regions of the U.S., apply Atlas models and
databases for uniform construction design and corporate-wide construction budgeting.
Cost modeling is useful for third party validation, negotiating contractor's bids and
monitoring as-built costs. Cost modeling drives the life cycle decision process in the
early design phase.
Atlas creates custom client models from actual client schematics and building plans that
incorporate construction budgets and cost history. Atlas uses benchmark databases
that are applied to the models to project costs forward in time, historically, and across
various geographic locations
Independent Cost Estimates
Energy Conservation
Costing
Design Schematic
Pricing
Economic Analysis
Life Cycle Cost Analysis
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Independent Cost Estimating
For many projects, obtaining an independent cost estimating is a mandated procedure.
Atlas Project Support has taken this process of independent analysis to new heights by
expanding the value of this costing technique by expanding its functionality and
application. For owner liability reporting, contractor price checking, and change
management, APS’s independent cost estimating services bring tangible value to
architects, engineers, building owners, and public agencies.
This methodology ensures work is completed as soon as possible, with turnaround
times that are forecasted and negotiated. APS independent cost estimating includes:
an estimate review metrics report that summarizes and compares several key
benchmark ratios and factors versus historical (and sometimes estimated) values from
similar projects; cost targets for the company; and/or benchmarks from external
sources.
An Atlas Project Support independent cost estimate can be used in the following ways:
To serve as the basis for reserving funds for the contract as part of acquisition
planning
To serve as a basis for comparing costs or prices proposed by offerors
To serve as an objective basis for determining price reasonableness in cases in
which one bidder or offeror responds to a solicitation.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Energy Conservation Estimating In this estimating practice APS combines highly customizable cost estimating
techniques including range of magnitude, detailed, and parametric costing with
expertise in energy data analysis. Our energy efficiency estimating expertise covers
energy program management initiatives, renewable energy systems and energy
efficiency measure decision-making examination. APS clearly defines risk, cost, and
makes recommendations in order to best achieve our client’s energy goals. Generated
reports demonstrate cost/energy savings as well as life cycle cost analysis and financial
pro forma.
This unique blend of energy-centric cost analysis is derived from a deep understanding
of the economics of energy-related projects. From the design, implementation, or
reporting of energy-related activities, Atlas Project Support guides clients in the most
efficient and fiscally responsible action to move their energy projects forward.
The APS techniques for this service are highly proprietary and based on years of
involvement with many types of Cleantech projects. The use of energy modeling
software, traditional take-offs, and historical databases make this service almost unique
to the APS staff. The opportunity to glean invaluable decision-making information from
this practice will provide the advantage your company is seeking to promote your
project and have it move forward or certified.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Conceptual Estimating
Conceptual (parametric) estimating refers to a technique which utilizes the statistical
relationship that exists between historical data and a particular delineated list of
variables. Examples of these variables can include square footage in a construction
project, building type, and other variables. This information is then used for the
purposes of calculating and demonstrating a reliable estimate for the project at hand.
One valuable aspect of parametric estimating is the high level of accuracy that can
achieved. Accuracy levels of this method are, of course, dependent on the quality of the
original data that is provided.
Atlas’ long history of estimating a plethora of construction projects has provided a
blueprint to guide other projects still in preliminary design. Our seasoned estimators
can bring exceptional value by knowing what concepts to introduce into pricing as the
design phases progress forward. Owners and architects can rely on Atlas’ documented
history of being involved as active participants every step during the design phase. This
long standing practice of Atlas is now an individual service being provided as a
specialization by its APS staff.
There are two key steps in this service:
The identification step addresses project scope and development process at a
conceptual level to include asset solution alternatives
The feasibility step addresses schedule planning and development, cost
estimating, resource planning, value analysis/engineering and risk management
– again, at a conceptual level of detail.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
QC/QA Program
The main objective of the APS QC/QA program is to ensure the quality and accuracy of
cost estimates. The cost estimating principles and processes provided here may be
used to meet Federal requirements while utilizing industry standards and best practices.
Atlas Project Support’s Best Practice Estimating Controls Process:
1. Define the estimate’s purpose
2. Develop an estimating plan
3. Define the project (or program) characteristics
4. Determine the estimating structure [e.g., Work Breakdown Structure (WBS)]
5. Identify ground rules and assumptions
6. Obtain data
7. Develop a point estimate and compare to an independent cost estimate
8. Conduct sensitivity analysis
9. Conduct risk and uncertainty analysis
10. Document the estimate
11. Present the estimate for management approval
12. Update the estimate to reflect actual costs and changes
APS’s Quality Control and Quality Assurance procedures are an effective method for
ensuring client satisfaction. With more than ten years of Atlas construction consulting
guiding the formation of APS Best Practices, the vast historical data and lessons
learned of Atlas Project Support are effused throughout APS Cost Consulting group.
The rigorous standards the have made the parent brand Atlas the unrivaled benchmark
in energy management in Southern California are the same standards, processes, and
procedures leading APS Cost Consulting.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Key Personnel Resumes
Michael Vargas
EXECUTIVE SUMMARY
As Atlas’ senior cost consultant, Michael is specialized in cost engineering best
practices and Green Building approaches. His specific expertise is in implementing
effective controls by controlling the time, cost, quality, and scope at the right time and
reacting according to measurable, verifiable results based on actual performance while
measured against planned performance.
CURRENT ROLES
Principal of Atlas Project Support
Adjunct Professor of Business Administration at Saint Leo University
EDUCATION
Graduate Certificate in Financial Analysis, Keller Graduate School of
Management
Master of Project Management, Keller Graduate School of Management
M.B.A., Keller Graduate School of Management
B.S.B.A. Management, San Diego State University
CERTIFICATIONS AND SOFTWARE
Certified Business Energy Professional- Association of Energy Engineers
Certified Energy Plans Examiner- California Association Building Energy Consultants
Certified Cost Technician- Association for the Advancement of Cost Engineering
Green Building Construction Certificate- San Diego State University CES
Entrepreneurial Management Center- San Diego State University
Oracle University, Primavera P6 Certified Scheduler
LEED Green Associate and GBCI Advisory Panel Member
NAVFAC Certified Contractor Quality Manager
OSHA 10 hour construction training- Current
Advanced SharePoint 2007, Excel, Visio, MS Project, Primavera P6, Word, Access, PowerPoint
(MS Office Suite), SalesForce, Sage ACT, Central Desktop, Outlook
MRP-Fabtrol, StruMis, Division 5, Xactimate, On-Screen, JDEdwards-OneWorld and SES,
Expedition and Contract Manager
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
PROFESSIONAL EXPERIENCE
04/2009-Present Atlas Project Support San Diego, CA
Principal Consultant
Consistently demonstrated sound judgment and experience in the application of
scientific principles and techniques to problems of business and program
planning; cost estimating; economic and financial analysis; cost engineering;
program and project management; planning and scheduling; Earned Value cost
and schedule performance measurement, and change control.
Develop strategies and identify funding sources for renewable energy generation
and energy conservation projects working with Utilities such as PG&E, SDG&E,
and SCE.
Draft and assist with negotiations with cross-functional team for complex
contractual arrangements; negotiate terms of letters of understanding including
inclusions, exclusions and qualifications.
Perform comprehensive cost estimates using a variety of software including
MCACES II and ACEIT for Federal clients.
Knowledgeable in DOD technical expertise, knowledge of defense acquisition,
and experience across a wide range of defense systems, system architectures
and information technology platforms while adhering to TINA and FAR
requirements.
Use MS Project and Primavera P6 to create work lifecycles, allocate resources,
create baselines, create WBS and assigned activities, and develop Master
Project Schedules identifying major milestones, and administering resource
pools.
Provide Independent Cost Estimates for Clients to use as an analytical tool to
validate, cross-check, or analyze estimates developed in proponency channels.
The independent cost estimate also serves as a basis for verifying risk
assessments.
Perform Senior Estimating duties managing estimating staff of 3-4 persons.
Been counted upon to work with various engineering, planning and surveying
firms from the initial land acquisition/feasibility stage, through construction
management supporting the entire development process, which included
entitlement and regulatory permit processing including environmental clearance,
engineering, Department of Energy (DOE) and CEC applications for NEPA and
CEQA compliance issues.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Gerry Collins
EXECUTIVE SUMMARY
Responsible for entire estimating, design, scopes of work development, job walks and
proposal generation. Responsible for entire corporate, operations, project management,
marketing and sales efforts including: public relations, media relations, advertising and
publications. Also responsible for creating and maintain business partnerships and
corporate contracts. Planned and implemented nation-wide rollouts
EDUCATION:
U.S.Navy, Cbc, Naval Construction Center, Port Hueneme, Ca (Construction “A” School)
Long Beach City College, Long Beach, Ca (Communications, Marketing, Ba)
Berean University, M.Th. Program, Costa Mesa, Ca (Ministerial Studies, Theology,
Philosophy)
CERTIFICATIONS:
USACE/NAVFAC Construction Quality Control Manager
OSHA 30 Hour – CPR AED/First Aid Certified
ECATTS – Environmental Controls Certified
Amtrak Contractor Safety Certification
Scaffold/ Fall Protection Certified Competent Person
EXPERIENCE:
Chief Estimator
Atlas Project Support
Responsibilities include estimating, design, scopes of work development, job walks, project
management, and proposal generation. Also responsible for creating and maintaining sub-
contractor, business partnerships and corporate contracts. Also involved in executive level
decision making, business plan development, and corporate and competitive strategies.
Developed whitepaper and RFP's and engineering estimates for both Fortune 500 and
government entities. Designed and oversaw completion of food processing facilities, TI and EPA
projects.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Experience
County of San Diego As Needed Energy and Water Conservation Program
Host
Organization
County of San Diego
Personnel Michael Vargas
Completion
Date
Five Year Contract -2011-2016
Contact Name Eric Scheidlinger
Contact Number 619-220-0224
Description Energy Economics cost modeling and Construction Cost Estimators
for 1300 building portfolio
State of California Department of General Services Solar Power Purchase Program
Location Various
System Type Various
Completion Date Ongoing for two years 2011-2012
Personnel Michael Vargas
Customer/Owner State of California
Contact Name Steven Nowell
Contact Number 916-375-5908
Description Construction Cost Estimators – Commercial Size and Large Scale
Photovoltaic Systems
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Point of Departure Architects
Owner Daniel Smith Architect, LEED AP, (619) 294-2500
Personnel Michael Vargas
Completion Date 05/2011– Present, Multiple and continuous projects
Project Value $ 1,572,000.00
Description Independent Cost Estimating Services - Residential, Tennant
Improvement, and Commercial Mixed Use
United States Army Corps of Engineers (USACE) Los Angeles District
Owner Michelle Jones , 951-506-0055 PB/Entech
Personnel Michael Vargas and Gerry Collins
Completion
Date 01/2010– Present, Multiple projects
Project Value $ 275,000,000.00
Description
Independent Cost Estimating Services for office buildings, hospital
renovation, parking structures, dry and wet utility upgrades and
power plant upgrades. Have performed over 200 Individual IGEs.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
AT&T Services, Inc. CRE - Building Design and Construction
Host
Organization AT&T - 433 S. Olive St., Los Angeles, CA
Personnel Michael Vargas
Completion
Date 8/10/2011
Contact Name Tim Ng
Contact Number 626 -308-8575
Project Value $ 1,200,000.00
Description Cost Engineering Audit as part of a justification package to sole
source a vendor for a large chiller plant in Los Angeles
AT&T Services, Inc. CRE - Building Design and Construction
Host
Organization AT&T - 14800 Ventura Boulevard, Sherman Oaks, CA
Personnel Michael Vargas
Completion
Date 8/10/2011
Contact Name John Najar
Contact Number 626 -308-8575
Project Value $ 2,300,000.00
Description Cost Engineering Audit HVAC & Lighting Energy Upgrade
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
NAVSPECWARCEN - Facilities
Host
Organization Naval Special Warfare Basic Training Command
Personnel Michael Vargas
Completion
Date 12/15/2011
Contact Name Brad Fisher
Contact Number 619-537-2072
Project Value $ 55,000.00
Description Expand Cased Opening at Quarterdeck :Predictive Cost Modeling
Reno ESP™ Cost Consulting
Host
Organization Reno Contracting, Inc.
Personnel Michael Vargas
Completion
Date Ongoing
Contact Name Eric Scheidlinger
Contact Number 619-220-0224
Project Value 1,000,000.00
Description
Perform variety of predictive cost modeling exercises, hard bid
photovoltaic system cost estimates, and energy conservation
estimating.
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Small Business Certificates
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Page | 18
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Page | 19
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Page | 20
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Page | 21
Atlas Project Support | Excellence
What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others…
Page | 22