table of contents
DESCRIPTION
PRESENTATION TO THE PORTFOLIO COMMITTEE 2012/13 ANNUAL REPORT 10 OCTOBER 2013 Presented by : Ms Veliswa Baduza Director-General. Table of Contents. Annual Report - 2012/13 Strategic Overview Overall Performance Overview of the Department - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/1.jpg)
PRESENTATION TO THE PORTFOLIO COMMITTEE
2012/13 ANNUAL REPORT
10 OCTOBER 2013
Presented by : Ms Veliswa Baduza Director-General
![Page 2: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/2.jpg)
Table of Contents
Annual Report - 2012/13 Strategic Overview Overall Performance Overview of the Department
Performance overview per Programme Overall Financial Performance of the Department
Financial Performance per Programme Auditor-General’s report Governance Highlights of Significant Achievements
Requested Adjustments for 2013/14 (AENE)Funding Re-alignment - 2014/15 and the Medium Term
Expenditure Framework (MTEF)
2
![Page 3: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/3.jpg)
Strategic Overview
Vision A fully inclusive society free from unfair discrimination, inequality, abuse and exploitation
Mission To drive Government`s equity, equality and empowerment agenda for women, children
and people with disabilities through an integrated approach to accelerate the realisation of their human rights
ValuesPerformance excellence
Integrity
Equality
Fairness
Consultation
Accountability
Empowerment
Social Justice and Redress
3
![Page 4: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/4.jpg)
Performance overview of the DepartmentFigure 1 below provides the performance scores for the four Programmes in the department, namely Administration, Women Empowerment and Gender Equality (WEGE), Children’s Rights and Responsibilities (CRR) and Rights of People with Disabilities (RPD), in relation to set annual targets outlined in the 2012/13 Annual Performance Plan. The programmes had achieved as follows: Administration 71% (51 of 71), WEGE 82% (14 of 17), CRR 93% (13 of 14) and RPD 31% (5 of 16). The total of achieved targets is 83 out of 118, (70%) while 35 targets (30%) were not achieved.
Figure 1: Programmes Performance scores
4
Programmes Programmes Name Targets Achieved
Targets Not Achieved
Total targets % of targets Achieved
% of targets not achieved
Total targets %
Programme 1 Administration 51 20 71 71% 29% 100%
Programme 2
Women Empowerment and Gender Equality (WEGE)
14 3 17 82% 18% 100%
Programme 3 Children`s Rights and Responsibilities (CRR)
13 1 14 93% 7% 100%
Programme 4 Rights of People with Disabilities (RPD)
5 11 16 31% 69% 100%
Grand Total of all programmes:
83 35 118 70% 30% 100%
Departmental % Achieved and Not Achieved
70% 30% 100%
![Page 5: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/5.jpg)
Performance overview of the Department
Figure 2 below provides a graphical depiction of the overall performance of the Department in relation to set annual targets outlined in the 2012/13 Annual Performance Plan. The department had achieved 70% (83 of 118 set targets), and not achieved 30% (35 of 118 set targets).
Figure 2: Departmental overall score against Predetermined Objectives for 2012/13
5
![Page 6: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/6.jpg)
Performance overview for the DepartmentComparison of Departmental Performance 2011/12 and 2012/13
The graph below illustrates a comparative analysis of the overall performance of the department during the financial years 2011/2012 and 2012/2013. In 2011/2012, the department planned 121 targets and achieved 63% while 37% was not achieved. During the 2012/2013 financial year, the department’s performance improved by 7%, where out of the planned 118 targets, 70 % were achieved and 30% remained unachieved.
Figure 3 (B): Comparison of programmes performance for 2011/12 and 2012/13
6
![Page 7: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/7.jpg)
Performance overview for the DepartmentComparison of Programme Performance 2011/12 and 2012/13
A comparison is made in figure 3(A) below of the department’s performance per programme in the 2011/12 and 2012/13 financial years against predetermined objectives. Although the graph below indicates improvement in the performance of the department in 2012/13 relative to the 2011/12 programme performance, the Rights of People with Disabilities (RPD) Programme did not perform well - with 31% (5 of 16 planned targets) achieved and 69% (11 of 16 targets) not achieved.
Figure 3 (A): Comparison of programmes performance for 2011/12 and 2012/13
7
![Page 8: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/8.jpg)
A comparison is made in figure 4 below of the department’s vacancy rate in the 2011/12 and 2012/13 financial years. The department had a vacancy rate of 15.8% in 2011/12 compared to 15.0% in 2012/13. Regardless of the slight decrease of the vacancy rate in 2012/13 the department has managed to pull through and improve the performance of 2012/13 with 70% compared to 63% of 2011/12.
Figure 4 Comparison of vacancy rates for 2011/12 and 2012/13
8
Human Resource Management Overview Report
![Page 9: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/9.jpg)
9
Programme 1 - Performance Overview
The figure below illustrates that out of 71 planned targets , Programme 1 achieved 51 targets (71%) while 20 targets (29%) were not achieved.
![Page 10: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/10.jpg)
Sub-programme: Financial Management
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Proper budget planning and sufficient allocated funds facilitated
Proper budget planning and sufficient allocated funds facilitated
Budget allocated to programmes
No deviation
Budget vs. expenditure monitored
Budget vs. expenditure monitored
Budget monitored and there was no overspending
No deviation
In-Year Monitoring implemented
In-Year Monitoring implemented
In-Year Monitoring developed to monitor budget spending
No deviation
30 days payment deadline implemented
30 days payment deadline implemented
Not fully achieved, however in some instances it was achieved
Target not fully achieved as planned
This was mainly in the later part of the year where there were intervening public holidays and delays in confirmation of banking details on the safety net
10
![Page 11: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/11.jpg)
Sub-programme: Financial Management
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Compliance to policies and prescriptsimplemented
Compliance to policies and prescriptsimplemented
The department complied to internal policies, National Treasury and government prescripts
No deviation
SCM policy, strategy, processes and procedures aligned to legislative requirements implemented
SCM policy, strategy, processes and procedures aligned to legislative requirements implemented
SCM policy, strategy, processes and procedures developed and complied with legislative requirements
No deviation
Prescribed reporting requirements and timeframes complied
Prescribed reporting requirements and timeframes complied
Managed to comply with all National Treasury timeframes
No deviation
Internal control environment improved
Internal control environment improved
Target not fully achieved because LOGIS was not implemented
Target not achieved as planned
Policies, processes, procedures approved and LOGIS developed however not implemented due to the delay of launching.
11
![Page 12: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/12.jpg)
Sub-programme: Financial Management
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Prescribed reporting requirements and timeframes complied
Complied with prescript reporting and timeframes
Complied with department business processes
No deviation
100% updated moveable asset register
100% updated moveable asset register
Asset register not fully implemented as planned
100% not achieved as planned
While the department improved its capacity on asset management, as at the end of the financial year, there was no sufficient capacity and skill to manage the asset register.
12
![Page 13: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/13.jpg)
Sub-programme: Secretariat for the National Council Against Gender-Based Violence
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
National Council established
National Council launched Coordinated the launching of the National Council against Gender Base Violence and established the Secretariat Unit in the department
No deviation
Number of Council sittings coordinated
Six Council sittings coordinated
Secretariat coordinated the sittings on GBV
No deviation
Number of Provincial Councils established and facilitated
Four Provincial Councils established and facilitated
Not achieved Target not achieved as planned
Provincial council not established however Interim NCGBV established and a NCGBV launched on 10 December 2012
Number of Sessions of Secretariat services provided
Six sessions of Secretariat services provide
Achieved No deviation
13
![Page 14: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/14.jpg)
Sub-programme: Secretariat for the National Council Against Gender-Based Violence
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Number of programmes in 365 Days PoA coordinated
Three programmes in 365 Days PoA coordinated
Not Achieved as planned Programmes not coordinated as planned
An Interim Council met several times and reviewed the 365 Days National Plan of Action. However, the implementation that was supposed to be led by the Council could not take off due to the major focus on the establishment of the NCGBV, which involved compiling Concept Document, Terms of References and inviting nominations for serving on the Council, appointment of Council members and ultimate inauguration of the Council.
Number of Social campaigns coordinated
One Social campaigns coordinated
Not Achieved as planned Not achieved as planned The focus was on the women`s day and launching of NGBV
14
![Page 15: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/15.jpg)
Sub-programme: Internal Audit
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13Approved Internal Audit Charter developed
Internal Audit Charter approved
The Internal Audit Charter presented to Audit Committee and was approved
No deviation
Approved Audit Committee Charter developed
Audit Committee Charter approved
The Audit Committee Charter presented to Audit Committee and was approved
No deviation
Approved Risk Management Committee Charter developed
Risk Management Committee Charter approved
The Risk Management Committee Charter presented to Audit Committee and was approved
No deviation
Number of Strategic Risk Assessment Reports developed
Report and risk assessment register compiled
Not achieved Target not achieved Risk Management workshop was prioritised. Risk policy was develop and the development of operational risk still underway to be finalised in 2013/14
Number of Operational Risk Assessment Reports
Operational Risk Assessment Reports completed
Not achieved Risk assessment could not be carried out because the focus was changed to capacitate the Senior officials on risk
15
![Page 16: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/16.jpg)
Sub-programme: Internal Audit
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Approved audit report on strategic and Annual performance plans developed
Audit report on strategic and Annual performance plans developed
Report was presented in the Audit Committee
No deviation
Approved Internal Audit Procedure Manual developed
Procedure Manual developed
Procedure Manual approved by Audit Committee
No deviation
Number of follow-up reports on AGSA Audit findings for 2011/12
Two reports on AGSA findings and the audit Steering Committee verified
Reports presented to Audit Committee
No deviation
Anti-fraud and corruption strategy developed
Anti-fraud and corruption strategy developed
Not achieved Target not achieved as planned
The Fraud prevention policy was prioritised. Fraud Prevention Strategy and plan will be finalised in Q1 of 2013/14
Number of coaching and training on Risk Management workshops
Three training on Risk Management workshops conducted
Management were trained on Risk management
No deviation
Awareness campaigns on anti-fraud and corruption strategy conducted
Not conducted as planned Not conducted as planned Due to unavailability of anti-fraud and corruption strategy the target was not achieved it will be rolled over to next financial year.
16
![Page 17: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/17.jpg)
Sub-programme: Strategic Management
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13Institutional M&E Policy and Policy Register developed
Institutional M&E Policy and Policy Register developed
The policy was developed and its name was changed to Performance Management Policy and Policy Register was also developed
No deviation
Institutional M&E Framework developed
Institutional M&E Framework developed
The framework was developed however is known as Performance Management Framework
No deviation
Approved 2012/16 Strategic Plan
Strategic Plan approved Revised Strategic Plan 2013/14 has been approved.
No deviation
Annual Performance Plan (APP) approved
2013/14 APP approved APP for 2013/14 tabled to the Portfolio Committee
No deviation
ENE chapter approved ENE chapter submitted to National Treasury
ENE chapter approved and submitted to NT
No deviation
Functional M&E system Functional M&E system developed
Not achieved The target was not achieved as planned
The first phase of benchmarking was done with Stats SA, however could not continue due to the process of revising the department strategy for 2013/14. The project will be finalised in 2013/14 financial year.
Management Performance Assessment Tool (MPAT) finalised
MPAT finalised MPAT approved and submitted to DPME
No deviation
17
![Page 18: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/18.jpg)
Sub-programme: Strategic Management
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Performance Quarterly reports submitted
Performance Quarterly reports submitted quarterly
Quarterly reports approved and submitted to National Treasury
No deviation
2011/12 Annual Report Approved
2011/12 Annual Report Approved
2011/12 AR approved and submitted to NT and Parliament
No deviation
DWCPD participated in FOSAD Clusters
DWCPD participated in FOSAD Clusters
Department participated in all FOSAD Clusters
No deviation
18
![Page 19: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/19.jpg)
Sub-programme: Inter-sectoral and International Coordination
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Beneficial Stakeholder Coordination Framework developed
Beneficial Stakeholder Coordination Framework developed
Framework developed No deviation
The Plan of Action (POA) for National and International commemoration events developed and implemented
The Plan of Action (POA) for National and International commemoration events developed and implemented
Plan of Action in place No deviation
Stakeholder DatabaseManagement System developed
Stakeholder DatabaseManagement System developed
Stakeholder DatabaseManagement System developed
No deviation
Partnerships between the department and inter-sectoral stakeholders signed and coordinated
Partnerships between the department and inter-sectoral stakeholders signed and coordinated
Partnerships between the department and inter-sectoral stakeholders signed
No deviation
A Donor Funding Register for the department developed
A Donor Funding Register for the department developed
A Donor Funding Register for the department developed
No deviation
DWCPD Fund-Raising Policy developed
DWCPD Fund-Raising Policy developed
DWCPD Fund-Raising Policy developed
The development and consultation of fundraising guidelines delayed the development of the Fund-Raising Policy, however it will be developed in the next financial year
19
![Page 20: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/20.jpg)
Sub-programme: Inter-sectoral and International Coordination
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Guidelines and Standards on obligatory multilateral and bilateral country reports coordinated and populated
Guidelines and Standards on obligatory multilateral and bilateral country reports coordinated and populated
Guidelines and Standards on obligatory multilateral and bilateral country reports coordinated and populated
No deviation
Schedule on participation for multilateral and bilateral activities/events developed
Schedule on participation for multilateral and bilateral activities/events developed
Schedule on participation for multilateral and bilateral activities/events developed
Schedule not developed as planned
The draft schedule developed. However consultation with internal and external stakeholders delayed the achievement of this target.
20
![Page 21: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/21.jpg)
Sub-programme: Research and Policy Development
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Research projects supported andadvised
Study on Violence against children conductedAudit of Special Schools conducted Study on Violence Against Women initiated
Achieved No deviation
Research Forums onWomen, Children &People with Disabilities coordinated
Research Forums on Women, Children & People with Disabilities coordinated
Achieved. Research Indaba report on women, children and people with disabilities compiled
No deviation
Report on InstitutionalArrangements tabled in linewith CD’s InstitutionalSupport and CapacityDevelopment
Report onInstitutionalArrangementstabled
Achieved No deviation
KIM Plan of Action (POA) approved and implemented
KIM Plan of Action (POA) approved
Not achieved KIM POA not achieved as planned
The focus on the on the survey of special school audit affected the target however the Chief Directorate will utilise the available human resources to implement the KIM POA and also re-submit request for the position to be filled during financial year 2013/14
21
![Page 22: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/22.jpg)
Sub-programme: Research and Policy Development
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
KIM Strategy developed KIM Strategy developed Not achieved KIM Strategy not developed as planned
The focus on the survey of special school audit affected the target however the Chief Directorate will utilise the available human resources to implement the KIM POA and also re-submit request for the position to be filled during financial year 2013/14
Reports on policy development coordination and support services rendered
Reports on policy development coordination and support services rendered
Achieved Also coordinated inputs on National Food Security Policy
No deviation
22
![Page 23: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/23.jpg)
Sub-programme: Communications
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Communication Strategy for 2012/13 developed
Communication Strategy developed
Strategy approved No deviation
Events Management Policy developed
Events Management Policy developed
Events Management Policy/guidelines delivered as planned and approved
No deviation
Weekly internal online publication Newsflash produced
Weekly internal online publication Newsflash produced
Communications on weekly online produced
No deviation
At least one departmental media statement, message or article published or aired in the media
At least one departmental media statement, message or article published or aired in the media
Departmental media statement aired in the media
No deviation
Speeches drafted and delivered to the Executive Authority and DG at least 24 hours before delivery
Speeches drafted and delivered to the Executive Authority and DG at least 24 hours before delivery
Drafted speeches for the Executive Authorities
No deviation
23
![Page 24: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/24.jpg)
Sub-programme: Legal Services
Performance Indicator
Actual Performance against target
Deviation from planned target Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13Legislation as per the Departmental legislative programme developed
Legislation as per the Departmental legislative programme developed
Not achieved Draft WEGE Bill still in Consultation
Draft WEGE Bill was submitted to the Cabinet and the advice was that it should go back to NEDLAC for consultation
Framework for review of constitutionality and harmonisation of all legislation impacting on the rights of women, children and people with disabilities developed
Framework for review of constitutionality and harmonisation of all legislation impacting on the rights of women, children and people with disabilities developed
Framework was presented to the Branch meeting
No deviation
MOU`s as per requests from branches within the department developed
MOU`s as per requests from branches within the department developed
MOUs developed as requested
No deviation
Contract Management Protocol developed
Contract Management Protocol developed
Contracts developed as per request
No deviation
Litigation Management Strategy developed
Litigation Management Strategy developed
Litigation Management in place
No deviation
24
![Page 25: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/25.jpg)
Sub-programme: Resource Management
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13HR Plan revised andImplemented
HR Plan revised andImplemented
HR Plan in place No deviation
Service Delivery Improvement Plan developedand implemented
Service Delivery Improvement Plan developedand implemented
Not achieved SDIP was not finalised as planned
The draft SDIP was developed however the DPSA developed the new guidelines as a result it had to be reviewed and it will be finalised in the 1st quarter of 2013/14
Workplace Skills Plan(WSP) developed
Workplace Skills Plan(WSP) developed
WSP implemented No deviation
Institutionalisation of the PMDS
PMDS institutionalised PMDS implemented No deviation
Employee AssistanceProgramme developed
Employee AssistanceProgramme developed
Not achieved EAP not carried out as planned
The target could not be carried out before the development of the Policy, however Health and Wellness Day was organised for staff and EAP coordinator appointed for the achievement of this target in 2013/14
Computer network implemented
Computer network implemented
Not achieved Only the first phase was done and 2nd phase not implemented as planned
Not achieved because of the hardware required. However request has been made for additional funding for the 2013/14 financial year to procure hardware and software for the implementation of additional file servers
25
![Page 26: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/26.jpg)
Sub-programme: Resource Management
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
ICT Governance framework designed and phase 1 implemented
ICT Governance framework designed and phase 1 implemented
Not achieved Not implemented Implementation Guideline for Corporate Governance of Information and Communication Technology Policy Framework was only made available by DPSA to departments towards the end of February 2013 which was already late to implement, however Revised IT Security Policy is submitted for approval
Internal Security Policy developed
Internal Security Policy developed
Policy developed as planned and implemented
No deviation
Occupational Health and Safety (OHS) Policy developed
Occupational Health and Safety (OHS) Policy developed
OHS Policy developed as planned and implemented
No deviation
Suitable and compliant accommodation secured
Suitable and compliant accommodation secured
Not achieved Insufficient office accommodation
The department still on long term lease agreement, however the negotiations are still taking place on the proper office accommodation space
26
![Page 27: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/27.jpg)
27
Programme 2 - Performance Overview
The figure below illustrates that out of 17 planned targets , Programme 2 achieved 14 targets (82%) while 3 targets (18%) were not achieved.
![Page 28: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/28.jpg)
Sub-programme: Advocacy and Mainstreaming
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
Number of departments and provinces work shopped and supported on implementation of National Policy on WEGE
Workshop and supported 24 departments and 6 provinces on implementation of National Policy on WEGE
The presentation done in WEGE policy to DG clusters
No deviation
Number of National departments and provinces work shopped and supported on implementation of Gender Mainstreaming Strategy
Draft Gender Mainstreaming Strategy
The workshop was done on Mainstreaming strategic framework and was incorporated into the integrated Mainstreaming Framework which included Gender Mainstreaming/advocacy strategy
No deviation
New Growth Path Engendered
New Growth Path Engendered and Advocate for 50% allocation of Job Fund for women
Not achieved Target not achieved as planned
Inputs were made towards engendering the New Growth Path, and gender disaggregated statistics was not available to influence and determine 50% allocation of Job
Fund for women.
Number of programmes on rural women’s development coordinated
Seven provincial programmes on rural women`s development coordinated.
Coordinated women participation in development programmes.
No deviation
Number of Advocacy and Social Campaigns coordinated
Two advocacy and two social campaigns coordinated
1 Social Campaign on National Women’s month coordinated . Successfully celebrated the World Rural Women’s Day in Free State on 19 November 2012. 16 Days Campaign on No Violence Against Women and Children, on 25 November and 10 December in Northern Cape and North West respectively.
No deviation
28
![Page 29: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/29.jpg)
Sub-programme: Monitoring and EvaluationPerformance Indicator Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Number of national departments monitored on WEGE
34 national departments monitored on gender responsiveness
Developed Analytical report on M&E for WEGE issues. This was followed by the development of a draft M&E Framework for WEGE, which was then work shopped with all national departments and provinces to agree on indicators for WEGE and gaps in current M&E indicators.
No deviation
Number of provinces gender audited
12 gender audit reports developed
Not all the provinces responded to gender audits
Not all the provinces responded to gender audits
Provinces have not received approval of the audit reports and findings from their executive hence it slowed the process of follow up on recommendations.
Number of databases established and monitored
Six database on women in construction, tourism, mining, farm, SETA boards and cooperatives established
Database has been developed and is available
No deviation
Number of provincial monitoring visits to women’s projects, including green economy projects and case studies documented and published
Twelve provincial monitoring visits to women’s projects conducted
35 Provincial women owned / managed projects under different funding agencies were visited
No deviation
29
![Page 30: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/30.jpg)
Sub-programme: Monitoring and Evaluation
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
Number of reports on compliance to regional, continental and international commitments developed and submitted to Cabinet and /or Multilateral bodies as per timeframe and requests
Nine reports on SADC Monitoring Tool; AU Solemn Declaration; CEDAW; African Women`s Protocol to AU; participation at 3rd NAM, SADC, AU Ministerial meetings; 56th session of UN CSW; and two Ad Hoc Reports developed
Nine reports developed as planned
No deviation
Number of reports on compliance to national commitments developed and submitted to Cabinet
Five reports on compliance to national commitments developed
Not achieved Reports not done as planned This key performance indicator was not implemented due to the complexity of the subject and scope of coverage that the impact assessment had to be conducted. However, a Draft Impact Assessment Proposal was developed.
30
![Page 31: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/31.jpg)
Sub-programme: Institutional Support and Capacity Development
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
Capacity building and institutional support programmes facilitated and coordinated
Report on Capacity building/development at national, provincial and municipal level coordinated
Achieved.Gender mainstreaming, gender score card, CEDAW and MSA trainings were co-ordinate
No deviation
Strategy for mainstreaming gender considerations in integrated public service delivery coordinated
Strategy for mainstreaming gender considerations in integrated public service delivery coordinated
Achieved.An overall departmental mainstreaming strategy was developed and consulted for alignment by line function departments at national and provincial level
No deviation
Institutional Framework developed
Institutional Framework developed
Achieved.Framework for the 3 sectors was developed and consulted with sector machineries, NGO’s, joint machineries and UN Agencies
No deviation
Gender Machineries convened
Gender Machineries convened
Achieved.Sector and joint machineries were convened during each quarter
No deviation
31
![Page 32: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/32.jpg)
Sub-programme: Institutional Support and Capacity Development
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
Institutional support and capacity building to meet international and regional obligations facilitated
Report on four provincial green economy empowerment initiatives coordinated and facilitated compiled
Achieved.Green economy initiatives were coordinated in partnership with Cogta and correctional services and a report was compiled
No deviation
Integrated institutional mechanisms for empowerment of young women facilitated
Report on partnerships with business and government compiled
Achieved.In partnership with the Techno-girl programme business and government departments took girls for job shadowing and a report for the years activities was compiled
No deviation
32
![Page 33: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/33.jpg)
33
Programme 3 - Performance Overview
The figure below illustrates that out of 14 planned targets, Programme 3 achieved 13 targets (93%) while 1 targets(18%) were not achieved.
![Page 34: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/34.jpg)
34
Sub-programme: Advocacy and Mainstreaming
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
National Plan of Action for Children (NPAC) Approved
National Plan of Action for Children (NPAC) Approved
Achieved.NCPA was presented in Parliament
No deviation
Integration of mainstreaming strategy into policies and governance processes facilitated
Integration of mainstreaming strategy into policies and governance processes facilitated
Achieved.Mainstreaming Strategy integrated for the three sectors (women, children and people with disabilities)
Department has collaborated with the Lekwe Municipality in North West Province and Deputy Presidents office team in promoting access to services for children with profound disabilities.
No deviation
Sanitary Dignity Programme coordinated
Sanitary Dignity Programme coordinated
Achieved.Different departments were called and coordinated the development of Sanitary Dignity Strategy
No deviation
Number of Social Campaigns coordinated
Four social campaign concept documents for Child protection week, Universal Access to Education, Child and Maternal Mortality, and ECD.
Achieved.Child protection week was successfully coordinated . Two Department events were held on Child protection week.
Department collaborated with Limpopo Province to launch the Access to Education Programme in the province.
No deviation
![Page 35: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/35.jpg)
35
Sub-programme: Advocacy and Mainstreaming
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
Child participation and self advocacy strengthened
Child participation and commemoration of children`s days coordinated
Achieved.International Day of Girl Child and Nelson Mandela Parliament held in Mpumalanga.
The Celebration of the National Children’s Day was successfully hosted on the 3rd November 2012, in partnership with Limpopo Premier’s Office, Provincial Government Departments and the Ephraim Mogale Local Municipality
No deviation
![Page 36: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/36.jpg)
36
Sub-programme: Monitoring and Evaluation
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
Comprehensive children’s rights M&E Strategy developed
Comprehensive children’s rights M&E Strategy developed
Achieved.Incorporated final children’s rights indicators into Integrated Monitoring and Evaluation Framework and strategy
No deviation
Indicators for ECD reviewed and monitored
Indicators for ECD reviewed and monitored
Achieved.ECD Indicators included in the M&E strategy
No deviation
UNCRC 2013 periodic country report, ACRWC report and Optional Protocols reports finalised
UNCRC 2013 periodic country report, ACRWC report and Optional Protocols reports finalised
Achieved.The 2013 UNCRC/ AU Periodic reports was approved by Cabinet and was also released to the public for comments in January 2013 .
The report was presented to the Portfolio Committee on Women Children and People with Disabilities in March 2013
No deviation
Indicators for monitoring violence against children developed
Indicators for monitoring violence against children developed
Achieved.Indicators were consulted to stakeholders in a Workshop held on 23 January 2013.
No deviation
One comprehensive report on Progressive Realization of Children’s Rights compiled
One comprehensive report on Progressive Realisation of Children’s Rights compiled
Achieved.The UNCRC/ACRWC represents the comprehensive report.
No deviation
![Page 37: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/37.jpg)
37
Sub-programme: Institutional Support and Capacity Development
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation
Planned Target
2012/13
Actual Achievement
2012/13
Machineries convened Machineries convened Achieved.Facilitated Joint Machinery with SALGA, (11 February 2013)
Provided Institutional support to Joint Machineries in KZN (8/02/2013) , North West (26/01/2013) and on 7//03/2013
No deviation
Strategy for mainstreaming children considerations in integrated public service delivery coordinated
Strategy for mainstreaming children considerations in integrated public service delivery coordinated
Achieved.Mainstreaming Strategy integrated for the three sectors (women, children and people with disabilities)
No deviation
Child Friendly Cities/ Communities initiatives for realisation of children’s rights facilitated and coordinated in three municipalities
Child Friendly Cities/ Communities initiatives for realisation of children’s rights facilitated and coordinated in three municipalities
Achieved.Child friendly Cities model piloted
No deviation
Institutional Framework Developed Institutional Framework Developed
Not achieved Not achieved The draft Children’s Rights Institutional Framework has been developed and awaiting final approval which is envisaged to happen during the first quarter of 2013/2014 financial year.
![Page 38: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/38.jpg)
38
Programme 4 - Performance Overview
The figure below illustrates that out of 16 planned targets , Programme 4 achieved 5 targets (31%) while 11 targets(69%) were not achieved.
![Page 39: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/39.jpg)
39
Sub-programme: Advocacy and Mainstreaming
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
National Disability Policy published
National Disability Policy published
Not achieved National Disability Policy not published as planned
The project has been carried over to 2013/14 with additional technical and financial support having been secured through the UN Partnership to Promote the Rights of Persons with Disabilities
National Disability Awareness Campaign coordinated
National Accessibility Campaign launced
Launch of National Disability Awareness Month and International Day of Persons with Disabilities celebrations coordinated
No deviation
Universal Access Strategy approved
Universal Access Strategy approved
Not achieved Universal Access Strategy not achieved as planned
The project has been carried over to 2013/14 with additional technical and financial support having been secured through the UN Partnership to Promote the Rights of Persons with Disabilities
![Page 40: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/40.jpg)
40
Sub-programme: Advocacy and Mainstreaming
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Participation bydisability sector in key sector policydevelopmentprocesses &governmentprogrammesfacilitated
Participation bydisability sector in key sector policydevelopmentprocesses &governmentprogrammesfacilitated
Achieved.The EE Amendment Bill, Revised BBBEE Codes of Good Practice and Technical Assistance Guidelines were circulated to the sector and external stakeholders for comment
Held a Presidential Disability consultation summit with the Disability sector to determine the process of promulgating the Disability legislation, universal access strategy and aligning other relevant policies (Summit resolutions available
No deviation
SA Country Plan of the African Decade Continental Plan implemented and coordinated
SA Country Plan of the African Decade Continental Plan implemented and coordinated
Not achieved Target not achieved as planned
The indicator not achieved due to the delays at AU level in approval of the African Decade Continental Plan. The Plan was approved in January 2013.
The Continental Plan will be domesticated through the National Disability Policy and Programme of Action development process in 2013/14.
Statements made bythe SA delegation tothe UNCRPD Conference of Parties are published and circulated
Statements made bythe SA delegation tothe UNCRPD Conference of Parties are published and circulated
Achieved.Publication and circulation of Final Statements and Report finalised
No deviation
![Page 41: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/41.jpg)
41
Sub-programme: Monitoring and Evaluation
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Number of reports on access to education for children and young people with disabilities compiled
Five reports on access to education for children and young people with disabilities compiled
Not achieved No reports were compiled The indicator not achieved due to delays in capturing analysing the Special School Survey questionnaires, as well as capacity challenges. The process has been deferred to 2013/14
Number of M&E reports on access to employment and economic empowerment opportunities for people with disabilities compiled
Three reports on access to employment and economic empowerment opportunities for people with disabilities compiled
Not achieved Reports not compiled as planned
No reports completed as a result of capacity challenges. The process has been deferred to 2013/14.
Two reports on participation by people with disabilities in rural development programmes compiled
Two reports on participation by people with disabilities in rural development programmes compiled
Not achieved Reports not finalised No reports completed as a result of capacity challenges. The process has been deferred to 2013/14.
![Page 42: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/42.jpg)
42
Sub-programme: Monitoring and Evaluation
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Disability considerationsintegrated into allGovernment M&E(GWME) systems
Disability M&E indicators for GWME systems finalised
Not achieved Disability M&E indicators for GWME systems not finalised as planned
An Integrated M&E Strategy for Women, Children and People with Disabilities has been finalised, Draft Disability M&E Strategy and Indicator Matrix have been developed. The project will be completed in 2013/14 with additional technical and financial support from the UN Partnership to Promote the Rights of Persons with Disabilities
UNCRPD ReportingRequirements complied with.
UNCRPD ReportingRequirements complied with.
Achieved No deviation
![Page 43: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/43.jpg)
43
Sub-programme: Institutional Support and Capacity Development
Performance Indicator
Actual Performance against target
Deviation from planned target
Comment on deviation Planned Target
2012/13
Actual Achievement
2012/13
Intervention Model to accelerate access to education for children and young people with disabilities developed
Intervention Model to accelerate access to education for children and young people with disabilities developed
Achieved No deviation
Two institutional supportinterventions to facilitate equal access to employment and economic empowermentopportunities for people with disabilities coordinated
Two institutional supportinterventions to facilitate equal access for people with disabilities not conducted
Not achieved Target not achieved as planned
Indicator not achieved due to delays on both the KZN Skills Development Centre and NW Itsoseng sites.
Strategy for mainstreaming of disability considerations in integrated public service delivery coordinated
Strategy for mainstreaming of disability considerations in integrated public service delivery coordinated
Not achieved Draft Integrated Institutional and Capacity Development Strategy finalised
The roll-out of a Disability Mainstreaming Course through PALAMA was suspended due to quality challenges in the implementation.
A re-worked capacity development project for the implementation of the Convention on the Rights of Persons with Disabilities will be piloted in 2013/14 with UN-DESA support.
![Page 44: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/44.jpg)
44
Overall Financial Performance of the Department
ProgrammeFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE % SPENDFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE
% SPEND
R '000 R '000 R '000 R '000 R '000 R '000
- Administration 85 203 80 110 5 093 94% 43 779 67 105 -23 326 153%
- WEGE 79 502 77 572 1 930 98% 78 170 77 196 974 99%
- CRR 13 025 9 205 3 820 71% 10 179 12 006 -1 827 118%
- RPD 15 119 13 002 2 117 86% 11 019 9 554 1 465 87%
-
TOTAL 192 849 179 889 12 960 93% 143 147 165 861 -22 714 116%
2012 - 2013 2011 - 2012
• The department spent 93% of its allocated budget, with an under-spending of 7%
• There was an improvement from the 2011/12 budget expenditure performance
• The major cost drivers of the budget per economic classification are:
• Compensation of Employees (expenditure is at 94%)• Goods & Services (expenditure is at 88%)
• Transfer to the Commission on Gender Equality (CGE) was R59 073 million which amounts to 100% expenditure in this economic classification
• Donor funding was received to the value of R3 541 million to assist in the implementation of some KPIs
![Page 45: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/45.jpg)
45
Economic classificationFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE
% SPEND
FINAL BUDGET
ACTUAL EXPENDITURE
(OVER) / UNDER
EXPENDITURE
% SPEND
R '000 R '000 R '000 R '000 R '000 R '000
- Compensation of employees 43,506 43,497 9 100% 18,929 29,787 (10,858) 157%
- Goods and services 38,974 34,630 4,344 89% 17,723 30,795 (13,072) 174%
- Transfer and Subsidies 80 75 5 94% 21 120 (99) 571%
- Capital 2,643 1,908 735 72% 7,106 6,403 703 90%
TOTAL 85,203 80,110 5,093 94% 43,779 67,105 (23,326) 153%
2011 - 20122012 - 2013ADMINISTRATION
Programme 1 Financial Performance
• In 2011/12 Programme 1 over spent on Compensation of Employees by (R10 858) million. However, this was corrected in 2012/13 by ensuring that there is no over spending in this expenditure item
• In 2011/12 the Programme over spent on Goods & Services by (R13 072) million and this was closely monitored and avoided in 2012/13
• The under spending on Goods & Services in 2012/13 was due to the non-billing by the Department of Public Works (DPW) for Office Accommodation
![Page 46: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/46.jpg)
46
Economic classificationFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE % SPENDFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE
% SPEND
R '000 R '000 R '000 R '000 R '000 R '000
Compensation of employees 7,807 6,782 1,025 87% 7,208 7,208 - 100%- -
Goods and services 12,455 11,635 820 93% 15,812 14,838 974 94%- -
Transfer and Subsidies 59,073 59,073 - 100% 55,150 55,150 - 100%- -
Capital 167 82 85 49% - - - - -
TOTAL 79,502 77,572 1,930 98% 78,170 77,196 974 99%
2011 - 20122012 - 2013WEGE
Programme 2 Financial Performance
• The under spending on Compensation of Employees was due to delays in the recruitment processes in 2012/13 and the funding that was received in December 2012 from National Treasury
• Goods & Services under spent by R820 000 which was earmarked for the NCGBV
![Page 47: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/47.jpg)
47
Economic classificationFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE % SPENDFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE
% SPEND
R '000 R '000 R '000 R '000 R '000 R '000
Compensation of employees 6 754 5 276 1 478 78% 5 629 6 843 -1 214 122%- 0
Goods and services 6 102 3 792 2 310 62% 4 550 5 132 -582 113%- 0
Transfer and Subsidies - - - 0% - 0 0%- 0
Capital 169 137 32 81% - 31 -31 0%- 0
TOTAL 13 025 9 205 3 820 71% 10 179 12 006 -1 827 118%
2011 - 20122012 - 2013CRR
Programme 3 Financial Performance
• In 2011/12 Programme 3 over spent on Compensation of Employees by (R1 214) million. However, in 2012/2013, there was an under spending in this budget item due to delays in the recruitment processes
• On Goods & Services the Programme over spent by (R582 000) in 2011/2012. In 2012/2013, the under spending of R2 310 million was due to the delay in the development and publication of the UNCRC reports and African Union Charter.
![Page 48: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/48.jpg)
48
Economic classificationFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE % SPENDFINAL
BUDGETACTUAL
EXPENDITURE
(OVER) / UNDER
EXPENDITURE
% SPEND
R '000 R '000 R '000 R '000 R '000 R '000
Compensation of employees 6,778 5,404 1,374 80% 4,670 3,979 691 85%-
Goods and services 8,013 7,413 600 93% 6,349 5,575 774 88%-
Transfer and Subsidies 159 159 - 100% - 0%-
Capital 169 26 143 15% - 0%- -
TOTAL 15,119 13,002 2,117 86% 11,019 9,554 1,465 87%
2011 - 20122012 - 2013RPD
Programme 4 Financial Performance
• The under spending on Compensation of Employees was due to delay in recruitment processes in 2012/13 and the funding that was received in December 2012 from National Treasury
• Goods & Services was under spent by R600 000 due to the delay in conducting the baseline studies on Public Servant, Student in Public Universities and Learnership Programmes for People with Disabilities
![Page 49: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/49.jpg)
Auditor General’s Report
The department received an unqualified audit opinion with emphasis of matter
No material findings were reported on Predetermined Objectives on usefulness and reliability of information
The Internal Audit did not have a three year rolling strategic plan
In some instances procurement processes were partially complied with
Effective steps were not taken to prevent irregular expenditure
49
![Page 50: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/50.jpg)
Action plan to improve controls
Interim financial statements are prepared on a quarterly basis to improve the quality and integrity of information
In 2013/14 the performance indicators and annual & quarterly targets will follow the SMART principle in order to avoid too many targets not measurable and achievable
Quarterly reports and portfolio of evidence are discussed at Branch level and signed off by the Programme Managers
Reports are audited internally and endorsed for consideration by the Audit Committee
The capacity of the Audit Committee has been increased The department is in the process of capacitating the Internal Audit
Unit Improved internal controls have been introduced to ensure full
compliance with Supply Chain Management processes
50
![Page 51: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/51.jpg)
GovernanceIn the year under review the department implemented principles of good
governance and as such non compliance with prescripts improved:
In adhering with Risk Management principles, a Risk Management Committee was appointed. Risk Management Charter and Policy were approved
An approved Fraud Prevention Policy is in place and awareness campaigns as well as training was conducted to officials on fraud and corruption
Department adheres to the Public Service Code of Conduct, any breach constitutes misconduct. Senior Managers declare financial interests annually as regulated
An approved Occupational Health and Safety Policy is in place and the Occupational Health and Safety Committee was appointed as well as representatives
51
![Page 52: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/52.jpg)
Highlights of Significant Achievements
52
Sector Research
and Internatio
nal Reports
•Study on Violence Against Children (VAC)
•The AU Solemn Declaration Report
•The 2013 UNCRC/ AU Periodic reports
•Assessment Report on National Awareness and Accessibility Campaigns
![Page 53: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/53.jpg)
Highlights of Significant Achievements
53
Turnaround strategy
(Kharifaris
ane)
•Increase in the number of targets achieved (7%)
•No unauthorised expenditure
•Revision of the Strategic Plan and the Annual Performance Plan for alignment with the SMART principles
•Sustained the Unqualified Audit Opinion
![Page 54: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/54.jpg)
Highlights of Significant Achievements
54
Sector Governanc
e Tools
•National Plan of Action for Children (NPAC)
• Women Empowerment and Gender Equality Bill
•Integrated National Mainstreaming Framework
•Integrated National Advocacy Strategy
•Integrated National Monitoring and Evaluation Strategy
•Integrated National Institutional Coordination Framework
![Page 55: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/55.jpg)
Highlights of Significant Achievements
55
Advocacy / Social
Campaigns
•Through the National Council Against Gender-Based Violence
•GBV Summit (Traditional Healers and Rural Women)•Ride-on-Speak-out bikers campaign, where bikers rode through SADC region to raise awareness on the war against Gender-Based Violence, was used as a build up to the 16 Days Campaign.
•Launched the Access to Education for All Children Campaign
![Page 56: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/56.jpg)
Requested Adjustments for 2013/14 - AENE A request was made to National Treasury for additional funding
through the AENE process amounting to R16 070 million detailed as follows:
Item Amount
(R’000)
Office Accommodation (arrears) 1 970Claims by the Presidency 2 900Disaster Recovery Plan 700Legal Fees 2 000Gender-Based Violence (GBV) 8 500
Funding request for Council activities (GBV) is also included in the MTEF inputs submitted to National Treasury
Funding support for the GBV programmes / activities was requested through the General Budget Support with National Treasury
56
![Page 57: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/57.jpg)
Funding Re-alignment - 2014/15 and the MTEF
57
2015/16 2016/17
DWCPDIndicative Baseline
Unforseen/ unavoidable
Proposed revised baseline
Indicative Baseline
Indicative Baseline
Compensation of Employees 84,641 25,397 110,038 115,980 122,127
Goods and Services 62,643 40,800 103,443 109,029 114,807
Capital Assets 4,005 580 4,585 4,833 5,089
Transfers & Subsidies. 67,241 0 67,241 70,872 74,628
Total 218,530 66,777 285,307 300,714 316,651
218,530 230,234 243,598Additions to baseline 66,777 70,480 73,053
CONSOLIDATED MTEF - 2014/15 - 2016/17
Original Indicative baselines as received from National Treasury:
2014/15
![Page 58: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/58.jpg)
Funding Re-alignment 2014/15 and the MTEF
58
Motivations to proposed changes to the baselineCompensation of Employees
Goods & Services
Implementation of the WEGE bill (unavoidable)Servicing of multilateral and bilateral obligatory treaties, not accommodated for in baseline after reprioritisation. (unavoidable)
Financial Management, Internal Audit & Information Technology (unavoidable)
NCGBV: implementation of new policy in the department Baseline Adjustment requested:
Baseline adjustment requested on critical unfunded posts:NCGBV: New policy in the department: 9 posts (SMS = 5, L11 = 1, L7 = Financial Management, Internal Audit & Information Technology: 23 Implementation of the WEGE Bill 2 posts (SMS = 1, Non SMS: L11 =
![Page 59: Table of Contents](https://reader035.vdocuments.site/reader035/viewer/2022070412/568148fe550346895db624ab/html5/thumbnails/59.jpg)
59
THANK YOUTHANK YOU