ta:±£ of efu jlerseyp3generatorservices.com/wp-content/uploads/2018/08/njdoh-emergency... ·...

5
PHILIP 0. MURPHY Goveor SHEILA Y. OLIVER Lt. Goveor �t±£ of �e erse y DEPARTMENT OF HEALTH PO BOX 367 TRENTON, N.J. 08625-0367 www.nj.gov/health June29,2018 TO: FROM: SUBJECT: All Nursing Home Administrators Stefanie Mozgai � Assistant Commissioner Health Facility Survey and Field Operations Emergency Generators SHEREEF M. ELNAHAL. MD, MBA Commissioner The New Jersey Department of Health (NJDOH) has received several requests for clarification regarding requirements for generators. There are four areas that require clarification: annunciator panels, reporting generator testing, requirements for full load generator testing, and statutory requirements for generators in Long Term Care facilities. ANNUNCIATOR PANELS: Annunciator panel requirements are not new. They were part of NFPA 70 (National Electrical Code) and NFPA 110 (Standard for Emergency and Standby Power Systems). CMS references NFPA 99 (Health Care Facilities Code). Please see the Codes and Standards regulations below: K916 Electrical Systems - Essential Electric System Alarm Annunciator. A remote annunciator that is storage battery powered is provided to operate outside of the generating room in a location readily observed by operating personnel. The annunciator is hard-wired to indicate alarm conditions of the emergency power source. A centralized computer system (e.g., building information system) is not to be substituted for the alarm annunciator. 6.4.1.1.17, 6.4.1.1.17.5 (NFPA 99)

Upload: others

Post on 24-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

PHILIP 0. MURPHY

Governor

SHEILA Y. OLIVER

Lt. Governor

�ta:±£ of �efu Jlersey DEPARTMENT OF HEALTH

PO BOX 367 TRENTON, N.J. 08625-0367

www.nj.gov/health

June29,2018

TO:

FROM:

SUBJECT:

All Nursing Home Administrators

Stefanie Mozgai � Assistant Commissioner Health Facility Survey and Field Operations

Emergency Generators

SHEREEF M. ELNAHAL. MD, MBA

Commissioner

The New Jersey Department of Health (NJDOH) has received several requests for clarification regarding requirements for generators. There are four areas that require clarification: annunciator panels, reporting generator testing, requirements for full load generator testing, and statutory requirements for generators in Long Term Care facilities.

ANNUNCIATOR PANELS:

Annunciator panel requirements are not new. They were part of NFPA 70 (National Electrical Code) and NFPA 110 (Standard for Emergency and Standby Power Systems). CMS references NFPA 99 (Health Care Facilities Code). Please see the Codes and Standards regulations below:

K916 Electrical Systems - Essential Electric System Alarm Annunciator. A remote annunciator that is storage battery powered is provided to operate outside of the generating room in a location readily observed by operating personnel. The annunciator is hard-wired to indicate alarm conditions of the emergency power source. A centralized computer system (e.g., building information system) is not to be substituted for the alarm annunciator. 6.4.1.1.17, 6.4.1.1.17.5 (NFPA 99)