णाली चालन िववरण SYSTEM OPERATION REPORT SOUTHERN REGION SOUTHERN REGION SOUTHERN REGION SOUTHERN REGION 2020 2020 2020 2020-21 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER SYSTEM OPERATION CORPORATION LTD November 2020 BANGALORE November November November November 20 20 20 2020 20 20 20

Upload: others

Post on 13-Feb-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • �णाली �चालन िववरण SYSTEM OPERATION REPORT

    SOUTHERN REGION SOUTHERN REGION SOUTHERN REGION SOUTHERN REGION 2020202020202020----22221111

    SOUTHERN REGIONAL LOAD DESPATCH CENTRE

    POWER SYSTEM OPERATION CORPORATION LTD

    November 2020 BANGALORE

    NovemberNovemberNovemberNovember 2020202020202020

  • Departmental Procedure Document Number

    (Based on ISO 9001:2008) SRLDC/SO/D-03/SYSTEM OPERATION

    REPORT

    Prepared By: Checked By Approved by: Issued by:

    Chief Manager

    (SO) Sr.DGM (SO) GM (SO) MR (SRLDC)

    Document Management Information

    Document Effective Date: 20 December 2020

    Classification

    Modification History

    Sr. No Description of Change Date of Change Version No.

    1 System Operation Report –November 2020 20 December 2020 00

  • Table of Contents

    AAAA SR Performance

    1 IMPORTANT EVENTS

    a) COMMISSIONING OF New GENERATING UNITS

    b) COMMISSIONING OF New TRANSMISSION LINES

    c) COMMISSIONING OF New SUB-STATIONS

    2 FREQUENCY PROFILE

    3 POWER SUPPLY POSITION

    BBBB DETAILED REPORTSDETAILED REPORTSDETAILED REPORTSDETAILED REPORTS

    1 INSTALLED CAPACITY

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15 State Wise Wind Generation Mu's

    CONSUMPTION OF SR STATES

    LTA,MTOA and STOA ENERGY EXCHANGES

    REGIONAL AVAILABILITY CURVE

    REGIONAL and STATE GENERATION/LOAD CURVE FOR PEAK DEMAND DAY

    REGIONAL and STATE GENERATION/LOAD CURVE FOR MINIMUM DEMAND DAY

    MAXIMUM DEMAND OF SR STATES

    Net Drawal Schedules and Actual Drawals

    BRIEF DISCRIPTION OF DISTURBANCES

    PROGRESS OF SHUNT CAPACITORS

    FREQUENCY PROFILE CURVE

    INDEXINDEXINDEXINDEX

    SALIENT FEATURES OF SYSTEM CONDITION

    PERFORMANCE OF CONSTITUENTS

    RESERVOIR PARTICULARS

  • ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMIL NADU

    (I) GENERATION DETAILS:(MU)

    HYDRO 327.43 329.51 932.25 521.81 576.99

    THERMAL 1301.50 1992.68 832.57 978.29

    DIESEL 0.00 0.00 0.00 0.00 0.00

    GAS 113.38 164.03

    TOTAL 1742.31 2322.19 1764.82 521.81 1719.31

    INDEPENDENT P.P * 215.68 83.64 636.67 19.94 490.00

    INTER REGIONAL IMPORT(HVDC)

    WIND MILL 273.23 21.02 581.56 6.26 184.86

    SOLAR 328.29 503.74 692.08 10.72 428.80

    CAPTIVE PLANTS * * 0.00 0.00 0.00 0.00 0.00

    TOTAL DRAWALS INCL HVDC 2307.79 1356.11 1836.56 1565.19 5161.34

    (II)ACTUAL CONSUMPTION (MU) 4867.30 4286.70 5511.69 2123.92 7984.31

    (III) MAXIMUM DEMAND(MW) 9490 7427 10878.3975 3672 15297.5

    MAX DEMAND ON DATE 03-11-2020 02-11-2020 13-11-2020 30-11-2020 04-11-2020

    MAX DEMAND AT TIME 13:00 08:20 10:00 19:00 11:00

    FREQUENCY OF MAX DEMAND 49.99 50.03 49.99 50.06 50.04

    MW DATE TIME FREQUENCY

    44968 04-Nov-2020 11:57:20 50.05

    SR GRID SUMMARY FOR THE MONTH OF November-2020

    As per Annexure

    REGIONAL MAXIMUM DEMAND:

  • 1) IMPORTANT EVENTS 01-11-2020

    A)CHARGING/COMMISSIONING OF NEW GENERATING UNITS

    SL.NO. STATE/ISGS STATION NAME UNITCAPACITY

    (MW)TYPE DATE

    Nil

    B)CHARGING/COMMISSIONING OF NEW TRANSMISSION LINES

    SL.NO. OWNER KVCONDUCTOR

    TYPELength (kM) DATE

    1 TSTRANSCO 400 TWIN MOOSE 84.43 05-11-2020

    2 TSTRANSCO 400 TWIN MOOSE 84.43 05-11-2020

    3 KPTCL 400 TWIN MOOSE 51.2 13-11-2020

    4 KPTCL 400 TWIN MOOSE 30 17-11-2020

    5 APSPCL 220 Single Moose 4.598 09-11-2020

    C)CHARGING/COMMISSIONING OF NEW ICTs

    SL.NO. CONSTITUENT STATION NAME ICT- NUMBER KV RATIOCAPACITY

    (MVA)DATE

    1 ANDHRA PRADESH RACHAGUNNERI 1 400/220 315 30-11-2020

    2 ANDHRA PRADESH PODILI 2 400/220 315 06-11-2020

    3 APSPCL NP KUNTA PS -3 3 220/33 80 06-11-2020

    d) CHARGING/COMMISSIONING OF NEW SUBSTATIONS

    SL.NO. CONSTITUENT KV RATIOCAPACITY

    (MVA)DATE

    Nil

    e)CHARGING/COMMISSIONING OF REACTORS/STATCOM

    SL.NO. OWNERREACTOR/FIL

    TER BANK

    CAPACITY

    (MVAR)DATE

    1 APTRANSCO BUS REACTOR 125 30-11-2020

    2 APTRANSCO BUS REACTOR 80 20-11-2020

    2) a) FREQUENCY PROFILE FOR THE MONTH [Hz]

    FREQUENCY (HZ) DATE FVI DATE

    MAXIMUM 50.27 16-Nov-20 0.04 23-Nov-20

    MINIMUM 49.68 05-Nov-20 0.02 03-Nov-20

    AVERAGE 50.00 0.03

    b) FREQUENCY DISTRIBUTION FOR THE MONTH

    The frequency ranges as a percentage of time during the month

    %TIME FREQUENCY < 49.9 49.90-50.05 >50.05

    % 3.91 81.74 14.35

    3) POWER SUPPLY POSITION FOR THE MONTH

    AP TG KAR KER TN PONDY REGION

    UNRESTRICTED PEAK

    DEMAND(MW)9493 7443 10,882 3672 15298 391 44968

    PEAK DEMAND MET

    (MW)9490 7427 10878 3672 15298 391 44968

    UNRESTRICTED ENERGY

    REQMT(MU)4867 4286 5510 2124 7982 203 24972

    ENERGY MET (MU)

    4867 4287 5511 2124 7984 203 24975

    LINE NAME & CKT NO.

    400kV Shankarpally - Maheswaram Line -1

    400 KV Nelamangala - Devanahalli

    Hardware Park

    400kV Shankarpally - Maheswaram Line -2

    400 KV Yelhanka - Devanahalli Hardware

    Park

    220 KV NP KUNTA PS3- NP KUNTA PG

    STATION NAME

    RACHAGUNNERI

    STATION/LINE NAME

    HINDUPUR

  • ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R

    DEMAND DEMAND DEMAND DEMAND DEMAND DEMAND DEMAND

    01-Nov-20 8660 6984 8625 3278 13548 338 39920

    02-Nov-20 9338 7427 9657 3628 15234 364 44348

    03-Nov-20 9490 7324 9841 3579 15281 387 44896

    04-Nov-20 9022 7269 10196 3519 15298 385 44968

    05-Nov-20 8951 7159 10619 3430 14383 387 44111

    06-Nov-20 8368 7385 9781 3593 13865 391 42545

    07-Nov-20 8107 7082 9910 3635 13861 383 44288

    08-Nov-20 7908 6580 8707 3178 12288 329 41595

    09-Nov-20 8256 6877 10011 3657 14149 378 41907

    10-Nov-20 8350 6867 10127 3671 14419 380 42885

    11-Nov-20 8618 6890 10432 3592 15208 365 43050

    12-Nov-20 7833 6863 10790 3628 14479 375 42566

    13-Nov-20 7560 7099 10878 3251 12494 342 41142

    14-Nov-20 7465 6626 9200 3512 9678 272 35787

    15-Nov-20 7370 6390 8867 3315 9436 287 35291

    16-Nov-20 7314 6768 8356 3381 10846 344 36899

    17-Nov-20 7414 6823 8513 3321 11677 362 38235

    18-Nov-20 7516 7075 9113 3566 12321 353 38969

    19-Nov-20 7772 7199 9330 3612 12995 363 39148

    20-Nov-20 7940 7202 10157 3547 12850 351 40521

    21-Nov-20 7933 7119 10052 3555 13004 354 40761

    22-Nov-20 8192 7038 9345 3179 11554 322 38971

    23-Nov-20 8150 7173 10388 3552 13383 342 41804

    24-Nov-20 7877 7095 10441 3573 12971 315 41014

    25-Nov-20 7522 7290 10708 3572 11704 218 39205

    26-Nov-20 5826 7043 10255 3308 10961 253 38229

    27-Nov-20 6286 6556 10465 3604 12162 320 39115

    28-Nov-20 6817 6548 9397 3535 12721 346 38885

    29-Nov-20 6607 6760 9318 3345 11401 323 36821

    30-Nov-20 6914 7217 10045 3672 12784 340 38947

    AVG 7846 6991 9784 3493 12899 342 40561

    MAX 9490 7427 10878 3672 15298 391 44968

    MIN 5826 6390 8356 3178 9436 218 35291

    17.DEMAND

    MAX DEMAND FOR THE MONTH OF November-2020

    DATE

    0

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    40000

    45000

    50000

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    18000

    Peak Demand-November-2020

    ANDHRA DEMAND TELANGANA DEMAND KARNATAKA DEMAND KERALA DEMAND TAMILNADU DEMAND PONDY DEMAND S.R DEMAND

  • ANDHRA TELANGANA KARNATAKA KERALA TAMILNADU PONDY S.R

    CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT CONSMPT

    01-Nov-20 177.45 149.64 167.91 67.07 296.79 7.20 866.06

    02-Nov-20 185.34 152.97 184.11 73.21 317.32 7.77 920.72

    03-Nov-20 190.88 153.06 187.20 73.11 328.38 7.84 940.47

    04-Nov-20 183.76 149.46 191.50 72.58 326.68 7.89 931.87

    05-Nov-20 185.78 149.17 192.44 71.43 301.69 7.91 908.42

    06-Nov-20 178.98 150.05 185.93 71.35 294.59 7.98 888.88

    07-Nov-20 174.24 147.31 186.43 73.07 296.21 7.99 885.25

    08-Nov-20 169.20 137.07 172.90 66.72 269.71 6.95 822.55

    09-Nov-20 170.38 138.92 188.67 73.47 290.00 7.27 868.71

    10-Nov-20 170.94 137.75 190.10 74.33 300.60 7.90 881.62

    11-Nov-20 173.15 138.92 193.03 72.54 301.41 7.48 886.53

    12-Nov-20 163.69 139.91 197.24 72.79 299.06 7.66 880.35

    13-Nov-20 157.42 142.44 194.59 72.27 259.91 7.09 833.72

    14-Nov-20 157.37 132.51 171.85 69.28 197.06 4.99 733.06

    15-Nov-20 151.97 130.01 160.55 65.99 194.58 5.39 708.49

    16-Nov-20 153.48 140.62 154.75 71.50 219.57 6.58 746.50

    17-Nov-20 158.06 143.23 164.27 68.98 232.55 6.86 773.95

    18-Nov-20 162.81 145.86 177.55 70.25 243.85 7.05 807.37

    19-Nov-20 167.46 148.27 181.48 72.14 255.33 7.06 831.74

    20-Nov-20 171.34 149.57 189.64 72.46 264.68 7.15 854.84

    21-Nov-20 169.99 148.99 189.87 71.39 267.12 7.27 854.63

    22-Nov-20 167.76 144.19 181.49 64.22 249.38 6.71 813.75

    23-Nov-20 170.38 147.10 195.24 69.40 270.21 6.82 859.15

    24-Nov-20 166.81 146.31 200.93 71.18 266.43 5.85 857.51

    25-Nov-20 155.12 146.61 198.60 72.50 236.58 3.13 812.54

    26-Nov-20 122.35 138.38 186.07 67.29 208.42 2.28 724.79

    27-Nov-20 116.62 128.82 186.36 72.17 243.85 6.21 754.03

    28-Nov-20 127.87 130.65 177.94 71.74 255.38 6.76 770.34

    29-Nov-20 130.83 135.49 174.85 66.07 241.34 6.79 755.37

    30-Nov-20 135.59 143.36 187.57 73.35 255.11 6.75 801.73

    AVG 162.23 142.89 183.70 70.80 266.13 6.75 832.50

    MAX 190.88 153.06 200.93 74.33 328.38 7.99 940.47

    MIN 116.62 128.82 154.75 64.22 194.58 2.28 708.49

    TOTAL 4867.02 4286.64 5511.06 2123.85 7983.79 202.58 24974.94

    CONSUMPTION FOR THE MONTH OF November-2020

    DATE

    0.00

    100.00

    200.00

    300.00

    400.00

    500.00

    600.00

    700.00

    800.00

    900.00

    1000.00

    0.00

    50.00

    100.00

    150.00

    200.00

    250.00

    300.00

    350.00

    30

    -Oct-2

    0

    31

    -Oct-2

    0

    01

    -No

    v-2

    0

    02

    -No

    v-2

    0

    03

    -No

    v-2

    0

    04

    -No

    v-2

    0

    05

    -No

    v-2

    0

    06

    -No

    v-2

    0

    07

    -No

    v-2

    0

    08

    -No

    v-2

    0

    09

    -No

    v-2

    0

    10

    -No

    v-2

    0

    11

    -No

    v-2

    0

    12

    -No

    v-2

    0

    13

    -No

    v-2

    0

    14

    -No

    v-2

    0

    15

    -No

    v-2

    0

    16

    -No

    v-2

    0

    17

    -No

    v-2

    0

    18

    -No

    v-2

    0

    19

    -No

    v-2

    0

    20

    -No

    v-2

    0

    21

    -No

    v-2

    0

    22

    -No

    v-2

    0

    23

    -No

    v-2

    0

    24

    -No

    v-2

    0

    25

    -No

    v-2

    0

    26

    -No

    v-2

    0

    27

    -No

    v-2

    0

    28

    -No

    v-2

    0

    29

    -No

    v-2

    0

    30

    -No

    v-2

    0

    01

    -De

    c-20

    02

    -De

    c-20

    Consumption of States and Region -November-2020

    ANDHRA CONSMPT TELANGANA CONSMPT KARNATAKA CONSMPT KERALA CONSMPT TAMILNADU CONSMPT S.R CONSMPT

  • DATE Net Schd Act. Drawal

    Net

    Schd Act. Drawal Net Schd

    Act.

    Drawal Net Schd Act. Drawal Net Schd

    Act.

    Drawal Net Schd

    Act.

    Drawal

    01-Nov-20 53.92 55.08 43.34 42.24 54.32 55.10 36.00 37.11 135.71 133.26 7.13 6.51

    02-Nov-20 55.81 56.17 49.44 49.77 57.07 57.30 42.66 42.65 137.60 135.00 6.93 6.13

    03-Nov-20 49.65 50.31 55.39 57.19 52.93 54.60 41.82 42.02 130.80 127.10 7.12 6.16

    04-Nov-20 46.13 45.01 65.40 65.58 47.64 48.29 36.64 37.03 127.04 125.00 6.98 6.83

    05-Nov-20 53.17 56.65 60.58 61.30 51.38 52.94 44.56 44.69 150.53 153.59 7.41 7.32

    06-Nov-20 69.23 71.63 61.62 61.43 61.52 63.29 46.01 46.31 189.19 188.06 7.89 8.00

    07-Nov-20 76.76 75.85 63.23 60.56 64.88 65.90 48.02 48.13 183.49 181.76 7.93 7.84

    08-Nov-20 85.90 86.79 62.91 62.69 69.60 73.62 49.26 49.10 191.98 191.16 8.11 7.91

    09-Nov-20 89.89 91.85 70.43 69.67 72.10 72.47 45.15 45.10 171.18 167.84 8.19 8.08

    10-Nov-20 84.36 84.03 58.58 57.11 59.21 60.30 45.58 46.05 162.91 158.23 8.11 7.93

    11-Nov-20 68.54 67.16 49.87 47.85 38.99 39.24 40.15 40.84 146.06 140.43 7.37 7.28

    12-Nov-20 59.50 58.64 42.04 41.64 45.78 45.38 43.23 43.07 145.54 141.34 7.96 7.65

    13-Nov-20 40.81 40.77 34.56 30.79 46.96 46.13 37.48 37.54 142.43 137.96 8.15 8.14

    14-Nov-20 37.44 36.41 12.72 14.70 24.63 17.86 36.44 36.18 152.25 147.75 8.26 8.15

    15-Nov-20 50.29 50.81 33.66 31.62 28.16 27.25 33.86 33.76 164.44 165.31 8.33 8.18

    16-Nov-20 63.69 63.21 39.89 39.27 38.47 36.72 32.95 31.94 174.05 171.26 8.33 8.45

    17-Nov-20 73.01 75.24 42.08 41.04 56.12 55.55 33.87 33.34 174.96 175.05 8.28 8.27

    18-Nov-20 83.30 83.25 32.32 31.31 51.11 50.94 32.68 32.36 166.37 163.22 7.11 6.70

    19-Nov-20 82.66 83.77 33.27 35.01 55.03 55.86 37.90 37.82 166.07 163.07 7.56 7.14

    20-Nov-20 74.04 75.01 38.20 37.62 54.75 54.84 38.26 37.96 164.01 161.92 7.56 7.46

    21-Nov-20 70.60 70.73 43.34 43.10 54.17 54.72 39.14 40.73 149.17 145.51 7.97 7.60

    22-Nov-20 73.23 73.04 43.48 43.34 53.29 52.98 38.84 38.64 145.44 141.64 8.04 7.63

    23-Nov-20 71.06 70.07 46.31 44.68 51.95 50.85 41.60 41.67 148.92 146.89 8.08 7.65

    24-Nov-20 66.85 66.79 42.23 40.69 53.68 52.77 40.24 40.27 156.52 155.83 7.92 7.35

    25-Nov-20 68.81 67.32 35.86 35.35 52.93 51.51 39.02 38.87 166.04 164.20 6.70 6.22

    26-Nov-20 70.87 70.54 39.55 41.06 48.51 49.23 42.56 43.42 177.27 178.31 7.61 7.16

    27-Nov-20 76.81 76.08 48.82 47.43 51.29 50.45 45.80 45.76 187.40 188.81 7.88 7.63

    28-Nov-20 74.46 73.81 43.00 41.99 52.24 52.77 45.05 45.19 193.06 192.52 7.92 7.59

    29-Nov-20 77.21 76.93 43.23 42.01 58.49 57.14 47.66 47.31 189.38 190.11 7.94 7.55

    30-Nov-20 79.10 79.47 42.66 42.47 62.75 62.96 48.28 47.80 192.00 191.52 7.75 7.53

    Total 2027.10 2032.42 1378.01 1360.51 1569.95 1568.96 1230.71 1232.66 4881.81 4823.65 232.52 224.04

    NET DRAWAL SCHEDULE AND ACTUAL DRAWAL FOR THE MONTH OF November-2020

    ANDHRA PRADESH TELANGANA KARNATAKA KERALA TAMILNADU PONDICHERRY

    0.00

    50.00

    100.00

    150.00

    200.00

    250.00

    Schedules -November-2020

    ANDHRA PRADESH

    TELANGANA

    KARNATAKA

    KERALA

    TAMILNADU

    PONDICHERRY

    0.00

    50.00

    100.00

    150.00

    200.00

    250.00

    ISTS Drawal Profile November 2020

    ANDHRA PRADESH TELANGANA

    KARNATAKA KERALA

    TAMILNADU PONDICHERRY

  • B) DETAILED REPORTS.

    1. Detailed State wise breakup of installed capacity (MW)

    AGENCY GAS DIESEL

    ANDHRA PRADESH 272__

    TELANGANA__ __

    KARNATAKA__

    0

    KERALA__

    160

    TAMILNADU 516__

    PONDICHERRY 33__

    CENTRAL SECTOR 0__

    PRIVATE 4879.8 33

    TOTAL 5700 193

    * The Installed Capacity is reconciled with the data received from states

    2. SALIENT FEATURES OF SYSTEM CONDITIONS.

    Nov-2019 7085 8723 32.5 17962 56734 106065

    Nov-2020 7085 8733 32.521528 55403 108026

    % INCREASE (i) 0.00 0.11 0.00 19.85 -2.35 1.85

    ENERGY (GROSS)

    Unrestricted

    Requirement(MU)

    Nov-20195049 5194 2095

    Nov-20204867 5510 2124

    Energy Availability (MU)

    Nov-20195049 5196

    Nov-20204867 5511

    Shortage(-)/

    Surplus(+)

    Nov 2019 (MU) / %0 / (-0.00) 2 / -(-0.03)

    Nov 2020 (MU) / %0 / (-0.00) 1 / -(-0.02)

    DEMAND

    Unrestricted

    Demand (MW)

    Nov-20198426 10670

    Nov-20209493 10882

    Availability (MW)

    Nov-20198426 10670

    Nov-20209490 10878

    Shortage(-)/

    Surplus(+)

    APTRNSCO KPTCL

    Nov 2019 (MW) / %0 / (-0.00) 0 / (-0.00)

    Nov 2020 (MW) / %-3 / (-0.03) -4 / (-0.03)

    3725.42

    3725

    108027

    24972

    REGIONALPONDY

    7075

    7075

    25979

    6125

    43683

    IPP

    3320

    14390

    ---

    1061

    21528

    41878

    3320

    0.00

    REGIONALTNEB

    2328

    KSEB

    2224

    TNEBCENTRAL

    SECTOR

    PONDY

    TELANGANA

    5945

    ---

    4320 17

    APTRANSCO KPTCLTELANGANA

    13254

    11440

    -2.94

    ---

    KSEB

    50203679

    55403

    ---

    2222

    3818

    37989

    1

    34

    2224

    --- 33

    ---

    ---

    7075---

    25986

    WIND/OTHERSHYDRO

    1798

    2052

    THERMAL

    ---

    5010

    2442 3503

    TOTAL

    --- 7085

    --- 8733

    NUCLEAR

    5945---

    212

    7982

    4287

    0 / -(-0.03)

    4286 203

    82465182

    24975203

    3 / -(-0.01)

    1 / -(-0.03) 7 / -(-0.03)

    7984

    3 / -(-0.03)

    2124

    0 / -(-0.02)1 / -(-0.02)

    2128249

    5

    13

    0 / (-0.00)

    14213

    0 / (-0.00)

    0 / (-0.00)

    TNEB PONDY

    0 / (-0.00)

    TNEB PONDY

    389

    0 / (-0.00)

    391

    -16 / (-0.22)

    9424

    TELANGANAAPTRANSCO KPTCL

    1 / -(-0.02)

    9408

    2 / -(-0.03)

    5184

    INSTALLED CAPACITY DERATED

    (MW)APTRANSCO

    0 / (-0.00)

    KSEB

    7443

    15298

    KPTCL

    -4.43

    REGIONAL

    0 / (-0.00)

    -16 / (-0.17)

    15298

    0 / (-0.00)

    3672

    44968

    REGIONALTELANGANA KSSB

    7427 3672

    44968

    42827

    391

    2095

    4282738914213

    0 / -(-0.01)

  • 3) PERFORMANCE OF CONSTITUENTS

    Nov-20From 01-04-20

    To 31-11-2020

    1 MACHKUND (3x23+3x17)x70% = 84.00 25.14 216.05

    2 T.B.DAM (8x9)x80% = 57.60 19.23 92.21

    3 UPPER SILERU 4x60 = 240.00 45.44 329.17

    4 DONKARAYI 1x25 = 25.00 13.44 130.38

    5 LOWER SILERU 4x115 = 460.00 115.83 855.80

    6 SRISAILAM RBPH 7x110 = 770.00 75.89 1082.00

    7 NSR RT.CANAL.P.H 3x30 = 90.00 25.05 83.82

    8 PENNA AHOBILAM 2x10 = 20.00 0.00 0.00

    9

    Mini Hydro(Chettipet2x0.5) & Nagarjunasagar

    Tailpond 1+2x25 = 51.0015.10 55.64

    TOTAL 1797.60 335.13 2845.06

    1 VIJAYAWADA 6x210 + 1x500 = 1760.00 1033.84 4095.00

    2 RAYALASEEMA 5x210+1X600 = 1650.00 6.58 853.30

    3 KRISHNAPATNAM 2x800 = 1600.00369.89 4744.67

    TOTAL 5010.00 1410.31 9692.97

    1 VIJJESWARAM STAGE 1 (GAS) 2x33+1x34 = 100.00 114.88 863.39

    2 VIJJESWARAM STAGE 2 (GAS) 1x112.5+1x59.5 = 172.00 0.00 0.00

    TOTAL 272.00 114.88 863.39

    1 SOLAR JURALA 5.43 = 5.43 0.00 0.00

    2 Wind 0 = 0.00 0.00 0.00

    TOTAL 5.43 0.00 0.00

    1 MINI HYDRO 103.098 = 103.10 30.00 98.11

    COAL

    2 HINDUJA POWER CORPORATION LTD 2x520 = 1040.00 0.00 1208.16

    1 GVK-I (Godavari Gas)(Jegurupadu) 2x45.8+1x48.9+1x75.5 = 216.82 41.20 411.99

    2 GVKStg-II EXTENSION(GAS) 1x145+1x75 = 220.00 0.00 0.00

    3 SPECTRUM (GAS) 1x46.8+2x46.1+1x68.88 = 208.31 33.43 351.19

    4 LANCO (GAS) 2x115+1x125 = 351.49 76.53 593.37

    5 ISOLATED GAS WELL (GAS) (LVS) 27.04 = 27.04 0.00 0.00

    6 RELIANCE ENERGY LTD. (GAS) 1x140+1x80 = 220.00 0.00 0.00

    7 VEMAGIRI POWER GENERATION LTD.(GAS) 1x233+1x137 = 370.00 0.00 0.00

    8 GAUTAMI CCPP 2x145 + 1x174 = 464.00 0.00 0.00

    9 KONASEEMA CCPP 145+140+165 = 444.08 0.00 0.00

    10 GMR (BARG) 237 = 237.00 0.00 0.00

    Total 2758.74 151.16 1356.56

    1 Solar Energy(RPSSGP, NVVN, Grid interactive2243.36 = 2243.36

    2 Solar Energy (AP State Solar Policy)406.38 = 406.38 3416.41

    3 WIND 4079.37 = 4079.37 273.24 4886.52

    4

    BAGASSE+BIOMASS+WASTE BASED

    PP+CO-GENERATION (NC)489.81

    =489.81 29.95 344.66

    5 MINI POWER PLANTS 82 = 82.00 0.00 0.00

    RE Total 7300.92 756.18 8647.59

    TOTAL IPP 11202.76 1810.85 19579.89

    TOTAL ANDHRA PRADESH 18287.788 2797.66 32981.31

    452.99

    ENERGY GENERATED BY GENERATING STATIONS / UNITS IN

    SOUTHERN REGION DURING November 2020

    ANDHRA PRADESH

    SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)

    ENERGY GENERATION

    HYDRO

    WIND/SOLAR

    IPP

    GAS/NAPTHA/DIESEL

    WIND / SOLAR / OTHERS

    THERMAL

    GAS/NAPTHA/DIESEL

  • Nov-20From 01-04-20

    To 31-11-2020

    1 SRISAILAM LBPH 6x150 = 900.00 182.64 901.37

    2 N'SAGAR 1x110+7x100.8 = 815.60 62.51 1065.27

    3 NSR LT.CANAL.P.H 2x30 = 60.00 14.80 56.36

    4 NIZAMSAGAR 2x5 = 10.00 0.24 0.33

    5 POCHAMPAD 4x9 = 36.00 2.52 101.11

    6 SINGUR 2x7.5 = 15.00 0.70 6.16

    7 JURALA 6x39 = 234.00 20.98 180.18

    8 LOWER JURALA 6x40 = 240.00 48.60 401.57

    9 PULICHINTALA 4x30 = 120.00 27.75 125.94

    10 MINI HYDEL 11.16 = 11.16 0.00 0.00

    TOTAL 2441.76 360.72 2838.28

    1 RAMAGUNDAM-B 1x62.5 = 62.50 33.31 169.16

    2 KOTHAGUDEM-A 4x60(Unit-1,2,3,4 Decomissioned) = 0.00 0.00 84.63

    3 KOTHAGUDEM-B 2x120 (Unit-5,6 Decomissioned) = 0.00 0.00 67.09

    4 KOTHAGUDEM-C 2x120 (Unit-7,8 Decomissioned) = 0.00 0.00 63.21

    5 KOTHAGUDEM-D 2x250 = 500.00 131.53 1513.77

    6 KOTHAGUDEM ST VI 1x500 = 500.00 281.66 2321.73

    6 KOTHAGUDEM ST VII 1X800 = 800.00 554.05 4178.30

    7 KAKATIYA ST1&ST2 1x500+1x600 = 1100.00 340.46 3941.21

    8 Bhadradri Thermal Power Plant 2X270 = 540.00 15.68 624.73

    TOTAL 3502.50 1356.70 12963.83

    1 Solar 1 = 1.00 0.00 0.00

    2 Wind 0 = 0.00 0.00 0.00

    TOTAL 1.00 0.00 0.00

    1 MINI HYDRO(SMALL HYDRO) 39.86 = 39.86 0.00 0.00

    COAL1 SINGARENI TPS 2x600 = 1200.00 710.43 3168.67

    1 Solar 3545.472 = 3545.47 503.73 4051.09

    2

    BAGASSE+BIOMASS+WASTE BASED

    PP+CO-GENERATION (NC)67.2+129.6+62.9

    =259.70 30.00

    244.00

    3 WIND 100.8 = 100.80 21.01 145.88

    RE TOTAL 3905.97 554.74 4440.97

    TOTAL IPP 5145.83 1265.17 7609.64

    TOTAL TELANGANA 11091.092 2982.59 23411.75

    Nov-20From 01-04-20

    To 31-11-2020

    1 SHARAVATHY 10x103.5 = 1035.00 371.54 3170.26

    2 LINGANAMAKKI.P.H. 2x27.5 = 55.00 29.09 148.77

    3 JOG (MGHES) 4x21.6+4x13.2 = 139.20 28.07 276.02

    4 NAGJHERI 1x135+5x150 = 885.00 220.07 2081.60

    5 SUPA 2x50 = 100.00 30.48 228.15

    6 VARAHI 4x115 = 460.00 72.44 732.63

    7 BHADRA POWER HOUSE 1x7+2x12.1+1x2+6 = 39.20 6.03 36.73

    8 SIVANSAMUDRAM 6x3+4x6 = 42.00 37.37 240.70

    9 SHIMSHA 2x8.6 = 17.20 0.00 0.00

    10 MUNIRABAD 1x10 + 3x9 = 38.00 11.35 68.93

    11 T.B.DAM SHARE (20 %) 8x9(20%) = 14.40 4.82 23.24

    12 GHATAPRABHA 2x16 = 32.00 6.08 70.87

    13 MANI DAM.P.H. 2x4.5 = 9.00 3.92 12.04

    14 MINI HYDRO 1.4+0.35+2.7 = 4.45 0.00 0.00

    15 MALLAPUR 2x4.5 = 9.00 0.00 0.00

    16 KADRA 3x50 = 150.00 18.25 313.07

    17 KODASALLI 3x40 = 120.00 21.45 272.67

    18 SHARAVATHI TAIL RACE 4x60 = 240.00 36.10 345.06

    19 ALMATTI 1x15+5x55 = 290.00 23.11 555.66

    TOTAL 3679.45 920.16 8576.42

    TELANGANA

    SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)

    ENERGY GENERATION

    HYDRO

    THERMAL

    WIND/SOLAR

    IPP

    WIND / SOLAR / OTHERS

    KARNATAKA

    SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)

    ENERGY GENERATION

    HYDRO

  • 1 RAICHUR.T.PS. 7x210 +1x250 = 1720.00 55.45 2142.37

    2 BELLARY TPS 2x 500+1x700 = 1700.00 381.22 1358.09

    3 YERAMARAS TPS 2x800 = 1600.00 459.21 1625.21

    TOTAL 5020.00 895.88 5125.67

    1 SOLAR 34.00 = 34.00 0.00 22.842 Wind 0.00 = 0.00 0.70 5.68

    TOTAL 34.00 0.70 28.52

    HYDRO

    1 MINI HYDEL 853.46 = 853.46 0.00 0.00

    COAL1 UPCL(THERMAL) 2x600 = 1200.00 112.06 613.64

    2 JINDAL (COAL & COREX) 2x130+4x300 = 1460.00 25.20 154.53

    2660.00 137.26 768.17

    1 TATA ELECTRIC (DIESEL) 5x16.26* = 0.00 0.00 0.00

    2 RAYAL SEEMA ALKALIES (DIESEL) 3x12* = 0.00 0.00 0.00

    3 I T P L (DIESEL) 9* = 0.00 0.00 0.00

    0.00 0.00

    1 WIND MILL 4859.54 = 4859.54 5622.46

    2 CO-GENERATION+Biomass 1731.16 = 1731.16

    3 SOLAR 5304.03 = 5304.03

    4 Bio mass 139.03 = 139.03

    State total 12033.76 1816.74 13730.61

    TOTAL IPP 15547.22 2181.323 6390.629

    TOTAL KARNATAKA 24280.670 3998.06 20121.24

    Nov-20From 01-04-20

    To 31-11-2020

    1 KUTTIADI + EXTENTION + ADDL. EXTN. 3x25+ 1x50+2x50 = 225.00 36.70 541.61

    2 SHOLAYAR 3x18 = 54.00 17.49 130.14

    3 PORINGALKUTHU 4x9 = 36.00 9.33 101.31

    4 PORIG. L. BANK 1x16 = 16.00 6.67 79.39

    5 PALLIVASAL 3x7.5+3x5 = 37.50 9.58 97.12

    6 SENGULAM 4x12 = 48.00 14.98 112.50

    7 PANNIAR 2x16 = 32.00 21.14 124.08

    8 NERIAMANGALAM + EXTENSION 3x17.5 +25 = 77.50 35.04 279.95

    9 SABARIGIRI 2x60 + 4x55 = 340.00 110.89 828.97

    10 IDUKKI 3x130+3x130 = 780.00 155.91 1536.59

    11 IDAMALAYAR 2x37.5 = 75.00 21.18 163.95

    12 KALLADA 2x7.5 = 15.00 4.63 33.29

    13 PEPPARA 3 = 3.00 0.76 6.57

    14 MADUPETTY 2 = 2.00 0.12 2.71

    15 MALAMPUZHA 1x2.5 = 2.50 0.73 1.05

    16 Lower Periyar 3x60 = 180.00 50.60 449.07

    17 KAKKAD 2x25 = 50.00 16.01 122.52

    18 CHEMBUKADAVU 1x2.7+1x3.75 = 6.45 0.16 9.14

    19 URUMI 3x1.25+3x0.8 = 6.15 0.19 11.57

    20 MALANKARA 3 x 3.5 = 10.50 2.16 20.38

    21 Lower Meenmutty 2x1.5 + 1x0.5 = 3.50 0.42 5.56

    22 Kuttiady tail race 3 x 1.25 = 3.75 0.33 5.54

    23 Poozhithode 3 x 1.60 = 4.80 0.26 7.98

    24 Ranni-Perunadu 2 x 2 = 4.00 0.65 5.83

    25 Vilangad 3x2.5 = 7.50 0.40 14.92

    26

    Peechi+Chimini+Addiyan

    para+Barapole+Vellathuval SHEP+Peruthenaruvi

    SHEP 1 x 1.25+22.60 = 31.850.00 0.22

    TOTAL 2052.00 516.34 4691.96

    KERALA

    GAS/NAPTHA/DIESEL

    WIND / SOLAR / OTHERS

    2044.07

    WIND/SOLAR

    IPP

    THERMAL

    SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)

    ENERGY GENERATION

    HYDRO

  • 1 BRAHMAPURAM DGPP (DIESEL)* 3x21.32 = 63.96 0.00 0.00

    2 KOZHIKODE DPP (DIESEL)* 6x16 = 96.00 0.00 0.00

    TOTAL 159.96 0.00 0.00

    1 WIND MILL 2.03 = 2.03 0.07 0.82

    2 Solar 10.50 = 10.50 0.51 4.31

    TOTAL 12.53 0.58 5.13

    1 MANIYAR(CPP) 3x4 = 12.00 2.32 24.96

    2 KUTHUNGAL(CPP) 3x7 = 21.00 6.08 36.91

    3 ULLUNKAL(IPP) 2x3.5 = 7.00 1.38 11.74

    4 IRUTTUKANAM(IPP) 1x3 = 3.00 2.17 19.73

    5 KARIKKAYAM(IPP) 3 x 3.5 = 10.50 2.85 30.47

    6 MEENVALLOM(IPP)+ Pathankayam(IPP) 2x3.5+1x11 x 3 = 11.00 0.53 5.64

    64.50 15.33 129.45

    1 RGCCPP,KAYAMKULAM (KSEB) - NTPC 2x116.6(GT)+1x126.38(ST) = 359.58 0.00 0.00

    2 BSES (NAPTHA) 3x40.5(GT)+1x35.5(ST) = 157.00 0.00 0.00

    3 KASARGODE (DIESEL) 3x7.31(De Commissided) = 0.00 0.00 0.00

    4 MPS STEEL CASTINGS(Co-gen)(IPP) 1x10 = 10.00 0.00 0.00

    526.58 0.00 0.00

    1 Wind (CPP-10)+Wind (IPP-58.25) 10+58.25 = 68.25 6.34 11.11

    2 Solar(IPP-52)+Solar CPP(37.418) 89.418 = 89.42 10.96 74.75

    3 PCBL Thermal CPP 10 = 10.00 4.09 32.93

    RE TOTAL 167.67 21.39 118.80

    TOTAL IPP 758.75 52.04 377.70

    TOTAL KERALA 2983.233 568.95 5074.78

    Nov-20From 01-04-20

    To 31-11-2020

    1 PYKARA 3x6.65+1x11+2x14 = 58.95 0.00 0.07

    2 PYKARA MICRO 1x2 = 2.00 0.58 4.38

    3 PYKARA ULTIMATE (PUSHEP) 3x50 = 150.00 28.70 215.04

    4 MOYAR 3x12 = 36.00 9.76 70.52

    5 MARAVAKANDI 1x0.75 = 0.75 0.07 0.27

    6 KUNDAH-I 3x20 = 60.00 26.14 190.89

    7 KUNDAH-II 5x35 = 175.00 69.06 498.83

    8 KUNDAH-III 3x60 = 180.00 44.02 293.10

    9 KUNDAH-IV 2x50 = 100.00 12.31 108.53

    10 KUNDAH-V 2x20 = 40.00 9.92 41.84

    11 SURULIYAR 1x35 = 35.00 12.73 57.27

    12 KADAMPARAI 4x100 = 400.00 24.01 248.42

    13 ALIYAR 1x60 = 60.00 13.11 100.69

    14 POONACHI 1x2 = 2.00 0.00 0.29

    15 METTUR DAM 4x12.5 = 50.00 12.78 93.66

    16 METTUR TUNNEL 4x50 = 200.00 33.07 114.43

    17 LOWER METTUR BARRIAGE - 1 TO 4 8x15 = 120.00 29.43 265.85

    18 BHAVANISAGAR MICRO 4x2 = 8.00 2.52 24.16

    19 PERIYAR 4x35 = 140.00 88.90 377.43

    20 VAIGAI 2x3 = 6.00 2.66 10.60

    21 PAPANASAM 4x8 = 32.00 16.93 75.40

    22 SERVALAR 1x20 = 20.00 6.50 22.93

    23 SARKARAPATHY 1x30 = 30.00 13.22 83.09

    24 SHOLAYAR 2x35+25 = 95.00 43.83 212.67

    25 KODAYAR 1x60+1x40 = 100.00 37.08 126.97

    26 LOWER BHAVANISAGAR 2X4 = 8.00 2.10 8.83

    27 SATHANUR DAM PH 1x7.5 = 7.50 0.004 0.51

    28 KUNDAH-VI (Parson Valley) 1x30 = 30.00 2.94 34.24

    29 MICRO TOTAL 0.70+1.95+2.5+4+1.3+5.25 = 15.70 8.61 33.91

    30 BHAVANI KATTALAI BARRAGE - I & II 4x15 = 60.00 24.55 210.93

    TOTAL 2221.90 575.55 3525.74

    WIND

    IPP

    HYDRO

    HYDRO

    GAS/NAPTHA/DIESEL

    GAS/NAPTHA/DIESEL

    WIND/OTHERS

    TAMILNADU

    SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)

    ENERGY GENERATION

  • 1 ENNORE.T.P.S* 2x60+3x110 = 0.00 0.00 0.00

    2 TUTUCORIN.T.P.S 5x210 = 1050.00 314.02 3325.44

    3 METTUR.T.P.S 4x210 + 1x600 = 1440.00 193.43 2816.07

    4 NORTH CHENNAI T.P.S 3x210 + 2x600 = 1830.00 1116.15 12085.61

    TOTAL 4320.00 1623.60 18227.11

    ENNORE.T.P.S* shutdown of Units permenently from 31.03.17

    1 BASIN BRIDGE (NAPTHA) 4x30 = 120.00 0.00 0.00

    2 KOVIL KALAPPAL (GAS) 1x70+1x37.88 = 107.88 17.14 168.40

    3 VALUTHUR (GAS) STG1 1x60+1x35 = 95.00 49.43 478.53

    4 VALUTHUR (GAS) STG2 1 x 60 + 1 x 32 = 92.00 43.86 368.94

    5 KUTTALAM (GAS) 1x64+1x37 = 101.00 53.55 376.24

    TOTAL 515.88 163.97 1392.10

    1 TNEB WIND MILL 17.465 = 17.47 0.00 0.00

    2 Solar 0 = 0.00 0.00 0.00

    TOTAL 17.47 0.00 0.00

    1 NEYVELI-I (TN) - NLC 6x50+3x100* = 0.00 0.00 635.48

    2 ST - CMS 250 = 250.00 0.00 487.45

    250.00 0.00 1122.93

    1 GMR POWER (DIESEL) 4x49* = 0.00 0.00 0.00

    2 SAMALPATTY (DIESEL) 7x15.1* = 0.00 0.00 0.00

    3 MADURAI POWER CL (DIESEL) 106* = 0.00 0.00 0.00

    4 P P NALLUR (NAPTHA) 330.5 = 330.50 2.01 0.00

    5 ABAN POWER (GAS)(LANCO) 74.41+38.81 = 113.20 0.00 360.45

    6 ARKEY ENERGY(PENNA)(GAS)(PIONEER) 1x38 + 2x6.8 + 1x20 = 52.80 27.42 147.53

    496.50 29.44 507.99

    1 WIND MILL * 8550.195 = 8550.195 184.85 8010.39

    2 SOLAR 4002.15 = 4002.15 428.80 3369.78

    3 CO-GENERATION 688.40 = 688.40 3062.83

    4 BIO-MASS & CPP 265.60 = 265.60 0.00

    5 Captive Power Projects (CPPs) 1074.80 = 1074.80 0.000 0.00

    RE TOTAL 13506.35 1072.503 14442.99

    TOTAL IPP 15327.65 1101.94 15438.43

    TOTAL TAMIL NADU 22402.89 3465.05 38583.38

    * NLC ST1 -U1 to U9 Decommissioned.

    THERMAL

    COAL/LIGNITE

    GAS/NAPTHA/DIESEL

    LIGNITE/THERMAL

    GAS/NAPTHA/DIESEL

    WIND / SOLAR / OTHERS

    458.851

    WIND / SOLAR

    IPP

  • Nov-20From 01-04-20

    To 31-11-2020

    1 KARAIKAL POWER PLANT (GAS) 22.9 + 9.6 = 32.50 0.00 0.00

    TOTAL 32.50 0.00 0.00

    TOTAL PONDICHERRY 32.50 0.00 0.00

    1 LANCO KONDAPPILLI POWER LTD. ST2&ST3 233 + 133+2*(233 + 133) = 1098.00 0.00 0.00

    2 SIMHAPURI ENERGY PVT LTD 4 x 150 = 600.00 0.00 0.00

    3 MEENAKSHI ENERGY PVT LTD 2 x 150+1X350 = 650.00 0.00 0.00

    4 COASTAL ENERGY 2x600 = 1200.00 297.46 1271.24

    5 SEIL(TPCIL) 2x660 = 1320.00 634.54 5390.21

    6 IL&FS 2x600 = 1200.00 298.76 3347.15

    7 SEILP2(SGPL) 2x660 = 1320.00 745.91 2621.08

    TOTAL 7388.00 1230.76 10008.60

    TOTAL IPP UNDER OPEN ACCESS 7388.00 1230.76 10008.60

    Nov-20From 01-04-20

    To 31-11-2020

    1 RAMAGUNDAM T.P.S (ISGS) - NTPC 3x200+4x500 = 2600 1464.09 11170.35

    2 TALCHER STAGE II (ISGS) - NTPC 4x500 = 2000 995.13 9988.99

    3 SIMHADRI STAGE - I - NTPC 2x500 = 1000 222.71 2228.81

    4 SIMHADRI STAGE - II - NTPC 2x500 = 1000 177.51 2676.21

    5 VALLUR TPS - NTPC 3x500 = 1500 525.80 2403.13

    6 NTPL 2X500 = 1000 475.72 3402.96

    7 NTPC KUDGI 3x800 = 2400 0.00 1018.68

    TOTAL 11500.00 1782.01 32889.13

    8 NEYVELI-II (ISGS) - NLC 7x210 = 1470 682.95 4265.72

    9 NEYVELI TPS-I (Expansion) (ISGS) - NLC 2x210 = 420 147.03 1962.13

    10 NEYVELI TPS-II (Expansion) (ISGS) - NLC 2 x 250 = 500 146.68 1334.47

    11 New Neyveli Thermal Power Project 1x500 = 500 290.54 1834.98

    TOTAL 2890.00 6619.64 9397.31

    10 M.A.P.S KALPAKAM (ISGS) - NPC 2x220 = 440.00 69.09 1108.52

    11 KAIGA A.P.S (ISGS) - NPC 4x220 = 880.00 595.40 5093.33

    12 KUDANKULAM A.P.S (ISGS) - NPC 2x1000 = 2000.00 1288.62 7518.15

    TOTAL 3320.00 1953.11 13720.00

    13 RAMANGUNDAM 10.000 = 10.00 1.24 6.16

    14 N P Kunta 1000.000 = 1000.00 97.86 941.06

    15 PAVAGADA 2050.000 = 2050.00 254.95 1823.90

    TOTAL 3060.00 354.05 2771.12

    16 GREEN INFRA 249.900 = 249.90 28.47 515.04

    17 Orange Sironj 200.000 = 200.00 21.28 379.33

    18 Mytrah 250.000 = 200.00 14.99 406.40

    19 Betam Wind Energy Pvt Ltd. 108.000 = 108.00 15.39 154.71

    TOTAL 757.90 80.13 1455.48

    TOTAL CENTRAL SECTOR 21527.90 9006.93 60233.04

    GRAND TOTAL 107994.07 24049.99 155356.45891

    Note: Generation received from RPC/States ISTS Wind and Solar Act upto 22-11-20

    PONDICHERRY

    SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)

    ENERGY GENERATION

    GAS/NAPTHA/DIESEL

    IPP UNDER OPEN ACCESS

    GAS/NAPTHA/DIESEL

    CENTRAL SECTOR

    SL.NO. STATION EFFECTIVE INSTALLED CAPACITY (MW)

    ENERGY GENERATION

    THERMAL

    COAL

    LIGNITE

    NUCLEAR

    SOLAR

    WIND

  • 4) RESERVOIR PARTICULARS

    STORAGE

    MDDL (M) FRL (M) LEVEL (M) ENERGY (MU's)

    As on 1 st As on 31st As on 1 st As on 31st

    JALAPUT 818.39 838.40 838.05 837.65 526.00 506.00 48.42

    LINGANAMAKKI 522.73 554.50 553.39 552.36 4217.00 3899.00 353.75

    SUPA 495.00 568.85 533.68 557.85 2697.00 2611.00 243.70

    IDDUKKI 694.94 732.43 729.64 729.37 1959.00 1937.00 150.21

    KAKKI 908.30 981.45 978.64 970.90 798.00 784.00 106.11

    NILGIRIS --- 0 0 0.00 1148.00 1047.00 196.33

    5) a) BRIEF DESCRIPTION OF GRID INCIDENCES:-

    Outage Duration

    Time

    1

    i. 400kV/220kV ICT#1 , 2 and 3 at Nellore ii. 220kV Manubolu line-1, 2 and 3 iii. 220kV/132kV Transformer-1, 2 and 3 iv. 220kV Sullurpet line-1, 2 and 3 v. 220kV Rachaguneri line-1 and 2

    ANDHRA PRADESH 59 min

    Tripping of 220kV Bus-1 and Bus-2 at Nellore SS of APTRANSCO: As per the information received, 220kV Bus-1 and Bus-2 BBP operated resulting in the

    tripping of all connected elements at 220kV Nellore SS. 400kV/220kV ICT#1, 2 and 3 at Nellore also got tripped during this event. Details are

    awaited.

    0 128 GI-1 ----

    2

    i. 400kV/220kV ICT#1 and 3 at Narsapur ii. 220kV Meenajipet line-1 iii. 220kV/132kV Transformer-1

    TELANGANA 16 hr 15 min

    Tripping of Bus-1 at 220kV Narsapur SS of TSTRANSCO: Triggering incident was failure of Y-Phase Suspension Insulator string on LV side of Narsapur ICT-1 near 220kV Bus-1. Bus-1 BBP operated resulting in the tripping of all

    the elements connected to Bus-1 at 220kV Narsapur SS.

    0 0 GI-1 ----

    3

    i. U#5 at Srisailam RB ii. 220kV Dindi line

    iii. 220kVSomayajulapaali line iv. 220kV Mydukur line

    v. 220kV Podili line vi. 220kV Talapalli line-2

    ANDHRA PRADESH 47 min

    Tripping of220kV Bus-2 at Srisailam Right Bank of APGENCO: Triggering incident was failure of CB of U#5 at Srisailam RB. LBB operated resulting in the tripping of all the elements connected to Bus-2 at Srisailam RB. There

    was no generation at Srisailam LB during antecedent condtions.

    0 0 GI-1 ----

    4

    i. 230kV/110kV Transformer-1, 2 and 3 ii. 230kV Alandur line-1 and 2 iii. 230kV Jambunathapuram

    TAMIL NADU 51 min

    Tripping of Bus-1 at 230kV Trichy TN SS of TANTRANSCO: Triggering incident was BN fault in 230kV Trichy TN Alandur line-1. Due to non

    opening of breaker at 230kV Trichy TN end, LBB operated resulting in the tripping of all the elements connected to Bus-1 at 230kV Trichy TN SS.

    0 0 GI-1 ---

    5

    i. 400kV/220kV ICT#2 and 4 at Shankarapally ii. 220kV Sadhashivpeta line-2 iii. 220kV Yedumylaram line-2 iv. Gachuboli line-1 v. 220kV Tandur line vi. 220kV Parigi line-1

    TELANGANA 1 hr 58 min

    Tripping of 220kV Bus-2 at Shankarapalli SS of TSTRANSCO: Triggering incident was failure of R phase CB of 220kV Shanakarapalli Parigi line-1 at

    Shanakarapalli end. LBB operated resulting in the tripping of all the elements connected to Bus-2 at Shankarapalli SS.

    0 0 GI-1 ----

    6

    i. 400kV Jindal BTPS line ii. 400kV Jindal BPS line-1 iii. 400kV Jindal Guttur line iv. 400kV BTPS Hiriyur line-1 v.U#1, 3, 4 and 5 at Jindal TPS vi. U#1 and 2 at BTPS

    KARNATAKA 36 min

    Multiple Tripping at 400kV Jindal TPS of JSWEL and 400kV BTPS of KPCL : Units 1,3,4 and 5 at Jindal TPS (780 MW) tripped due to flash over in GIS Chamber and Units#1 and 2 at BTPS (906 MW) tripped due to electrical

    side problem. Complete Generation loss of 1690 MW. 400kV Jindal - BTPS , 400kV Jindal - BPS -1, 400kV Jindal - Guttur and 400kV BTPS - Hiriyur -1 also

    got tripped during this event. Details are still awaited.

    1690 0 GI-2 ----

    Outage Duration

    Time

    1 12 min

    Complete Outage of 220kV VSS and 220kV Parawada SS of APTRANSCO: Triggering incident was failure of R-Ph LA of 220KV VSS-Gajuwaka_AP line. Due to non tripping of line at 220kV VSS end, fault was cleared by tripping of all connected elelments at remote end. This resulted in complete loss of supply at 220kV VSS. Since 220kV Parawada was radially fed from 220kV VSS, there was complete loss of suply at 220kV Parawada SS.

    0 153 GD-1

    2 56 min

    Complete Outage of 230kV Betam Wind Energy: Triggering incident was tripping of 230kV Betam TTGS Line on operation of OV st-1 protection at Betam end. Due to tripping of single connected line, there was complete loss of supply at 230kV Betam Wind Energy resulting in wind generation loss of 42MW

    42 0 GD-1

    3 31 minComplete Outage of 230kV MAPS of NPCIL: As per the information received, all connected lines got tripped at 230kV MAPS due to BBP operation resulting in complete loss of suppy. Details are awaited.

    210 0 GD-1

    4 51 min

    Complete Outage of 230kV Checkanurani SS of TANTRANSCO: Triggering incident was failure of R phase CB limb of 230kV Checkanurani Nallamanayakkanpatti line at Checkanurani end. LBB of 230kV Checkanurani Nallamanayakkanpatti line operated at 230kV Checkanurani end resulting in the operation of Bus-1 BBP. Due to this, all connected elements at 230kV Checkanurani SS got tripped since all the elements were connected only to Bus-1 during antecedent conditions.

    0 0 GD-1

    5 1 hr 3 min

    Complete Outage of 220kV Kalamasherry SS of KSEB: During antecedent conditions, due to outage of 220kV Kalamasherry Idukki line-1 and 2, 220kV Kalamasherry SS was radially fed from 400kV/220kV Kochi_PG SS and flows in 220kV Kochi_PG Kalamasherry line-1 and 2 were around 195MW each respectively . As per the report submitted, triggering incident was B phase to Earth fault in 220kV Kochi_PG Kalamasherry line-1. After the tripping of 220kV Kochi_PG Kalamasherry line-1, 220kV Kochi_PG Kalamasherry line-2 got overloaded. 220kV Kochi_PG Kalamasherry line-2 got tripped on operation of DEF protection as per IDMT curve at Kochi_PG end and was holding at Kalamasherry end.

    0 390 GD-1

    6 4 hr 30 minComplete Outage of 230kV BHAVINI: As per the information received, all connected lines got tripped only at Bhavini end due to Over voltage resulting in complete loss of suppy. Details are awaited.

    0 70 GD-1

    6

    CONSTITUENTSInstalled as on 31-03-2020 (MVAr)

    Additional requirement during 2020-21 (MVAr)

    Actual Addition upto 31-08-2020 (MVAr)

    Balance to be installed (MVAr)

    A B CD

    (D = B-C)

    APTRANSCO 5496.3 358.4 7.2 351.2

    TSTRANSCO 5774 297.8 15 282.8

    KPTCL 7625.8 475.39 23.2 452.19

    KSEB 1027 15 0 15

    TNEB 3841.61 448 0 448

    PONDY 25.2 7.2 7.2 0

    SOUTHERN REGION 23789.911601.79 52.6 1549.19

    Date and Time Date and Time

    Date and Time Date and Time

    07-11-2020 16:18

    12-11-2020 12:58

    17-11-2020 00:01

    26-11-2020 07:57

    29-11-2020 13:16

    02-11-2020 23:26

    13-11-2020 03:40

    16-11-2020 14:16

    17-11-2020 13:44

    26-11-2020 03:22

    07-11-2020 16:06

    12-11-2020 12:03

    13-11-2020 03:09

    16-11-2020 13:25

    17-11-2020 12:41

    25-11-2020 22:53

    26-11-2020 09:55

    29-11-2020 13:52

    DETAILS OF CAPACITORS INSTALLED (All figures in MVAR):-

    Affected Area

    ANDHRA PRADESH

    TAMIL NADU

    TAMIL NADU

    TAMIL NADU

    TAMIL NADU

    KERALA

    Category as per CEA Grid

    Standards

    Energy Unserved (MU)

    PROGRESSIVE ENERGY USAGE (MU's)

    Generation Loss

    (MW)

    Load Loss

    (MW)

    Category as per CEA

    Grid Standards

    Energy Unserved

    (MU)

    Event(As reported)

    Generation Loss

    (MW)

    Load Loss

    (MW)

    S.NO.

    S.NO.Outage Revival

    02-11-2020 22:27

    10-11-2020 01:13

    16-11-2020 20:26

    10-11-2020 17:28

    16-11-2020 21:13

    17-11-2020 00:52

    NAME OF RESERVOIR

    Affected AreaOutage Revival

    ELEMENT NAME Event(As reported)

  • System Operation Report-November 2020 1

    FREQUENCY PROFILE October 2020

    Date MAX MIN AVG 50.05 FVI STD_DEV

    01-Nov-20 50.17 49.82 50.01 2.43 82.44 15.13 0.021 0.045

    02-Nov-20 50.16 49.77 50.00 5.38 79.33 15.29 0.029 0.053

    03-Nov-20 50.15 49.82 50.02 1.71 80.29 18.00 0.020 0.042

    04-Nov-20 50.16 49.82 50.00 3.60 82.74 13.66 0.026 0.051

    05-Nov-20 50.20 49.68 50.00 7.03 77.44 15.53 0.038 0.062

    06-Nov-20 50.20 49.86 50.01 1.97 77.96 20.07 0.026 0.050

    07-Nov-20 50.15 49.83 50.00 2.77 83.25 13.98 0.025 0.050

    08-Nov-20 50.16 49.81 50.00 2.57 84.17 13.26 0.022 0.046

    09-Nov-20 50.19 49.83 50.01 2.64 81.18 16.18 0.024 0.048

    10-Nov-20 50.17 49.82 50.01 1.48 80.07 18.45 0.024 0.047

    11-Nov-20 50.19 49.82 50.00 2.80 85.07 12.13 0.024 0.049

    12-Nov-20 50.15 49.78 49.99 6.64 78.50 14.86 0.032 0.056

    13-Nov-20 50.19 49.79 50.01 2.43 78.66 18.91 0.027 0.050

    14-Nov-20 50.17 49.76 49.99 7.78 73.54 18.68 0.039 0.063

    15-Nov-20 50.18 49.79 49.98 10.38 80.22 9.40 0.039 0.059

    16-Nov-20 50.27 49.77 50.00 5.79 74.01 20.21 0.037 0.060

    17-Nov-20 50.18 49.81 50.00 2.73 81.12 16.15 0.026 0.051

    18-Nov-20 50.17 49.77 50.00 4.20 81.82 13.98 0.029 0.054

    19-Nov-20 50.14 49.83 50.00 4.19 82.63 13.18 0.025 0.049

    20-Nov-20 50.15 49.77 50.00 2.93 14.62 0.025 0.050

    21-Nov-20 50.21 49.82 50.00 5.61 77.54 16.85 0.032 0.056

    22-Nov-20 50.18 49.77 49.99 8.48 78.35 13.17 0.036 0.059

    23-Nov-20 50.15 49.77 49.99 10.38 75.28 14.34 0.042 0.063

    24-Nov-20 50.16 49.78 50.00 5.67 76.75 17.58 0.030 0.055

    25-Nov-20 50.25 49.84 50.01 2.07 78.99 18.94 0.028 0.052

    26-Nov-20 50.18 49.77 50.01 3.84 72.73 23.43 0.033 0.056

    27-Nov-20 50.15 49.70 50.01 3.46 75.23 21.31 0.032 0.056

    28-Nov-20 50.19 49.81 50.00 3.55 80.67 15.78 0.027 0.052

    29-Nov-20 50.21 49.79 49.99 6.41 79.77 13.82 0.033 0.056

    30-Nov-20 50.17 49.81 50.00 2.76 83.61 13.63 0.024 0.049

    AVERAGE 50.16 49.80 50.00 3.91 81.74 14.35 0.03 0.05

    MAX 50.27 16-11-

    2020

    50.02 23-11-

    2020

    0.042 0.063

    MIN 05-11-

    2020

    49.68 03-11-

    2020

    0.020 0.042

  • System Operation Report-November 2020 2

    SR GRID SUMMARY FOR THE MONTH OF November-2020

    (I)

    GENERATION

    DETAILS:(MU)

    ANDHRA

    PRADESH TELANGANA KARNATAKA KERALA TAMIL NADU

    HYDRO 327.43 329.51 932.25 521.81 576.99

    THERMAL 1301.50 1992.68 832.57 -- 978.29

    DIESEL 0.00 0.00 0.00 0.00 0.00

    GAS 113.38 -- -- -- 164.03

    TOTAL 1742.31 2322.19 1764.82 521.81 1719.31

    INDEPENDENT

    P.P * 215.68 83.64 636.67 19.94 490.00

    WIND MILL 273.23 21.02 581.56 6.26 184.86

    SOLAR 328.29 503.74 692.08 10.72 428.80

    CAPTIVE

    PLANTS * * 0.00 0.00 0.00 0.00 0.00

    TOTAL

    DRAWALS INCL

    HVDC

    2307.79 1356.11 1836.56 1565.19 5161.34

    (II)ACTUAL

    CONSUMPTION

    (MU)

    4867.30 4286.70 5511.69 2123.92 7984.31

    (III) MAXIMUM

    DEMAND(MW) 9490 7427 10878.3975 3672 15297.5

    MAX DEMAND

    ON DATE 03-11-2020 02-11-2020 13-11-2020 30-11-2020 04-11-2020

    MAX DEMAND

    AT TIME 13:00 08:20 10:00 19:00 11:00

    FREQUENCY OF

    MAX DEMAND 49.99 50.03 49.99 50.06 50.04

    REGIONAL

    MAXIMUM

    DEMAND:

    MW DATE TIME FREQUENCY

    44968 04-Nov-

    2020 11:57:20 50.05

  • System Operation Report-November 2020 3

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    0

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    40000

    45000

    50000

    0:0

    0

    0:4

    7

    1:3

    4

    2:2

    1

    3:0

    8

    3:5

    5

    4:4

    2

    5:2

    9

    6:1

    6

    7:0

    3

    7:5

    0

    8:3

    7

    9:2

    4

    10

    :11

    10

    :58

    11

    :45

    12

    :32

    13

    :19

    14

    :06

    14

    :53

    15

    :40

    16

    :27

    17

    :14

    18

    :01

    18

    :48

    19

    :35

    20

    :22

    21

    :09

    21

    :56

    22

    :43

    23

    :30

    REGIONAL GENERATION AND DEMAND FOR MINIMUM DEMAND DAY

    15-11-2020

    DEMAND HYD THL Drawl WIND SOLAR

    MAX DMD 36493 MIN DMD 27486

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    00

    :00

    00

    :48

    01

    :36

    02

    :24

    03

    :12

    04

    :00

    04

    :48

    05

    :36

    06

    :24

    07

    :12

    08

    :00

    08

    :48

    09

    :36

    10

    :24

    11

    :12

    12

    :00

    12

    :48

    13

    :36

    14

    :24

    15

    :12

    16

    :00

    16

    :48

    17

    :36

    18

    :24

    19

    :12

    20

    :00

    20

    :48

    21

    :36

    22

    :24

    23

    :12

    MW

    MW

    Time

    AP DEMAND ON MINIMUM DEMAND DAY 15-11-2020

    HYD SOLAR WIND THL Drawl DEMAND

    MAX DMD 7623 MIN DMD 5786

  • System Operation Report-November 2020 4

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    -1000

    -500

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    0:0

    0

    0:5

    6

    1:5

    2

    2:4

    8

    3:4

    4

    4:4

    0

    5:3

    6

    6:3

    2

    7:2

    8

    8:2

    4

    9:2

    0

    10

    :16

    11

    :12

    12

    :08

    13

    :04

    14

    :00

    14

    :56

    15

    :52

    16

    :48

    17

    :44

    18

    :40

    19

    :36

    20

    :32

    21

    :28

    22

    :24

    23

    :20

    KARNATAKA ON MINIMUM DEMAND DAY 15-11-2020

    HYD THL Drawl WIND SOLAR DEMAND

    MAX DMD 7351 MIN DMD 4433

    -500

    0

    500

    1000

    1500

    2000

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    00

    :00

    00

    :52

    01

    :44

    02

    :36

    03

    :28

    04

    :20

    05

    :12

    06

    :04

    06

    :56

    07

    :48

    08

    :40

    09

    :32

    10

    :24

    11

    :16

    12

    :08

    13

    :00

    13

    :52

    14

    :44

    15

    :36

    16

    :28

    17

    :20

    18

    :12

    19

    :04

    19

    :56

    20

    :48

    21

    :40

    22

    :32

    23

    :24

    TAMIL NADU ON MAXIMUM DEMAND DAY 15-11-2020

    DEMAND HYD THL Drawl WIND SOLAR

    MAX DMD 13594 MIN DMD 10595

  • System Operation Report-November 2020 5

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000 0

    0:0

    0:0

    0

    00

    :49

    :00

    01

    :38

    :00

    02

    :27

    :00

    03

    :16

    :00

    04

    :05

    :00

    04

    :54

    :00

    05

    :43

    :00

    06

    :32

    :00

    07

    :21

    :00

    08

    :10

    :00

    08

    :59

    :00

    09

    :48

    :00

    10

    :37

    :00

    11

    :26

    :00

    12

    :15

    :00

    13

    :04

    :00

    13

    :53

    :00

    14

    :42

    :00

    15

    :31

    :00

    16

    :20

    :00

    17

    :09

    :00

    17

    :58

    :00

    18

    :47

    :00

    19

    :36

    :00

    20

    :25

    :00

    21

    :14

    :00

    22

    :03

    :00

    22

    :52

    :00

    23

    :41

    :00

    KERALA ON MAXIMUM DEMAND DAY 15-11-2020

    DEMAND Drawl THL HYD

    MAX DMD 3148 MIN DMD 1969

    0

    5000

    10000

    15000

    20000

    25000

    30000

    35000

    40000

    45000

    50000

    00

    :00

    :00

    00

    :54

    :00

    01

    :48

    :00

    02

    :42

    :00

    03

    :36

    :00

    04

    :30

    :00

    05

    :24

    :00

    06

    :18

    :00

    07

    :12

    :00

    08

    :06

    :00

    09

    :00

    :00

    09

    :54

    :00

    10

    :48

    :00

    11

    :42

    :00

    12

    :36

    :00

    13

    :30

    :00

    14

    :24

    :00

    15

    :18

    :00

    16

    :12

    :00

    17

    :06

    :00

    18

    :00

    :00

    18

    :54

    :00

    19

    :48

    :00

    20

    :42

    :00

    21

    :36

    :00

    22

    :30

    :00

    23

    :24

    :00

    MW

    Time

    DEMAND HYD THL Drawl WIND SOLAR

    REGIONAL GENERATION AND DEMAND FOR MINIMUM DEMAND DAY 04-11-2020

    MAX DMD 44944 MIN DMD 32859

  • System Operation Report-November 2020 6

    Wind Generation Generation Region and State Wise

    0

    15

    30

    45

    60

    75

    01

    02

    03

    04

    05

    06

    07

    08

    09

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    EN

    ER

    GY

    IN

    MU

    s --

    --->

    DAYS -------->

    DAY WISE WIND GENERATION OF SR FROM 01-November-2020 to 30-November-

    2020 in Mus

    ANDHRA PRADESH KARNATAKA SOUTHERN REGION TAMIL NADU

    0

    200

    400

    600

    800

    1000

    1200

    1400

    00

    :00

    01

    :00

    02

    :00

    03

    :00

    04

    :00

    05

    :00

    06

    :00

    07

    :00

    08

    :00

    09

    :00

    10

    :00

    11

    :00

    12

    :00

    13

    :00

    14

    :00

    15

    :00

    16

    :00

    17

    :00

    18

    :00

    19

    :00

    20

    :00

    21

    :00

    22

    :00

    23

    :00

    00

    :00

    EN

    ER

    GY

    IN

    MU

    s --

    --->

    AP WIND GENERATION ON MAXIMUM AND MINIMUM GENERATION DAYS

    Maximum 17.79 MU on 19-11-2020/ Minimum 1.43 MU on 02-11-2020

    TIME

  • System Operation Report-November 2020 7

    0

    200

    400

    600

    800

    1000

    12000

    0:0

    0

    01

    :00

    02

    :00

    03

    :00

    04

    :00

    05

    :00

    06

    :00

    07

    :00

    08

    :00

    09

    :00

    10

    :00

    11

    :00

    12

    :00

    13

    :00

    14

    :00

    15

    :00

    16

    :00

    17

    :00

    18

    :00

    19

    :00

    20

    :00

    21

    :00

    22

    :00

    23

    :00

    00

    :00

    EN

    ER

    GY

    IN

    MU

    s --

    --->

    TAMIL NADU WIND GENERATION ON MAXIMUM AND MINIMUM

    GENERATION DAYS

    0

    200

    400

    600

    800

    1000

    1200

    1400

    1600

    1800

    2000

    00

    :00

    01

    :00

    02

    :00

    03

    :00

    04

    :00

    05

    :00

    06

    :00

    07

    :00

    08

    :00

    09

    :00

    10

    :00

    11

    :00

    12

    :00

    13

    :00

    14

    :00

    15

    :00

    16

    :00

    17

    :00

    18

    :00

    19

    :00

    20

    :00

    21

    :00

    22

    :00

    23

    :00

    00

    :00

    EN

    ER

    GY

    IN

    MU

    s --

    --->

    KARNATAKA WIND GENERATION ON MAXIMUM AND MINIMUM GENERATION

    DAYS Maximum 28 MU on 19-11-2020/ Minimum 9.76 MU on 01-11-2020

  • System Operation Report-November 2020 8

    0

    500

    1000

    1500

    2000

    2500

    3000

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    00

    :00

    00

    :48

    01

    :36

    02

    :24

    03

    :12

    04

    :00

    04

    :48

    05

    :36

    06

    :24

    07

    :12

    08

    :00

    08

    :48

    09

    :36

    10

    :24

    11

    :12

    12

    :00

    12

    :48

    13

    :36

    14

    :24

    15

    :12

    16

    :00

    16

    :48

    17

    :36

    18

    :24

    19

    :12

    20

    :00

    20

    :48

    21

    :36

    22

    :24

    23

    :12

    TELANGANA ON MAXIMUM DEMAND DAY 15-11-2020

    DEMAND THL Drawl HYD SOLAR

    MAX DMD 8147 MIN DMD 5678

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    00

    :00

    :00

    00

    :45

    :00

    01

    :30

    :00

    02

    :15

    :00

    03

    :00

    :00

    03

    :45

    :00

    04

    :30

    :00

    05

    :15

    :00

    06

    :00

    :00

    06

    :45

    :00

    07

    :30

    :00

    08

    :15

    :00

    09

    :00

    :00

    09

    :45

    :00

    10

    :30

    :00

    11

    :15

    :00

    12

    :00

    :00

    12

    :45

    :00

    13

    :30

    :00

    14

    :15

    :00

    15

    :00

    :00

    15

    :45

    :00

    16

    :30

    :00

    17

    :15

    :00

    18

    :00

    :00

    18

    :45

    :00

    19

    :30

    :00

    20

    :15

    :00

    21

    :00

    :00

    21

    :45

    :00

    22

    :30

    :00

    23

    :15

    :00

    DEMAND HYD THL Drawl WIND SOLAR

    MAX DMD 9028 MIN DMD 6503

    AP DEMAND ON MAXIMUM DEMAND DAY 04-11-2020

  • System Operation Report-November 2020 9

    0

    2000

    4000

    6000

    8000

    10000

    12000

    00

    :00

    :00

    00

    :52

    :00

    01

    :44

    :00

    02

    :36

    :00

    03

    :28

    :00

    04

    :20

    :00

    05

    :12

    :00

    06

    :04

    :00

    06

    :56

    :00

    07

    :48

    :00

    08

    :40

    :00

    09

    :32

    :00

    10

    :24

    :00

    11

    :16

    :00

    12

    :08

    :00

    13

    :00

    :00

    13

    :52

    :00

    14

    :44

    :00

    15

    :36

    :00

    16

    :28

    :00

    17

    :20

    :00

    18

    :12

    :00

    19

    :04

    :00

    19

    :56

    :00

    20

    :48

    :00

    21

    :40

    :00

    22

    :32

    :00

    23

    :24

    :00

    MW

    Time

    DEMAND HYD THL Drawl WIND SOLAR

    MAX DMD 10200 MIN DMD 5873

    KARNATAKA ON MAXIMUM DEMAND DAY 04-11-2020

    0

    500

    1000

    1500

    2000

    2500

    3000

    0

    2000

    4000

    6000

    8000

    10000

    12000

    14000

    16000

    18000

    MW

    MW

    TIME

    TAMIL NADU ON MAXIMUM DEMAND DAY 04-11-2020

    DEMAND Drawl HYD THL WIND SOLAR

    MAX DMD 15688 MIN DMD 12028

  • System Operation Report-November 2020 10

    0

    500

    1000

    1500

    2000

    2500

    3000

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    00

    :00

    :00

    00

    :47

    :00

    01

    :34

    :00

    02

    :21

    :00

    03

    :08

    :00

    03

    :55

    :00

    04

    :42

    :00

    05

    :29

    :00

    06

    :16

    :00

    07

    :03

    :00

    07

    :50

    :00

    08

    :37

    :00

    09

    :24

    :00

    10

    :11

    :00

    10

    :58

    :00

    11

    :45

    :00

    12

    :32

    :00

    13

    :19

    :00

    14

    :06

    :00

    14

    :53

    :00

    15

    :40

    :00

    16

    :27

    :00

    17

    :14

    :00

    18

    :01

    :00

    18

    :48

    :00

    19

    :35

    :00

    20

    :22

    :00

    21

    :09

    :00

    21

    :56

    :00

    22

    :43

    :00

    23

    :30

    :00

    TELANGANA ON MAXIMUM DEMAND DAY 04-11-2020

    DEMAND THL Drawl HYD SOLAR

    MAX DMD 7168 MIN DMD 5288

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    00

    :00

    :00

    00

    :45

    :00

    01

    :30

    :00

    02

    :15

    :00

    03

    :00

    :00

    03

    :45

    :00

    04

    :30

    :00

    05

    :15

    :00

    06

    :00

    :00

    06

    :45

    :00

    07

    :30

    :00

    08

    :15

    :00

    09

    :00

    :00

    09

    :45

    :00

    10

    :30

    :00

    11

    :15

    :00

    12

    :00

    :00

    12

    :45

    :00

    13

    :30

    :00

    14

    :15

    :00

    15

    :00

    :00

    15

    :45

    :00

    16

    :30

    :00

    17

    :15

    :00

    18

    :00

    :00

    18

    :45

    :00

    19

    :30

    :00

    20

    :15

    :00

    21

    :00

    :00

    21

    :45

    :00

    22

    :30

    :00

    23

    :15

    :00

    HYD THL Drawl DEMAND

    KERALA ON MAXIMUM DEMAND DAY 04-11-2020

    MAX DMD 3590 MIN DMD 2440

  • ENERGY EXCHANGES

    Regional Enity HARYANA ODISHA APDISCOMS APSPDCL BSPHCL JBVNL Assam_Ben UPPCL BRPL KAR_ESCOMS GESCOM BESCOM MESCOM HESCOM KAR_CESC Grand Total

    ANP_ACMEBhiwadi 7.12 7.12

    ANP_ACMEHisar 7.18 7.18

    ANP_ACMEKarnal 6.89 6.89

    ANP_AYANA 5.43 5.43

    ANP_AZURE 5.93 5.93

    ANP_FRV 7.14 7.14

    ANP_FRV2 7.04 7.04

    ANP_NTPC 27.28 27.28

    ANP_SBENERGY 37.04 37.04

    ANP_TATARENEWABLE 12.94 12.94

    PVG_ACME_Kurukshetra 7.51 7.51

    PVG_ACME_REWARI 7.52 7.52

    PVG_ADYAH_BLOCK_1 7.61 7.61

    PVG_ADYAH_BLOCK_10 7.78 7.78

    PVG_ADYAH_BLOCK_13 7.84 7.84

    PVG_ADYAH_BLOCK_2 7.67 7.67

    PVG_ADYAH_BLOCK_3 7.65 7.65

    PVG_ADYAH_BLOCK_6 7.89 7.89

    PVG_AVAADASOLAR 7.67 7.83 7.81 23.31

    PVG_AvaadaSolarise 23.50 23.50

    PVG_AzurePowerEarth 8.12 8.12 16.25

    PVG_FORTUMFINSURYA 14.97 14.97

    PVG_FortumSolar 15.73 7.86 7.86 7.86 39.32

    PVG_KREDL 6.72 6.72

    PVG_PARAMPUJYA 22.33 22.33

    PVG_ReNew_TN2 7.20 7.20

    PVG_TATARENEWABLE 23.43 7.82 23.46 7.82 62.52

    PVG_YARROW 7.49 7.49

    Tuticorin_BETAMWIND 6.85 8.24 15.09

    Tuticorin_GIREL 7.66 7.66 15.32

    Tuticorin_Mytrah 5.26 5.26 10.51

    Tuticorin_Orange 13.84 13.84

    Anp_SprngAgnitra 0.69 0.69

    Tuticorin_BETAMWIND 6.85 6.85

    Tuticorin_Mytrah 5.26 5.26

    SBGPAVAGADA 33.24 33.24

    Tuticorin_GIREL 15.30 7.66 22.96

    Tuticorin_Mytrah 10.51 10.51

    Tuticorin_Orange 13.84 13.84

    Grand Total 13.84 6.85 117.65 7.04 35.00 12.92 5.26 65.91 7.66 90.45 23.26 108.34 15.70 31.65 15.67 557.18

    RENEWABLE LTA

  • Seller/Buyyer ANDHRAPRADESH BANGLADESH GOA KARNATAKA KERALA TAMILNADU TELANGANA

    Sch Energy In

    Mu's

    APNRL 49.56 49.56

    APTRANSCO 27.26 27.26

    BALCO 59.30 120.97 180.28

    COASTGEN 106.42 106.42

    DBPL 141.04 141.04

    DHARIWAL 58.22 58.22

    GMRWARORA 106.05 106.05

    GOA-SR 1.07 1.07

    ILFS 268.79 268.79

    JHABUA_IPP 139.98 139.98

    JITPL 61.73 61.73

    JPL-2 237.52 284.22 521.74

    KODERMA 133.33 133.33

    KSK_MAHANADI 324.30 324.30

    MARWATPP 413.69 413.69

    MEJB 86.81 56.64 143.45

    MPL 194.42 194.42

    NVVN_SOLAR_AP 1.95

    RAJ_SOLAR 5.59

    RTPS 22.59 22.59

    SEIL 124.75 438.08 562.83

    SEILP2 95.73 95.73

    Grand Total 124.75 95.73 1.07 220.14 772.18 1459.58 879.03 3552.48

    Seller/Buyyer ANDHRAPRADESH BANGLADESH BIHAR DELHI GOA Gujarat HARYANA KARNATAKA PUNJAB TAMILNADU TELANGANA UTTARPRADESH WESTBENGAL ODISHA DADRA&NAGARHAVELI DAMANANDDIU

    APLStage-2 346.96

    DBPL 2.08

    ITCWIND 0.55 0.34 1.57 0.28 0.30

    MARTIISPAT 3.40

    PCKL 0.22 3.67 2.06

    PENNACEM 5.81

    SEIL 0.92

    SEILP2 58.31 45.78 196.61 30.27

    UDUPI_SR 2.03

    EDCLHARANGI 2.32 0.12 0.45

    RPREL 89.07 18.94

    ZUARICEMCPP 9.36

    CORSUGKRPET 5.29

    TSSPDCL 1.26 15.70 0.31 51.00 7.16 11.50 8.15 4.03 2.39

    REGL 144.48

    SHMNR 5.17

    Grand Total 15.17 58.31 1.81 24.79 0.31 2.03 51.00 1.57 45.78 779.20 22.62 37.73 15.29 15.82 4.03 2.39

    STOA

    LTOA

  • SOUTHREN REGION BLACK START RESTORATION[AUTHOR NAME]

    पावर �स�टम ऑपरेशन कारपोरेशन �ल�मटेड

    (एक भारत सरकार का उ�यम)

    POWER SYSTEM OPERATION CORPORATION LIMITED (A Govt. of India Enterprise)

    द��ण �े�ीय लोड ड�पेच के�� /SOUTHERN REGIONAL LOAD DESPATCH CENTRE

    29, रेस कोस� �ास रोड, ब�गलरू – 560 009. / 29, RACE COURSE CROSS ROAD, BANGALORE – 560 009. Phone – 080 2225004, Fax – 080 22268725, E Mail – [email protected], Website – www.srldc.org,

    www.srldc.in