Background Capital Improvement Project

Proposed Scope Priorities

Proposed Scope by Building

Proposed Conceptual Budget Key Dates Questions

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

BACKGROUND

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Background

August 2018 Preliminary scope for the Capital Improvement Project was presented to the Board of Education with tiered potential cost packages of $26,383,456, $31,063,051, and $38,821,537.

November 2018 An updated presentation was made to the Board of Education based on their feedback, identifying a cost of $43,154,174 for the Capital Improvement Project.

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Background

January 2019 Campus Construction Management Group (CCMG) was hired by Sweet Home CSD to serve as Construction Manager for the Capital Improvement Project.

February 2019 CCMG created a new estimate for the Capital Improvement Project at $49,584,069

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Background

April 2019 YWA and CCMG worked with Sweet Home CSD and several user groups to refine the scope of the Capital Improvement Project. The new Project Total is currently $39,927,382.

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

CAPITAL IMPROVEMENT

PROJECT

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Envelope BCS Items for Building Investment and Student Protection

Mechanical / Electrical / Plumbing BCS Items for Building System Replacement and Restoration

Service Center Renovations and Additions for Maintenance, Safety, Program

Safety New Building Systems for Student and Staff Protection

Student Experience Renovations and Updates to Improve the Everyday Experience of Students

Proposed Scope Priorities

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Glendale Elementary

•  Replace Aluminum and Steel Windows

•  Replace Sidewalks and Pavement

•  Replace Heating, Cooling, Ventilation Systems

•  Provide Main Entrance Safety Glazing Film

$2,039,786

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Heritage Heights Elementary

•  Replace Full Roof System

•  Replace Site Lighting

•  Replace Site Drainage Systems

•  Replace Various Exterior Doors

•  Provide Main Entrance Safety Glazing Film

$3,870,920

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Maplemere Elementary

•  Replace Aluminum and Steel Windows

•  Replace Heating, Cooling, Ventilation Systems

•  Replace Various Exterior Doors

•  Provide Main Entrance Safety Glazing Film

$1,129,718

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Willow Ridge Elementary

•  Replace Sidewalks and Pavement

•  Provide Main Entrance Safety Glazing Film

$1,140,024

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Dexter Terrace School

•  Replace Full Roof Systems

•  Provide Main Entrance Safety Glazing Film

$3,300,943

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Middle School

•  Replace Heating, Cooling, Ventilation Systems

•  Replace Chillers

•  Restore Service Elevator

•  Renovate Middle School Cafeteria for Noise Reduction and Finishes Updates

•  Replace Pool Tile

•  Provide Main Entrance Safety Glazing Film

$2,432,573

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

High School

•  Replace Theater Lighting, Sound, and Stage Finishes

•  Renovate High School Locker Rooms

•  Replace Flooring

•  Replace Heating, Cooling, Ventilation Systems

•  Replace Chillers

•  Provide Main Entrance Safety Glazing Film

$8,974,118

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

High School

Existing Locker Rooms

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

High School

Existing Locker Rooms

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

High School

Proposed Locker Rooms

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Service Center

•  Provide New Office and Training Areas for B&G, Transportation, and Central Kitchen

•  Provide New Parking Lot and Configuration

•  Provide Single-Story ADA Accessible Building

•  Provide New Above-Ground Fuel Tanks

•  Provide Larger Bay Areas for Maintenance and Cleaning of Buses and District Vehicles

$16,857,382

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Service Center

Existing Exterior

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Service Center

Existing Interior

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Service Center

Existing First Floor Plan

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Service Center

Existing Second Floor Plan

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Proposed Service Center

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Proposed Central Kitchen

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Service Center Transition

•  Current plans would not require offsite space for Transportation Department during construction.

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

PROPOSED CONCEPTUAL BUDGET

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Proposed Conceptual Budget

_____________ TOTAL $39,927,382

Scope Priorities: Envelope Mechanical / Electrical / Plumbing Service Center Safety Student Experience

Service Center $16,857,382 High School $8,974,118 Middle School $2,432,573 Glendale Elementary $2,039,786 Heritage Heights Elementary $3,870,920 Maplemere Elementary $1,129,718 Willow Ridge Elementary $1,140,024 Dexter Terrace School $3,300,943 District Wide $181,917

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Financial Scenarios ProposedCapitalProjectFinancialScenarios

BestCaseScenario WorstCaseScenario

Descrip6on: ServiceCenteris95%Aidable

ServiceCenteris55%Aidable

TotalProjectCost: $39,927,382 $39,927,382

Es6matedBuildingAidRa6o: 66.5% 66.5%

AssumedLengthofDebtService 15Years 15Years

Es6mated%ofProjectAidable: 95.0% 78.0%

AnnualLocalShare $1,468,633 $1,835,777

ImpactonAvg.House* $63 $72

PercentageIncrease 3.07% 3.51%

*Amherst:$150,000AssessedValue;Tonawanda:$55,500AssessedValueusing2019-20projectedtaxrates

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

KEY DATES

SWEET HOME CSD BOARD OF EDUCATION UPDATE

MAY 14, 2019

Key Dates

5/14/19 Presentation of Proposed Capital Project to Board Of Education

6/18/19 Board Of Education Approves Proposed Capital Project Scope and Budget

6/18/19 SEQR / SHPO Process Begins

8/27/19 Board Of Education Approves SEQR 8/27/19 Board Of Education Resolution for

a Community Referendum Vote

10/22/19 Community Referendum Vote

2021 Anticipated Start of Construction