From: Suzuki, Susan To: Glendening, Susan@Waterboards Cc: White, Eileen ; Chan, Clifford ; Smith, James ; Teefy, Susan ; Burquez, Christopher ; Orinda WTP ; Ambrose, Michael ; Schroeter, John ; Lai, Hubert ; Work, Lori ; Prachyaratanawooti, Pongsiri ; Lim, Jack ; Lorenson, Kristi Subject: Comments on EBMUD OrWTP Tentative Order Date: Friday, January 11, 2013 2:27:30 PM Attachments: BP-08B Facility Map.pdf Schem-OrWTP 13-0109.doc Dear Susan, Thank you for the opportunity to comment on the amendment to the NPDES Permit for the East Bay Municipal Utility District (EBMUD) Orinda Water Treatment Plant. Thank you also for taking the time to understand our operating processes and concerns while you were developing the amendment. The amendment is acceptable as is; however, we would like to suggest the following revisions: Please correct spelling of Moke lumne Aque ducts (see pages 1, F- 1, and F- 2). Page F- 2, first paragraph, last sentence: replace “Discharge Point E- 004 is only used during rare water transfers to discharge excess raw water” with “Discharge Point E- 004 is for raw water transfers from other sources.” Page F- 12, Table F-2 (Beneficial Uses of San Pablo Creek and San Pablo Reservoir): revise table so that it is consistent with Order No. R2-2009-0067 (Table F- 6) or the current Basin Plan (Table 2-1). Also, as per the Basin Plan, include the following qualifier for REC- 1: “Water quality objectives apply; water contact recreation is prohibited or limited to protect public health.” Replace Attachment B with the new figure (below) since Emergency Response Vehicle 972 is no longer in service. Replace Attachment C with the new figure (below) since the discharge for E- 001 originates closer to the confluence rapid mixer (rather than by the north rapid mixer). Also, for simplicity, we’ve removed the “supernatant” label and changed the labels from “excess raw water” to “raw water” and “raw water transfers” to “raw water.” Sincerely, Susan Susan Suzuki, P.E. Senior Environmental Health & Safety Specialist East Bay Municipal Utility District 375 - 11th Street (MS #704), Oakland, CA 94607-4240 Phone: 510-287-0327 Pager: 510-437-7952 Fax: 510-287-0569 _____________________________________________ From: Glendening, Susan@Waterboards [mailto:[email protected]] Sent: Friday, December 07, 2012 2:13 PM To: Schroeter, John Cc: Robyn Stuber ([email protected] ) Subject: Orinda Water Treatment Plant Tentative Order Hello John, Attached to this email are the Orinda Water Treatment Plant Tentative Order, Transmittal Letter, and Notice Public Hearing. Please respond to this email to confirm you have received this email and the three attachments.

Upload: others

Post on 02-Aug-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

  • From: Suzuki, SusanTo: Glendening, Susan@WaterboardsCc: White, Eileen; Chan, Clifford; Smith, James; Teefy, Susan; Burquez, Christopher; Orinda WTP; Ambrose,

    Michael; Schroeter, John; Lai, Hubert; Work, Lori; Prachyaratanawooti, Pongsiri; Lim, Jack; Lorenson, KristiSubject: Comments on EBMUD OrWTP Tentative OrderDate: Friday, January 11, 2013 2:27:30 PMAttachments: BP-08B Facility Map.pdf

    Schem-OrWTP 13-0109.doc

    Dear Susan,

    Thank you for the opportunity to comment on the amendment to the NPDES Permit for the East Bay

    Municipal Utility District (EBMUD) Orinda Water Treatment Plant.

    Thank you also for taking the time to understand our operating processes and concerns while you were

    developing the amendment.

    The amendment is acceptable as is; however, we would like to suggest the following revisions:

    Please correct spelling of Mokelumne Aqueducts (see pages 1, F-1, and F-2).

    Page F-2, first paragraph, last sentence: replace “Discharge Point E-004 is only used duringrare water transfers to discharge excess raw water” with “Discharge Point E-004 is for rawwater transfers from other sources.”

    Page F-12, Table F-2 (Beneficial Uses of San Pablo Creek and San Pablo Reservoir): revisetable so that it is consistent with Order No. R2-2009-0067 (Table F-6) or the current BasinPlan (Table 2-1). Also, as per the Basin Plan, include the following qualifier for REC-1: “Waterquality objectives apply; water contact recreation is prohibited or limited to protect publichealth.”

    Replace Attachment B with the new figure (below) since Emergency Response Vehicle 972 is

    no longer in service.

    Replace Attachment C with the new figure (below) since the discharge for E-001 originatescloser to the confluence rapid mixer (rather than by the north rapid mixer). Also, for simplicity,

    we’ve removed the “supernatant” label and changed the labels from “excess raw water” to “rawwater” and “raw water transfers” to “raw water.”

    Sincerely,

    Susan

    Susan Suzuki, P.E.

    Senior Environmental Health & Safety Specialist

    East Bay Municipal Utility District

    375 - 11th Street (MS #704), Oakland, CA 94607-4240

    Phone: 510-287-0327 Pager: 510-437-7952 Fax: 510-287-0569

    _____________________________________________From: Glendening, Susan@Waterboards [mailto:[email protected]]Sent: Friday, December 07, 2012 2:13 PMTo: Schroeter, JohnCc: Robyn Stuber ([email protected])Subject: Orinda Water Treatment Plant Tentative Order

    Hello John,

    Attached to this email are the Orinda Water Treatment Plant Tentative Order, Transmittal Letter,and Notice Public Hearing. Please respond to this email to confirm you have received this email and the three attachments.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[mailto:[email protected]]mailto:[email protected]
  • 20

    C-2

    20

    22

    1

    MA

    NZA

    NITA

    DRI

    VE

    LOC

    KED

    GA

    TE

    BRID

    GE

    CAMINO PABLO

    19

    3

    2

    RAW WATER CHANNEL

    TRENCH STORM DRAIN

    STAIRSTO CREEK

    14

    4

    4

    5

    17 16 15

    76

    a b c d e

    13

    E-002

    E-001/S-3

    E-003

    1210

    11

    10

    9

    21

    San PabloCreek

    8

    SOUTHENTRANCEGATE

    NORTHENTRANCEGATE

    S-2S-1

    S-4

    S-5

    S-6

    BASIN 2 BASIN 1

    N

    RESIDENTIAL AREA

    RESIDENTIAL AREA

    RIP

    AR

    IAN

    WO

    OD

    LAN

    D

    GO

    LF C

    OU

    RSE

    ORINDA WATER TREATMENT PLANT

    FACILITY DIAGRAM

    PLANT LAYOUT1. Chemical Building & Administrative Offices • Ammonium hydroxide • Fluoride • Polymer • Sodium bisulfite • Sodium hydroxide • Sodium hypochlorite2. North Coagulant Feed Point3. Jet mixer4. Filters (30′x20′x10′)5. #2 Effluent Pit6. Grounds Maintenance Building a. storage b. toolroom and fertilizer storage c. garage–fuel storage d&e. office & lockers

    7. Maintenance Shop8. #1 Effluent, Glory Hole (East Portal)9. Los Altos Pumping Plant #210. Access Shaft11. Pesticide storage12. Los Altos Pumping Plant #1/ Raw Water Diversion Works13. South Spillway14. Confluence Rapid Mix15. Underground Diesel Storage16. Emergency Generator17. Electrical Switch Gear Center18. Truck Loading Station - Sludge Truck19. Washwater Pumping Station20. Settling Ponds21. Water Treatment Section Offfices22. Maintenance Support East

    Storm Drains

    Loading Station Sump

    HW Hazardous Waste Storage Locker

    BP-08B • 2/12

    A

    B

    Q

    P

    N

    K

    O

    ML

    EF G

    I

    X

    V W

    T

    U

    S

    J

    R

    DC

    Y

    Z

    ZtoA

    18

    H

    HW

    SENSITIVE INFORMATION -DO NOT COPY OR DUPLICATE

    E-004

    ATTACHMENT C - FLOW SCHEMATIC

    Briones Disinfection Facility

    Lime

    Sodium Hypochlorite

    Sodium Hydroxide

    Fluoride

    Ammonia

    Orinda Washwater Tank

    PUMP STATION

    Briones

    Reservoir

    LAF WTP

    WC

    WTP

    Sodium Hypochlorite

    MOKELUMNE

    AQUEDUCTS

    PARDEE CHEMICAL FACILITY

    LAFAYETTE

    AQUEDUCTS

    Pardee Reservoir

    ORINDA WATER TREATMENT PLANT BOUNDARY

    RAPID MIX

    (North)

    Sodium Hypochlorite

    Hyper+Ion1020 Polymer

    Cationic Polymer

    RAPID MIX

    (confluence)

    FILTERS (20)

    treated drinking water

    Distribution System

    RAPID MIX (South)

    filter backwash & filter-to-waste

    WASHWATER TANK

    DIVERSION WORKS

    Sodium Bisulfite

    Sodium

    Bisulfite

    SETTLING

    BASINS (� HYPERLINK "mailto:[email protected]" ��[email protected]�)

    raw water

    raw water

    E-004 to San Pablo Creek

    (as needed)

    E-002 to San Pablo Creek

    (routine)

    E-001 to

    San Pablo Creek

    (emergency)

    raw water

    KEY

    E-003 to

    San Pablo Creek

    (routine)

    TRUCK HAUL TO SD1

    clarified backwash water

    sludge

    Gravity Flow

    Pumped Flow

  • Regards,Susan

    Susan GlendeningEnvironmental SpecialistSan Francisco Estuary Partnership/San Francisco Regional Water Board1515 Clay Street, Suite 1400Oakland, CA [email protected]

    mailto:[email protected]

  • From: Suzuki, SusanTo: Glendening, Susan@WaterboardsCc: Teefy, Susan; Burquez, ChristopherSubject: RE: Comments on EBMUD OrWTP Tentative OrderDate: Wednesday, January 16, 2013 1:38:34 PMAttachments: BP-08B Orinda WTP Facility Map.pdf

    Schem-OrWTP 13-0114.doc

    Below is the revised Site Layout (new).

    The 1/14/13 schematic was the final, but here it is again

    From: Suzuki, Susan [mailto:[email protected]] Sent: Monday, January 14, 2013 8:19 AMTo: Teefy, SusanCc: Glendening, Susan@WaterboardsSubject: RE: Comments on EBMUD OrWTP Tentative Order

    I agree, thank you.

    The schematic is a quick fix (see below)… I also changed “ammonia” to “ammonium hydroxide” so it’s

    consistent with the site layout.

    The site layout could take awhile depending on Graphic Design’s schedule… so as far as the NPDES

    permit amendment, we may have to be stuck with what we have (but I’ll go talk with Graphics right

    away today!).

    _____________________________________________From: Teefy, SusanSent: Monday, January 14, 2013 7:57 AMTo: Suzuki, Susan; 'Glendening, Susan@Waterboards'Cc: White, Eileen; Chan, Clifford; Smith, James; Burquez, Christopher; Orinda WTP; Ambrose, Michael;Schroeter, John; Lai, Hubert; Work, Lori; Prachyaratanawooti, Pongsiri; Lim, Jack; Lorenson, KristiSubject: RE: Comments on EBMUD OrWTP Tentative Order

    Hi Susan,

    Just a minor edit in the schematic and the site layout attachments. The primary coagulant

    should be shown as “polyaluminum chloride”. We are currently using Hyper+Ion 1020 from

    General Chemical, but the supplier may change from year to year. Also in the list of

    chemicals shown (under chemical building and administrative offices), polyaluminum

    chloride should be includes along with the other chemicals.

    Thanks,

    Susan

    -----------------------------------------------

    Susan Teefy

    Water Treatment Superintendent

    East Bay Municipal Utility District

    P.O. Box 24055, MS 72

    (510) 287-1146

    [email protected]

    _____________________________________________From: Suzuki, Susan Sent: Friday, January 11, 2013 2:27 PM

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]
  • 20

    C-2

    20

    22

    1

    MA

    NZA

    NIT

    A

    DRI

    VE

    LOC

    KED

    GA

    TE

    BRID

    GE

    CAMINO PABLO

    19

    3

    2

    RAW WATER CHANNEL

    TRENCH STORM DRAIN

    STAIRSTO CREEK

    14

    4

    4

    5

    17 16 15

    76

    a b c d e

    13

    E-002

    E-001/S-3

    E-003

    1210

    11

    10

    9

    21

    San PabloCreek

    8

    SOUTHENTRANCEGATE

    NORTHENTRANCEGATE

    S-2S-1

    S-4

    S-5

    S-6

    BASIN 2 BASIN 1

    N

    RESIDENTIAL AREA

    RESIDENTIAL AREAR

    IPA

    RIA

    N W

    OO

    DLA

    ND

    GO

    LF C

    OU

    RSE

    ORINDA WATER TREATMENT PLANTFACILITY DIAGRAM

    PLANT LAYOUT1. Chemical Building & Administrative Offices • Ammonium Hydroxide • Cationic Polymer • Fluoride • Polyaluminum Chloride • Sodium Bisulfite • Sodium Hydroxide • Sodium Hypochlorite2. North Coagulant Feed Point3. Jet Mixer4. Filters (30ʹx20ʹx10ʹ)5. #2 Effluent Pit

    6. Grounds Maintenance Building a. storage b. toolroom and fertilizer storage c. garage–fuel storage d.& e. office & lockers7. Maintenance Shop8. #1 Effluent, Glory Hole (East Portal)9. Los Altos Pumping Plant #210. Access Shaft11. Pesticide Storage12. Los Altos Pumping Plant #1/ Raw Water Diversion Works13. South Spillway

    Storm Drains Loading Station SumpHW Hazardous Waste Storage Locker

    BP-08B • 1/13

    A

    B

    Q

    P

    N

    K

    O

    ML

    EF G

    I

    X

    V W

    T

    U

    S

    J

    R

    DC

    Y

    Z

    ZtoA

    18

    H

    HW

    SENSITIVE INFORMATION -DO NOT COPY OR DUPLICATE

    E-004

    14. Confluence Rapid Mix15. Underground Diesel Storage16. Emergency Generator17. Electrical Switch Gear Center18. Truck Loading Station - Sludge Truck19. Washwater Pumping Station20. Settling Ponds21. Water Treatment Section Offfices22. Maintenance Support East

    ATTACHMENT C - FLOW SCHEMATIC

    Briones Disinfection Facility

    Lime

    Sodium Hypochlorite

    Sodium Hydroxide

    Fluoride

    Ammonium Hydroxide

    Orinda Washwater Tank

    PUMP STATION

    Briones

    Reservoir

    LAF WTP

    WC

    WTP

    Sodium Hypochlorite

    MOKELUMNE

    AQUEDUCTS

    PARDEE CHEMICAL FACILITY

    LAFAYETTE

    AQUEDUCTS

    Pardee Reservoir

    ORINDA WATER TREATMENT PLANT BOUNDARY

    RAPID MIX

    (North)

    Sodium Hypochlorite

    Polyaluminum Chloride

    Cationic Polymer

    RAPID MIX

    (confluence)

    FILTERS (20)

    treated drinking water

    Distribution System

    RAPID MIX (South)

    filter backwash & filter-to-waste

    WASHWATER TANK

    DIVERSION WORKS

    Sodium Bisulfite

    Sodium

    Bisulfite

    SETTLING

    BASINS (� HYPERLINK "mailto:[email protected]" ��[email protected]�)

    raw water

    raw water

    E-004 to San Pablo Creek

    (as needed)

    E-002 to San Pablo Creek

    (routine)

    E-001 to

    San Pablo Creek

    (emergency)

    raw water

    KEY

    E-003 to

    San Pablo Creek

    (routine)

    TRUCK HAUL TO SD1

    clarified backwash water

    sludge

    Gravity Flow

    Pumped Flow

  • To: 'Glendening, Susan@Waterboards'Cc: White, Eileen; Chan, Clifford; Smith, James; Teefy, Susan; Burquez, Christopher; Orinda WTP;Ambrose, Michael; Schroeter, John; Lai, Hubert; Work, Lori; Prachyaratanawooti, Pongsiri; Lim, Jack;Lorenson, KristiSubject: Comments on EBMUD OrWTP Tentative Order

    Dear Susan,

    Thank you for the opportunity to comment on the amendment to the NPDES Permit for the East Bay

    Municipal Utility District (EBMUD) Orinda Water Treatment Plant.

    Thank you also for taking the time to understand our operating processes and concerns while you were

    developing the amendment.

    The amendment is acceptable as is; however, we would like to suggest the following revisions:

    Please correct spelling of Mokelumne Aqueducts (see pages 1, F-1, and F-2).

    Page F-2, first paragraph, last sentence: replace “Discharge Point E-004 is only used duringrare water transfers to discharge excess raw water” with “Discharge Point E-004 is for raw watertransfers from other sources.”

    Page F-12, Table F-2 (Beneficial Uses of San Pablo Creek and San Pablo Reservoir): revisetable so that it is consistent with Order No. R2-2009-0067 (Table F-6) or the current Basin Plan(Table 2-1). Also, as per the Basin Plan, include the following qualifier for REC-1: “Waterquality objectives apply; water contact recreation is prohibited or limited to protect public health.”

    Replace Attachment B with the new figure (below) since Emergency Response Vehicle 972 is no

    longer in service.

    Replace Attachment C with the new figure (below) since the discharge for E-001 originatescloser to the confluence rapid mixer (rather than by the north rapid mixer). Also, for simplicity,

    we’ve removed the “supernatant” label and changed the labels from “excess raw water” to “rawwater” and “raw water transfers” to “raw water.”

        >Sincerely,

    Susan

    Susan Suzuki, P.E.

    Senior Environmental Health & Safety Specialist

    East Bay Municipal Utility District

    375 - 11th Street (MS #704), Oakland, CA 94607-4240

    Phone: 510-287-0327 Pager: 510-437-7952 Fax: 510-287-0569

    _____________________________________________From: Glendening, Susan@Waterboards [mailto:[email protected]]Sent: Friday, December 07, 2012 2:13 PMTo: Schroeter, JohnCc: Robyn Stuber ([email protected])Subject: Orinda Water Treatment Plant Tentative Order

    Hello John,

    Attached to this email are the Orinda Water Treatment Plant Tentative Order, Transmittal Letter,and Notice Public Hearing.    Please respond to this email to confirm you have received this email and the three attachments.   

    Regards,Susan