SUTP 3rd Annual Meet21.06.13
Alex Paul Menon, IAS Additional Chief Executive Officer,
Naya Raipur Development Authority, Raipur, CG
GEF-UNDP-WB assisted Sustainable Urban Transport Project (SUTP)
INDIA
Introduction� Naya Raipur is being developed in green-field area of
80.13 Sq. Km. for a projected population of 5.60 Lakhs, as
a Capital City for the State of Chhattisgarh.
� It shall decongest Raipur and shall also be the engine of
growth for the region
� The State Secretariat has been shifted to Naya Raipur and
is functioning since November 2012
Introduction Cont’d…
� Around 3000 dwelling units of different categories have
been handed over to the owners
� Another 4000 dwelling units are under construction
� Head of the Departments’ Building at the Capitol Complex
is nearing completion
� Other government office buildings are under construction
� Multiple social, residential, recreational, institutional, and
commercial projects are being developed
Projects: Functional, & In-progress, Up-coming
International Cricket
Stadium
Law University
Airport
Express Way
Rawatpura Sarkar Institute
Administrative Academy
Muktangan
Capitol Complex
Naya Rakhi
(Resettlement Village)
1st Housing Colony
Sec- 27
Office Complex
Railway Station
Logistic Hub
Chhattisgarh Orissa
Subarea ARMY
BSF
CRPFSec – 17 : GOVT.
Housing
Sec – 29: Housing Colony
Sec – 30: PVT. Housing
Sr. Secondary School
Cancer Research Hospital
HP Fuel Refilling Station
Ayush University
ITM University
IIITNI Urban Mgmt
RIT
Central Business Dist.
IIM
Theme township & Golf Course
Knowledge Park
Gems & Jewelry SEZ
IT SEZ
Fair Ground
Amusement park
Sports City
Introduction Cont’d…
� Raipur and Naya Raipur shall be twin city needing seamless
connectivity
� BRTS, being developed
under SUTP, shall
facilitate connectivity
between Raipur and
Naya Raipur and within
Naya Raipur.
Introduction Cont’d…
� In absence of public transport system from the beginning,
informal para-transit services shall fill the space and it will
be very difficult to replace those at later stage.
� A bus based efficient, reliable, affordable public transport
service from the beginning would curtail use of personal
vehicles and other modes of para-transit;
� BRTS will reduce congestion, decrease emission of green-
house gases and will provide equitable accessibility
Introduction Cont’d…
The Interim Bus Service connecting Naya Raipur
� NRDA signed an MOU with the Raipur Nagar Nigam for the Interim Bus
Service
� The SPV, Raipur Nagar Nigam Transport Limited is providing the interim
bus service
� Presently 40 buses are plying dedicatedly between Raipur and Naya
Raipur in the peak hours. Bus service at off-peak is at frequency of 30
minutes
� The operator is equipping buses with Camera, GPS and GPRS enabled
ticketing with RFID and card reader
� The operator would increase fleet size as per the actual demand
Progress StatusS.
No.
Component Progress Status
1 Bus Depot, shelters,
pick up point - M/s.
Arya Architect
Financial Proposals for selection of
contractor opened on 14.06.2013.;
being evaluated
The DRM, Railways has agreed on the
condition that the development of
shelter shall be carried out by them as
deposit work. NRDA shall deposit the
required amount.
Progress Status Cont’d…
S.
No.
Component Progress Status
2 Cycle Track &
pedestrian walk way -
Consortium of iTrans,
UMTC and SG
Architects
Draft DPR submitted, examined by
NRDA and required modifications
communicated. The final DPR, detail
drawings with BOQ and measurement
sheets shall be submitted by the
consultant by end of June 2013
Progress Status Cont’d…
S.
No.
Component Progress Status
3 Study on Transit
Oriented
Development - IBI
Draft Final Report submitted by the
consultant and cleared by the Bank with
some observations.
Presentation on the final report, addressing
the comments, after the charettee and
study tour, made during the MTR mission.
Progress Status Cont’d…
S.
No.
Component Progress Status
4 Monitoring &
Evaluation -
DIMTS
First Draft of Baseline Survey report submitted on
04.05.2013. The consultant made presentation
during the MTR mission on the findings
5 ITS - DIMTS Contract document has been signed with M/s.
Delhi Integrated Multi Modal Transit System Ltd.
(DIMTS) on 21.05.2013.
Progress Status Cont’d…
S.
No.
Component Progress Status
6 Selection of Consultant
for preparation of
Regional Mobility Plan
for Greater Raipur Area
Financial Proposals opened on
18.06.2013 and is under evaluation
7 Selection of
Construction
Supervision Consultant
Negotiation meeting held with SAI
Consulting Engineers Pvt. Ltd. Draft
contract and minutes of negotiation
meeting submitted for the clearance of
the Bank on 17.06.13.
Monitoring & Evaluation� Study Objectives
� Evaluate user benefits of the proposed BRT system (measures such as reduced travel times, Reliable and safer service, etc.)
� Evaluate operator benefits of the BRT system (measures such
as increased ridership, efficiency, etc.)
� Evaluate impacts to surrounding and other traffic
� Recommend Measures for Improvement of BRTS
Monitoring & Evaluation Cont’d…
� Approach & Methodology:
Project Performance Monitoring & Evaluation
Monitoring Before
BRT Implementa
tion
• Secondary Data Collection• Primary Surveys at Specified intervals and
Submission of Reports
Monitoring During BRT
• Assessment of Designs• Operational & Performance Measures for BRTS• Primary Surveys at Specified intervals • Stake Holders Workshop
Performance
Evaluation
• Performance indicator-Targets achieved • Quantification of Improvement• Stake Holders Workshop
1
2
3
Performance measuresCommuters between Naya Raipur and old
Raipur (PT Availability)
Attractiveness of BRTS and NMT as a
mode of public transport in Naya
Raipur (Pax. Trips, Modal Share)
Schedule Adherence
Ridership and Revenue-Bus
Transport Viability (EPK, O&M Cost)
Environment Impacts (PM10,
PM2.5, SO2, NoX, CO)
Real Estate Values-TOD Impacts
Safe sidewalks and cycle tracks (Length)
Cost and Time Savings For bus users and private
vehicle users (Travel time)
Branding and Image - For Bus
passengers, pedestrians and
cyclists (User opinion)
Impact on Private Vehicle Users
(Average Speed)
Deviation from corridor design, BRT
Corridor Safety & Passenger Access to
corridor
Overall user satisfaction
1
2
3
4
8
7
6
5
9
10
11
12
Showcase project in Transport -Reforms
� Unified Metropolitan Transport Authority (UMTA)
for Greater Raipur Area (GRA), comprising of following
cities:
� Naya Raipur
� Raipur
� Bhilai
� Durg
Naya Raipur
Showcase project in Transport -Reforms Cont’d…
� An approach paper and draft legislation for constitution of UMTA for
Greater Raipur Area has been prepared with the assistance of the
World Bank
� Legislation for UMTA is being vetted by the Law Department
� Executive Orders are expected soon
� Dedicated Urban Transport Fund:
� NRDA has constituted and maintained Dedicated Urban Transport Fund
with effect from April 01, 2010
� More than Rs. 2 Crores have been accumulated in the UTF till 31.03.13
Showcase project in Transport Cont’d…
� Naya Raipur being a green-field development has the unique
opportunity to adopt innovation in planning and development
� Study on Transit Oriented Development (TOD) for Naya Raipur
has been done under the SUTP by selecting a consultant – IBI
Group
� Separate presentation shall be made by the consultant
explaining the concepts and recommendations
Implementation challenges� Co-ordination with multiple agencies:
� Indian Railways
� Raipur Municipal Corporation
� Transport Department, Government of Chhattisgarh
� General Administration Department, Government of
Chhattisgarh
� Traffic Police, District Administration and Police
Department
� National Highway Authority of India
Implementation challenges Cont’d…
� Ridership Estimation:
� Naya Raipur is a green-field development, there is no
established traffic demand, hence there is no traffic data
available
� Ridership estimation was done by identifying potential traffic
nodes and in-depth analysis of development under
implementation and in pipe-line for a horizon of 5 years;
� It is to be reviewed and updated time to time
Lessons learnt
� Dynamic nature of urban transport project:
� Urban transport projects are dynamic in nature, growth patterns
and modal share are organic;
� It is necessary to collect and analyse the data frequently and
revise service and operation plan accordingly
� The ToR and selection of consultant having experience
in the required domain is very important for timely
preparation and implementation of a project.