sustainable urban transport -...

10
08.03.2012 GOVERNMENT OF BOGOR CITY ------ DEVELOPMENT PLANNING BOARD Sustainable Urban Transport ACCELERATING ENERGY EFFICIENCY ACTION

Upload: phungdang

Post on 07-Jul-2018

224 views

Category:

Documents


1 download

TRANSCRIPT

08032012

GOVERNMENT OF

BOGOR CITY

------

DEVELOPMENT

PLANNING

BOARD

Sustainable Urban Transport ACCELERATING ENERGY EFFICIENCY ACTION

INDONESIA

WEST JAVA PROVINCE

City of Bogor

1

2

6

4

5

3

JAKARTA

Jakarta

Bali

11850 HECTARES

Pop 1004831

387 growth

More Than

246-MASL

26 CAverage

bull Reporting at carbonn Climate Registry

httpcarbonnorgindexphpid=313amptx_datareport_pi1[uid]=582

bull Expressed intent to comply with Compact of Mayors

bull Urban LEDS Profile httpurbanledsicleiorgindexphpid=408

Developed by IPCC expert Stephen Kenihan amp ICLEI based on consultation with City Working Group May 2014 - Feb 2015

Using Bogor community GHG inventory developed under Urban-LEDS

~ 4MtCO2eyr in 2010 doubling by 2020

Transport highest share

MANUFACTURING 322

TRANSPORT 338

COMMERCIAL AND INSTITUTIONAL

53

RESIDENTIAL 167

INDUSTRIAL PROCESSES 00

LIVESTOCK 01

AGRICULTURE NON-CO2 05

SOLID WASTE 61

BIOLOGICAL WASTE 00

OPEN BURNING OF WASTE 11

WASTEWATER 40

Bogor City GHG Emissions Inventory (2010)

Bogor City GHG Inventory

08032012

PEOPLErsquoS

MOBILITY

PATTERN ON

CITY CENTER

POOR

PEDESTRIAN

HIGH RATE OF

TRAFFIC

VIOLATION

POOR

INFRASTRUCTURE

QUALITY OF PUBLIC

TRANSPORTATION

ANGKOT

OWNERSHIP

DAILY TRAFFIC

JAM

plusmn 600 PEOPLE

COMMUTERD

AY

AS A TRANSIT POINT

KE JAKARTA URBAN DEVELOPMENT AND

MOBILITY ENHANCEMENT

STRATEGY

Reducing traffic load in city

center

Developing public

transportation

DEVELOPMENT OF

FREIGHT AND

PASSANGER

TERMINAL

ROAD NETWORK

ENHANCEMENT

REGIONAL

MOBILITY

ENHANCEMENT LOCAL MOBILITY

ENHANCEMENT

DEVELOPMENT OF

PEDESTRIAN

DEVELOPMENT OF

MASS

TRANSPORTATION

DEVELOPMENT OF

GREEN PUBLIC

TRANSPORTATION

IT BASED

TRANSPORT

LAW ENFORCEMENT

DEEVELOPMENT

OF TOD

POLICY OF CITYrsquoS

MOBILITY

DEVELOPMENT

PEDESTRIANS

BICYLES

PUBLIC TRANSPORT

COMERCIAL

VEHICLE

TAXIS

HOVs

CAR

DEVELOPMENT OF ROAD BASED MASS

PUBLIC TRANSPORTATION

URBAN DEV

DEVELOPMENT OF NON MOTORIZED

TRANSPORT

MOBILITY

STRATEGIES

DEVELOPMENT OF RAIL BASED MASS

PUBLIC TRANSPORTATION

ENHANCEMENT OF INTER CITY

REGIONAL MOBILITY

MOBILITY

PEOPLErsquoS EDUCATION

IT BASED TRANSPORT

TOD

SUKARESMI

ENHANCEMENT OF INNER CITY

MOBILITY

BOGOR GREEN ROOM

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

INDONESIA

WEST JAVA PROVINCE

City of Bogor

1

2

6

4

5

3

JAKARTA

Jakarta

Bali

11850 HECTARES

Pop 1004831

387 growth

More Than

246-MASL

26 CAverage

bull Reporting at carbonn Climate Registry

httpcarbonnorgindexphpid=313amptx_datareport_pi1[uid]=582

bull Expressed intent to comply with Compact of Mayors

bull Urban LEDS Profile httpurbanledsicleiorgindexphpid=408

Developed by IPCC expert Stephen Kenihan amp ICLEI based on consultation with City Working Group May 2014 - Feb 2015

Using Bogor community GHG inventory developed under Urban-LEDS

~ 4MtCO2eyr in 2010 doubling by 2020

Transport highest share

MANUFACTURING 322

TRANSPORT 338

COMMERCIAL AND INSTITUTIONAL

53

RESIDENTIAL 167

INDUSTRIAL PROCESSES 00

LIVESTOCK 01

AGRICULTURE NON-CO2 05

SOLID WASTE 61

BIOLOGICAL WASTE 00

OPEN BURNING OF WASTE 11

WASTEWATER 40

Bogor City GHG Emissions Inventory (2010)

Bogor City GHG Inventory

08032012

PEOPLErsquoS

MOBILITY

PATTERN ON

CITY CENTER

POOR

PEDESTRIAN

HIGH RATE OF

TRAFFIC

VIOLATION

POOR

INFRASTRUCTURE

QUALITY OF PUBLIC

TRANSPORTATION

ANGKOT

OWNERSHIP

DAILY TRAFFIC

JAM

plusmn 600 PEOPLE

COMMUTERD

AY

AS A TRANSIT POINT

KE JAKARTA URBAN DEVELOPMENT AND

MOBILITY ENHANCEMENT

STRATEGY

Reducing traffic load in city

center

Developing public

transportation

DEVELOPMENT OF

FREIGHT AND

PASSANGER

TERMINAL

ROAD NETWORK

ENHANCEMENT

REGIONAL

MOBILITY

ENHANCEMENT LOCAL MOBILITY

ENHANCEMENT

DEVELOPMENT OF

PEDESTRIAN

DEVELOPMENT OF

MASS

TRANSPORTATION

DEVELOPMENT OF

GREEN PUBLIC

TRANSPORTATION

IT BASED

TRANSPORT

LAW ENFORCEMENT

DEEVELOPMENT

OF TOD

POLICY OF CITYrsquoS

MOBILITY

DEVELOPMENT

PEDESTRIANS

BICYLES

PUBLIC TRANSPORT

COMERCIAL

VEHICLE

TAXIS

HOVs

CAR

DEVELOPMENT OF ROAD BASED MASS

PUBLIC TRANSPORTATION

URBAN DEV

DEVELOPMENT OF NON MOTORIZED

TRANSPORT

MOBILITY

STRATEGIES

DEVELOPMENT OF RAIL BASED MASS

PUBLIC TRANSPORTATION

ENHANCEMENT OF INTER CITY

REGIONAL MOBILITY

MOBILITY

PEOPLErsquoS EDUCATION

IT BASED TRANSPORT

TOD

SUKARESMI

ENHANCEMENT OF INNER CITY

MOBILITY

BOGOR GREEN ROOM

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Developed by IPCC expert Stephen Kenihan amp ICLEI based on consultation with City Working Group May 2014 - Feb 2015

Using Bogor community GHG inventory developed under Urban-LEDS

~ 4MtCO2eyr in 2010 doubling by 2020

Transport highest share

MANUFACTURING 322

TRANSPORT 338

COMMERCIAL AND INSTITUTIONAL

53

RESIDENTIAL 167

INDUSTRIAL PROCESSES 00

LIVESTOCK 01

AGRICULTURE NON-CO2 05

SOLID WASTE 61

BIOLOGICAL WASTE 00

OPEN BURNING OF WASTE 11

WASTEWATER 40

Bogor City GHG Emissions Inventory (2010)

Bogor City GHG Inventory

08032012

PEOPLErsquoS

MOBILITY

PATTERN ON

CITY CENTER

POOR

PEDESTRIAN

HIGH RATE OF

TRAFFIC

VIOLATION

POOR

INFRASTRUCTURE

QUALITY OF PUBLIC

TRANSPORTATION

ANGKOT

OWNERSHIP

DAILY TRAFFIC

JAM

plusmn 600 PEOPLE

COMMUTERD

AY

AS A TRANSIT POINT

KE JAKARTA URBAN DEVELOPMENT AND

MOBILITY ENHANCEMENT

STRATEGY

Reducing traffic load in city

center

Developing public

transportation

DEVELOPMENT OF

FREIGHT AND

PASSANGER

TERMINAL

ROAD NETWORK

ENHANCEMENT

REGIONAL

MOBILITY

ENHANCEMENT LOCAL MOBILITY

ENHANCEMENT

DEVELOPMENT OF

PEDESTRIAN

DEVELOPMENT OF

MASS

TRANSPORTATION

DEVELOPMENT OF

GREEN PUBLIC

TRANSPORTATION

IT BASED

TRANSPORT

LAW ENFORCEMENT

DEEVELOPMENT

OF TOD

POLICY OF CITYrsquoS

MOBILITY

DEVELOPMENT

PEDESTRIANS

BICYLES

PUBLIC TRANSPORT

COMERCIAL

VEHICLE

TAXIS

HOVs

CAR

DEVELOPMENT OF ROAD BASED MASS

PUBLIC TRANSPORTATION

URBAN DEV

DEVELOPMENT OF NON MOTORIZED

TRANSPORT

MOBILITY

STRATEGIES

DEVELOPMENT OF RAIL BASED MASS

PUBLIC TRANSPORTATION

ENHANCEMENT OF INTER CITY

REGIONAL MOBILITY

MOBILITY

PEOPLErsquoS EDUCATION

IT BASED TRANSPORT

TOD

SUKARESMI

ENHANCEMENT OF INNER CITY

MOBILITY

BOGOR GREEN ROOM

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

08032012

PEOPLErsquoS

MOBILITY

PATTERN ON

CITY CENTER

POOR

PEDESTRIAN

HIGH RATE OF

TRAFFIC

VIOLATION

POOR

INFRASTRUCTURE

QUALITY OF PUBLIC

TRANSPORTATION

ANGKOT

OWNERSHIP

DAILY TRAFFIC

JAM

plusmn 600 PEOPLE

COMMUTERD

AY

AS A TRANSIT POINT

KE JAKARTA URBAN DEVELOPMENT AND

MOBILITY ENHANCEMENT

STRATEGY

Reducing traffic load in city

center

Developing public

transportation

DEVELOPMENT OF

FREIGHT AND

PASSANGER

TERMINAL

ROAD NETWORK

ENHANCEMENT

REGIONAL

MOBILITY

ENHANCEMENT LOCAL MOBILITY

ENHANCEMENT

DEVELOPMENT OF

PEDESTRIAN

DEVELOPMENT OF

MASS

TRANSPORTATION

DEVELOPMENT OF

GREEN PUBLIC

TRANSPORTATION

IT BASED

TRANSPORT

LAW ENFORCEMENT

DEEVELOPMENT

OF TOD

POLICY OF CITYrsquoS

MOBILITY

DEVELOPMENT

PEDESTRIANS

BICYLES

PUBLIC TRANSPORT

COMERCIAL

VEHICLE

TAXIS

HOVs

CAR

DEVELOPMENT OF ROAD BASED MASS

PUBLIC TRANSPORTATION

URBAN DEV

DEVELOPMENT OF NON MOTORIZED

TRANSPORT

MOBILITY

STRATEGIES

DEVELOPMENT OF RAIL BASED MASS

PUBLIC TRANSPORTATION

ENHANCEMENT OF INTER CITY

REGIONAL MOBILITY

MOBILITY

PEOPLErsquoS EDUCATION

IT BASED TRANSPORT

TOD

SUKARESMI

ENHANCEMENT OF INNER CITY

MOBILITY

BOGOR GREEN ROOM

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

KE JAKARTA URBAN DEVELOPMENT AND

MOBILITY ENHANCEMENT

STRATEGY

Reducing traffic load in city

center

Developing public

transportation

DEVELOPMENT OF

FREIGHT AND

PASSANGER

TERMINAL

ROAD NETWORK

ENHANCEMENT

REGIONAL

MOBILITY

ENHANCEMENT LOCAL MOBILITY

ENHANCEMENT

DEVELOPMENT OF

PEDESTRIAN

DEVELOPMENT OF

MASS

TRANSPORTATION

DEVELOPMENT OF

GREEN PUBLIC

TRANSPORTATION

IT BASED

TRANSPORT

LAW ENFORCEMENT

DEEVELOPMENT

OF TOD

POLICY OF CITYrsquoS

MOBILITY

DEVELOPMENT

PEDESTRIANS

BICYLES

PUBLIC TRANSPORT

COMERCIAL

VEHICLE

TAXIS

HOVs

CAR

DEVELOPMENT OF ROAD BASED MASS

PUBLIC TRANSPORTATION

URBAN DEV

DEVELOPMENT OF NON MOTORIZED

TRANSPORT

MOBILITY

STRATEGIES

DEVELOPMENT OF RAIL BASED MASS

PUBLIC TRANSPORTATION

ENHANCEMENT OF INTER CITY

REGIONAL MOBILITY

MOBILITY

PEOPLErsquoS EDUCATION

IT BASED TRANSPORT

TOD

SUKARESMI

ENHANCEMENT OF INNER CITY

MOBILITY

BOGOR GREEN ROOM

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

DEVELOPMENT OF ROAD BASED MASS

PUBLIC TRANSPORTATION

URBAN DEV

DEVELOPMENT OF NON MOTORIZED

TRANSPORT

MOBILITY

STRATEGIES

DEVELOPMENT OF RAIL BASED MASS

PUBLIC TRANSPORTATION

ENHANCEMENT OF INTER CITY

REGIONAL MOBILITY

MOBILITY

PEOPLErsquoS EDUCATION

IT BASED TRANSPORT

TOD

SUKARESMI

ENHANCEMENT OF INNER CITY

MOBILITY

BOGOR GREEN ROOM

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

ENHANCEMENT OF INTER CITY

REGIONAL MOBILITY

MOBILITY

PEOPLErsquoS EDUCATION

IT BASED TRANSPORT

TOD

SUKARESMI

ENHANCEMENT OF INNER CITY

MOBILITY

BOGOR GREEN ROOM

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Alternative Energy

Current Status 50 angkot

Target up to 1000 angkot in 2020

Gas Station available at PGN Office Bogor

will then be built at the North amp South Bogor Area

CNG ANGKOT Installation of CNG Converter Kit to existing

angkot amp development the gas station

Electric ANGKOT Developing grid as the base for future public

transport Prototype Is developed in cooperation

with LIPI (Indonesian Institues of Sciences)

Current Status 1 prototype (FS)

Target Feasibility Study

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

PUBLIC CAMPAIGN

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo

Preserving The Past Serving The People

Facing The Future

ldquoDinu kiwari ngancik nu bihari

seuja ayeuna sampeureun jagardquo