Background
h Center, LEED Platinum
![Page 3: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/3.jpg)
Alameda County Buildings
~100 buildings ~8 million sq ft ~9,000
employees
~90% of County-operated space is owned by County New Construction: LEED Silver min.
Ashland Youth Center: LEED Platinum
![Page 4: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/4.jpg)
Why Building Products?
10%-40% of building emissions are embodied in materials Building materials impact indoor air quality Maintenance and durability have
operational impacts
![Page 5: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/5.jpg)
Why Building Operations?
![Page 6: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/6.jpg)
Going Beyond LEED
Meeting County-Specific: Sustainability Priorities Mandates Operational Needs
![Page 7: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/7.jpg)
Integrating Sustainability Into
Design
![Page 8: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/8.jpg)
Critical Stages in Process
General Design
ConstructionDetails
Construction Modifications
Programming Conceptual
Design Design
Drawings
Construction Documents (Schematics and Specifications)
Construction Occupancy
![Page 9: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/9.jpg)
Challenges Engaging at right time with the right info
General Design
ConstructionDetails
Construction Modifications
![Page 10: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/10.jpg)
Challenges Engaging at right time with the right info
General Design
ConstructionDetails
Construction Modifications
Budget cut Project Manager Leaves
![Page 11: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/11.jpg)
Challenges Engaging at right time with the right info
General Design
ConstructionDetails
Construction Modifications
Budget cut Project Manager Leaves
5 yrs?
![Page 12: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/12.jpg)
Challenges Engaging at right time with the right info
General Design
ConstructionDetails
Construction Modifications
Budget cut Project Manager Leaves
10 yrs?
![Page 13: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/13.jpg)
Challenges
Balancing sustainability goals with space and cost limitations Uniqueness of each project
![Page 14: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/14.jpg)
Strategies for Success
Describe sustainability goals as early as possible in design process Identify critical times in design process to
consult Sustainability Program Define performance criteria, but allow
designers to meet goals creatively
![Page 15: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/15.jpg)
Alameda County Case Study
![Page 16: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/16.jpg)
How We Did It
Convene key stakeholders Produced specifications in several
formats:▫ Checklist – easy reference during initial
design▫ Design Narratives– requirements &
recommended best practices Continuous iteration from lessons learned
after each project
![Page 17: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/17.jpg)
County Focus Areas
Products Carpet Paint/Coating Composite Wood
Finishes Hard Surface Flooring Adhesive/Sealant Lighting
Operations Janitorial Waste & Recycling Landscaping
![Page 18: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/18.jpg)
Example: Carpet
![Page 19: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/19.jpg)
Critical Stages in Process
General Design
ConstructionDetails
Construction Modifications
Carpet durability
Carpet tile Non-glue
installation
Surplus given to County for replacements
![Page 20: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/20.jpg)
Other Carpet Specifications
PVC-free – OR – 40% recycled content PVC backing NSF/ANSI-140 Platinum certified Solution-dyed Low-Emitting
More on carpet at: http://www.acgov.org/sustain/what/purchasing/success/carpet.htm
![Page 21: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/21.jpg)
Example: Waste & Recycling
![Page 22: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/22.jpg)
Critical Stages in Process
General Design
ConstructionDetails
Construction Modifications
Enclosure capacity
Interior bin capacity
Cabinetry for Interior Bins
Modify future enclosure gates: lessons learned
![Page 23: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/23.jpg)
Other Considerations
Restrooms with Appropriate Waste Bins Path of Travel for Janitors Waste Hauler Access Public Receptacles for Waste & Recycling
![Page 24: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/24.jpg)
![Page 25: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/25.jpg)
![Page 26: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/26.jpg)
Strategies for Success
Engage earlyIdentify critical decision pointsAllow flexibility
![Page 27: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/27.jpg)
Resources
![Page 28: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/28.jpg)
http://www.acgov.org/sustain/what/greenbuilding/susdesign.htm
![Page 29: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/29.jpg)
http://www.acgov.org/sustain/what/greenbuilding/grlease.htm
![Page 30: Sustainable Building Design - ACGOV.org · Sustainable Building Design Nicole Gaetjens Green Purchasing Roundtable May 20, 2015. Background h Center, LEED Platinum. Alameda County](https://reader033.vdocuments.site/reader033/viewer/2022051511/6017755bb11cf36b1077d2c0/html5/thumbnails/30.jpg)