Page 1: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

SITE SAFETY SEMINAR FOR WORKS CONTRACTS AND PROPERTY SERVICES CONTRACTS (15.12.2011)

Surprise Safety Inspection Programme (SSIP)突擊安全檢查計劃突擊安全檢查計劃

Jason Wong, Senior ConsultantOccupational Safety and Health Council

1

Page 2: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Background

1. To strengthen the commitment of and resource i b OSHinput by contractors at source on OSH

2. to raise vigilance and further enhance site management / physical conditions through surprise site visits by independent occupational safety and health inspectorates.

3. to Capital Works New Works Contracts (contracts p (under HASAS(New Works-NW)

4 expect to roll out from March 2012 onwards4. expect to roll out from March 2012 onwards

2

Page 3: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Implementation

1. Surprise Safety Inspection (SSI) will be conductedb f i l f i i d bby professional safety inspectorates appointed byOccupational Safety & Health Council (OSHC)i l b i2. in a quarterly basis

3. SSI is independent from safety audits under HASAS( )(NW)

4. SSI will adopt sampling strategy and target on highi k i i i d f drisk activities and areas of concern; and

5. check the compliance of the contractors related toi l f d h l h (OSH) ioccupational safety and health (OSH) requirements

Page 4: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Key Features

1. SSI- conducted based on objective checklist with a ki hmarking scheme.

2 P d t it i & i t f SSIP2. Proposed assessment criteria & scoring system of SSIP: - no partial compliance for each checklist item &

f ll li it b t t d f- non-fully compliance item be treated as non conformance item.

3. The contractor representatives (resident site staff of Housing Department whenever practicable) accompany theHousing Department whenever practicable) accompany the inspectorate throughout SSI.

4

Page 5: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Key Features

4. Non-conformance items shown on the inspection pchecklist will be acknowledged by the contractor representatives in presence of site staff of Housing p p gDepartment.

5. In the initial stage, subject to trial run on ongoing projects, SSIP will be introduced as a “standalone” system p j , yin order to gather substantive data for score analysis and facilitate contractors to get acquainted with the system. g q y

5

Page 6: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Procedures1. SSI will be carried out WITHOUT prior notice

(including Housing CM, site staff, contractor, ASA, OSHC Safety Audit Management Office, SI, etc.)

2. SSI will adopt sampling strategy:hi h i k i i i d f- target on high risk activities and areas of concern.

- target may change where necessary and will inform l i i drelevant parties in advance.

3 SSI ill h k h li f ll3. SSI will check the compliance of all contractors (including main contractor, subcontractors, &

i d b ) l d OSH6

nominated subcontractors) related to OSH requirements.

Page 7: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Procedures

4. Initial stage, SSI will focus onHigh Risk Activities (Critical Pass Item,Part B of HASAS(NW) Ver 1.5

1. Fall from Height2. Falling Objects3. Lifting Operationsf g p4. Housekeeping5. Electrical Supply Systempp y y

Areas of concernf1. Excavation (civil projects)2. Work in Confined Spaces2. Work in Confined Spaces

7

Page 8: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

ProceduresProcedures

SSI generally completed not more than half dayg y p y(4 hours including open and closing meeting).May be longer for mega site or where consideredy g gnecessary

Page 9: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

ProceduresProceduresInspection Schedule

SI not be notified in advance of which contract willSI not be notified in advance of which contract will be inspected until they get the sealed envelope which contain the contract information, namely the w c co ta t e co t act o at o , a e y t ename of contractor and site address, before they depart from their office on the date of inspection.dep o e o ce o e d e o spec o .

SSIP in-charge officer will plan ahead of the g pschedule of visits to various contracts under HASAS based on the contract period as well as the pprogress of work on site. The inspection schedule will be arranged such that it fulfills PASS gassessment schedule.

Page 10: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Sampling Logistics1. necessary stationary and equipment, namely measuring

p g g

tape, digital camera and telescope

2. A short open meeting (about 10 minutes) with site representatives and HA site staff for arrangement of siterepresentatives and HA site staff for arrangement of site inspection recorded in HA site diary as proof of inspection with date-recorded in HA site diary as proof of inspection with date

and timet t d ti d t-contractor produces necessary supporting document,

mainly inspection, test and exam records, etc.

10

Page 11: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Sampling Logistics3. Site representatives (including nominated subcontractors

h il bl ) h h h i i

p g g

when available) must accompany throughout the inspection and will be kept informed of any non-conformance (NC) items observeditems observedshould be supported with photos or evidence of related site personnel (e g name or trade or work carried out by thepersonnel (e.g. name or trade or work carried out by the personnel failed to follow safety measures)

4. Verification of NC items should be completed before leaving the siteleaving the site.

5 SSI i l d i i hi h ill h f5. SSI is a planned inspection which will have areas for inspection focus 11

Page 12: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Sampling Logistics

6. Closing meeting (not more than 30 minutes) will be

p g g

done with site representatives (including nominated subcontractors) and HA site staff for rounding up the results of safety

7. Contractor’s representative will need to acknowledge with the results on non conformance items in thewith the results on non conformance items in the presence of Housing site staff with a copy of the Surprise Safety Inspection Checklists (SSIC) which willSurprise Safety Inspection Checklists (SSIC) which will be used as reference and record for the SSI inspection

12

Page 13: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Sampling Logistics8. SI will take photographs and collect evidence for

ifi i f li f OSH i

p g g

verification of compliance of OSH requirements (including interviewing of related personnel to the contract checking of records and supporting documentcontract, checking of records and supporting document, obtaining copy of supporting record and document, etc)

9. SI will advise contractors and their employees or representatives for improvement or enhancement of OSHrepresentatives for improvement or enhancement of OSH performance either verbally on site and/ or in writing where appropriatewhere appropriate.

13

Page 14: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Sampling Logistics10. SSI Management Office will report to HA (CM of

j ) b h l f SSI i f f f

p g g

project) about the result of SSI in form of a summary of inspection result with a copy of the inspection checklist copied to site staff (CTO of project) and contractor Acopied to site staff (CTO of project) and contractor. A copy of the result will also be sent to ASA for reference in future auditin future audit.

(Details please refer to Flowchart)(Details please refer to Flowchart)

14

Page 15: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Focus on Inspection1. General site boundary all around the site- site entrance,

hi l f l

p

vehicles, passenger passageway for general access, egress including those that will affect the general public ( i f f lli bj f lif i i(protection of falling objects, safe lifting operation, measures of fall protection.)

2. Storage areas at G/F or basement (floor & lift shaft opening, safe means of access and egress, falling objects, housekeeping, storage of façade, pre-cast formwork, lifting areas or loading areas, etc)

3. Associated structure of building/ temporary structure such as excavation, slope work/road work, falsework for , p ,footbridge or access road, drainage system (confined space access and egress), etc. 15

Page 16: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Focus on Inspection4. Focus on working platforms in particular during the

installation of electrical fire and air conditioning services

p

installation of electrical, fire and air conditioning services and the finishing stage

5 F lifti ti5. Focus on lifting operationsTower cranes- concreting, lifting of formwork, façades,etcMobile cranes- lifting of equipment and building materials, suspension of load for assembly, etc. in normal transportation, bore piling work, tower crane erection and dismantling work, etc.Lifting operation involving electric chain block, winches, etc for curtain wall erection (e.g. shopping centre), lift ( g pp g ),installation, etc.

16

Page 17: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Focus on Inspection6. Inspection on working floors) t fl & it 3 t 4 fl i di t l b l

p

1) top floor & its 3 to 4 floors immediately below;2) floors where the tower cranes supports are mounted on;3) floors where the tower cranes were previously mounted

on;4) floors with passenger hoist landings;5) floors where material hoist is transporting materials;5) floors where material hoist is transporting materials;6) floors where gondolas are landing and anchored;

fl h h l di l f7) floors where there are loading platforms;

17

Page 18: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Focus on Inspection

6. Inspection on working floors

p

8) G/F- 2/F;9) floors where there are access and egress to the bamboo9) floors where there are access and egress to the bamboo

scaffolds;10) floors where most work activities are in progress such as10) floors where most work activities are in progress such as

plastering, floor tile laying, etc..Hi h l l l ti h it i t f f d11) High level locations where it is not safe for access and inspection can be done with the help of telescope.

P.S. The list is NOT exhaustive and particular floor, area, equipment or plant, etc may be inspected where the Safety Inspector considered it is necessary.

18

Page 19: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target AreasTarget Area 1: Activities and precautions involving falls

from height

g

from height 1) Workplace where risk of person falling a distance, including

maintenance cleaning & repair has to be identified & appropriatemaintenance, cleaning & repair, has to be identified & appropriate control measures implemented (e.g. access points to fragile surfaces, stairs, lift shaft & floor openings, roof edges, etc). , , p g , g , )

2) Access & egress/equipment for such purposes, is of good & sound construction, well maintained, regularly inspected & properly used. g y y

3) Erection / dismantling / altering of scaffolding or working stage for structure of building, plant or temporary structure should be identified & safety practices adopted (e.g. method statement).

4) Use of equipment/aid related to working at height including ladders, l bil ff ld & h i l l d kitrestles, mobile tower scaffold & mechanical elevated working

platforms etc.19

Page 20: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target AreasTarget Area 2: Activities and precautions involving

materials fall from height

g

materials fall from height1) Steps to have good housekeeping to prevent displacement or fall of

objectsobjects.2) Steps taken to ensure scaffolding materials, tools or other objects

and materials are properly lowered in a safe manner by means of aand materials are properly lowered in a safe manner by means of a lifting appliance or lifting gear.

3) Steps to prevent scaffolding materials, tools or other objects and3) Steps to prevent scaffolding materials, tools or other objects and materials from being thrown, tipped or shot down from a height where they are liable to cause injury to persons on or near a site.

4) Precautions shall be taken to protect workers employed at a site and the public from falling materials or flying debris.

20

Page 21: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target AreasTarget Area 3: Activities and precautions involving

housekeeping

g

housekeepingGeneral1) daily jobsite cleanup program2) disposal of rubbish) p3) individual cleanup duties for all workers4) materials piled stacked or otherwise stored to prevent4) materials piled, stacked, or otherwise stored to prevent

tipping and collapsingi l d f h d li5) materials stored away from overhead power lines

6) work and travel areas kept tidy, well-lit, and ventilated7) signs posted to warn workers of hazardous areas

21

Page 22: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target AreasTarget Area 3: Activities and precautions involving

housekeeping

g

housekeepingSpecific1) keep stairways, passageways, and gangways free of material,

supplies, and obstructions at all times.d b i b f h h d d i2) Lower debris by means of a chute or other approved devices.

3) projecting nails removing or bending and projecting objects t tiprotection

Storage1) storage areas should be at least 1.8 metres (6 feet) from roof or floor

openings, excavations/any open edges where material may fall offil b d i l h 10 b hi h l h f f h2) pile bagged material more than 10 bags high unless the face of the

pile is supported by the walls of a storage bin or enclosure. 22

Page 23: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target AreasTarget Area 4: Activities and precautions involving lifting

operations by lifting appliances

g

operations by lifting appliancesLifting plant operation1) Lifting appliance with valid statutory certificates2) lifting gear with valid statutory certificates and indication of safe

ki l dworking load3) use the lifting gear inspected by competent person4) operators, signalers and slingers with valid certificates5) lift material with sling legs forming an angle less than 45 degrees to

ti lvertical6) mobile crane properly extend the outriggers if provided during

lifting operationlifting operation

23

Page 24: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target AreasTarget Area 4: Activities and precautions involving lifting

operations by lifting appliances

g

operations by lifting appliancesLifting work safe behaviour1) rig the material properly before lifting operation2) lift load (including material) routing across workers) ( g ) g3) use of guide rope sling for holding the loading object

24

Page 25: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target AreasTarget Area 5: High Risk Activity of Concern –

l i l l

g

Electrical supply system1) Provision of safe electrical supply system (General Safe Practice

h i i / i di l d l i lsuch as appropriate signage/notice displayed to warn electrical hazard and live parts; and appropriate notice for treatment of electrical shock and resuscitation in both English and Chineseelectrical shock and resuscitation, in both English and Chinese, displayed in areas where electricity is used.)

2) Safety provision of temporary distribution boards of securely2) Safety provision of temporary distribution boards of securely mounted supports and with suitable main switches; and generators of properly earthed with exhaust fumes properly discharged.

3) Appropriate earth leakage protection devices provided to electrical supply system.

4) Provision of reduced voltage systems used for portable and hand-held tools and temporary site lighting. 25

Page 26: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Target Areas (Areas of Concern)Work in Confined Spaces (Civil work project/ Near completion NW)

C d t i k t b t t k i fi d

g ( f )

1) Conduct risk assessment by competent person on work in confined space before commencement with developed procedure and arrangement such as Permit-to-Work (PTW)arrangement such as Permit to Work (PTW)

2) Provision of competent workers worked in confined spaces and being supervisedbe g supe v sed

3) Provision of safety equipment and rescue equipment to support the confined space workp

Confined space work safe behaviour1) Follow the defined procedure and arrangement of confined space1) Follow the defined procedure and arrangement of confined space

such as PTW.2) Proper use of safety equipment) p y q p3) Proper use of emergency rescue equipment

26

Page 27: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Assessment Criteria and Scoring

1. There will be no partial compliance for each checklist

g

item for SSIC. 2. Non-fully compliance item will be treated as non y p

conformance (NC) item. 3 Not applicable item will be applied to non existence of3. Not applicable item will be applied to non existence of

such activities or plant or equipment. It will only be applied to those conditions where the part of theapplied to those conditions where the part of the structure or machine or plant that is totally suspended and cordoned off and prevented from accessand cordoned off and prevented from access.

4. Results will be in term of percentage of score with total Conformance (C) items over total applicable itemsConformance (C) items over total applicable items.

(Details please refer to SSI Checklist) 27

Page 28: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

To Sum Up

To keep the momentum of good safety performance ofTo keep the momentum of good safety performance ofHousing Authority contracts in implementation of safetymanagement system with continuous improvementmanagement system with continuous improvementthrough various means including the new SSIP.

To show the commitment and determination of Housingh i id d li f h i hi h iAuthority to provide good quality of housing which is

built safely.

28

Page 29: Surprise Safety Inspection Programme (SSIP) · PDF file · 2016-04-22Surprise Safety Inspection Programme (SSIP) ... floors with passenger hoist landings; 5) ... maintenance cleaning

Way Forward

The scores from SSIP shall eventually be linked to theThe scores from SSIP shall eventually be linked to theIntegrated Pay for Safety, Environment and HygieneScheme as an incentive for contractor to tightenScheme as an incentive for contractor to tightenvigilance in their day-to-day work.

SSIP scores can also be subsumed into HASAS (Newk ) dWorks) and PASS.