supply chain key performance indicators

Upload: valerio-paolo-marconi

Post on 08-Apr-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/7/2019 Supply Chain Key Performance Indicators

    1/52

    We support

    com anies in creatin

    more value for their

    customers Su l Chain Ke Performance Indicators

  • 8/7/2019 Supply Chain Key Performance Indicators

    2/52

    2

    GC&P Performance Measurement System (LOGOS)

    Logistics Costs

    Customer Service AnalysisSupplier Service Analysis

    Vendor Rating

    Cross Analysis

    Cross Analysis

    FactoryWHRM

    WHFP

    CustomersSuppliers

    na ys s

    OLE Anlaysis

    Flow Index

  • 8/7/2019 Supply Chain Key Performance Indicators

    3/52

    3

    Customer Service: Order Line Dates

    Date

    Received

    Date

    Entered

    Date

    Required

    Date

    Promised

    Date of Last

    Shipment

    Time

    Customer Waiting Time

    FLEX

    Delay

    Order Lead Time

  • 8/7/2019 Supply Chain Key Performance Indicators

    4/52

    4

    Customer Service: Which Indicators?

    Indicators representing an average: e.g. Average customer waiting time, average flexibility,

    , .

    Indicators representing a percentage: e.g. On time delivery (% of order lines delivered on, ,

    lead time (% of order lines delivered within a lead time of XX-days)

    Note: Both the avera e and the indicators have the advanta e of bein sim le to calculate

    and to understand, but at the same time they do not give a comprehensive overview of what ishappening.

    Indicators represented by a histogram or curve : e.g. Customer Waiting Time Curve,

    Flexibility Curve, Reliability Curve, Order Lead Time Curve, etc.

    Indicators can be calculated either on the total number of order lines, or just on a few of them

    (for instance: order lines of a particular product / item range, order lines by customer, orderlines related to a certain period). In such cases we speak of analysis segmentation.

  • 8/7/2019 Supply Chain Key Performance Indicators

    5/52

    5

    Customer Service: The 4 Service CurvesCustomer Waiting Time Curve

    2000

    2500

    Flexibility Curve

    10000

    12000

    A CWT Curve like this is almost To be flexible is fine, but only if the service

    500

    1000

    1500

    LineN

    4000

    6000

    8000

    LineN

    impossible (one-item-only companies).But it could show more peaks as relatedto the product ranges.

    policies are shared with customers. Shouldthe Flex curve be erratic, it might bedisastrous for the company!

    0

    1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81

    Days of Customer Waiting Time

    0

    2000

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

    Days of Flexibility

    Reliability Curve

    3000

    3500

    Order Lead Time Curve

    1800

    2000

    1500

    2000

    2500

    LineN

    600

    800

    1000

    1200

    1400

    LineN

    The OLT curve shape is affected by

    the trend of the other three curves.

    0

    500

    -36 -9 -5 -1 3 7 11 15 19 23 27 31 35 43 49 59 69

    Da s of Dela

    0

    200

    400

    1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89

    Days of Lead Time

  • 8/7/2019 Supply Chain Key Performance Indicators

    6/52

  • 8/7/2019 Supply Chain Key Performance Indicators

    7/52

    7

    Customer Service A Real Example of Order Lead Time Curve

    Service policies designed with accuracy: Someitems will be delivered in 1 week and others in2-3 weeks.

    Generally speaking, customer is happy to find that service policies are well defined, ,

    are delivered sooner.

  • 8/7/2019 Supply Chain Key Performance Indicators

    8/52

    8

    Customer Service: Files and Data NeededItem Master File

    Item Code

    Description

    Customer Database

    Customer Code

    Company Nameant o e

    Standard Cost

    Lead Time

    Unit of Measurement

    eature ountryFeature 2 (Area)

    Feature 3 (Category)

    Feature 4 (Etc.)eature

    Feature 2Feature 3Feature 4 (Etc.)

    Order Lines

    Order Number

    Shipment LinesPlant Code

    Warehouse Code

    r er ne um er

    Order DateRequired Delivery Date

    Confirmed Delivery Date

    pment um erShipment Line

    Order Number

    Order Line Number

    Customer Code

    Item

    Plant Codepment ate

    Quantity ShippedNote 1 (Order Type)Order Not Completed (Y/N Flag)Order Cancelled (Y/N Flag)

    Note: All the data in the above lists can be retrieved from any information

    system.

  • 8/7/2019 Supply Chain Key Performance Indicators

    9/52

    9

    Customer Service Some Tips to Consider

    The fundamental service measurement indicators are:

    Reliability Curve

    Order Lead Time Curve

    The customer waiting time and flexibility are not always possible to calculate, since thedelivery date as requested by customer is sometimes not managed by IT systems.

    It could be interesting to measure the speed at which a confirmation of delivery date is

    g ven to t e customer.

    For a meaningful analysis, a long time frame (from 6 months to 1 year) should be

    cons ere .

    Indicators can be calculated on the basis of order lines, of quantities or by amount (How

  • 8/7/2019 Supply Chain Key Performance Indicators

    10/52

    10

    Customer Service Some Tips to Consider

    Indicators can be calculated either in working days or calendar days.

    Late deliveries do not just decrease the customer satisfaction. They can even show one or

    more among the following:

    1. Lack of service olicies.2. Inability to determine the delivery date.

    3. Problems with the production planning.

    4. Insufficient production capacity.

    An erratic shape of the Order Lead Time Curve shows that a delivery date determination

    policy is missing.

    Beside meaning a lack of service to customers, partial deliveries cause a cost increase for

    handling and transportation.

    Indicators can be also used as a tool in negotiations with customers.

  • 8/7/2019 Supply Chain Key Performance Indicators

    11/52

    11

    Exercise 02-01

    Draw the on time delivery Curve and the Order Lead time Curve for the Company

    CINZANO

    Calculate the average delay and the average order lead time

    How man lines have been delivered with a dela of less than 1 week?

    Is the customer service the company is providing good or not?

  • 8/7/2019 Supply Chain Key Performance Indicators

    12/52

    12

    One often-used classification is related to the flow of materials into, through, and out of a

    manu ac ur ng organ za on:

    Raw materials: purchased items received which have not entered the production process.

    Work-in-process: raw materials that have entered the manufacturing process and are beingworked on or waiting to be worked on.

    Finished goods: products that are ready to be sold as completed items.

    Distribution inventories: finished oods located in the distribution s stem.

    MROs: item used that do not come part of the product (maintenance supplies, spare parts and

    consumables such as lubrificants, cleanin staff

  • 8/7/2019 Supply Chain Key Performance Indicators

    13/52

    13

    Wh Inventories

    Anticipation inventory: inventories are built up in anticipation of future demand, for example they

    are created ahead of a peak selling season.

    Fluctuation inventory (safety stock): inventory is held to cover random unpredictable fluctuations

    in supply and demand.

    Lot-Size inventory: items purchased or manufactured in quantities greater than needed immediately

    Trans ortation inventor : the exist because of the time needed to move oods from one location

    to another such as from a plant to a distribution center.

    Hedge inventory: some products such as minerals and commodities are traded on a worldwidemarket. The price of this products fluctuates according to orld supply and demand.

    Information System data is not updated

    Designers do not standardize components which causes unnecessary increases in complexity.

  • 8/7/2019 Supply Chain Key Performance Indicators

    14/52

    14

    The following costs are considered in inventory management decisions:

    Item costs: is the price paid for a purchased item. For an item manufactured in-

    house, the cost includes direct material, direct labor, and factory overheads.

    Carrying costs include all expenses incurred by the firm because of the volume ofinventory carried (capital cost, storage cost, risk cost such as obsolescence, damage,

    , .

    Ordering costs: are those associated with placing an order either with the factory ora supp er purc ase or er cost, pro uct on contro costs, set up costs

    Stockout costs: if demand during the lead time exceeds forecast we can expect astockout

  • 8/7/2019 Supply Chain Key Performance Indicators

    15/52

    15

    Inventor Mana ement - Introduction

    .

    Need of inventor mana ement olicies.

    TO MAKE

    DECISIONS

    IN ORDER TO PROVIDE

    THE REQUIREDWHEN TO ORDER?

    ABOUT CUSTOMER SERVICEHOW MUCH TO

    ORDER?

  • 8/7/2019 Supply Chain Key Performance Indicators

    16/52

    16

    Cross Analysis StepsClassify items into groups: Raw Materials (RM), Work in Process (WIP), Finished Products (FP).

    Determine the average stock and annual usage per each item.

    Multiply the average stock and the annual usage by the item standard cost.

    Classify the items according to their annual dollar usage and average stock value.

    ClA

    ClB

    ClC

    ClDClass

    AClass

    BClass

    CClass

    D

    STOC

    Cl B

    USAGE K

    Cl D

    Cl C

    Class Class Class Class

    STOCK

    A B C D

  • 8/7/2019 Supply Chain Key Performance Indicators

    17/52

    17

    Stock Usa e

    ota

    Stock

    Usage

    Item N

    Stock

    Usage

    IT

    Item N

    Stock

    Usage

    IT

    Item N

    Stock

    Usage

    IT

    Item N

    Stock

    Usage

    IT

    Item N

  • 8/7/2019 Supply Chain Key Performance Indicators

    18/52

    18

    Turns

    Total Average Stock==

    , ,

    1,506,061= 4 Turns / Year

    What do the inventory turns mean? At the very least it means that with 1.5 M of inventory acompany is able to generate 6 M in sales.

    =Total Average Stock 1.506.061

    Supply Average Daily Shipments=

    16.577=

    (55 Working Days)

    Days of Supply is a measure of the equivalent number of days of inventory on hand, based onusage.

  • 8/7/2019 Supply Chain Key Performance Indicators

    19/52

    19

    Stock Control - Files and Data Needed

    Item Master File

    Part Number

    Stock file

    Part NumberDescription

    Plant Number

    Standard Cost

    Plant Number

    Warehouse Number

    Quantity on HandFeature 1 (Part Type)

    Feature 2 (Category)

    Feature 3 (Family)

    Date

    WH Transaction File

    Feature 4 (Etc.)

    WH Transaction type file

    Transaction T e

    em um er

    Plant NumberWarehouse Number

    DescriptionPlant Number

    Warehouse Number

    Quantity Handled

    Transaction Date

    Note: All the above data can be retrieved from any information system.

  • 8/7/2019 Supply Chain Key Performance Indicators

    20/52

    20

    Cross Analysis Some Tips to Consider

    The stock for each item can be either the Average Stock or Stock on Hand. Average Stock is abetter measure.

    The choice of transactions types is very important in running the cross and turns analysis.

    In calculatin the item usa e do not include internal transfers.

    In case the number of items having neither consumption nor stock (DD class) is high, it

    might be that standard costs have not been calculated for all items.

    The Cross Analysis should be run for Raw Materials (RM), Work-In-Process (WIP) andFinished Products (FP).

    Flow curves show stock and lead time trends in time. The curve shape shows seasonality, the

    number of orders, the number of pickings and the frequency of pickings. These arephenomena which cannot be seen in a simple Cross Analysis.

    Flow curves on a single-code provide what is usually called the Item Logistics History .

  • 8/7/2019 Supply Chain Key Performance Indicators

    21/52

    21

    Exercise 02-02

    .

    Comment on the final results.

    On which parts number would you work to increase the turnover ratio?

  • 8/7/2019 Supply Chain Key Performance Indicators

    22/52

    22

    Manufacturing Lead Time Introduction

    c= op oor

    = Work Center

    b

    =

    a

    Sin le Lead Time

    Cumulated Lead TimeStart End

    Routing a c+ b +

    Flow Curves /Distribution Curves

    STD Time Flow Index

  • 8/7/2019 Supply Chain Key Performance Indicators

    23/52

    23

    Manufacturing Lead Time - The 5 Elements

    Manufacturing lead time is the time normally required to produce an item in a typical lot quantity.

    ,

    order is completed and loaded into stock.

    Queue Time: Amount of time the job is waiting at a work center before operation begins.

    Setup Time: Time required to prepare the work center for operation.

    Run Time: Time needed to run the order throu h the o eration.

    Wait Time: Amount of time the job is in the work center before being moved to the nextwork center.

    Move Time: Transit time between work centers.

    Queue Setup Run Wait Queue Setup Run Wait

    Move

    Among the above elements, the only one that generates value is Run Time;all the otherelements are Waste Time.Generally speaking, 95% of the production lead time is Waste Time.

  • 8/7/2019 Supply Chain Key Performance Indicators

    24/52

    24Manufacturing Lead Time Flow Curves

    K

    LoadLoad WIP/BacklogWIP/Backlog

    UnloadUnloadLead TimeLead Time

    tFlow Curves are the best tool to show the manufacturing lead time of a work center or of the

    whole manufacturin rocess.

    The main problems in using the flow curve method are: determining the initial WIP, choosing the

    unit of measure and the unit of time.

  • 8/7/2019 Supply Chain Key Performance Indicators

    25/52

    25Manufacturing Lead Time The Flow Index

    Lead Time

    Run Time

    The Flow Index measures the relationship between Lead Time and Run Time.A Flow Index of 10 means that for each cycle time unit there are 10 lead time units. In other words: for each

    , .

  • 8/7/2019 Supply Chain Key Performance Indicators

    26/52

    26Manufacturing Lead Time A Flow

    n ex a cu at on xamp eSeq

    Descri tionAvg

    RT minRT Avg Lot LRT LRT

    u. ays s ze pcs m n ays

    15 Hydraulic Presses 7,6 55 0,115 76 4.201 9

    20 Preparations 6,4 18 0,038 89 1.605 3

    25 Automatic welding 10,0 44 0,092 8 334 1

    30 Manual welding 5,7 38 0,079 14 549 1

    35 Turning 5,8 120 0,250 39 4.681 10

    40 Drilling and riveting 3,7 137 0,285 10 1.404 3

    45 Intermediate check 3,5 12 0,025 8 96 0

    ec rop ores s p an , ,

    55 Transit 1,8 0 0,000 0 0 060 Final check 3,9 12 0,025 6 69 0

    TOT 51,0 512 1,067 13.550 28

    FI = a / b = 47.8

    T

  • 8/7/2019 Supply Chain Key Performance Indicators

    27/52

    27Manufacturing Lead Time Files and Data

    Item Master FilePart Number

    Description

    Work Center Master FileWork Center Number

    DescriptionPlant Codestandard Cost

    Lead Time

    Unit of Measurement

    Routing FilePart Number

    Work Center NumberFeature 1 (Part Type)

    Feature 2 (Category)Feature 3 (Family)Feature 4 (Etc.)

    Sequence

    Run TimeSetup Time

    Shop Order NumberPart NumberOrder Quantity

    Shop Order Detail FileShop Order NumberPart Number

    uan y omp e e

    Quantity ScrappedBalanced Due

    Shop Order Date

    Operation NumberActual Setup TimeActual Run Time

    Initial Dateop r er ue a eCompletion Date

    Note: The data needed for Manufacturing Lead Time measurement are normally available in companies

    Finish Date

    .

  • 8/7/2019 Supply Chain Key Performance Indicators

    28/52

    28

    Manufacturing Lead Time A Few Tips to Consider

    In order to reduce Manufacturing Lead Time, it is important to consider the following

    manufacturing system items:

    Layout

    Capacity balance between processes (if processes are linked, a lack of balance causes

    Waiting Time)

    Planning and control tools

    Lot size (the bigger the lot, the longer the Manufacturing Lead Time)

  • 8/7/2019 Supply Chain Key Performance Indicators

    29/52

    29

    Machine Efficiency Overall Equipment Effectiveness Ratio (OEE)

    OEE is a method to measure the overall effectiveness of equipment. It is calculated by.

    Availability Ratio

    Performance Ratio

    ualit Ratio

    Normaly OEE is presented as a percentage.

  • 8/7/2019 Supply Chain Key Performance Indicators

    30/52

    30

    Efficiency Overall Equipment Effectiveness Ratio (OEE)

    Potential Time

    Potential Time: 24h a day X 365 days

    Theoretical Available Time

    Theoretical available time: (potential time days closed, hours not worked, planned maintenance)

    Available Time: (theoretical available time -available time not used)

    Ex: (480 m - 60 m) = 420Available time

    Availability ratio: (Available time Downtime/Available time)

    - =

    SetupsBreakdownsWorking Time

    Minor Stoppages

    ,

    Efficiency ratio: (Run Time X totalproduction/working time)

    Startup

    Net Working

    Reduced Speed Ex: (0,6m/units X 358 units) / 390 m = 55,1%

    Real

    Quality ratio: (total production defects)/Totalproduction

    TimeEx: (358 units 5 units) / 358 units = 98,6%

  • 8/7/2019 Supply Chain Key Performance Indicators

    31/52

    31

    Efficiency Overall Equipment Effectiveness Ratio (OEE)

    Work Center XY

    OEE= Availability ratio X Performance ratio X quality ratio=50,4% = Production Time

    Analisi delle Perdite Linea XY

    29%

    27%

    79%

    86%93%

    97%99% 100%

    30%

    35%

    70%

    80%

    90%

    % % cum

    23%

    56%

    15%

    20%

    25%

    40%

    50%

    60%

    Losses Analysis

    7% 6%4%

    2%

    29%

    5%

    10%

    10%

    20%

    30%

    0%

    Cambio Bobina e

    setup

    Regolazione e

    verifica taraturatecnica

    Fermo macchina

    per avaria

    Manutenzione

    Ordinaria

    Mancanza qualit

    stampa

    Mancanza

    alimentazione dastampante

    TPM Addestramento

    0%

  • 8/7/2019 Supply Chain Key Performance Indicators

    32/52

    32

    100%100%

  • 8/7/2019 Supply Chain Key Performance Indicators

    33/52

    33

    Example 2: Stamping

    100%100%

  • 8/7/2019 Supply Chain Key Performance Indicators

    34/52

    34

    Exam le 3: In ection Mouldin

    100%100%

  • 8/7/2019 Supply Chain Key Performance Indicators

    35/52

    35

    Attivit Ore Peso%TempoT

    otOEE

    STAMPAGGIO 19.949 65,47% 30.471 VERO

    Mancanza Personale 4.155 13,64% 30.471 VERO

    Mancanza Ordini 2.828 9,28% 30.471 FALSO

    Prova Stampi 1.361 4,47% 30.471 VERO

    Cambi Stampo 380 1,25% 30.471 VERO

    Fermi Straordinari 320 1,05% 30.471 FALSO

    Cambi Colore 313 1,03% 30.471 VEROPausa Pranzo/Cena 231 0,76% 30.471 VERO

    Guasti Stampo (Almeno 10 Minuti) 228 0,75% 30.471 VERO

    30 471 VERO , .

    Guasti Macchina (Almeno 10 Minuti) 201 0,66% 30.471 VERO

    Mancanza Stampo Da Officina 77 0,25% 30.471 VERO

    Pulizia (Gruppo Iniezione, Cilindro) 64 0,21% 30.471 VERO

    Mancanza Componenti 47 0,15% 30.471 VERORegolazioni 47 0,15% 30.471 VERO

    Guasti Robot (Almeno 10 Minuti) 26 0,09% 30.471 VERO

    Materiale Difettoso 13 0,04% 30.471 VERO

    Pulizia Macchina 4 0,01% 30.471 VERO

    Pulizia Stam o 3 0 01% 30.471 VERO

    Prova Colori 2 0,00% 30.471 VERO

    Mancanza Attrezzisti 1 0,00% 30.471 VERO

    TOT PERDITE 10.521 34,53%

    6

  • 8/7/2019 Supply Chain Key Performance Indicators

    36/52

    36Efficiency Files and Data Needed

    Shop CalendarWork Center NumberWeek

    Item Master FilePart NumberDescription

    Work Center Master FileWork Center NumberDescription

    DayShiftWorkstation Code

    Available Time

    Plant Codestandard CostLead Time

    Unit of Measurement

    Routing FilePart Number

    Work Center NumberFeature 1 (Part Type)Feature 2 (Category)

    Feature 3 (Family)Feature 4 (Etc.)

    Sequence

    Run TimeSetup Time

    Waste Type FileWorkstation NumberWaist Type

    Shop Order Master FileShop Order Number

    Part NumberOrder uantit

    Shop Order Detail FileShop Order NumberPart Number

    Item Number

    Shop Order NumberQuantity Completed

    Quantity Completed

    Quantity ScrappedBalanced Due

    Sho Order Date

    Actual Setup TimeActual Run TimeInitial Date

    uant ty crappeTime

    Shop Order Due DateCompletion Date

    Note: Data needed for the OEE calculations are not eas to collect. Usuall theOEE is used by companies with very advanced manufacturing systems.

    37

  • 8/7/2019 Supply Chain Key Performance Indicators

    37/52

    37Focus - Total Productive Maintenance

    Eliminate machine stoppages with Total Productive Maintenance (TPM).

    Would not it be great if you had a maintenance program that fixed your equipment before it broke?Because when your equipment is running as it should, you make products, meet deadlines and make moneywhile keeping customers happy. But if a machine breaks, it is not making you money it is costing you

    money. It hits Lean Manufacturing companies even harder. Lean systems minimize excess capacity and. , .warning signs that you need help:

    Equipment experiences unexplained shut-downs and failures or needs constant repair.Equipment operates at a slower speed than designed.

    Productivity decreases due to machine-related problems.

    .is 37%. That means the machinery is averaging only 22 minutes of operation out of every hour!

    The Answer is Total Productive Maintenance (TPM).The TPM system addresses your production operation with a solid, team-based program that is proactiveinstead of reactive. It helps eliminate losses, whether from breakdowns, defects or accidents, etc.

    38

  • 8/7/2019 Supply Chain Key Performance Indicators

    38/52

    38

    Focus - Total Productive Maintenance

    TPM begins by measuring and analyzing your Overall Equipment Effectiveness (OEE). This not only helps diagnose problems,but also becomes the measurement to determine how successful TPM efforts are.

    TPM then introduces the concept of Autonomous Maintenance, with machine operators as key members of the maintenance. , , , .

    operators know their machines better than anyone. They can tell if their machine is not working perfectly, often from just the

    sound or feel. They can alert maintenance people and provide excellent information. Also, when they perform routine

    maintenance and lubrication, they become process owners while relieving skilled trades of simple yet time-consuming jobs., ,

    maintenance quick and easy.The Big Six Wastes

    TPM will also teach you how to recognize the Big Six equipment-related wastes and how to minimize them:

    , , , , ,Properly implemented, TPM eliminates machine-related bottlenecks that hold up your processes and torpedo your productivity.In addition, TPM will help you achieve:

    Improved machine reliability

    Increased capacity without purchasing additional machines or sacrificing additional floor space

    Improved teamwork between machine operators and maintenance peopleImproved safety

    -A more involved, creative workforceThe ability to re-allocate your skilled workforce by having machine operators perform routine maintenanceDr. Sengupta(CEO Dr. Sengupta and Associates)

    39

  • 8/7/2019 Supply Chain Key Performance Indicators

    39/52

    39

    Supplier Service

    PurchaseRequisition Date

    Order EntryDate

    DateNeeded

    DatePromised

    Date Received

    Paper cycle

    Time

    Waiting time

    FLEX

    Reliability

    Supplier Lead Time

    .

    40

  • 8/7/2019 Supply Chain Key Performance Indicators

    40/52

    40Supplier Service Files and Data Needed

    Supplier Data BaseSupplier NumberCom an Name

    Item Master FilePart NumberDescri tion

    Feature 1Feature 2

    Feature 3

    Plant Numberstandard Cost

    Lead Timeea ure

    Purchasing Order File

    n t o easurementFeature 1 (Part Type)Feature 2 (Category)Feature 3 Famil

    r er ype

    Order NumberOrder DateDate Needed

    Goods Received File

    Bill Number

    Feature 4 (Etc.)

    Date PromisedSupplier CodeItem Number

    Order NumberOrder DateItem Number

    Unit PriceReceived QuantityDate ReceivedWarehouse Number

    Note: All the above data can be retrieved from any information system.

    41S li S i A F Ti C id

  • 8/7/2019 Supply Chain Key Performance Indicators

    41/52

    41Supplier Service A Few Tips to Consider

    e purc as ng o ce s overw e me y a y rout ne act v t es, suc as rece v ng, expe t ng,

    etc. Little time is actually spent on selection and evaluation of suppliers or on stock levelanalysis.

    The basic indicators to measure supplier service are On-Time Delivery and Order Lead Time.

    Comparing the System Lead Time and Actual Lead Time can be of especial interest and can.

    In order to get significant results from the analysis, it is necessary to take into account a timespan of at least 6 months, 1 year.

    Indicators can be calculated on the basis of either order lines, volumes or value.

    Indicators can be ex ressed in either workin da s or calendar da s.

    Partial deliveries can affect both production and customer service. They can also cause areceiving and handling cost increase.

    Indicators can be used as a tool in negotiations with suppliers.

    All of the above can be applied to subcontractors, too.

    42

  • 8/7/2019 Supply Chain Key Performance Indicators

    42/52

    4

    Vendor Rating

    43Logistics Costs

  • 8/7/2019 Supply Chain Key Performance Indicators

    43/52

    Logistics Costs

    P & L of the logisticsP & L of the logistics

    Operating Cost Revenues

    Operations CostGeneral & Administrative

    ater a s an

    SubcontractorsLaborLogistic Cost Overhead

    Inbound logistic Cost Internal Logistic Cost Outbound Logistic Cost

    44L i i C

  • 8/7/2019 Supply Chain Key Performance Indicators

    44/52

    Logistics Costs

    Inbound Logistic Cost Internal Logistic Cost Outbound Logistic Cost

    1. Personnel

    (purchasing, stores

    1. Personnel (planning

    and control, stores

    1. Personnel (customer

    service, stores && inventory

    personnel)

    2. Warehouse

    & inventory

    personnel)

    2. Warehouse

    inventory personnel)

    2. Warehouse

    E ui ment

    Equipment

    3. Rents

    Equipment

    3. Rents3. Rents

    4. Outbound

    4. Inbound

    Transportation

    4. Inventory

    Opportunity Cost

    Transportation

    5. Distribution Centers

    .Opportunity Cost

    6. Inventory

    Opportunity Cost

    45P f M t R f T bl

  • 8/7/2019 Supply Chain Key Performance Indicators

    45/52

    Performance Measurement Reference Table

    Customer On-Time Delivery > 95%

    Company Inventory Turns > 10

    Flow Index < 10

    OEE > 85%

    Supp ier On- ime De ivery > 95%

    % of Logistics Cost on Revenues* < 8%

    *Note: Excluding distribution centers and subsidiaries costs.

    46The Purpose of Logistics Meeting

  • 8/7/2019 Supply Chain Key Performance Indicators

    46/52

    The Purpose of Logistics Meeting

    Service to customer

    Stock levels (total and by part type)Production lead time

    Efficiency / Productivity

    Detect problems and perform analysis according to the Denim cycle (plan-do-c ec -act .

    .

    47

    The steps in running Logistics Meeting

  • 8/7/2019 Supply Chain Key Performance Indicators

    47/52

    The steps in running Logistics Meeting

    Definition of the indicators to be adopted.Choice of the calculation tool (For example: Excel?, Access?, Business Intelligence?,e c. . e oo s ou e a gne w e corpora e sys em an cons an yupdated .Appointment of persons, each taking the responsibility of one or more indicators.

    e n on o arge s or eac n ca or.Periodic status reports on indicator trends by the above persons.Gap analysis and definition of improvement actions.Follow up on improvement actions.

    Participants:

    Purchase Manager

    Production Manager Sales Manager

    Marketing Manager IT Manager

    Supply Chain Manager

    48

    The Logistics Meeting Reporting System (1)

  • 8/7/2019 Supply Chain Key Performance Indicators

    48/52

    The Logistics Meeting Reporting System (1)

    Customer Service Trend

    target

    target

    target

    49The Logistics Meeting Reporting System (2)

  • 8/7/2019 Supply Chain Key Performance Indicators

    49/52

    g g p g y ( )

    Company Inventory Turns

    5.991.0226.128.829

    6.265.6146.000.000

    7.000.000

    12

    14

    4.000.000

    5.000.000

    st)value

    8

    10

    1.946.9161.965.326

    2.033.180

    3,1 3,1

    2.000.000

    3.000.000

    (S

    tdco

    4

    6IT target

    ,

    0

    1.000.000

    01/01/2002 - 31/12/2002 01/06/2002 - 31/05/2003 01/07/2002 - 30/06/2003

    0

    2

    Usage Avg stock IT

    50

    The Logistics Meeting Reporting System (3)

  • 8/7/2019 Supply Chain Key Performance Indicators

    50/52

    The Logistics Meeting Reporting System (3)

    Supplier Service Trend

    target

    target

    51

    Assignment 02 05

  • 8/7/2019 Supply Chain Key Performance Indicators

    51/52

    Assignment 02-05

    See Case Study Attila in attached file.

    Assignment 02-06

    You want to measure your customers satisfaction.

    Prepare a questionnaire to measure the customers satisfaction.You choose the business and the company type.

    52

    References

  • 8/7/2019 Supply Chain Key Performance Indicators

    52/52

    References

    Logistics KPI Slides.

    Introduction to Materials Management, Tony Arnold Chapters 9-10-11.

    perat ons anagement, ge ac apters .