supplement to the kohler co. global supplier quality manual engines supplier quality...supplier...

27
UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012 The Kohler Engines Division will provide one level of finest quality for all products and services. We will provide a discernibly better value to our customers than our competition. Everyone in the division has the responsibility to comply with and continually improve our quality management system. …Kohler Engines Quality Policy Supplement to the Kohler Co. Global Supplier Quality Manual

Upload: others

Post on 03-Feb-2020

13 views

Category:

Documents


1 download

TRANSCRIPT

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

The Kohler Engines Division will provide one level of finest quality for all products and services. We will provide a discernibly better value to our customers than our competition. Everyone in the division has the responsibility to comply with and continually improve our quality management system. …Kohler Engines Quality Policy

Supplement to the Kohler Co. Global Supplier Quality Manual

Supplier Quality Requirements Supplement (SQR) Page 1 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

This document is controlled and maintained by the Manager of Supplier Quality. The Manager of

Supplier Quality must approve changes and/or revisions.

Document Revision History (see page 26 for details)

This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Company Global Supplier Quality Manual. To verify the latest version of this manual, go to http://www.kohler.com/corporate/supplier/conducting-business.html . To access the Kohler Co. Global Supplier Quality Manual, or find additional information about supplying product to Kohler Co., go to www.kohler.com; select Suppliers, then Conducting Business

.

This manual has been reviewed and approved by:

Jeremy Maes, Supplier Quality Manager (Signature on file)

Revision Date Released By Revision J 11/1/07 Aimee M. Pflughoeft Revision K 1/26/09 Supplier Quality Team Revision L 7/16/2010 Supplier Quality Team Revision M 12/1/2012 Quality Team

Supplier Quality Requirements Supplement (SQR) Page 2 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

TABLE of CONTENTS Section ....................................................................................................................... Page 1.0 Introduction ................................................................................................................................................. 3

Links to Kohler Co. Global SQR and Kohler Engines SQR supplement websites .......................... 3

2.0 Change Process ......................................................................................................................................... 4 Kohler Print Change Process........................................................................................................... 4 Supplier Request for Change .......................................................................................................... 5 Supplier Request for Change Form ................................................................................. Appendix D

3.0 General Requirements ............................................................................................................................... 7 Warranty Participation ..................................................................................................................... 7 Prohibited Practices ......................................................................................................................... 7

4.0 Production Part Approval Process (PPAP) ................................................................................................ 8 Production Sample Requirements ................................................................................................... 8 Submission Requirements ............................................................................................................... 9 Re-submission Reasons and Required Submission Level ............................................................ 10 Pre-Production Run and Sample Guidelines ................................................................................ 11 Manufacturing Documentation Requirements .............................................................................. 12 Master Samples ............................................................................................................................. 11 Preliminary Process Capability Guidelines ................................................................................... 12 First Piece Inspection Requirements ............................................................................................ 13 Risk Management Plan (RMP) ...................................................................................................... 13 Risk Management Plan Exit Requirements Sign-off form ............................................... Appendix E

5.0 GD&T Gauge Set-Up ................................................................................................................................ 14

6.0 Prints/drawings ........................................................................................................................................ 15 Classification of Characteristics .................................................................................................... 15 Drawing Information, Z-Specs ....................................................................................................... 16 Tooling Variation (TV) Notes ........................................................................................................ 16

7.0 Defect Resolution ..................................................................................................................................... 17

Supplier Responsibilities ............................................................................................................... 17

8.0 Tooling and Gauging Requirements .......................................................................................................... 20 Submission Requirements for Tooling Acceptance ...................................................................... 20 Kohler Owned Tooling .................................................................................................................. 20

9.0 Equipment Control (calibration, maintenance, capability) ....................................................................... 22

10.0 Deviation Process .................................................................................................................................... 23

11.0 Screening/Rework Activity - Expectations and Required Paperwork ..................................................... 24

12.0 Stop-Ship/Stop Build Procedures ............................................................................................................ 25

Revision History .................................................................................................................................................. 26

Appendices Kohler Engines Electronic Submission Information................................................................................................................. A Packaging/Labeling Specification ........................................................................................................................................... B PPAP Forms ................................................................................................................................................................... C Supplier Request for Change Form (K-SRC001) .................................................................................................................... D Risk Management Plan Form RMP-001 ................................................................................................................................. E GD & T Resources .................................................................................................................................................................. F Supplier Scorecard Overview ................................................................................................................................................. G

Table of Contents

Supplier Quality Requirements Supplement (SQR) Page 3 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 1.0 Introduction Go to

Table of Contents

At the Kohler Company Engine Division (hereafter referred to as Kohler Engines), we recognize the critical role quality plays in our success. We are committed to meeting our customer’s quality needs and expectations of excellence by pursuing continuous quality, delivery and productivity improvements. A large segment of our quality performance is dependent on you

as our supplier.

1.1 Purpose

: This manual is a supplement to the Kohler Global Supplier Quality Manual. As an engine manufacturer, Kohler Engines has additional requirements, specified herein, that must be met by its suppliers. Kohler Engines suppliers are expected to certify/acknowledge compliance to this manual and to the Kohler Company Global Requirements (ref. 1.1.1).

1.1.1 Kohler Co. Global Supplier Requirements. Click the link to access Global Supplier Quality Manual, Supplier Code of Conduct, Terms and Conditions Agreement, and other supplier documents. If the link does not work, go to www.kohler.com, click Suppliers, Conducting Business

.

1.1.2 Kohler Co Supplier Certification is an electronic automated system that allows suppliers to self-certify by acknowledging compliance with Kohler Co. requirements. If the link does not work, go to www.kohler.com, click Suppliers, Certification

. Please see the FAQ on this site for further information.

1.1.3 Kohler Engines: Supplier Quality Requirements Supplement. If the link does not work, copy the following URL address into your browser’s address bar: http://www.kohlerengines.com/sqr/index.htm

1.2 Additional Resources: Please refer to the Automotive Industry Action Group (AIAG) manuals: Failure Mode

and Effect Analysis, Advanced Product Quality Planning and Control Plan, Production Part Approval Process, Quality System Requirements, Statistical Process Control, and Measurement Systems Analysis for further details. These documents can be ordered from the AIAG as a “7-pack” by contacting AIAG Customer Service at (248) 358-3003, or on-line at www.aiag.org.

1.3 Kohler Engines reserves the right to update this manual at any time and the supplier is expected to verify the

latest version of this manual at http://www.kohlerengines.com/sqr/index.htm, or contact Kohler Engines Supplier Quality for verification.

1.3.1 Minor changes or corrections may be made at any time after publication of this manual. These

changes will be documented and published to the Kohler Engines Supplier Quality Requirements website, http://www.kohlerengines.com/sqr/index.htm, under the title “After publication change log”. Suppliers are encouraged to access this document for the latest information.

For further explanation of the Kohler Engines Supplier Quality Requirements (SQR) supplement, contact Kohler Engines Quality, Purchasing, or Engineering departments.

Section 1.0 Introduction

Supplier Quality Requirements Supplement (SQR) Page 4 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 2.0 Change Process Go to

Table of Contents

2.1 Kohler Engines Change Management Lifecycle System

2.1.1. Product lifecycles are managed through lifecycle states. The current lifecycle state of the Kohler Engines drawing is clearly marked on the left edge of the drawing and in the information box located in the lower right corner. Lifecycle states are defined below.

Drawing Lifecycle State Definition

Authorized for PPAP

submission?

Authorized for quoting purposes?

Authorized for

production?

In Progress Design is under development. No No No

Prototype Functional design used to purchase or manufacture prototype material. No Yes No

Eng. Rel. - Task Review Testing and validation are in progress. No Yes No

Eng. Rel. - Audit Design is under review and pending board approval. No Yes No

Engineering Release Design is validated. Yes Yes No

Production Release

Process is validated. This is the onlyYes

drawing lifecycle state authorized for use in production.

Yes Yes

Under Review Any state where some type of review is required. No Yes No

Canceled/Obsolete Never released or void. No No No

EX EX part number designates engineering samples/cost estimators. No No No

2.2. Kohler Engines Print Change Process

2.2.1. When a change is made or a new material is released by Kohler Engines, the Purchasing Department provides the supplier with the Print Revision or Release Notification (form PUR-007) and a copy of the revised or released print.

2.2.1.1. The supplier must complete and return form PUR-007 as directed by Kohler Engines Purchasing Department.

2.2.2. Kohler Engines Purchasing Department retains all completed forms PUR-007 in the supplier file for at least the length of time the revision remains in effect.

2.2.3. Kohler Co. Purchasing Expectations:

• Request for Quote (RFQ) and accompanying documents (drawing, packaging specification, etc.) are read and understood by the supplier.

• Supplier has completed a cross-functional review of the design and specifications.

• All areas of the Request for Quote (RFQ) form are completed, including, but not limited to:

o Unit Price o Tooling Costs o Number of parts tools will produce

Supplier Quality Requirements Supplement (SQR) Page 5 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents o Lead time for production parts, tooling, and sample parts o Gauging needed o Payment Terms o Freight Terms o Date o Signature

• Drawing Acceptance Form (DAF) (K-7452) must be signed by supplier functional areas approving the design. Anything that cannot be manufactured to print must be documented on the DAF along with recommended alternatives.

• All tooling or gauging, including changes to current tooling, should be considered and included in the quote.

• Suggestions for improvements to control costs or reduce risk are requested.

• Respond by the requested date.

2.3. Supplier Request for Change

2.3.1. The supplier must notify Kohler Engines of any change that has the potential to affect the fit, form, or function of the part.

2.3.2. Kohler Company’s list of changes requiring approval is reiterated below for your convenience along with additional requirements specific to the Engine Division. (ref. Kohler Co. Global Supplier Quality Manual, Section 11.0).

Process Changes • Reduction or change in product testing • Movement of production line equipment • Production line machine/equipment changes • Manufacturing location changes • Tooling transfer, refurbishment, replacement or additional tools • Any tooling modification (Kohler Engines requirement)

Design Changes

• Construction changes or assembly methods • Constituent material changes • Constituent material sourcing changes • Change to optional construction material or method including packaging.

2.3.3. Reference Section 4.0 of this manual for PPAP requirements.

2.3.4. Document the change on the Supplier Request for Change form (ref. Appendix D) and provide supporting data.

2.3.5. Dimensional change requirements.

Anything that cannot be manufactured to the print must be documented on the DAF. We rely on your expertise to determine

if the design is manufacturable.

Section 20.0 Supplier Request for C

hange

Supplier Quality Requirements Supplement (SQR) Page 6 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

2.3.5.1. Typically, a minimum of 30 data point distribution chart with Cpk process capability is required for tolerance related changes. In addition, the supplier shall supply a Cpk process capability and a drawing layout with the corresponding measurements. Please contact your Kohler Supplier Quality rep for exact requirements.

2.3.5.2. If the characteristic is classified as critical, emissions, or major, a sample size of 100 may be required for the distribution chart and run charts. In addition, the supplier shall provide a Cpk process capability.

2.3.6. Suppliers unable to hold drawing tolerances must contact the buyer for a deviation to ensure Kohler Engines will accept product. Deviations are short term fixes used only until long term solutions are implemented. (Ref. Section 10 – Deviations.)

Section 30 G

eneral Requirem

ents

Supplier Quality Requirements Supplement (SQR) Page 7 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 3.0 General Requirements Go to Table of Contents

3.1 As part of the documented quality program, the supplier shall provide a key contact list. Supplier shall promptly notify Kohler Engines Purchasing and Quality of any changes to the key contact list.

3.2 Warranty Participation:

Suppliers will provide Kohler Engines with technical assistance, field support, and financial support to rectify any substantiated non-conformances. Kohler Engines will ensure a process for the return of sample parts.

3.3 Prohibited Practices

:

3.3.1 Unauthorized Repairs:

3.3.2

Supplier may not repair parts damaged or found to be faulty or non-conforming during fabrication without prior approval from Kohler Engines Supplier Quality. No tooling owned by Kohler Engines shall be “repaired” or changed in any way without consent and approval of Kohler Engines Supplier Quality and Purchasing.

Change in Approved Processes, Material or Procedures:

3.3.3

Supplier shall not change any process, material, or procedure without prior notification and re-submittal of samples and PPAP (reference Section 4.0 PPAP Requirements).

Unauthorized Submittal of Production Parts:

3.3.4

No production parts will be shipped without an approved PPAP for the drawing level being supplied or an approved deviation (reference Section 10 Deviations) prior to shipment. Qualification parts can be shipped as long they are in the form of an “EX” part number or Kohler Engines purchase order. PPAP samples shall be identified as PPAP samples and shipped in a separate carton from current production parts. Form PUR-007, Print Revision or Release Notification must be completed by the supplier, returned to Kohler Engines, and approved by Kohler Engines before production quantity purchase orders are generated.

Facility Change:

Supplier shall not relocate any production, manufacturing, and/or processing facilities during performance of the purchase agreement without promptly notifying Kohler Engines Purchasing of an opportunity to examine such facilities for compliance as outlined in this manual. Kohler Engines Supplier Quality and Purchasing shall determine the level of requirements necessary prior to relocating manufacturing, and provide approval to the supplier. Changes in supplier status, part approval, and incoming inspection requirements may result.

3.4 Advanced Product Quality Planning (APQP)

: Product quality begins with design. Therefore, from initial product concept through production, the supplier and Kohler Engines must understand and agree on all applicable quality standards and requirements. Agreement must be reached on all critical quality characteristics, control items, checking fixtures, packaging requirements, and all other quality related matters. Kohler Engines prefers that suppliers use the advanced product quality planning techniques (as they apply) described in the AIAG Advanced Product Quality Planning and Control Plan manual (www.aiag.org).

Section 30 G

eneral Requirem

ents

Supplier Quality Requirements Supplement (SQR) Page 8 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 4.0 Production Part Approval Process (PPAP) Go to Table of Contents 4.1 The Kohler Engines Production Part Approval Process (PPAP) has been benchmarked from the Automotive

Industry Action Group, Production Part Approval Process. The purpose of the PPAP is to determine if suppliers have understood all Kohler Engines’ requirements, and if processes have the potential to produce parts that meet these requirements consistently. Permanent changes from Kohler Engines are documented through an internal change control system. The change control system provides information to suppliers defining PPAP submission level within form PUR-007 - Print Revision or Release Notification, as outlined in Section 2. In addition, submission of PPAP documentation may also be the result of changes at the supplier as identified in section 4.5.

4.2 Kohler Engines prefers electronic submission of PPAP documentation in Adobe Acrobat .pdf file

format. PPAPs should be submitted to your Kohler Supplier Quality Representative. A secure file transfer system is available for submission of large files that cannot be submitted through regular email. The Kohler Secure File Transfer website address is http://files.4kohler.com/. You will need to create an account by clicking the “New User” link, and a user guide is available onsite.

4.3 Production Part Samples

. For production parts, samples for PPAP shall be taken from the initial production run. This production run shall be from four to eight hours of production, with a minimum of 300 parts, unless otherwise specified by an authorized Kohler Engines representative. Reference tables in sections 4.3.1 and 4.12. The production run shall be conducted at the production site, using production tooling, production gauging, production process, production materials, and production operators. If any of the part specifications cannot be met, the supplier shall document their problem solving efforts and shall contact the authorized Kohler Engines representative.

4.3.1 Pre-Production Runs/Samples

. The supplier must have authorization from the Kohler Engines Supplier Quality prior to applying any exceptions.

4.4 Submission Requirements

Capability Sample Size

: The supplier shall meet all level 3 PPAP requirements, shown in the table below, regardless of the requested PPAP submission level. When a level 1 or level 2 PPAP is requested, submit the required documentation as shown below (or as requested by the Kohler Quality Rep) and retain the remainder to be available upon request.

Requirement 100 piece data set from a 300 piece minimum production run

Process capability for new production tooling, material or process settings for all major, critical and emission related dimensions. Kohler Engines reserves the right to add dimensions to this requirement.

If the initial production run is less than 300 pieces

Use partial data (minimum 30 pcs) for the preliminary capability study for all required dimensions. When additional orders arrive, continue to collect the data until a 100 piece sample is reached.

If the initial production run is less than 30 pieces

100% dimensional and visual inspection is required for each dimension as defined by a Kohler Engines representative, until more data is available and a more reliable capability study report is submitted. When additional orders arrive, continue to collect the data until a 30 piece sample is reached.

Supplier Quality Requirements Supplement (SQR) Page 9 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

PPAP Requirements

Level 1 Level 2 Level 3 Default

Kohler Form #

Design Record Retain Submit Submit Current Part Print Revision

Engineering Change Documents

Retain Submit Submit K-SRC001 (Appendix D)

Customer Engineering Approvals

Retain Retain Submit Marked Drawing or Approved K-

SRC001 (Appendix D)

Design FMEA Retain Retain Upon request Upon Request Process Flow

Diagrams Retain Retain Submit Process flow

Diagram (Appendix C)

Process FMEA Retain Retain Submit Upon Request Control Plan Retain Retain Submit Control Plan

(Appendix C) Measurement

System Analysis Study (GR&R)

Retain Retain Submit Upon Request

Dimensional Results Retain Inspection Report

Full Inspection Report

PPAP Dim Results

(Appendix C) Material

Performance Test Results

Retain Submit Submit PPAP Performance (Appendix C)

Initial Process Capability Studies

Retain Submit Submit n/a

Qualified Laboratory Documentation

Retain Submit Submit n/a

Appearance Approval Report

Submit Submit Submit Appearance Report

(Appendix C) Sample of Product Retain Submit Submit Identification Tag

Master Sample Retain Retain Retain Identification Tag Checking Aids Retain Retain * Upon Request n/a

Part Submission Warrant

Submit Submit Submit Warrant (Appendix C)

Records of Compliance

Retain Retain Submit ** Kohler Engines Specific

Requirements Packaging Method Retain Retain * Submit Appendix B

PPAP Checklist Retain Submit Submit PPAP Packaging Checklist – Appendix C

*These items meet or exceed the AIAG requirements and are required by Kohler Engines **Reference Kohler Engines Z-Specs and professional manufacturing organization requirements. NOTE TO SUPPLIER: Kohler Engines reserves the right to require a capability study on drawings without critical/major characteristics, and to require additional documents for level 1 and 2 PPAP submissions.

Supplier Quality Requirements Supplement (SQR) Page 10 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

4.4.1 Optional material and/or configuration

: Where optional materials or configurations may be used, as indicated on the Kohler drawing, specify the actual material/configuration used on the Part Submission Warrant in the Explanation/Comments section. This applies to all submission levels.

4.4.2 Low Volume Part Approval Process

: This process applies for those service parts or engine option parts which marketing forecasts show will be at such low volumes that the normal PPAP process does not apply. Kohler Company Supplier Quality makes the final determination regarding level of PPAP required. As a general guideline though, this process applies when forecast volumes are less than 100 - 300 parts per year. Contact your Supplier Quality Representative if you think this may apply.

Each shipment of this type of part shall consist of the following as a minimum:

1. Supplier control plan (required for initial lot and acceptance only) 2. Measurement data

a. 100% inspection of major, critical, and emissions characteristics b. Inspection of minimum 3 samples on all other features

i. Variable data – audit or process data ii. Attribute data – Pass/fail data

3. Material certification or third party verification if material is specified on the print. 4. Evidence of compliance to performance criteria as applicable.

Maintain the initial control plan and data in the same location as normal PPAP documentation.

4.5 Re-submission of PPAP documentation is required if any of the following situations occur:

Reasons for PPAP Submission Required PPAP Level

Parts Produced at alternate location (ref. Section 3.3.4 Facilities Change) Level 3 New designed tooling, tooling replacement, tooling that has major restoration work.

Level 3

Machine or equipment location change to include moving within manufacturing site.

Level 3

New Material that is not specified by optional, alternative or equivalent material on the print. With approved Kohler Engines deviation and/or approved Supplier Request for Change

Level 3

Material Source changes. Level 3 Any changes affecting Critical, Major or Emissions requirements. Level 3

Process technology new to the organization, not previously used for this product. Level 3 New part, material or color not previously defined. Level 3

Changes in gauging or gauging process with no effect on acceptance criteria Level 2 Changes in part processing or methods to include changes in test or inspection methods with no effect on acceptance criteria

Level 2

Tool has minor restoration Level 2

Minor Engineering Changes Level 2

Product produced after the tooling had been inactive for 12 months or more Level 2 Correction of a discrepancy on a previous submitted part Level 2

Engineering Changes not affecting part dimensions or processes Level 1

Supplier Quality Requirements Supplement (SQR) Page 11 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

4.6 PPAP Submission Status

: Upon receipt of the PPAP submission, Kohler Engines shall review and assign status as follows:

4.7 Master samples

: The supplier organization shall retain a master sample for the same period as the production part approval records, or until:

a. A new master sample is produced for the same part number for approval.

b. Where a master sample is required by the design record, control plan or inspection criteria, as a reference or standard. The master sample shall be identified as such, and shall show the approval date on sample. The supplier shall retain a master sample for each position of a multiple cavity die, mold, tool or pattern, or production process.

4.8 Boundary Samples

: Suppliers are responsible for establishing boundary samples for cosmetic issues, not matching the “master” samples, prior to shipping questionable product to Kohler Engines. Boundary samples are retained by the supplier for on-going process control and serve as the “master” for comparison purposes. All cosmetic boundary samples require approval prior to implementation.

4.9 ISIR Samples

4.9.1 ISIR Sample Size: 3 pieces per cavity and/or fixture or as specified by your Kohler Quality Rep.

: Forwarded with PPAP submittals and require the part number, cavity number and date produced be marked on the part.

4.10 Family Part (Composite Print Parts):

Parts may be evaluated as a family only when they are on the same composite print and made from the same process/equipment/material, or from the same tooling but different inserts.

4.11 Preliminary Process Capability Studies

: A preliminary process capability study is required for each classified characteristic that can be evaluated using variable (measured) data. Capability requirement levels and classification definitions and symbols are indicated in Section 6.1.

There are classified characteristics identified where variable data will not be available. Following are examples of this situation and the means to ensure that these characteristics are effectively controlled: 4.11.1 Materials/Alloys: Effective process development and the appropriate process controls and

frequencies listed on the control plan. 4.11.2 Materials (provided by Tier II suppliers or separate internal supplier process): Material

certifications received with every shipment, material testing by supplier or third party to ensure material specifications are met. Either method must be listed on control plan.

Status Actions Approved The part or material, including all sub-components, meets all customer requirements. The

supplier is authorized to ship production quantities of the product subject to purchase orders or releases.

Interim Approval

Permits shipment of parts or material for production requirements on a limited time or piece quantity basis. Interim approval will only be granted when the supplier has

1. Clearly defined the non-compliances preventing approval and 2. Prepared an action plan agreed upon by Kohler Engines. PPAP re-submission is

required to obtain a status of approved. Interim Approval can be renewed. However, if additional time is required by the supplier, it is the responsibility of the supplier to contact the appropriate SQE with an expected completion date.

Rejected The PPAP submission does not meet requirements based on the production lot from which it was taken and/or accompanying documentation. The submission process shall be corrected to meet requirements.

Supplier Quality Requirements Supplement (SQR) Page 12 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

4.11.3 Porosity/Internal Defects: Effective process development (typically gating and process parameters) and the appropriate process controls listed on the control plan.

4.11.4 Heat treatment process development and controls: Temperature chamber of fully loaded oven

required to support control plan. Contact your Kohler Supplier Quality rep for details. 4.11.5 Attributes (presence of features or assembly components): Effective process controls and

check/inspection frequencies listed on the control plan to ensure requirement is met. 4.12 Preliminary Process Capability Study

:

4.12.1 The purpose of the initial process study is to understand process variation. If enough historical data are available to plot a control chart (at least 100 individual samples), Cpk can be calculated when the process is stable. For processes with known and predictable special causes and output meeting specifications, Ppk should be used (ref. AIAG, Production Part Approval Process).

4.12.2 Acceptance criteria for preliminary process capability study:

Results Applies to

≥ 1.67 Critical and Emission characteristics

≥ 1.33 Major characteristics, Control Plan characteristics, and any other characteristics determined by Kohler Engines

≥ 1.0 All other characteristics

*If results fall below minimum requirements, the process may be acceptable in certain circumstances - contact Kohler Engines Supplier Quality.

4.13 Manufacturing Documentation

Process work instructions

: The manufacturing process with specifically the following shall be documented and made available to Supplier Quality upon request. This shall include, but not be limited to, the following:

Fabrication and/or assembly instructions In-Line and Off-Line rework process Failure Analysis and closed loop corrective action plans Stop ship process In process gauging results

4.14

Dimensional and Performance Test Results

A full part inspection includes all of the following: A full inspection report, not just a dimensional layout. It must cover all requirements on the drawing. Kohler part number/revision level and your tooling # must be on the report, including written details

on the drawing and the notes listed. Limited dimensional drawings are indicated by a note on the print and require a scan of each tooling

cavity showing fit to the datum structure (not best fit). Must be signed and dated. All nonconforming items must be highlighted or identified. Sample size For new tooling, see Tooling Acceptance as outlined in Section 9 of this manual.

Supplier Quality Requirements Supplement (SQR) Page 13 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

4.15 First Piece Inspection Requirements

Measurements in conjunction with control plan and indicate compliance

: Supplier shall document their first piece inspection requirements for all new products or revisions to existing products. Where mutually agreed upon, the Supplier will provide their piece built inspection report(s) to Supplier Quality. Elements of an acceptable process for first piece builds include:

Identification and inspection components and materials from receipt through processing, final inspection, and shipment

Thorough and complete final inspection of the “first piece” with recording of the actual numerical measurements (ISIR).

Retention of written “first piece inspection” reports, test samples or certificates, and all other inspection records.

Each record shall indicate the date of record, revision level (or change level), authorized engineering change document, drawing date, CMM, cross sections, layout result sheets, attribute data, and corrective actions for items that do not meet specifications.

Supplier shall perform failure analysis and take corrective action for all defects found during the first piece build. Each first piece sample shall be marked accordingly.

4.16 Risk Management Plan (RMP)

4.16.1 SCOPE: Risk Management plan (RMP) is an organized short term elevated quality inspection. The RMP is implemented to verify product and process stability, establish common understanding of acceptable product, and/or reduce risk of non conforming product being shipped.

4.16.2 REQUIREMENTS: Supplier quality engineer will determine the need for RMP based on risk. If

RMP is required, a plan will be jointly created including features/requirement to be inspected, tools or gauging to be used, frequency of inspection and exit criteria. The RMP requirements will be documented in a control plan. The requirements will be shared with the receiving Kohler plant and, when practical, be part of the receiving inspection plan for the plant. The supplier must submit supporting data to Kohler as defined in the plan. Supporting data should be identified by P.O. number, manufacturing order number, part number, revision level, and run date.

4.16.3 LABELING OF PRODUCT: All shipments under RMP process must be labeled with a Yellow tag

adjacent to the each shipping label. The label must be at least 3 inches by 5 inches and have the “RMP” or “Risk Management Parts” printed on the label.

4.16.4 EXIT CRITERIA: Exit requirements will be part of the agreed plan. To exit the RMP program, the

supplier must provide supporting data to Kohler Quality proving no failures have occurred for the duration of the RMP. Kohler Quality and the supplier must sign a statement of agreement indicating the exit requirements have been met (ref. Fig. 4.16.4A and Fig. 4.16.4B in the “Example” tab in Appendix E). Once exit requirements are met and the sign-off is obtained, the supplier may return to using the standard control plan and discontinue the RMP labeling. Form RMP-001 (Exit Requirements and Sign-off) is available in Appendix E.

Supplier Quality Requirements Supplement (SQR) Page 14 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 5.0 GD&T Gauge Set-Up Go to Table of Contents 5.1 Kohler Engines uses Geometric Dimensioning & Tolerancing (GD&T) to verify purchased parts. Verification

of product is critical to quality. If special gauging is required, gauge information must be provided as part of the PPAP package and details must be supplied to the Kohler Supplier Quality Engineer. Questions regarding set-up of GD&T can be answered by Kohler Engines Supplier Quality. A list GD&T resources, forms, and examples may be found in Appendix I.

5.2 The following is an acceptable method to report the feature in the control frame, print dimensions, and the outcome with PPAP documents:

5.2.1 Number the Kohler part print either electronically or manually to submit with your PPAP.

5.2.2 Prints with multiple pages should have beginning and ending number located on that print page noted in the lower right hand corner, along with number of major and critical characteristics.

5.2.3 Number the Dimensional Results Form (ref. Appendix C – PPAP Forms) to correspond with your numbered print. The supplier’s form is acceptable when it meets the same requirements as the Kohler Engines form.

5.2.4 All basic dimensions to have a numeric value.

5.2.5 For all dimensions called out on the print, the supplier should reference the following items, in order, for tolerance information:

1. Print Dimension Tolerances

2. Drawing Note

3. Z-spec

4. Title Block

For dimensions not specified on the print, reference the title block for tolerance information.

5.2.6 Items with a feature control frame will have a minimum of four (4) lines reporting.

5.2.6.1 Line 1 is the feature control frame itself. If no bonus tolerance is applicable, this line will also report the feature control frame results, in the appropriate column.

5.2.6.2 Line 2 is bonus tolerance applied. In some cases there is no bonus tolerance, reporting “na” or “no bonus” is sufficient. If bonus tolerance is applicable, this line will report the feature control frame results with the bonus tolerance calculation applied.

5.2.6.3 Line 3 is the X value deviation from the basic dimension using the Cartesian coordinate system. This line must also reference the item number of the corresponding basic dimension.

5.2.6.4 Line 4 is the Y value deviation from the basic dimension using the Cartesian coordinate system. This line must also reference the item number of the corresponding basic dimension.

5.2.7 A column after each line item will report the amount out of tolerance when applicable.

5.2.9 Report each item with characteristics dimensioned as multiple items (i.e.: 2X, 3X, 4X, etc.).

5.2.10 Tools with multiple cavities must have an inspection report for each cavity.

5.2.11 Part prints with significant characteristic symbols will also have corresponding capability data.

5.2.12 Include your completed CMM report (where applicable).

Section 50 G

D&T G

auge Set Up

Supplier Quality Requirements Supplement (SQR) Page 15 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 6.0 Kohler Engines Drawings Go to Table of Contents 6.1 Classification of Significant Characteristics: On Kohler Engines’ prints; the classification of characteristics

is expressed as follows with respective process capability requirements:

Characteristic Required Cpk

Critical- and Emissions- >1.67

Major- >1.33

All Others (No Classification) >1.00

6.1.1 Features identified with a triangle in a circle ( ) are critical characteristics. A critical characteristic is one that, if discrepant, is likely to cause a functional failure making the engine inoperable or to cause a safety concern for the operator. Features classified as critical require the highest confidence that they conform to specification.

6.1.2 Features identified with an E in a shield ( ) are emissions, regulatory or safety related characteristics. An emissions related characteristic is one that analysis indicates is likely, if discrepant, to cause a failure resulting in noncompliance with emissions or other regulations, or result in personal injury. Features classified as emissions related require the highest confidence that they conform to the specification.

6.1.3 Features identified with a diamond in a circle ( ) are major characteristics. A major characteristic is one that analysis indicates is likely, if discrepant, to materially reduce the usability or customer satisfaction with the product. Features classified as major require high confidence that they conform to specification.

6.1.4 Features which are not identified as Critical, Emissions, or Major, but which are on the control plan. A Cpk of ≥1.33 is required for control plan characteristics for processes that are statistically controlled. Other methods may used to measure process capability when agreement is obtained from the Kohler SQE.

6.1.5 Any features that are non-dimensional must be identified and controlled by a process agreed to by the Kohler SQE. (Examples: material, porosity, heat treating.)

6.1.6 All other features are considered normal characteristics. A normal characteristic is one that analysis indicates is likely, if discrepant, to have a minor effect on engine function or appearance. Features classified as normal must conform to specification. A Cpk of ≥1.00 is required for normal characteristics for processes that are statistically controlled. Other methods may used to measure process capability when agreement is obtained from the Kohler SQE.

Assignment of Critical, Emissions, or Major characteristics does not reduce the importance of any other characteristic on the drawing. Every tolerance is absolute and shall not be exceeded regardless of classification.

6.2 Drawing Information

6.2.1 Drawings include (in most cases):

• Metric unit dimensions

• GD&T

• References to Z-specs

• Notes

Supplier Quality Requirements Supplement (SQR) Page 16 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

6.2.2 For all dimensions called out on the print, the supplier should reference the following items, in order, for tolerance information:

1. Print Dimension Tolerances

2. Drawing Note

3. Z-spec

4. Title Block

6.3 Z-Specs

What are they?

• Z-specs are addenda to the print which contain additional information, specifications and/or requirements.

• Z-specs are to be considered identical to all notes, dimensions or specifications called out individually on the print.

Why does Kohler Engines use them?

• Kohler Engines uses Z-specs when routine information needs to be recorded on many prints (i.e., casting tolerances, plating specs).

• Z-specs can also cover unique testing assembly procedures for a part or assembly.

What do you as a supplier need to do?

• Review the print for any Z-spec call outs.

• Request copies of any Z-spec with quote requests or print updates if they are not included with the quote package.

• Request a current copy of the Z-spec. It may have changed since you received the quote package.

• Proof of meeting all Z-specs must be provided at PPAP submission and incorporated into the Control Plan.

6.4 Tooling Variation (TV) Notes

6.4.1 Purpose

Tooling Variation (TV) notes are used to record non-design intent, minor or nonfunctional discrepancies of components produced from intricate and expensive tooling. A TV note is created to document the dimensional issues and are part of the parent, design drawing.

• A TV note is issued for a particular tool or process at a designated supplier.

• Any future tooling should meet the original drawing tolerances.

• The Kohler SQE and Design Engineer determine if a TV note is appropriate or if tooling modification is required.

• TV notes last for the life of the tool or cavity for which they were issued.

Supplier Quality Requirements Supplement (SQR) Page 17 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 7.0 Defect Resolution Go to Table of Contents 7.1 Disposition of non-conforming material. Non-conforming product found in-house at Kohler Engines may be

dispositioned by Kohler Engines Quality in any of the following ways:

7.1.1 Reject the entire lot and return to the supplier.

7.1.2 Screen or Rework.

7.1.2.1 It is expected that non-conforming material will be contained and, when applicable, moved outside of Kohler Engines’ facilities for sorting and / or rework. The supplier will be financially responsible for all screening activities at Kohler Engines including labor, material handling, and downtime. In situations where screening is required, supplier support is expected within 24 hours.

7.1.2.2 Kohler Engines Quality must agree with the supplier upon screening/rework methods, and may require a process FMEA and interim control plan on the affected features. Identification of completed sort/rework is required on all boxes/pallets as well as identification on individual parts. Kohler Engines Quality and/or Purchasing must agree to the type and location of the identification markings.

7.1.2.3 The quantity and/or timeframe in which Kohler Engines will accept reworked material must be agreed upon in advance.

7.1.2.4 Acceptable parts are not to be released from screening/rework until Kohler Engines Quality signs-off on the screening audit .

7.1.2.5 Non-conforming parts are to be segregated from normal production and scrapped, reworked, or returned accordingly.

7.1.2.6 Documented rework/screening plan and method, within Kohler Engines, must be coordinated with Kohler Engines Quality and comply with the following:

• Appropriate safety attire is worn by all personnel involved.

• Rework/Screening plan and method is approved by Kohler Engines Quality.

• Screening results must be submitted to Kohler Engines Quality.

7.1.3 Accept the material. When a deviation is required, it must approved by Kohler Engines Engineering and Quality representatives. The deviation must include the quantity and/or timeframe in which the non-conformance will be dealt with, root cause, and corrective action. Kohler Engines Quality initiates the deviation and provides the material disposition to the supplier. Please note: if the deviation specifies a timeframe, the expiration date refers to the date Kohler Engines will no longer accept product.

7.2 Supplier Responsibility

7.2.1 When a supplier detects or suspects non-conforming material prior to shipment, Kohler Engines Quality Department should be contacted immediately.

7.2.1.1 Kohler Engines Quality may initiate a deviation, upon a supplier’s request, to accept the non-conforming product.

7.2.2 When a problem and/or non-conforming material is detected after shipment has been made to Kohler Engines, it is the supplier’s responsibility to contact Kohler Engines Purchasing, Quality, and Material Planning to begin containment activities of the suspect material.

7.2.3 UPON RECEIPT OF A DEFECTIVE MATERIAL REPORT (DMR):

IMMEDIATE CONTAINMENT ACTION IS REQUIRED, INCLUDING DIRECT CONTACT WITH KOHLER ENGINES QUALITY WITHIN 24 HOURS.

Supplier Quality Requirements Supplement (SQR) Page 18 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents IF THE SUPPLIER HAS NOT RESPONDED WITHIN 24 HOURS, A THIRD-PARTY

SORTING SERVICE CAN BE CONTRACTED BY KOHLER ENGINES AT THE SUPPLIER’S EXPENSE.

Contain all suspect inventory located at Kohler Engines, supplier facilities, and in the distribution system.

Containment actions must be documented by the supplier and may be requested by Kohler Engines Quality.

As applicable, replace nonconforming material with certified material.

Short –term corrective/preventive actions are to be put in place to prevent additional nonconforming material from reaching Kohler Engines.

Report results of any sorting activity to Kohler Engines Quality.

A formal corrective action response is not required at this time, unless a Supplier Corrective Action Request (SCAR/CAPA) has been issued.

7.2.4 UPON RECEIPT OF A SUPPLIER CORRECTIVE ACTION REQUEST (SCAR/CAPA):

COMPLETE THE ACTIONS OUTLINED IN SECTION 7.2.3 AND THOSE LISTED IN THIS SECTION.

ANALYZE THE PROBLEM USING THE 8D PROBLEM SOLVING METHOD, OR SIMILAR PROCESS.

SUBMIT A FORMAL CORRECTIVE ACTION RESPONSE TO KOHLER ENGINES QUALITY WITHIN THE TIMEFRAME REQUIRED BY THE SCAR PRIORITY LEVEL

No specific response format is required. Any form may be used as long as the following items are responded to fully and completely.

– REFERENCE SECTION 7.2.5 FOR A LIST OF PRIORITY LEVELS AND CORRESPONDING RESPONSE TIMES.

Root Cause: Definition and verification of the root cause of the non-conformance, including supporting data and/or study results.

Containment: Containment actions must be documented and submitted to Kohler Engines Quality within 24 hours.

Short-term Corrective Action: (reference Section 7.2.3).

Permanent Corrective Action: Provide a long term plan to correct the non-conformance, including expected implementation dates.

Controls/Preventive Action: Suppliers are responsible for updating control plans, process/design FMEAs and other internal documentation to prevent the problem from reoccurring. Copies of updates should be included in SCAR/CAPA response. PPAP submission may be required (ref. Section 4.0 PPAP Requirements).

Verification: It is expected that the supplier will audit the corrective action for effectiveness and take further action if conformance is not maintained. An expected audit date should be provided in the response.

Response should be submitted as follows: Send the response to your Kohler Engines Quality Rep, with a copy to the DMR/SCAR Coordinator.

7.2.5 Response Due Dates are set according to a priority level determined by problem severity. All reasonable requests for additional time will be considered. Contact your Kohler Quality Rep to discuss timing if necessary. Priority level definitions and corresponding days to respond are shown below.

Supplier Quality Requirements Supplement (SQR) Page 19 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

Priority Levels & Supplier Response Time

Priority Level Definitions

URGENT - 3 days

Urgent: Reached an outside customer

HIGH - 5 days

High: Reached internal mfg process

NORMAL –15 days

Normal: Caught at Supplier Audit or notified in advance by supplier.

LOW – no response required

Low: non-repeat single issue, non-critical, notification only.

7.3 Depending upon the severity of the problem, Kohler Engines reserves the right to request a new PPAP submission, and/or a site audit for verification of the corrective action.

7.4 The supplier will provide additional information, as requested, when the response does not meet Kohler Engines’ requirements as determined by Kohler Engines Quality.

7.5 Kohler Engines reserves the right to request certification to be shipped with each lot of material to verify that corrective actions are implemented and conformance maintained.

7.6 Failure to execute corrective action plans and/or repeat DMR occurrences is unacceptable. In these situations, at the financial responsibility of the supplier, Kohler Engines retains the right to implement extraordinary actions in order to minimize the risk of continued non-conforming product affecting Kohler Engines or its customers. Specific examples include but are not limited to: additional levels of inspection at Kohler Engines or the supplier; third-party certification.

Supplier Quality Requirements Supplement (SQR) Page 20 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 8.0 Requirements for Tooling and Gauging Go to

8.1

Table of Contents Tooling Acceptance Procedure:

This requirement applies to new tooling, tooling replacement, or tooling that has had major rework.

Tooling capabilities need to be understood and analyzed by engineers at both the supplier and Kohler Engines before the production run. This can only be accomplished by analyzing a sufficient amount of objective information.

8.1.1 Tooling is officially accepted at time of PPAP approval or, if changed, when the Supplier Request for Change, form K-SRC001 (ref. Appendix D) is approved by Kohler Engines Engineering and Supplier Quality.

8.1.2 When a discrepancy to these requirements has been identified, the first choice is always to improve the tooling/process and communicate with Kohler Engines Engineering if there is a gap between the tooling capability and SQR requirements. Form K-SRC001 - Supplier Request for Change (ref. Appendix D) is used to identify all alternative requirements initiated by the supplier.

8.2

8.2.1 All measurements and inspections are to be performed on parts made from the production tooling, setup, and raw material.

Submission Requirements for Tooling Acceptance

8.2.2 A full inspection report must be provided for one sample per cavity/mold pattern with numbered Kohler Engines prints. The full inspection report should include all dimensional measurements and defect inspections per the note requirements on the print.

8.2.3 Samples from 8.2.2 will be required for verification at Kohler Engines

8.2.4 Items on the drawing, where the supplier intends to ask for alternative requirements, should be identified in form K-SRC001 Supplier Request for Change (reference Appendix D).

8.2.5 All classified characteristics on the print require capability studies (see section 4.11). Classified characteristics are those identified on the drawing as critical, major, or emissions. Minimum sample size is 100 and distribution charts are required. The supplier is required to maintain records that demonstrate ongoing process capability in production. Kohler Engines reserves the right to review this documentation at any time.

8.2.6 Kohler Engines expects that the supplier will perform capability studies on non-classified features, where applicable, to ensure an understanding of the process capability. Non-classified is defined as those features not designated as critical, major, or emissions on the drawing and may be specified in the notes and/or other standards. As part of the submission requirements, Kohler Engines reserves the right to request capability studies on non-classified features. Minimum sample size is 30; distribution charts are required.

8.2.7 Any tooling in production and deemed “over useful life” requires a deviation, granting approval for use by Kohler Engines Purchasing, Operations and Quality Management. Extraordinary control plans, FMEAs and other proactive measures may be needed to ensure quality products.

8.3 Kohler Engines Owned Tooling

8.3.1 All Kohler Engines owned tooling must be engraved with the purchase order number and/or asset number.

8.3.2 All suppliers with Kohler Engines owned tooling on-site must carry insurance and provide proof of the insurance that covers cost of replacing the tool. Events such as those caused by nature, misuse, maintenance neglect, or fit-for-use should also be included in the insurance carried by the supplier. Any Kohler Engines owned tool that is unusable or no longer able to produce conforming product prior to the estimated end of life is subject to review by Kohler Engines This review may determine if the tool was misused, neglected, or was not used under the fit-for-use per the purchase order.

Supplier Quality Requirements Supplement (SQR) Page 21 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

8.3.3 Suppliers must provide Kohler Engines with certified drawings, documentation, and models of tooling and gauging owned by Kohler Engines

8.3.4 Upon program completion, the supplier shall ensure tooling is properly stored to prevent any damage and is readily available for production or service requirements.

Supplier Quality Requirements Supplement (SQR) Page 22 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 9.0 Equipment Control Go to Table of Contents 9.1 Calibration Requirements

The process for calibrating manufacturing and inspection equipment such as CNC (Computerized Numerical Control) machines, torque tools, hardness testers, dielectric strength, DVM’s (Digital Voltmeter), ICT (In-Circuit Test), vibration test equipment, and any other equipment utilized to verify product shall be defined and documented by the supplier. As part of the calibration requirements, supplier shall maintain records of the equipment calibrated, equipment labeling, calibration processes used, and the frequency of calibration. Any outside calibration labs utilized for any equipment shall have the signed lab or calibration service certificate, NIST traceability number, and lab accreditation.

9.2 Equipment Maintenance

Supplier shall document the processes used for equipment maintenance, including preventive maintenance records, scheduling, identification, and storage, and shall perform maintenance in accordance with such plans.

9.3 New Equipment Capability

A process for integrating new equipment and technology into the supplier’s operations shall be documented. Where appropriate, and when supplier is requesting permission from the buyer to use new equipment or technology in the production of the product, such request shall include:

• The number and duration of consecutive successful trials required prior to declaring the equipment qualified (i.e., qualification plan).

• The potential effect of the new equipment or technology on other required manufacturing operations, including those sub-contracted (i.e., FMEA).

• How manufacturing operations (including subcontracted manufacturing operations) will be evaluated (i.e., control plan).

• The expected timetable for updating all required quality plans, machine maintenance files, operator training plans, calibration schedules, etc.

• Additional requirements for use of new equipment or technology in the production of the Product may be included in the Product Quality Addendum

• Run@Rate or other capacity documentation must be provided as verification that the actual manufacturing equipment and processes will meet the capacity requirements specified by Kohler Engines.

Supplier Quality Requirements Supplement (SQR) Page 23 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 10.0 Kohler Engines Deviation Process Go to Table of Contents

10.1 The Kohler Engines Deviation System must be utilized by the supplier prior to

sending product that does not meet print. The Kohler Engines Quality representative or Buyer will request a deviation, using Kohler Engines’ internal deviation approval system, for non-conforming material, including material that is not yet PPAP approved.

10.2 Once the approved deviation is obtained, the supplier shall identify all shipping papers, boxes, and pallets with the deviation number.

10.3 Just prior to the deviation expiration date, the supplier shall contact Kohler Engines Quality or Purchasing

to determine status of the deviation. When the deviation expires, no additional product can be shipped until product meets Kohler Engines print requirements. However, Kohler Engines Quality or Purchasing may request a deviation extension.

10.4 Should the supplier be able to supply conforming product prior to the deviation expiration date, it is the

responsibility of the supplier to contact Kohler Engines Quality to determine what, if any, submittal data or paperwork is required. Additional data may be necessary depending on the severity of non-conformance.

10.5 Any supplier shipping product to Kohler Engines’ facilities prior to obtaining an approved deviation may be

required to sort product at Kohler Engines or have the product returned at the supplier’s expense. 10.6 A deviation is required prior to shipment for any process or part feature not documented in an approved

PPAP.

Supplier Quality Requirements Supplement (SQR) Page 24 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 11.0 Screening/Rework Activity Go to Table of Contents 11.1 Suppliers traveling to Kohler Engines to provide for rework or sorting of suspected non-conforming material

shall comply with the following:

11.1.1 Initiate an 8D, or similar problem solving methodology, and provide a plan for containment at the supplier facility.

11.1.2 A rework/screening plan, including a verification process, must be approved by Kohler Engines Quality. The plan must be implemented within 24 hours or Kohler Engines will contract a third party to perform the rework/screening activities at the supplier’s expense

11.1.3 Coordinate with Kohler Engines Quality upon arrival, during the rework/sort process, and upon completion.

.

11.1.4 Wear correct safety equipment to include ASTM-2413 approved steel toe safety shoes, safety glasses with side shields that meet ANSI Z-87, ear plugs (some of the shop area requires hearing protection).

11.1.5 If, at any time during the rework or sorting process, it is determined that product must be returned to the supplier, a return authorization must be provided to Kohler Engines. The product will be returned at the supplier’s expense.

11.1.6 Complete the containment/rework plans as required. Initiate an 8D, or similar problem solving methodology, and submit documentation of the results to Kohler Engines Quality within 48 hours. If defective parts have reached our customer, please see Section 7.0 of this manual.

Section 18.0 Stop-Ship/Stop Build Procedures

Supplier Quality Requirements Supplement (SQR) Page 25 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Section 12.0 Stop-Ship / Stop Build Procedures Go to Table of Contents 12.1

The supplier shall notify Kohler Company of any quality, reliability, or safety problems that may affect the products in any way, irrespective of the source of such identification. This notification must include any problems identified by other supplier customers on the same or similar products and identify where the cause of such problems may potentially apply to Kohler Engines product. This notification shall include reported problems with raw material or at sub-supplier sites. If other customers of the supplier have instituted stop shipments, subject to any confidentiality obligation the supplier has with its customers, the problem notification shall include the nature of such stop shipments. Kohler Company reserves the right to stop ships or stop build at the supplier’s manufacturing site(s) due to any issues that affect Kohler’s production yields or customer quality.

Quality Problem Notification

12.2

Problems must be reported that affect quality or reliability. The supplier shall develop a formal process to notify Kohler Supplier Quality and Purchasing of any problems. Immediate contact should be made via telephone; however, an 8D or similar process should be used to document all actions.

Problem Communication

12.3

Stop ships and stop builds shall be treated with maximum urgency, and will not be lifted until root cause is understood and corrective actions are in place. Supplier shall provide immediate technical support for root cause analysis, and provide containment actions. The working notes involved in resolution of problems shall be recorded in the problem solving process, to include root cause explanations, corrective actions, and material disposition.

Urgency

12.4 Product Disposition

Supplier shall ensure that no quality compromise will be made when dispositioning suspect or non-conforming product. There shall be no shipment of suspect products to Kohler Company without an approved deviation.

12.5

Costs associated with the supplier’s inability to meet Kohler Engines’ production demands will be passed on to the supplier.

Supplier Costs

Supplier Quality Requirements Supplement (SQR) Page 26 of 26 This manual is intended for use by Kohler Engines Division suppliers as a supplement to the Kohler Co. Global Supplier Quality Manual. To verify the latest version of this document, go to http://www.kohlerengines.com/sqr/index.htm. To access the Kohler Co. Global Supplier Quality Manual, go to www.kohler.com; Suppliers; Conducting Business.

UNCONTROLLED IF PRINTED Kohler Engines SQR Supplement, Rev. M, Dec. 1, 2012

Go to Table of Contents

Section Section TitleChange Type Change Description

1.0 Introduction Major 1.1.1 Links and URL addresses updated, 1.1.2 Supplier Certification System information added.

2.0 Change Process Major New section added as 2.1 Kohler Engines Change Management Lifecycle System. Previous sections 2.1 and 2.2 combined into 2.2.1 (print revision and release notifications) and 2.2.1.1 replaces 2.3 (example of form PUR-007). 2.4 Kohler Engines Purchasing Expectations is now 2.2.3. Supplier Change Request sections 2.5, 2.6., 2.7 changed to section 2.3 and updated.

3.0 General Requirements Major 3.3.3 Unauthorized submittal of production parts updated.4.0 PPAP Major Section 4.16 Safe Launch Plan added. Changes made to capability and

sample size requirements.5.0 GD&T Gauge Setup Major Section 5.1 example removed and placed in Appendix F. Section 5.2.5

added to provide information on tolerances.6.0 Kohler Engines Drawings Major Section 6.1.1 Definition of Critical Characteristic updated, Section 6.1.3

(referring to numbered teardrop) removed and remaining sections renumbered. Sections 6.1.4 (major characteristics) and 6.1.6 (normal charactertisitcs) updated. Section 6.1.5 is new and contains information on controlling non-dimensional features. Section 6.2.2 dimensional tolerance information updated. Section 6.4 updated (TV Notes).

7.0 Defect Resolution Minor References to Supplier Quality changed to Kohler Quality, other minor wording changes.

8.0 Requirements for Tooling & Gauging Minor Changes made to 8.2.1, 8.2.4 - 8.2.6 and 8.3.3.9.0 Equipment Control Major Section 9.3 changed to include requirements for capacity documentation.

10.0 Deviation Process Minor Section 10.6 updated.11.0 Screening/Rework Activity Minor Section 11.1.5 (SPC data requirements) removed and remaining sections

re-numbered. Section 11.1.2 updated (rework/screening plan)

12.0 Stop Ship/Build Procedures Minor Section 12.5 Supplier Costs added.

Appendix Appendix TitleChange Type Change Description

A Previous Title - Supplier Quality Contact InformationNew Title - Electronic Submission Information

Minor Specific contact information for Kohler personnel is now in a separate heading on the web page. Added information for SLP document submission and large file transfers.

B Packaging/Labeling Specification Major Bar Code, Label, Manifest, and Packing List Specifications sections updated, Resources section added

C PPAP Forms Major New dimensional form. Warrant now includes lines for Material Type, Tool No., and Machine No.

D Supplier Request for Change Major New form K-SRC001E Previous Title - Screening Activity Log

New Title - Risk Management FormMajor Screening Activity Log no longer used. Updated to Risk Management

Plan (RMP) Form RMP-001 (ref. section 4.16). Includes example.F Previous Title - Supplier Receipt and

Acknowledgement FormNew Title - GD&T Resources

Major Electronic Supplier Certification system replaces the Supplier Receipt and Acknowledgement form - ref. Section 1.1.2. GD&T Resources includes links and examples.

G Supplier Scorecard Overview Major Quality section changes include weighting, scoring, and categories. Advanced Procurement and Ease of Doing Business sections changed to informational scores only.

H Certificate of Conformance Program Major Removed. C of C program has been replaced with the Risk Management Plan - ref. Section 4.16 for details.

Revision HistoryKohler Engines Supplier Quality Requirements Supplement (SQR), Rev. M, 12/1/2012