suparatratpech: production engineer · 2012. 4. 6. · position : production engineer ( structural...

19
Position : Production Engineer ( structural section ) P lD t il Dt f Bi th A t 20 1982 A 29 Y Personal Detail : Date of Birth : August 20, 1982 Age: 29 Y ears. Nationality : Thai Religion : Buddhism Marital Status : Marries S Ml 4 Sukhumwit Rd. Huaypong Muang, Rayong 21150 Sex : Male Height : 168 Cm. Weight : 68 Kg. Health : Excellent Mobile 08-4249-5605 / 08-1723-1115 Office 038-692643-5 # 116 E-mail ; [email protected] E il RS t@D li Education : 2002~2005 Bachelor’s Degree Mechanical Engineering Institute : Phatumtani University GPA 2 46 E-mail ; R.Suparat@Dee-line.com GPA 2.46 : 1998~2001 Khumseanwittayasan School. Nongbaulumphu Secondar school Secondary school GPA 2.13 Suparat Ratpech : Production Engineer

Upload: others

Post on 27-Mar-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Position : Production Engineer ( structural section )

P l D t il D t f Bi th A t 20 1982 A 29 YPersonal Detail : Date of Birth : August 20, 1982 Age: 29 Years. Nationality : Thai Religion : BuddhismMarital Status : Marries S M l

4 Sukhumwit Rd. Huaypong Muang, Rayong 21150

Sex : Male Height : 168 Cm. Weight : 68 Kg. Health : Excellent

Mobile 08-4249-5605 / 08-1723-1115Office 038-692643-5 # 116E-mail ; [email protected]

E il R S t@D liEducation : 2002~2005

Bachelor’s Degree Mechanical EngineeringInstitute : Phatumtani UniversityGPA 2 46

E-mail ; [email protected]

GPA 2.46

: 1998~2001Khumseanwittayasan School. NongbaulumphuSecondar schoolSecondary schoolGPA 2.13

Suparat Ratpech : Production Engineer

Page 2: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Skill : Language : Thai (native)

: English Listening (fair) Speaking (fair) Reading (good) Writing (fair)

Computer : Program Auto CAD 2002,2007,2008

MS. Word, MS. Excel, MS Project , Internet , E-mailj

Practical Training :

* June 2007 : Technical Petroleum Training Institute Helicopter Under water Escape Training

* 2008 : Safety (ระดับหัวหนางาน )

* 2008 : การทํางานในที่อับอากาศ ระดับผควบคมงาน Confine space 2008 : การทางานในทอบอากาศ ระดบผูควบคุมงาน Confine space

* May 2008 : Survey Training (DIGITAL) Leica Bland

* 29-30 January 2009 : Guideline for ISO 9001 : 2008 ( Documentation )

* 02/2011 คณะกรรมการความปลอดภัยระดับหัวหนางาน

* 05/2011 การทํางานในที่อับอากาศ ระดับผูอนุญาติ Confine space

Suparat Ratpech : Production Engineer

Page 3: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Certificate

Suparat Ratpech : Production Engineer

Page 4: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

PAST EXPERIENCE

Years Project Name Scope of work PlatformYears Project Name Scope of work Q’ty

2007 Vincent FPSO Project(Si ga o e)

-Steel structure fabricate on shop deeline & separate part for transport to site install at Leamchabang Port Chonburi

Fab icatio la6

PositionProduction Engineer

(Singapore)WOODSIDE

- Fabrication plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report- Take of material / material balance / material shortag- Control schedule / manpower control

2007-2008 Aker FPSO Project

-Steel structure fabricate on shop deeline & separate part for transport to site install at Leamchabang Port Chonburi 42007 2008

PositionProduction Engineer

Aker FPSO Project(Singapore)

Chonburi- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all member of modify )

Fab icatio e o t

4

- Fabrication report- Take of material / material balance / material shortage- Control schedule / manpower control

Suparat Ratpech : Production Engineer

Page 5: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

PAST EXPERIENCE

Years Project Name Scope of work Platformm

Q’ty

2008FPSO Cidade de Sao Meteus ProjectProsaft production services PTE ltd.

-Steel structure fabricate on shop deeline & separate part for transport to site install at Leamchabang Port Chonburi 5

PositionProduction Engineer

pSingapore

PETROBRAS

g- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all member of modify )- Fabrication reportFabrication report- Take of material / material balance / material shortage- Control schedule / manpower control- Fabrication & Erection shell Ø9m.& cone i l d li i l & l i ll

2008-2009

PositionProduction

MODIFY WHRU STACK 135M.Project – PTT

(PTT#5 Maptaphut)

include lining plate & nozzle install- Fabrication & Erection duct Ø4m.x40m. include lining plate- Fabrication & Erection pipe rack support of ducting

1

Engineerg

- Lifting plan & lifting procedure- Take of material / material balance / material shortage- Control Schedule / manpower control- Fabrication Header include Hydro test

2008‐2009

PositionP d i

DIGESTER UPPER TUBE NO.1 ( Thailand ) 

Header  Ø1750x L9150 

Fabrication Header include Hydro test

1

Production Engineer

Suparat Ratpech : Production Engineer

Page 6: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

j S f k l fYears Project Name Scope of work PlatformQ’ty

-Steel structure fabricate on shop deeline & 2009-2010

PositionProduction

Pretrobras FPSO Cidade de Angra dos Reis MV22 Project / Modec

PETROBRAS

pseparate part for transport to site install at Leamchabang Port Chonburi- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all

10

Production Engineer

Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report- Take of material / material balance / material shortage

C t l h d l / t l- Control schedule / manpower control

2010 Micro-GTL Demonstration Plant(Toyo Engineering Corporation / Japan)

-Complete fabrication steel structure & Equipment installation on shop deeline rayong- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all

2

PositionProduction Engineer

- Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report-Take of material / material balance / material shortage- Control schedule / manpower control

2010Position

โครงการระบบขนสงมวลชนทางรางในพื้นที่

กรงุเทพมหานครและปริมณฑล โครงการระบบรถไฟ

ชานเมือง (สายสีแดง) ชวงบางซื่อ-ตลิ่งชัน

- Fabrication & Preassembly steel structure (Main truss) on shop deeline rayong- Control schedule / manpower control 26

Suparat Ratpech : Production Engineer

Production Engineer

ชานเมอง (สายสแดง) ชวงบางซอ-ตลงชน

Page 7: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

j S f k l fYears Project Name Scope of work PlatformQ’ty

-Steel structure fabricate on shop deeline & 2010-2011

PositionProduction

FPSO Cidade de Sāo Paolo MV23

PETROBRAS

pseparate part for transport to site install at Leamchabang Port Chonburi- Fabrication plan & Erection plan- Lifting plan & lifting procedure- Site instruction( SI ) clarify & report ( all

20

Production Engineer

Site instruction( SI ) clarify & report ( all member of modify )- Fabrication report- Take of material / material balance / material shortage

C t l h d l / t l- Control schedule / manpower control2011-2012

PositionProduction

EPCh GUDRUN Project

( Statoil )

‐Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port ChonburiTake of material / material balance / material 

2

Production Engineer

‐Take of material / material balance / material shortage‐ Fabrication plan & erection plan‐ Fabrication report‐ Lifting plan & lifting procedure

f f‐ Site instruction ( SI ) clarify & report ( all member of modify )‐Control schedule / manpower control‐ Fare boom fabrication & Erection

Suparat Ratpech : Production Engineer

Page 8: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Past Experience at Deeline Construction Co., Ltd , Rayong

Vi biStack PTT Vicbirg

Vincent FPSO

Suparat Ratpech : Production Engineer

Prosafe FPSO Vicbirg plant (chevron )

Page 9: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Process Module at Deeline Construction Co., Ltd , Rayong

 F b i ti  & E ti   f  t l  t t2007 Fabrication & Erection of steel structure

for  VINCENT FPSO Project,  Offshore module  at Leamchabang port  Chonburi. Total 6 module

Scope of work  : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port p p p p gChonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control

Suparat Ratpech : Production Engineer

Page 10: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Process Module at Deeline Construction Co., Ltd , Rayong

2007‐2008 Fabrication & Erection of steel structure & Equipment installation for 

AKER FPSO SMART#1 Project, Offshore module  at Laemchabang Port Chonburi. Total 4 module.

Scope of work  : Production engineerSt l t t f b i t h d li & t t f t t t it i t ll t L h b P t Ch b i-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control

Suparat Ratpech : Production Engineer

Page 11: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Process Module at Deeline Construction Co., Ltd , Rayong

2008 Fabrication & Erection Steel structure

PROSAFE FPSO Project , Offshore module at Laemchabang Port Chonburi. Total 5 module.

Scope of work  : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication reportFabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control

Suparat Ratpech : Production Engineer

Page 12: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

at Deeline Construction Co., Ltd , Rayong

Modify WHRU STACK Project : PTT, GSP#5 Maptaphut Rayong Total 1 set2008‐2009 Fabrication & Erection Stack 135 m.

fy j , p p y gScope of work  : Production engineer

- Fabrication & Erection shell Ø9m.& cone include lining plate & nozzle install- Fabrication & Erection duct Ø4m.x40m. include lining plate & pipe rack support-Material take off & Balance - Control Schedule / manpower controlControl Schedule / manpower control

Suparat Ratpech : Production Engineer

Page 13: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Fabrication & Erection Stack 135 m.Modify WHRU STACK Project : PTT, GSP#5 Maptaphut Rayong

Suparat Ratpech : Production Engineer

Page 14: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Process Module at Deeline Construction Co., Ltd , Rayong

2009-2010 Fabrication & Erection Steel structure & Equipment installation for

b id d d d i j ( d j ) Off h d l t L h bPretrobras FPSO Cidade de Angra dos Reis MV22 Project (Modec FPSO Project), Offshore module at Laemchabang

Port Chonburi. Total 10 module

Scope of work  : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedureLifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control

Suparat Ratpech : Production Engineer

Page 15: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Process Module at Deeline Construction Co., Ltd , Rayong

2010Complete fabrication Steel structure & Equipment installation on shop Deeline rayong.

Micro-GTL Demonstration Plant ProjectMicro-GTL Demonstration Plant Project(Toyo Engineering Corporation / Japan)

Scope of work  : Production engineer- Complete fabrication steel structure & Equipment installation on shop deeline rayong- Take of material / material balance / material shortage- Fabrication plan- Fabrication reportp- Site instruction ( SI ) clarify & report ( all member of modify )- Lifting plan & lifting procedure- Control schedule / manpower control

Suparat Ratpech : Production Engineer

Page 16: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Steel structure at Deeline Construction Co., Ltd , Rayong

2010-Present โครงการระบบขนสงมวลชนทางรางในพื้นทีก่รุงเทพมหานครและปรมิณฑล โครงการระบบรถไฟชานเมือง

(สายสแีดง) ชวงบางซื่อ-ตลิ่งชัน(สายสแดง) ชวงบางซอ ตลงชน

Freyssinet (Thailand) Ltd. Bangkok Thailand / UneuqsScope of work  : Production engineer- Fabrication & Preassembly steel structure (Main truss) on shop deeline rayong- Control schedule / manpower controlControl schedule / manpower control

Suparat Ratpech : Production Engineer

Page 17: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

Steel structure at Deeline Construction Co., Ltd , Rayong

2010-2011 Fabrication & Erection Steel structure

P t b FPSO Cid d d Sā Pā l MV23 P j t (M d FPSO P j t) Off h d l t L h b P t Ch b iPretrobras FPSO Cidade de Sāo Pāolo MV23 Project (Modec FPSO Project), Offshore module at Laemchabang Port Chonburi.

Total 20 module

Scope of work  : Production engineer-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedureg p g p- Site instruction ( SI ) clarify & report ( all member of modify )- Control schedule / manpower control

Suparat Ratpech : Production Engineer

Page 18: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

2011-2012 Fabrication & Erection Steel structure2011 2012 Fabrication & Erection Steel structure

EPCh GUDRUN Project ( Statoil )

Scope of work  : Production engineerSteel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )

DEE LINE CONSTRUCTION LTD.,PART

- Control schedule / manpower control- Fare boom fabrication & Erection

Page 19: SuparatRatpech: Production Engineer · 2012. 4. 6. · Position : Production Engineer ( structural section ) PlDtilPersonal Detail: Dt fBith A tDate of Birth : August 20, 1982 Age:

2012 - Present Fabrication & Erection Steel structure2012 Present Fabrication & Erection Steel structure

OSX3 Leasing B.V FPSO Project ( Modec )

Scope of work  : Production engineerSteel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi-Steel structure fabricate on shop deeline & separate part for transport to site install at Laemchabang Port Chonburi- Take of material / material balance / material shortage- Fabrication plan & erection plan- Fabrication report- Lifting plan & lifting procedure- Site instruction ( SI ) clarify & report ( all member of modify )

DEE LINE CONSTRUCTION LTD.,PART

- Control schedule / manpower control- Fare boom fabrication & Erection